Search NASA⌕ Search

SEARCH · Search NASA

Results for “day of launch processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Traceable random numbers from a non-local quantum advantage

The unpredictability of random numbers is fundamental to both digital security and applications that fairly distribute resources. However, existing random number generators have limitations—the generation processes cannot be fully traced, audited and certified to be unpredictable. The algorithmic steps used in pseudorandom number generators are auditable, but they cannot guarantee that their outputs were a priori unpredictable given knowledge of the initial seed. Device-independent quantum random number generators can ensure that the source of randomness was unknown beforehand, but the steps used to extract the randomness are vulnerable to tampering. Here we demonstrate a fully traceable random number generation protocol based on device-independent techniques. Our protocol extracts randomness from unpredictable non-local quantum correlations, and uses distributed intertwined hash chains to cryptographically trace and verify the extraction process. This protocol forms the basis for a public traceable and certifiable quantum randomness beacon that we have launched. Over the first 40 days of operation, we completed the protocol 7,434 out of 7,454 attempts—a success rate of 99.7%. Each time the protocol succeeded, the beacon emitted a pulse of 512 bits of traceable randomness. The bits are certified to be uniform with error multiplied by actual success probability bounded by 2−64. Further, the generation of certifiable and traceable randomness represents a public service that operates with an entanglement-derived advantage over comparable classical approaches.

97 MATHEMATICS AND COMPUTING↗

Astronauts Plasma-Derived Exosomes Induced Aberrant EZH2-Mediated H3K27me3 Epigenetic Regulation of the Vitamin D Receptor

There are unique stressors in the spaceflight environment. Exposure to such stressors may be associated with adverse effects on astronauts' health, including increased cancer and cardiovascular disease risks. Small extracellular vesicles (sEVs, i.e., exosomes) play a vital role in intercellular communication and regulate various biological processes contributing to their role in disease pathogenesis. To assess whether spaceflight alters sEVs transcriptome profile, sEVs were isolated from the blood plasma of 3 astronauts at two different time points: 10 days before launch (L-10) and 3 days after return (R+3) from the Shuttle mission. AC16 cells (human cardiomyocyte cell line) were treated with L-10 and R+3 astronauts-derived exosomes for 24 h. Total RNA was isolated and analyzed for gene expression profiling using Affymetrix microarrays. Enrichment analysis was performed using Enrichr. Furthermore, transcription factor (TF) enrichment analysis using the ENCODE/ChEA Consensus TF database identified gene sets related to the polycomb repressive complex 2 (PRC2) and Vitamin D receptor (VDR) in AC16 cells treated with R+3 compared to cells treated with L-10 astronauts-derived exosomes. Further analysis of the histone modifications using datasets from the Roadmap Epigenomics Project confirmed enrichment in gene sets related to the H3K27me3 repressive mark. Interestingly, analysis of previously published H3K27me3–chromatin immunoprecipitation sequencing (ChIP-Seq) ENCODE datasets showed enrichment of H3K27me3 in the VDR promoter. Collectively, our results suggest that astronaut-derived sEVs may epigenetically repress the expression of the VDR in human adult cardiomyocytes by promoting the activation of the PRC2 complex and H3K27me3 levels.

59 BASIC BIOLOGICAL SCIENCES↗

NREL Fleet Analysis Support Through Technology Integration Collaboration

This study leveraged the partnership between the United States Department of Energy's (DOE) Clean Cities Coalition Network and the Association for the Work Truck Industry (NTEA) to launch a vehicle and fleet analysis project that assisted fleets in identifying opportunities to save energy, improve efficiency, reduce costs, and meet environmental goals via short term data logging and analysis. The National Renewable Energy Laboratory (NREL) sought to establish a process that included initial data acquisition, provided data storage, and developed analytic methods to inform fleets of areas of opportunity based on approximately 30 days of in use vehicle performance data. However, long-term the project will require ongoing funding to fully develop and maintain the data sharing platform and to produce more complex analysis.

