Search NASA⌕ Search

SEARCH · Search NASA

Results for “capacity development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Historical Pattern Analysis of Global Geothermal Power Capacity Development

Between 1913 and 1958, Italy was the only country with an operational geothermal power plant until New Zealand installed its first plant in 1958. At present, 24 countries are involved in the geothermal power market, and they have a combined installed capacity of 16,127 GW. This study analyzes the historical patterns of geothermal power capacity in the world and in individual countries to investigate the ideal global geothermal development pattern by examining the annual cumulative capacity (ACC) and the annual capacity addition (ACA) graphs of the historical development of geothermal power capacity in 24 countries. First, the global patterns are analyzed using these graphs in five periods (1945-1957, 1958-1976, 1977-1991, 1992-2002, and 2003-2020) that are marked by a series of characteristics of ACA peaks separated by two major troughs. Then, five characteristic patterns are developed in five periods globally. These patterns correspond to the early-stage linear, the first acceleration, the first steady-state linear, the second acceleration, and the second steady-state linear developments. A positive relationship exists between global patterns and the 5-year shifted oil-price curve: two major factors influenced global development: 1) increasing oil prices and increasing awareness of global climate change, and 2) global development of geothermal power. Last, we investigate these patterns in each country. The top ten countries, which comprise 93.3% of the world's total installed capacity are separated into five groups based on the availability and characteristics of patterns globally developed in five periods. Group-1 (the United States) has an installed capacity of 3,794 MW, Group-2 (Mexico and Philippines) 963-1935 MW, Group-3 (New Zealand, Italy, Iceland, and Japan) 601-1,037 MW, and Group-4 (Indonesia, Kenya, and Turkiye) 944-2,356 MW. The remaining 14 countries (6.7%), which are called Group 5, are still in an immature stage and have installed capacities of 7-262 MW and are not involved in pattern analysis. Overall, geothermal power in the world is in its third stage of development, which had its peak development after 1977. A fourth development peak may be expected to occur after this through business-as-usual cases. The biggest barrier to the development of the global geothermal power market is the risk associated with exploration and drilling. If risk mitigation systems and funds are employed, the growth of geothermal power production projects could accelerate.

GEOTHERMAL ENERGY↗

Historical Pattern Analysis of Global Geothermal Power Capacity Development: Preprint

Between 1913 and 1958, Italy was the only country with an operational geothermal power plant until New Zealand installed its first plant in 1958. At present, 24 countries are involved in the geothermal power market, and they have a combined installed capacity of 16,127 GW. This study analyzes the historical patterns of geothermal power capacity in the world and in individual countries to investigate the ideal global geothermal development pattern by examining the annual cumulative capacity (ACC) and the annual capacity addition (ACA) graphs of the historical development of geothermal power capacity in 24 countries. First, the global patterns are analyzed using these graphs in five periods (1945-1957, 1958-1976, 1977-1991, 1992-2002, and 2003-2020) that are marked by a series of characteristics of ACA peaks separated by two major troughs. Then, five characteristic patterns are developed in five periods globally. These patterns correspond to the early-stage linear, the first acceleration, the first steady-state linear, the second acceleration, and the second steady-state linear developments. A positive relationship exists between global patterns and the 5-year shifted oil-price curve: two major factors influenced global development: 1) increasing oil prices and increasing awareness of global climate change, and 2) global development of geothermal power. Last, we investigate these patterns in each country. The top ten countries, which comprise 93.3% of the world's total installed capacity are separated into five groups based on the availability and characteristics of patterns globally developed in five periods. Group-1 (the United States) has an installed capacity of 3,794 MW, Group-2 (Mexico and Philippines) 963-1935 MW, Group-3 (New Zealand, Italy, Iceland, and Japan) 601-1,037 MW, and Group-4 (Indonesia, Kenya, and Turkiye) 944-2,356 MW. The remaining 14 countries (6.7%), which are called Group 5, are still in an immature stage and have installed capacities of 7-262 MW and are not involved in pattern analysis. Overall, geothermal power in the world is in its third stage of development, which had its peak development after 1977. A fourth development peak may be expected to occur after this through business-as-usual cases. The biggest barrier to the development of the global geothermal power market is the risk associated with exploration and drilling. If risk mitigation systems and funds are employed, the growth of geothermal power production projects could accelerate.

