Software Cost-Estimation Model

Software Cost Estimation Model SOFTCOST provides automated resource and schedule model for software development. Combines several cost models found in open literature into one comprehensive set of algorithms. Compensates for nearly fifty implementation factors relative to size of task, inherited baseline, organizational and system environment and difficulty of task.

Tausworthe, R. C.

NASA Software Cost Estimation Model: An Analogy Based Estimation Model

The cost estimation of software development activities is increasingly critical for large scale integrated projects such as those at DOD and NASA especially as the software systems become larger and more complex. As an example MSL (Mars Scientific Laboratory) developed at the Jet Propulsion Laboratory launched with over 2 million lines of code making it the largest robotic spacecraft ever flown (Based on the size of the software). Software development activities are also notorious for their cost growth, with NASA flight software averaging over 50% cost growth. All across the agency, estimators and analysts are increasingly being tasked to develop reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods there is very little focus on the use of models based on analogy and clustering algorithms. In this paper we summarize our findings on effort/cost model estimation and model development based on ten years of software effort estimation research using data mining and machine learning methods to develop estimation models based on analogy and clustering. The NASA Software Cost Model performance is evaluated by comparing it to COCOMO II, linear regression, and K-­ nearest neighbor prediction model performance on the same data set.

Hihn, Jairus

Software cost/resource modeling: Deep space network software cost estimation model

A parametric software cost estimation model prepared for JPL deep space network (DSN) data systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models, such as those of the General Research Corporation, Doty Associates, IBM (Walston-Felix), Rome Air Force Development Center, University of Maryland, and Rayleigh-Norden-Putnam. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software lifecycle statistics. The estimation model output scales a standard DSN work breakdown structure skeleton, which is then input to a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. J.

Optical Telescope Assembly Cost Estimating Model

Parametric cost models can be used by designers and project managers to compare cost between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. The NASA Marshall Space Flight Center has developed a 5- parameter cost model that explains 93% (Adjusted R2) of the cost variation in a database of 46 total ground and space telescope assemblies. This model can be used to estimate the most probably cost for the Habitable Exoplanet Telescope Assembly.

Stahl, H Philip

Deep space network software cost estimation model

A parametric software cost estimation model prepared for Deep Space Network (DSN) Data Systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit DSN software life cycle statistics. The estimation model output scales a standard DSN Work Breakdown Structure skeleton, which is then input into a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. C.

Deep space network software cost estimation model

A parametric software cost estimation model prepared for Jet PRopulsion Laboratory (JPL) Deep Space Network (DSN) Data System implementation tasks is described. The resource estimation mdel modifies and combines a number of existing models. The model calibrates the task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software life-cycle statistics.

Tausworthe, R. C.

Satellite servicing mission preliminary cost estimation model

The cost model presented is a preliminary methodology for determining a rough order-of-magnitude cost for implementing a satellite servicing mission. Mission implementation, in this context, encompassess all activities associated with mission design and planning, including both flight and ground crew training and systems integration (payload processing) of servicing hardward with the Shuttle. A basic assumption made in developing this cost model is that a generic set of servicing hardware was developed and flight tested, is inventoried, and is maintained by NASA. This implies that all hardware physical and functional interfaces are well known and therefore recurring CITE testing is not required. The development of the cost model algorithms and examples of their use are discussed.

Source record

Cost estimation model for advanced planetary programs, fourth edition

The development of the planetary program cost model is discussed. The Model was updated to incorporate cost data from the most recent US planetary flight projects and extensively revised to more accurately capture the information in the historical cost data base. This data base is comprised of the historical cost data for 13 unmanned lunar and planetary flight programs. The revision was made with a two fold objective: to increase the flexibility of the model in its ability to deal with the broad scope of scenarios under consideration for future missions, and to maintain and possibly improve upon the confidence in the model's capabilities with an expected accuracy of 20%. The Model development included a labor/cost proxy analysis, selection of the functional forms of the estimating relationships, and test statistics. An analysis of the Model is discussed and two sample applications of the cost model are presented.

Spadoni, D. J.

COMPACT KNN V2: Analogy-Based Cost Estimation Model for CubeSats

The CubeSat Or Microsat Probabilistic and AnalogiesCost Tool, or COMPACT, is a NASA Headquarters fundedeffort to fill the gap in cost estimating capabilities for CubeSats,as well as other microsat spacecraft. The COMPACT team hasfocused mainly on CubeSats to date, and has collected technical,programmatic and cost data on dozens of flown CubeSatsmissions led by NASA, research labs, and universities. In late2019, the team released the first tool prototype which uses a nonparametricregression technique, k-Nearest Neighbors (KNN),on actual data from historical CubeSat missions to produceearly ballpark analogy-based cost estimates for new CubeSatconcepts. Since the KNN prototype was first released, theCOMPACT team has normalized 17 new missions to be addedto the model in COMPACT V2. COMPACT V2 also featureschanges to the KNN tool algorithm including the introduction ofPrincipal Component Analysis (PCA) to the model developmentprocess and changes to the input parameters which have madethe analogy results more intuitive and have improved modelperformance. This paper describes the current COMPACTKNN dataset, improvements made to the model in COMPACTV2, an assessment of current model performance, and a forwardlook at COMPACT’s planned future enhancements.

