Search NASA⌕ Search

SEARCH · Search NASA

Results for “accelerator improvement project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

FRIB operations: first three years

During the first three years since May 2022, FRIB has been operating safely meeting expectations of both scientific and industrial users with high machine availability, while ramping up the beam power to 20 kW for heavy ions including uranium. The paper summarizes the operational experience and challenges, accelerator improvement projects, expansions in user stations, accelerator R&D and workforce growth programs, and preparation for facility upgrades.

Wei, Jie [Michigan State U.]↗

Energy deposition and radiological studies with MARS15 code for NuMI-AIP project

The studies described below have been performed for NuMI Accelerator Improvement Project (NuMI AIP). This work has been done to extend previous studies and address new issues encountered as the project evolves. The calculations have been performed for both normal operation and an accident scenario.

43 PARTICLE ACCELERATORS↗

Novel design and diagnostics improvements for increased production capacity and improved reliability at the Los Alamos Isotope Production Facility

The Isotope Production Facility (IPF) at Los Alamos National Laboratory (LANL) is used to produce an array of isotopes for medical, global security, and research applications with an intense beam of protons supplied by the linear accelerator at the Los Alamos Neutron Science Center (LANSCE). An Accelerator Improvement Project (AIP) was recently conducted at IPF to improve facility reliability and reduce programmatic risk while increasing general isotope production capacity and flexibility. This was accomplished through the installation of an improved beam window assembly, more robust beam diagnostics, an active and adjustable collimator, and a new beam rastering system. This paper will highlight the four exciting innovations and how they were designed, validated, and installed in parallel as well as the significant operational advantages they provide to IPF. Key experiments and the increased currents achieved in routine production runs demonstrating the enhanced capability from the AIP will be presented. As a result, the most notable capability enhancements include irradiations with beam currents ranging from 100 nA experimental runs up to 300 μA on routine production targets and utilization of a range of cylindrical target diameters.

100 MeV protons↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Prototype Installation and Testing Awardee: Accelerate Wind

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Accelerate Wind for Prototype Installation and Testing. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

In-Conduit Hydropower for Public Water Supply Systems: Development Challenges and Costs

Conduit hydropower leverages existing water infrastructure to provide energy solutions, though deployment has been slow. A 2022 US Department of Energy (DOE)–funded report led by Oak Ridge National Laboratory (ORNL) summarizes a reconnaissance-level study of hydropower potential at national conduits (Kao et al., 2022). The report includes power and energy estimates across three major sectors of conduit hydropower potential: municipal, agricultural, and industrial. Water resources include public water supply systems (municipal and industrial), irrigation canal systems (agricultural), thermoelectric cooling systems (industrial), and wastewater systems (municipal and industrial). In total, 1.41 GW of power potential was estimated nationwide. Subsequently, DOE has funded ORNL through the Conduit Hydropower Engineering, Evaluation, and Technology Acceleration project (CHEETA) to improve deployment potential for conduit hydropower. Work thus far has focused on “in-conduit” hydropower (ICH)—or “in-pipe” hydropower—for public water supply systems, though the project is planning to cover conduit hydropower more broadly. The timeline of ORNL’s conduit hydropower related research and development (R&D) is shown in Figure 1. The results of CHEETA should benefit the hydropower industry by providing insights into costs, barriers, and other considerations that impact project development. The hydropower industry and municipal/industrial conduit stakeholders will use the output to inform development decisions and advance low-impact hydropower growth in the US.

13 HYDRO ENERGY↗

IOTA Pre-Bake Test Development

The IOTA (Integrable Optics Test Accelerator) Bakeout project is intended to improve the quality of the vacuum within the IOTA ring. Impurities consisting of hydrogen and oxygen that build within the beampipe are reduced through applying heat to the beampipe’s exterior. Two versions of the Bakeout project exist, one as a smaller scale test setup, and one five times larger located within the IOTA ring. During my internship, I worked together with a team to bring this project from an effectively dormant state to ready for testing, working together to create full documentation of the PLC (Programmable Logic Controller) programs, making multiple new hardware configurations of this test possible, as well as an additional safety system.

Seagrave, Kayla [DuPage Coll.; Fermilab]↗

Dephasingless laser wakefield acceleration in the bubble regime

Abstract Laser wakefield accelerators (LWFAs) have electric fields that are orders of magnitude larger than those of conventional accelerators, promising an attractive, small-scale alternative for next-generation light sources and lepton colliders. The maximum energy gain in a single-stage LWFA is limited by dephasing, which occurs when the trapped particles outrun the accelerating phase of the wakefield. Here, we demonstrate that a single space–time structured laser pulse can be used for ionization injection and electron acceleration over many dephasing lengths in the bubble regime. Simulations of a dephasingless laser wakefield accelerator driven by a 6.2-J laser pulse show 25 pC of injected charge accelerated over 20 dephasing lengths (1.3 cm) to a maximum energy of 2.1 GeV. The space–time structured laser pulse features an ultrashort, programmable-trajectory focus. Accelerating the focus, reducing the focused spot-size variation, and mitigating unwanted self-focusing stabilize the electron acceleration, which improves beam quality and leads to projected energy gains of 125 GeV in a single, sub-meter stage driven by a 500-J pulse.