GEOTHERMAL ENERGY↗

Kenya Food Security & Agriculture II: Utilizing NASA Earth Observations to Enhance Drought Warning Systems and Develop Capacity to Use the RHEAS Model in Kenya

Twenty-three counties in Kenya experience frequent drought, which damages agricultural productivity and threatens the health and well being of millions. NASA DEVELOP partnered with NASA SERVIR, the Regional Centre for Mapping of Resources for Development (RCMRD) and Kenya’s National Drought Management Authority (NDMA) to enhance drought-detection capacity using NASA Earth observations. Currently, the NDMA publishes monthly Early Warning Bulletins with drought conditions for each arid or semi-arid county in Kenya. These bulletins utilize the Vegetation Condition Index (VCI) from the Moderate Resolution ImagingSpectroradiometer (MODIS) as well as a variety of biophysical, social and economic drought indicators, but do not allow for advanced forecasting. To improve drought-monitoring capabilities, the team created a Combined Drought Indicator (CDI) using the Regional Hydrologic Extremes Assessment System (RHEAS) model and data from Aqua and Terra MODIS and the National Centers for Environmental Prediction. The CDI combined precipitation anomalies, soil moisture anomalies, evaporative stress, and VCI according to weights determined by principal component analysis. To evaluate the performance of the CDI across Kenya, the team compiled a dataset of drought events from historical reports and the NDMA’s records. Results suggested that the CDI detected drought earlier thanVCI alone. However, more validation is needed to ensure that the CDI accurately and consistently detects drought earlier than current warning systems. In order to better understand the behavior of individual indices and the potential for earlier drought detection, the team also conducted a time-lag analysis. The team found that VCI responds to drought, on average, one month later than most other indices included in the CDI, suggesting that incorporating additional indices could improve early drought warning systems in Kenya.

Food Security & Agriculture↗

Kenya Food Security & Agriculture II: Utilizing NASA Earth Observations to Enhance Drought Warning Systems and Develop Capacity to Use the RHEAS Model in Kenya

Twenty-three counties in Kenya experience frequent drought, which damages agricultural productivity and threatens the health and well being of millions. NASA DEVELOP partnered with NASA SERVIR, the Regional Centre for Mapping of Resources for Development (RCMRD) and Kenya’s National Drought Management Authority (NDMA) to enhance drought-detection capacity using NASA Earth observations. Currently, the NDMA publishes monthly Early Warning Bulletins with drought conditions for each arid or semi-arid county in Kenya. These bulletins utilize the Vegetation Condition Index (VCI) from the Moderate Resolution Imaging Spectroradiometer (MODIS) as well as a variety of biophysical, social and economic drought indicators, but do not allow for advanced forecasting. To improve drought-monitoring capabilities, the team created a Combined Drought Indicator (CDI) using the Regional Hydrologic Extremes Assessment System (RHEAS) model and data from Aqua and Terra MODIS and the National Centers for Environmental Prediction.The CDI combined precipitation anomalies, soil moisture anomalies, evaporative stress, and VCI according to weights determined by principal component analysis. To evaluate the performance of the CDI across Kenya, the team compiled a dataset of drought events from historical reports and the NDMA’s records. Results suggested that the CDI detected drought earlier than VCI alone. However, more validation is needed to ensure that the CDI accurately and consistently detects drought earlier than current warning systems. In order to better understand the behavior of individual indices and the potential for earlier drought detection, the team also conducted a time-lag analysis. The team found that VCI responds to drought, on average, one month later than most other indices included in the CDI, suggesting that incorporating additional indices could improve early drought warning systems in Kenya.