Hooke, Melissa

A model for the cost of doing a cost estimate

A model for estimating the cost required to do a cost estimate for Deep Space Network (DSN) projects that range from $0.1 to $100 million is presented. The cost of the cost estimate in thousands of dollars, C(sub E), is found to be approximately given by C(sub E) = K((C(sub p))(sup 0.35)) where C(sub p) is the cost of the project being estimated in millions of dollars and K is a constant depending on the accuracy of the estimate. For an order-of-magnitude estimate, K = 24; for a budget estimate, K = 60; and for a definitive estimate, K = 115. That is, for a specific project, the cost of doing a budget estimate is about 2.5 times as much as that for an order-of-magnitude estimate, and a definitive estimate costs about twice as much as a budget estimate. Use of this model should help provide the level of resources required for doing cost estimates and, as a result, provide insights towards more accurate estimates with less potential for cost overruns.

Remer, D. S.

Software for Estimating Costs of Testing Rocket Engines

A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

Hines, Merion M.

Software for Estimating Costs of Testing Rocket Engines

A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

Hines, Merlon M.

Software for Estimating Costs of Testing Rocket Engines

A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

Hines, Merlon M.

The cost of doing a cost estimate

A model for estimating the cost required to do a cost estimate for Deep Space Network (DSN) projects that range from $0.1 to $100 million is presented. The cost of the cost estimate in thousands of dollars, C(sub E), is found to be approximately given by C(sub E) = K(/C(sub p)/(sup 0.35)) where C(sub p) is the cost of the project being estimated in millions of dollars and K is a constant depending on the accuracy of the estimate. For an order-of-magnitude estimate, K = 24; for a budget estimate, K = 60; and for a definitive estimate, K = 115. That is, for a specific project, the cost of doing a budget estimate is about 2.5 times as much as that for an order-of-magnitude estimate, and a definitive estimate costs about twice as much as a budget estimate. Use of this model should help provide the level of resources required for doing cost estimates and, as a result, provide insights towards more accurate estimates with less potential for cost overruns.

Remer, Donald S.

Nasa Space Flight Instruments: Cost Time Trends

Are NASA’s space flight instruments becoming cheaper or more expensive as time marches forward? After analyzing the costs of hundreds of instruments launched over the last 30 years, the short answer to this question is no… and yes. This paper gives a visual analysis of the cost time trends for various NASA space flight instrument types, such as optical, particles detectors, fields detectors and microwave instruments. In addition to the statistical approaches utilized, such as significance tests, cluster analysis and principle components analysis (PCA), we will also discuss the intangibles which are likely at play, including technological progress, NASA policy and the luck of the draw associated with mission manifests. This analysis was performed as the main driver for the NASA Instrument Cost Model (NICM) recent cost estimating model redesign. Started in 2004, the first version of NICM was based off of instruments launched from 1985-2005, or 20 years’ worth of data. As NICM hit its 10-year anniversary, we wanted to know: should NICM continue to only use the most recent 20 years’ worth of data (1995-2015)? Are instruments becoming cheaper or more expensive as time marches forward? There is evidence in favor of a drop in the median dollar-per-kg value across some instrument types, but little in others. Whereas further research is needed to substantiate, Particles and Optical-Planetary instrument types show moderate to strong evidence of a downward trend in dollar-per-kg. Further research is required to study the nature of this trend (shift, taper, cyclic, etc.). Little evidence for a similar downward trend was detected for Fields or Microwave instruments, or Optical instruments on Earth Orbiting spacecraft. We presented evidence in favor of a drop in the median dollar-per-kg value for Particles and Optical-Planetary instrument types. While similar evidence was weak at best for Fields and Microwave instruments. We can speculate as to the causes for this effect, but we are also equipped to begin to rule out, or at least prioritize, some of the suspected drivers. We observed, for Particles and Optical-Planetary instruments, that perhaps a launch manifest effect was playing part of the role in the observed decrease in dollar-per-kg over the years, noting that the more flagship class missions, which have more money to spend on their instruments, were seen in the earlier years in our data, versus the later years which were dominated by less expensive class missions. However, if this were a dominating driver, would we not have seen the downward trend in the Fields and Microwave instruments as well, which were drawn from that same launch manifest? The fact that we did not observe this helps us rule out the launch manifest effect, and other drivers, such as advances in technology, that seem to be more likely suspects. In that case, however, why would technology advances be helping the Particles and Optical-Planetary instruments only? Why would it not be impacting Optical-Earth Orbiting instruments? Further suspects were looked at as well and ruled out, such as the “Faster, Better, Cheaper”era of NASA development which did not seem to actually impact trends by instrument type on a dollar-perkg scale. VI. Future Work A. Time Series Detailed Statistical Assessment The analysis discussed above sets the foundation for a more rigorous time series analysis of the data. Time series analysis will further explore evidence to-date of time trends for the instrument types which showed the strongest indicators for a decrease in dollar-per-kg: Optical (Planetary) and Particles instruments. More than providing evidence and top-level significance tests, time series analysis would help elucidate what kind of trend that exists in the data, their significance and allow statistically based forecasting (see Figure 10)

Mrozinksi, Joseph