Search NASA⌕ Search

SEARCH · Search NASA

Results for “action plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Planning actions in robot automated operations

Action planning in robot automated operations requires intelligent task level programming. Invoking intelligence necessiates a typical blackboard based architecture, where, a plan is a vector between the start frame and the goal frame. This vector is composed of partially ordered bases. A partial ordering of bases presents good and bad sides in action planning. Partial ordering demands the use of a temporal data base management system.

Das, A.↗

Updated Medical Waste Management Plans and Emergency Action Plans for the Lawrence Livermore National Laboratory Main Site

Attached are the updated Medical Waste Management Plans and Emergency Action Plans for Lawrence Livermore National Laboratory’s (LLNL) Biosafety Level 2 (BSL-2) facilities and Biosafety Level 3 (BSL-3) facility. A redline version of each document has also been provided. Minor changes such as facility personnel, contact information, and titles for those that support onsite Biosafety Labs at LLNL have been made to the document. It should be noted that the most recent versions of the Medical Waste Large Quantity Generator Registration Application Form and Medical Waste Management Plan were incorporated and sourced from the Alameda County Department of Environmental Health website.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) is for Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” which is located in Area 5 of the Nevada National Security Site (NNSS). CAU 577 includes five low-level waste cells at the Area 5 Radioactive Waste Management Site (RWMS) where buried waste received from Nuclear Fuel Services, Inc. (NFS), was subsequently determined to contain chromium that exceeded the Toxicity Characteristic Leaching Procedure regulatory limit, which would require the waste to carry hazardous waste code D007. To resolve issues related to this alleged violation of hazardous waste regulations, a Settlement Agreement was executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office on April 25, 2019, which identified agreed-upon mitigation measures. The Settlement Agreement required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO).

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa Nevada National Security Site, Nevada (Rev. 1)

This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for the Central and Western Pahute Mesa (PM) Corrective Action Units (CAUs) 101 and 102. Corrective action is needed because underground radioactive contamination exists in these areas resulting from historic underground nuclear testing. The PM CAUs are located in the northwestern portion of the Nevada National Security Site and comprise 82 corrective action sites. A total of 85 underground nuclear detonations took place within the area covered by the PM CAUs between 1965 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa Nevada National Security Site, Nevada, Revision 2

This revision was prepared to document changes to the data-collection activities. Specifically, the drilling and completion of the wells have been revised, and enhancements to the surface geophysics measurements have been included. Corrective action is needed because underground radioactive contamination exists in these areas resulting from historic underground nuclear testing. The PM CAUs are located in the northwestern portion of the Nevada National Security Site and comprise 82 corrective action sites. A total of 85 underground nuclear detonations took place within the area covered by the PM CAUs between 1965 and 1992 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities.

54 ENVIRONMENTAL SCIENCES↗

Community Planning for Solar: Compiling a Community Solar Action Plan

This document provides an annotated outline for a Community Solar Action Plan. This document is designed to assist community officials, volunteers, and regional planning agency staff in preparing a draft Community Solar Action Plan for a municipality, community, or other jurisdiction. Preparing a Community Solar Action Plan is the fifth step in the Community Planning for Solar process (ag.umass.edu/solarplanning). The plan is intended to be the culmination of the planning process. The contents of the plan will include summaries of information gathered as part of foregoing steps in the process, including completion of a Solar Resource and Infrastructure Assessment, administering of a Community Solar Survey, interpretation of survey results, and review of Solar Financing and Ownership Options and tools. Once the Community Solar Action Plan has been drafted, it should be reviewed by municipal board and commission members and presented at an open community forum. Any important comments or revisions can be incorporated before the final Community Solar Action Plan is approved and implemented. The approved Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. The Monitoring, Evaluating, and Updating Your Community Solar Action Plan fact sheet (Step 6, Item a) describes some things to consider when updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

Monitoring, Evaluating, and Updating Your Community Solar Action Plan

The Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. This fact sheet describes some things to consider when implementing, monitoring, evaluating, and updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

Municipal Fleet Action Plan Guide

This action plan template and guide have been designed to support light-duty or medium-duty municipal fleet managers as they plan to adopt electric vehicles. The resource is an adaptation of content created by the National Laboratory of the Rockies (NLR), with support from World Resources Institute (WRI), for participants in the U.S. Department of Energy's Energy to Communities peer-learning cohort, Charting a Path to Municipal Fleet Electrification. Fifteen participating municipalities joined monthly cohort workshops from July through December 2024 to learn and plan for their own fleet electrification. Clean Cities and Communities coalitions supported participating municipalities throughout the cohort series by conducting fleet analysis and planning activities on their behalf. This template is an adapted version of cohort activities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Los Alamos National Laboratory Release of Cesium-137 Corrective Action Plan