Food Security & Agriculture↗

DEVELOP: Building Capacity in Early Career Individuals to Apply NASA Earth Observations in Health and Air Quality

The NASA DEVELOP National Program builds capacity to use and apply NASA Earth observations to address environmental concerns around the globe. The DEVELOP model builds capacity in both participants (students, recent graduates, and early and transitioning career professionals), who conduct the projects, and partners (decision and policy makers), who are recipients of project methodologies and results. While projects focus on a spectrum of thematic topics, health and air quality related topics made up more than a quarter of DEVELOP’s FY2023 project portfolio. These projects worked in collaboration with over 30 partner organizations throughout the US and internationally to explore how Earth observations could support decision making in areas such as health and air quality, wildland fires, climate, urban development, and transportation and infrastructure. This presentation provides an overview of the DEVELOP model of building capacity to use Earth observation data, environmental decision-making needs identified in health and air quality relevant projects, DEVELOP project case studies, commonly utilized data sources, and lessons learned. Key takeaways include best practices for project development and execution, how to balance learning with delivering impactful results for partners, and water resource relevant decisions guided by project end products.

Remote sensing↗

Implementing the GEOSS Water Strategy: From Observations to Decisions

In 2014, The GEOSS Water Strategy – From Observations to Decisions was published and steps were taken to implement the Strategy’s recommendations. The Strategy highlighted priority areas where the application of Earth observations to water research and water management decisions would have significant scientific and societal benefits. This article reviews the implementation of the Strategy’s recommendations over the past eight years. After a review of the Strategy’s assessment of the needs for water observations and their applications, it then reviews actions taken in response to the Strategy’s recommendations in its four major themes: improved data acquisition for Essential Water Variables, research and product development, interoperability, and capacity development. It highlights significant achievements in the implementation of the Strategy including some motivated by factors beyond this Strategy, reviews actions taken by participating agencies and programs for each of the main themes and summarizes the remaining challenges in achieving the Strategy’s full implementation. The article not only is an update for the Water Community regarding the GEOSS Water Strategy, but it is also an example of how other communities could develop and promulgate a set of strategic recommendations, monitor progress, and carry out assessments of their effectiveness.

Earth observations↗

A Geodetic and Positioning Thematic Layer - Identifying tools to connect the GGRF and IGIF

Effective and sustainable modernization of a nation’s geodetic framework relies on the ability of the relevant organizations and other stakeholders to communicate, integrate, and align both their strategic objectives and operational planning with the United Nations Committee of Experts on Global Geospatial Information Management (UN GGIM) Sub-Committee on Geodesy’s (SCoG) roadmap for a Global Geodetic Reference Frame (GGRF) for Sustainable Development. In addition, to implement geodetic modernization initiatives through multiple government agencies, a holistic country action plan (CAP) for geospatial information management must incorporate pertinent geodetic outcomes and outputs. Presently, the CAP framework and principles used by nations is the UN GGIM Integrated Geospatial Information Framework (IGIF). From engagement with geospatial and survey communities across emerging nations in the Asia Pacific region, it is evident more assistance and coordination is necessary to articulate, integrate and connect geodetic organizational strategies with the requirements of the GGRF roadmap; the strategic pathways of the IGIF; and resourcing for a meaningful and relevant multi-faceted CAP. One of the supporting mechanisms for such planning or preparation, which representatives of the International Federation of Surveyors (FIG) Asia Pacific Capacity Development Network (AP CDN) and the UN SCoG Education, Training and Capacity Building (ETCB) working group are considering, is a policy framework and guide for a “Geodetic and Positioning Thematic Layer” (GPTL). Essentially, this “thematic layer”, in terms of the GGRF and IGIF, aims to provide a comprehensive understanding of, and a toolbox for, the “why, what, how, and who” of geodesy and positioning. This discussion paper will provide background and insights for a GPTL dedicated to recognizing, and aligning the geodetic capacity development needs with broader geospatial information management issues and applications. The paper will also outline a rigorous, participatory, and inclusive consultation process for the design and development of a thematic layer. Furthermore, as the intention of the authors is to prepare a forthcoming “white paper” that will concisely describe the issues of a GPTL and initiatives for an appropriate guide and/or policy framework, this paper will seek feedback on: the potential scientific, social, environmental and political benefits of modernizing geodetic infrastructure and systems; the challenges associated with the GGRF roadmap; leveraging the geodesy-relevant elements of each IGIF strategic pathway; the importance of collaborative efforts; and the capacity development needs and resources in relation to governance, technology and people.