43 PARTICLE ACCELERATORS↗

An AI-driven framework for evaluating local and state authorities’ permitting processes

The demand for new energy infrastructure is increasing across the United States, but heterogenous permitting processes and embedded requirements across different local jurisdictions can cause project delays, increase “soft costs,” and hinder developer expansion. This study analyzes the variability in local permitting requirements across the U.S. and develops a quantitative approach to describe their clarity and effectiveness in enabling infrastructure project development. By using an Energy Language Model (ELM), a large language model (LLM) for energy technologies, we systematically gathered permitting information from nearly 300 state-, county-, and city-level documents, creating a structured dataset of requirements and procedures on an unprecedented scale and speed. Our analysis revealed that local (city and county) permitting requirement documents are underrepresented compared to state-level guidance documents, which can impede timely and cost-effective installation of new electric infrastructure. Our validation process showed that the final database has an accuracy of approximately 95%. We, further, created a new quantitative method to score permitting requirements for clarity and efficiency, with electric vehicle supply equipment as an initial use case. The average local permitting document scored a 1.8 out of 5, which we interpret as meaning that half of the requirements developers face when installing electric infrastructure are ambiguous, increasing both cost and time. We also created a “Generalized Permit Process”, highlighting common procedural steps and identifying specific opportunities for municipalities to improve their documentation. This research establishes a systematic and scalable framework for evaluating the complexities of local infrastructure permitting processes by combining LLM-powered data collection and quantitative scoring. The framework enables policymakers and developers to identify and mitigate procedural bottlenecks, with the expectation that these improvements can accelerate application review and approval, reduce project costs, and expedite connection to utility distribution grids. As a foundational approach for streamlining local project development processes, this study’s methods are intended to be extended to a wide range of energy applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Context-Aware Learning for Inverse Design in Photovoltaics

This document describes progress in the ARPA-E DIFFERENTIATE project titled “Context-Aware Learning for Inverse Design in Photovoltaics” during the period of May 2019 to May 2022. This project is being performed at Iowa State University, New York University, Stanford University, and National Renewable Energy Laboratory. The project aims to develop a new machine learning (ML) framework to significantly accelerate the design of organic microstructures for improved organic photovoltaic performance. In this project, we had developed an inverse design framework using Deep Learning called InvNets for generating microstructures with desired physics-driven properties. As a preliminary product, in Milestone 3, we demonstrated how InvNets show 20% improvement in the performance of the microstructures and over 100X speedup in the performance compared to traditional processes for physics-driven inverse design. Later, in Milestone 6, we demonstrated that InvNets work for more complex physics properties, specifically, generating microstructures for organic photovoltaic cells with desired current-voltage characteristics. Further, in Milestone 4, we explored the idea of using physics-aware surrogates for obtaining solutions of partial differential equations(PDE) called as DiffNets(now called as NeuFENets to avoid ambiguity of names). The connection between both frameworks is that DiffNet surrogates form the physics-aware surrogate in the InvNet framework. Finally in Milestone 8, we extend our framework for other physics domains. Specifically, we explore building geometry-aware NeuFENets by developing physics surrogates that exploit ideas from traditional immersed boundary finite element methods. With these updates, we are able to achieve all the Milestones.

36 MATERIALS SCIENCE↗

Research in Advanced Artificial Intelligence Techniques for Modern Accelerator Control

The major goals for the project were to remain in contact with accelerator stewardship customers, develop and test new techniques based to further improve accelerator and peripheral systems, and train early career persons to participate on the project and teach them aspects of the field of accelerator science and technology.

43 PARTICLE ACCELERATORS↗

Advanced Measurements for Resilient Integration of Inverter-Based Resources: PROGRESS MATRIX Final Report

As nearly every aspect of the electric power grid undergoes rapid change, measurement technologies that support grid operation and planning must evolve as well. The rapid large-scale deployment of inverter-based resources (IBRs) vital to achieving the nation’s clean energy goals has in some cases led to negative impacts on the reliability and security of the bulk power system (BPS). Advanced power system measurements, including synchronized phasor and waveform measurements, are key to making IBR integration secure and reliable. To this end, the Department of Energy (DOE) initiated the PROGRESS MATRIX project to develop advanced measurement capabilities and analytics that will accelerate adoption of IBRs while improving the reliability and resilience of the BPS. This report discusses the outcomes of the project, which was a joint effort between the Pacific Northwest National Laboratory (PNNL), Oak Ridge National Laboratory (ORNL), the National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL). In the project’s first year, PNNL, NREL, and ORNL partnered with the Bonneville Power Administration (BPA), the Western Area Power Administration (WAPA), and Kauai Island Utility Cooperative (KIUC) to understand their existing measurement capabilities and the gaps limiting deployment of IBR-focused measurement systems and analytics. The other primary activity in the first year was deployment of GridSweep instruments, which provide unprecedented precision in waveform measurement while probing distribution systems. The instruments were deployed at Dominion Energy and the University of California, Riverside. In the project’s second year, the input from partner utilities and collected measurements were used to advance measurement capabilities. Twelve analytical methods spanning disturbance analysis, power plant evaluation, feeder evaluation, and modeling were developed. Two software tools were developed, one to analyze GridSweep measurements and another to automatically evaluate the control performance of power plants connected to the BPS. Testbeds at ORNL and NREL were augmented to better enable studies of IBR integration. The project culminated in demonstrations of these analytical methods, software tools, and testbeds, both in the field and in the laboratory. This report discusses these various accomplishments and documents the significant progress in developing advanced measurement capabilities to support the secure, reliable, and accelerated adoption of IBRs in the BPS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power Hardware-In-the-Loop Hydropower and Ultracapacitor Hybrid Testbed