33 ADVANCED PROPULSION SYSTEMS↗

LuSEE-night power distribution system design

The Lunar Surface Electromagnetic Experiment at Night (LuSEE-Night) is a low-frequency, 0.5 to 50 MHz, radio experiment on the radio-quiet far side of the Moon. The instrument will be launched by NASA Commercial Lunar Payload Services in 2026. The LuSEE-Night instrument core is composed of a radio frequency spectrometer (SPT) processing signals from four antennas, the Data Controller Board (DCB), low electromagnetic interference (EMI) Picket Fence Power Supply (PFPS), and Power Distribution Unit (PDU). The battery powers the instrument during the lunar night and stores energy harvested by the solar panel array during the lunar day. The battery charging is controlled by the Power Conditioning and Distribution Unit (PCDU). The unregulated power is supplied either by the SpaceCraft (S/C) or the battery and gets distributed to the PFPS, communication radio, heaters, and deployables through the PDU. The PFPS generates all regulated low-voltage rails using switching regulation synchronized to the LuSEE-Night clock, which ensures self-generated EMI will be confined to well-defined frequency bins. Here, we discussed the unregulated power distribution system architecture and functionality. The PDU engineering and flight modules are developed and characterized to confirm compliance with LuSEE-Night requirements. At the time of writing, all power subsystem components have been integrated into the payload.

47 OTHER INSTRUMENTATION↗

LA100 Equity Strategies. Chapter 5: Low-Income Energy Bill Equity and Affordability

The LA100 Equity Strategies project synthesizes community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. Grounded in the analysis of past and ongoing energy inequities and engagement with underserved communities, the project presents community-guided strategies that aim to operationalize recognition and procedural justice. Building on the community-identified problems and solutions, and the analysis of the 11 strategies described in Chapter 3, this chapter continues to focus on the solution space through the lens of recognition and procedural justice. It centers the role of community engagement in energy utility planning and project development with a specific focus on how the Los Angeles Department of Water and Power (LADWP) can engage and work equitably with Los Angeles communities to cocreate a clean and just energy future for LA. LA100 Equity Strategies is rooted in the crucial role community engagement plays in restructuring the energy systems of cities, states, and nations. Scholarship on wind, solar, and other transitional energy technologies and projects has documented that such engagement is commonly used as a top-down mechanism for adapting social practices to fit new technological innovations. Yet, understanding how the clean energy transition - with related changes in technologies, infrastructures, practices, and costs - will fit equitably into the existing socio-political context is a challenge that requires substantive collaboration with local communities. Any form of community engagement opens up government officials and utilities to opposition from their public. Meaningful engagement methods turn such dissent into a strength, embracing critical feedback - particularly from communities historically excluded from decision-making - as contributing to more grounded design and effective implementation. Leveraging this collaborative model to further rectify past and ongoing inequities in the social, cultural, and institutional scaffolding of LA, this chapter presents options and methods to support LADWP in launching a just and equitable clean energy transition. We approach community engagement as a critical process linking recognition, procedural, and distributional justice, outlining how LADWP could learn from past engagement, coordinate such knowledge organization-wide, and use engagement as a key tool for achieving energy justice and equity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding the Roles of Convective Trigger Functions in the Diurnal Cycle of Precipitation in the NCAR CAM5

The wrong diurnal cycle of precipitation is a common weakness of current global climate models (GCMs). To improve the simulation of the diurnal cycle of precipitation and understand what physical processes control it, we test a convective trigger function described in Xie et al. (2019) with additional optimizations in the NCAR Community Atmosphere Model version 5 (CAM5). The revised trigger function consists of three modifications: 1) replacing the Convective Available Potential Energy (CAPE) trigger with a dynamic CAPE (dCAPE) trigger, 2) allowing convection to originate above the top of planetary boundary layer (i.e., the unrestricted air parcel launch level - ULL), and 3) optimizing the entrainment rate and threshold value of the dynamic CAPE generation rate for convection onset based on observations. Results from 1°-resolution simulations show that the revised trigger can alleviate the long-standing GCM problem of too early maximum precipitation during the day and missing the nocturnal precipitation peak that is observed in many regions, including the U.S. southern Great Plains (SGP). The revised trigger also improves the simulation of the propagation of precipitation systems downstream of the Rockies and the Amazon region. A further composite analysis over the SGP unravels the mechanisms through which the revised trigger affects convection. Additional sensitivity tests show that both the peak time and the amplitude of the diurnal cycle of precipitation are sensitive to the entrainment rate and dCAPE threshold values.