SARIB, Rob↗

Fractional capacity electrolyzer development for CO2 and H2O electrolysis

The electrolyzer module was designed to produce 0.24 kg/d (0.53 lb/d) of breathable oxygen from the electrolysis of metabolic carbon dioxide and water vapor. The fractional capacity electrolyzer module is constructed from three electrochemical tube cells and contains only three critical seals. The module design illustrated an 84 percent reduction in the total number of seals for a one person capacity oxygen generating system based on the solid electrolyte carbon dioxide and water vapor electrolysis concept. The electrolyzer module was successfully endurance tested for 71 days.

Wynveen, R. A.↗

Feasibility Studies as Catalysts for Capacity Building: The DEVELOP Experience from Local to National Scale

The NASA DEVELOP National Program occupies a unique niche in the capacity development ecosystem. It is not a traditional training or educational program primarily focused on individual capacity, nor is it a full-scale co-development program focused on institutional capacity. NASA DEVELOP conducts 10-week feasibility studies that bring together teams of participants and decision making partners. The participants are competitively selected students and emerging or transitioning professionals, who build their STEM and professional skillsets. The partners are groups that have decision making requirements that may benefit from insights that Earth observations can provide. The interaction of the participants and partners over the intense 10-week time period is especially well adapted to building capacity at smaller scales. DEVELOP projects have shown good results when working at municipal and smaller administrative levels like U.S. counties. Even when working with higher administrative levels like provinces, U.S states, or even national or federal levels, DEVELOP has shown most success when working with more localized institutions like state forests or national parks. This presentation will recount case studies of how DEVELOP projects worked with more local or “localized” partners and compare with outcomes with partners at other scales: state/provincial and federal/national levels.

Capacity Building↗

Feasibility Studies as Catalysts for Capacity Building: The DEVELOP Experience from Local to National Scale

The NASA DEVELOP National Program occupies a unique niche in the capacity development ecosystem. It is not a traditional training or educational program primarily focused on individual capacity, nor is it a full-scale co-development program focused on institutional capacity. NASA DEVELOP conducts 10-week feasibility studies that bring together teams of participants and decision making partners. The participants are competitively selected students and emerging or transitioning professionals, who build their STEM and professional skillsets. The partners are groups that have decision making requirements that may benefit from insights that Earth observations can provide. The interaction of the participants and partners over the intense 10-week time period is especially well adapted to building capacity at smaller scales. DEVELOP projects have shown good results when working at municipal and smaller administrative levels like U.S. counties. Even when working with higher administrative levels like provinces, U.S states, or even national or federal levels, DEVELOP has shown most success when working with more localized institutions like state forests or national parks. This presentation will recount case studies of how DEVELOP projects worked with more local or “localized” partners and compare with outcomes with partners at other scales: state/provincial and federal/national levels.

NASA DEVELOP↗

Game Based Learning For Earth Science Applications Training

Current NASA Earth capacity development programs employ mechanisms ranging from online resource sharing, and virtual and in-person trainings to share knowledge. While these programs are highly successful at engaging individuals around the world – in 2018, over 8000 individuals and over 2000 institutions from all 50 US states and over 140 countries were engaged through over 150 projects and trainings – user feedback has highlighted the desire for expanded hands-on, practical experiences in incorporating NASA EO insights with localized data and actions. We aim to address this gap by leveraging the benefits of game-based learning to build user skills in integrating NASA and local EO data to guide decisions for climate resiliency and hazard planning. This project is being executed as a two-phase crowdsourced challenge: 1) Phase 1 will require a well-researched product concept that reflects an understanding of NASA’s Earth data and tools and user needs, and proposes an innovative and interactive game or extended reality experience to train users in identifying relevant NASA data and applying insights to their climate resiliency decisions; 2) Winners of Phase 1 will be provided seed funding to develop a working prototype of the product. We aim to award 1-3 final winners to support the development of more than one game, thereby ensuring that NASA's diverse audiences around the world can access training games that best suit their needs and capabilities. This EO training game project fits in the NASA Earth Science Applied Sciences Program’s Capacity Development Program, contributing to the program mission of “helping people around the world better understand [NASA’s Earth] data and find ways to use them” (https://appliedsciences.nasa.gov/what-we-do/capacity-building). The final training game will complement existing programmatic activities of workforce development, trainings, and collaborative projects, while providing the unique value of providing interactive experiences to users and collecting real-time data and feedback to improve NASA’s Earth applications’ products and services related to climate resilience.