Widespread deployment of a proof-of-concept technological solution for power system performance improvement can be accelerated through onsite demonstration and pilot projects. Digital real-time simulation with power hardware-in-the-loop in controlled lab environment is the precursor to de-risk the timely and efficient execution of field demonstration and pilot projects. However, the detailed process of development, characterization, and calibration of such high fidelity simulation testbed needs to be documented in a reproducible and publicly accessible manner to leverage across broader research and development communities. This paper presents such a laboratory testbed to study black start capability of a run-of-river hydro + ultracapacitor hybrid system. Beside the high-fidelity model of the islanded grid with hydropower unit, the testbed includes the energy storage, grid following inverter, and grid emulator hardware. Several aspects such as storage characterization, control and various parameter settings necessary to capture frequency transients during load restoration are described in a comprehensive manner, which led to an effective and timely execution of black start field demonstration with an actual hydropower plant.

13 HYDRO ENERGY↗

Advances in the PIP-II Project and the Indian Institutions & Fermilab Collaboration

The Proton Improvement Plan – II (PIP-II) project at Fermi National Accelerator Laboratory (Fermilab) is the first particle accelerator project in the USA to receive significant in-kind contributions from international partners. Partnering countries include the USA, India, Italy, the United Kingdom, France, and Poland. When completed, PIP-II will accelerate protons to 800 MeV, and power the world’s most intense neutrino beam for the Deep Underground Neutrino Experiment (DUNE). Technological advancements for PIP-II across the entire collaboration have significantly matured, with the project currently in the construction phase. The Indian Institutions & Fermilab Collaboration (IIFC) for PIP-II has a 14+ years history. The IIFC R&D phase concluded with the validation of various prototypes and defined the beginning of the construction phase. This presentation highlights the advances of the synergistic PIP-II collaboration. Work supported, in part, by the U.S. Department of Energy, Office of Science, Office of High Energy Physics, under U.S. DOE Contract No. 89243024CSC000002.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Feature Based Qualification of 17-4PH Stainless Steel to Evaluate Location-Specific Variability in Wire Arc Additive Manufacturing

Qualifying large-scale metal additive manufacturing (M-AM) technologies such as wire arc additive manufacturing (WAAM) can be challenging. This is especially significant in precipitation hardened martensitic stainless steels like SS 17-4PH, where thermal histories induce location-specific microstructural variability and property anisotropy. The Department of Defense (DOD) and the United States Army Combat Capabilities Development Command Ground Vehicle Systems Center (GVSC) Ground Vehicle Materials Engineering (GVME) aim to build robust and qualified large-scale M-AM workflows that could reduce the time and cost through quick and informed evaluation, testing, and development of feedstock, processes, and parts. The report presents the findings from the collaborative efforts between Oak Ridge National Laboratory (ORNL) and the U.S. Army GVSC GVME. The aim of this project was to develop a geometric feature-based qualification framework for WAAM of SS 17-4PH components. This report outlines selection methodology of representative build geometries, optimization of WAAM process parameters, in-situ monitoring, microstructure-property evaluation, thermal simulations, as well as data visualization techniques incorporated in this project. The results from this project demonstrate a clear understanding of thermal history dependent phase evolution and consequent location-specific property variations in WAAM of SS 17-4PH. These results in conjunction with the data-driven methodologies used in this project are expected to reduce qualification timelines, improve predictability, and accelerate the development of reliable feature-based qualification strategies for part production via large-scale M-AM technologies.

36 MATERIALS SCIENCE↗

Exabiome: Advancing Microbial Science through Exascale Computing

The Exabiome project seeks to improve the understanding of microbiomes through the development of methods for accelerating metagenomic science using exascale computing. This article gives an overview of scientific impact of the three components of the project: metagenome assembly, protein family detection, and comparative analysis of metagenomes. Exabiome developed MetaHipMer, the only metagenome assembler capable of scaling to full exascale systems. MetaHipMer has enabled ground-breaking assemblies on the Frontier supercomputer, with many scientific benefits, such as the discovery of rare species and viral genomes. To investigate protein families, Exabiome developed two exascale tools, PASTIS and HipMCL. Together, these can utilize exascale resources to understand the functional diversity of billions of dark matter proteins and novel protein families. For comparative analysis, Exabiome developed kmerprof, a tool that can be used to compare huge metagenomes for many different scientific purposes, for example, grouping human microbiomes according to body location.

59 BASIC BIOLOGICAL SCIENCES↗