54 ENVIRONMENTAL SCIENCES↗

On the Road to Achieving Safety Excellence at the Idaho Cleanup Project: The Initial Challenges, Solutions, and Positive Results of Striving to be the Best and Safest in the DOE Complex - 20518

When Fluor Idaho, LLC (Fluor Idaho) assumed the Idaho Cleanup Project Core contract (ICP Core) in mid-2016, it inherited the successful multi-faceted, employee-owned safety programs of two prior contractors supporting cleanup operations at the Idaho National Laboratory Site. Fluor Idaho incorporated the best of both safety programs along with Fluor Corporate's 106-year legacy of safety initiatives and successes. Fluor Idaho integrated the separate programs and cultures under a One Fluor approach - one project, one mission, One Fluor. Job changes, management changes, and procedures, processes, and system changes presented multiple challenges. Those challenges combined with the severe Winter of 2016/2017 resulted in numerous slips, trips, and falls first aids and reportable injuries. The road to safety excellence started off bumpy and stayed that way for some time. Since then, Fluor Idaho has successfully implemented several key initiatives including employee engagement; management engagement and time in the field; communications improvements; safety culture sustainment; injury/illness prevention; organizational learning; and DOE Voluntary Protection Program (VPP) readiness and preparation. Management became more engaged by making more workplace visits and increasing their supervision of 'life critical work' or complex activities. Additional training became mandatory for first-line supervisors and front-line workers. Most recently, Fluor Idaho increased its injury and illness prevention initiatives extensively. In the last year, things have turned around in a dramatic way. This shift is directly attributable to the significant number of initiatives launched in late 2017 and 2018. These initiatives addressed safety performance in the five key areas of the DOE VPP and promoted sustainability of the company's safety culture. The five key areas are: management leadership, employee involvement, work-site analysis, hazard prevention and control, and safety and health training. Employees and managers alike recommitted to making safety the highest value. The result of this laser-like focus on safety and accident and injury prevention is that injuries and first aids are a fraction of what they were. During FY 2019, employees worked more than 4.2 million hours without a serious injury or lost work-day and 1 million hours without a recordable injury. Fluor Idaho is proud of its safety trend. The company invested significant resources in improving its safety record, and that investment is paying off. Other contractors in the DOE Complex can learn and benefit from this discussion of the challenges Fluor Idaho faced, as well as its innovative safety initiatives that are producing results that are being recognized by our U.S. Department of Energy (DOE) customer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Petrogenesis, alteration, and shock history of intermediate shergottite Northwest Africa 7042: Evidence for hydrous magmatism on Mars?