Human centered design↗

Global Precipitation Experiment—A New World Climate Research Programme Lighthouse Activity

The future state of the global water cycle and the prediction of freshwater availability for humans around the world remain among the challenges of climate research and are relevant to several United Nations Sustainable Development Goals. The Global Precipitation Experiment (GPEX) takes on the challenge of improving the prediction of precipitation quantity, phase, timing, and intensity, characteristics that are products of a complex integrated system. It will achieve this by leveraging existing World Climate Research Programme (WCRP) activities and community capabilities in satellite, surface-based, and airborne observations, modeling, and experimental research and by conducting new and focused activities. It was launched in October 2023 as a WCRP Lighthouse Activity. Here, we present an overview of the GPEX Science Plan that articulates the primary science questions related to precipitation measurements, process understanding, model performance and improvements, and plans for capacity development. The central phase of GPEX is the WCRP Years of Precipitation for 2–3 years with coordinated global field campaigns focusing on different storm types (atmospheric rivers, mesoscale convective systems, monsoons, and tropical cyclones, among others) over different regions and seasons. Activities are planned over the three phases (before, during, and after the Years of Precipitation) spanning a decade. These include gridded data evaluation and development, advanced modeling, enhanced understanding of processes critical to precipitation, multiscale prediction of precipitation events across scales, and capacity development. These activities will be further developed as part of the GPEX Implementation Plan.

Climate change↗

Advancing STEM in Bhutan through Increased Earth Observation Capacity: Applying NASA DEVELOP’s Model to Bhutanese Scholars

The NASA DEVELOP Program, a dual capacity building effort within NASA’s Applied Sciences, fosters the development of skills and knowledge to use Earth observations for environmental decision making. The program engages students, recent graduates, early career individuals, and transitioning career professionals through 10-week feasibility studies that assess the potential for integrating NASA Earth observing satellite data into partner organization decision making processes. DEVELOP projects provide an experiential learning opportunity for participants while building the institutional capacity of partner organizations. Since 2020, DEVELOP has worked with the Government of Bhutan to engage 30 Bhutanese scholars on a series of projects focused on environmental issues in Bhutan. These projects have offered an opportunity for Bhutanese scholars studying in the US to gain geospatial knowledge and skills, project management and leadership skills, and science communication experience. This presentation will highlight the DEVELOP model of empowering its participants, collaborative projects, and highlight example outcomes of the Bhutan engagement.

Capacity Building↗

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

The US Western Interconnection is facing unprecedented challenges in the form of less predictable peak demand, increasingly diverse generating resources, and fast-growing loads due to the onset of artificial intelligence, hyperscale computing, and electrification. Projecting where future generation may be developed is critical to maintaining a robust and resilient electric grid under this mounting uncertainty and variability. Using an integrated multisectoral, multiscale modeling framework that links a human-Earth systems model, an hourly load model, a geospatial power plant siting model, and an hourly grid operations model, we evaluate the power plant landscape evolution under eight alternative futures between 2020 and 2055. These futures represent a wide but plausible range of atmospheric conditions, emissions constraints, and economic, technological, and population growth assumptions. We find that local-level development can vary substantially both by generation type and capacity buildout across these futures. Specific regions of the Western Interconnection are projected to see large amounts of capacity development regardless of the future scenario. We additionally determine that projected power plant locations are more heavily influenced by the cost to interconnect to the electric grid than the locational energy value.

Mongird, Kendall↗