This Corrective Action Plan (CAP) was developed by a team chartered by John Sarrao, Deputy Director for Science, Technology, and Engineering (DDSTE), to review and respond to the findings of the Joint National Nuclear Security Administration/Triad National Security (NNSA/Triad) Investigation Team (JIT) Joint Investigation Report for the “Sealed Source Recovery at the University of Washington Harborview Training and Research Facility Results in Release of Cesium-137 on May 2, 2019,” dated March 30, 2020. On May 2, 2019, International Isotopes, Inc. (INIS), a subcontractor to Triad National Security, LLC, inadvertently breached a sealed cesium-137 source at the University of Washington (UW), Harborview Medical Center Research and Training (HRT) building in downtown Seattle while attempting to recover the source for the National Nuclear Security Administration (NNSA) Off-Site Source Recovery Program (OSRP). The source breach resulted in contamination of personnel and the HRT building, as well as a release of radioactive material to the environment

07 ISOTOPE AND RADIATION SOURCES↗

An Action Plan for Maritime Energy and Emissions Innovation

The Action Plan for Maritime Energy and Emissions Innovation (the action plan) lays out a strategy to reduce and eliminate nearly all greenhouse gas (GHG) emissions in the U.S. maritime sector by 2050, in line with the U.S. economy-wide goal of net-zero GHG emissions by 2050. To reach this goal, the action plan outlines actions, objectives, targets, and activities to scale low- and net-zero emissions fuels, energies, and technologies; strengthen the maritime workforce; bolster shipbuilding capacity; and expand complementary landside infrastructure. The action plan supports industry, mariners, communities, civil society, sub-national governments, and other interested parties that will decarbonize the maritime sector alongside the U.S. government.

09 BIOMASS FUELS↗

The United States' (DOE) Action Plan for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The U.S. Department of Energy (DOE) is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change. This Action Plan, developed by DOE, is focused on federal actions for power sector decarbonization primarily led by DOE. There are many other actions being led by other U.S. government agencies, or at the state and local level, that are not featured in this Action Plan.

21st Century Power Partnership↗

Lao Power Sector Vulnerability Assessment and Resilience Action Plan

This purpose of this work is to develop a power sector resilience action plan for the Lao PDR (resilience action plan). The resilience action plan provides strategies to address the key vulnerabilities identified in a previous vulnerability assessment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Uruguay's Action Plan and Experience for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM), Lessons Learned for Rapid Decarbonization of Power Sectors, was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The Uruguay Ministry of Industry, Energy and Mining is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for planning, building, and operating, as well as stakeholder engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Report of the Tape Recorder Action Plan Committee, 21 March 1972

A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.

Source record↗

Brazil's Action Plan for Rapid Decarbonization of Power Sectors

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at the CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The second cohort of action plans will be presented at CEM15 in Brazil. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions, given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for Planning, Building and Operating, as well as Stakeholder Engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

An Action Plan for Rail Energy and Emissions Innovation

The Action Plan for Rail Energy and Emissions Innovation proposes actions to reduce and nearly eliminate emissions in the U.S. rail sector, in line with the U.S. economy-wide goal of net-zero greenhouse gas (GHG) emissions by 2050. It also proposes actions to leverage the rail system to reduce emissions from other modes. The national goal of achieving a zero-emission freight system by 2050 draws our attention to the fact that freight transport cannot be addressed simply mode by mode, but it should instead be treated as an interdependent system. This is especially true when pursuing decarbonization. This action plan presents how both rail transport and decarbonization intersect with our national transportation decarbonization blueprint, the decarbonization of the freight system, and national transmission goals. The intended audience of this report is the stakeholders who will advance rail decarbonization in a just and economical way by propelling the suite of actions listed here. This includes government at all levels, rail companies, locomotive manufacturers, labor unions, Amtrak, and more.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Guide for Creating a Building-Level Action Plan to Improve Energy Efficiency and Reduce Carbon Emissions

Action plans are tools for commercial building owners to create pathways for reducing energy use and decarbonize, hence reducing carbon emissions. This template and associated direction manual provides a method for creating an action plan. Originally created for the Better Buildings Low Carbon Pilot, it can also be applied to the Better Buildings Climate Challenge and for any building owner striving towards lower carbon footprints.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