We report Northwest Africa (NWA) 7042 is an intermediate, permafic shergottite consisting of two generations of zoned olivine (early olivine Fo 41-76 , and late-stage olivine Fo 46-56 ), complexly zoned pyroxene (En 35-64 Fs 22-46 Wo 5-34 ), maskelynitized feldspar and shock melt (An 5-30 Ab 16-61 Or 1-47 ), and accessory merrillite, apatite, ilmenite, titanomagnetite, Fe-Cr-Ti spinels, pyrrhotite, and baddeleyite. The olivine grains have been pervasively altered resulting in orange-brown stained cores with dark-brown margins, surrounded by significantly less altered overgrowth rims. This textural relationship suggests that the alteration of the cores took place at magmatic temperatures prior to crystallization of the rims on Mars. While this type of olivine alteration is rare in shergottites, it is similar to deuterically altered olivine in basalts and gabbros on Earth, caused by residual water-rich magmatic fluids. Launch-generated shock veins in NWA 7042 crosscut and displace several of the altered olivine grains indicating that the alteration occurred before ejection of the meteorite from Mars. However, NWA 7042 has also been subjected to extensive terrestrial weathering, with terrestrial calcite/barite veins occurring throughout the sample. Transmission electron microscopy analysis of the olivine alteration also reveals an absence of high-temperature phases typically associated with hydrous deuteric alteration on Earth, complicating our interpretation. The potential presence of deuterically altered olivine in NWA 7042 has significant implications, as it is the third martian meteorite where deuteric alteration of olivine has been observed (the others being NWA 10416, ALH 77005). The different mantle sources for the parental melts of these three meteorites would suggest many, if not all martian mantle reservoirs have the potential to produce water-rich magmas.

58 GEOSCIENCES↗

Planetary Boundary-Layer Height (PBLHT) Value-Added Product: Remote-Sensing Retrievals

The planetary boundary layer (PBL) is fundamental to numerous atmospheric processes, including aerosol mixing and transport, cloud evolution, and precipitation formation. A critical parameter in these studies is the PBL height (PBLHT). This vertical depth is essential for characterizing PBL structures in numerical simulations and serves as a primary metric for estimating flux exchanges between the Earth’s surface and the atmosphere. Radiosonde (SONDE) observations provide high-vertical-resolution measurements of temperature and moisture profiles and are widely used to estimate PBLHT (Liu and Liang 2010, Seidel et al. 2010). The U.S. Department of Energy Atmospheric Radiation Measurement (ARM) User Facility’s PBLHT value-added product (VAP) for radiosonde measurements, known as PBLHTSONDE, applies three commonly used methods—the Heffter (1980) method, the Liu and Liang (2010) method, and the bulk Richardson number approach (Seibert et al. 2000)—to derive PBLHT. The PBLHTSONDE VAP operates routinely at ARM observatories and mobile facilities, with data available from the ARM Data Center shortly after sounding observations are collected (Sivaraman et al. 2013). However, radiosonde observations are limited by their low temporal resolution. Most stations launch soundings only twice daily, which constrains the ability to investigate and characterize the temporal evolution of the PBL using radiosonde data alone. The use of continuous remote-sensing observations provides high temporal resolution of PBLHT estimates. These observations include aerosol lidars (Dang et al. 2019, Su et al. 2020), Doppler lidar (DL; Tucker et al. 2009, Krishnamurthy et al. 2021), and water vapor and/or temperature lidars and radiometers (Turner et al. 2014). These observations provide valuable data on the PBL’s thermodynamic properties (e.g., water vapor and/or temperature lidars and radiometers), dynamic properties (e.g., DL), and distribution of tracer substances (e.g., aerosol lidars), all of which can be used to estimate PBLHT. ARM developed PBLHT estimates from the micropulse lidar (MPL; PBLHTMPL), Doppler lidar (PBLHTDL), and combined Raman lidar (RL)/atmospheric emitted radiance interferometer (AERI) thermodynamic profiles (PBLHTTHERMO). Each estimate captures different physical characteristics of the boundary layer—aerosol tracers, vertical velocity turbulence, and thermodynamic structure—and exhibits distinct strengths and limitations depending on the PBL regime and time of day. In addition, the ARM ceilometer (CEIL) provides three potential PBLHT candidates derived from the vendor's built-in algorithm. Building on these individual retrievals, ARM developed the PBLHTBEML VAP, which combines the four remote-sensing-based estimates with ancillary meteorological variables using the machine learning approach of Zhang et al. (2025) to produce a best-estimate PBLHT at 10-minute resolution.

54 ENVIRONMENTAL SCIENCES↗

Texas A&M University Mobile Facility Measurements during TRACER (Field Campaign Report)

One of the main goals of the U.S Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Tracking Aerosol Convection Interactions Experiment (TRACER) near Houston, Texas is to improve understanding of how meteorology and aerosols impact storm dynamical and microphysical processes in deep convection to better constrain and improve their model representation. The Houston area is strongly influenced by sea- and bay-breeze circulations that generate convergence and help to initiate and organize deep convection. To properly isolate and understand the roles of varied meteorological conditions and cloud condensation nuclei (CCN) and ice nucleation particles (INP) distributions in different air masses, co-located thermodynamic, kinematic, and aerosol vertical profile observations are needed. The focus of this campaign was to provide key measurements in air masses both in front of and behind sea/bay breeze fronts moving through the greater Houston area to sample the airmass heterogeneity. The overarching scientific goal of this campaign is to understand how the vertical distributions of both CCN and INP correspond to the inflow layer of deep convection in maritime, background continental, and polluted continental air masses, and how these variations influence deep convection. To fully sample the heterogeneity in both meteorological conditions and aerosols across the sea-breeze front (SBF), Texas A&M University (TAMU) deployed a InterMet 3050A 403 MHz mobile unit launching iMet-4 radiosondes and the new Rapid Onsite Atmospheric Measurement Van (ROAM-V) for aerosol sampling during the TRACER intensive operational period (IOP) from June to September 2022. The suite of instruments deployed on ROAM-V included a condensation particle counter (CPC; GRIMM Model 5.403 CPC), scanning mobility particle sizer (SMPS; TSI 3750 detector, TSI 3082 classifier, TSI 3088 neutralizer, TSI 3081A differential mobility analyzer), cloud condensation nuclei counter (Droplet Measurement Technologies CCN counter), micropulse lidar (Droplet Measurement Technologies micropulse lidar [miniMPL]), and a Davis Rotating Uniform size-cut Monitor (DRUM; DRUMAir 4-DRUM). Before sampling at each location, the latitude and longitude were recorded using the Global Positioning System (GPS) on the phone application “My Altitude”. The DRUM data were collected as part of a closely related ARM field campaign and also supported by DOE Atmospheric System Research grant DE-SC0021047. The TAMU team sampled these airmass heterogeneities by strategically choosing deployment sites in a different airmass than the ARM fixed sites in La Porte and Guy, Texas. On days when the sea/bay breeze boundary was pushing inland, the TAMU team would usually sample the airmass on the maritime side of the SBF at a coastal site in Galveston, Texas in the early afternoon (1730-1900 UTC) and then move inland ahead of the SBF to sample the airmass on the continental side during late afternoon (2030-2230). Figure 1 shows the Galveston maritime site and the array of sites for the late afternoon continental measurements.

54 ENVIRONMENTAL SCIENCES↗

Development and Bench-Scale Testing of a Novel Biphasic Solvent-Enabled Absorption Process for Post-Combustion Carbon Capture (Final Technical Report)

A new class of biphasic solvents was developed, and the concept of the enabled carbon dioxide (CO 2 ) absorption process was tested for post-combustion carbon capture in our previous lab-scale research. The primary goals of this project were to advance the development of the novel biphasic CO 2 absorption process (BiCAP) and validate its technical advantages by testing the integrated technology at a 40 kWe bench-scale with actual coal-derived flue gas in a power plant environment. The project was led by the University of Illinois at Urban-Champaign (UIUC), and Trimeric Corporation served as a sub-awardee providing support in basic design and techno-economic studies. To achieve the project goals and objectives, solvent management studies, process modeling and optimization, bench-scale equipment design, construction and testing, and technical, economic and environmental assessments have been conducted. The two top-performing biphasic solvents developed in our previous research were used in this project. Biphasic solvent emissions and control were investigated in the laboratory. The emissions of the biphasic solvents from the absorber were comparable to or lower than the reference 30 wt% monoethanolamine (MEA) solution, while they could be more effectively removed in the water wash column. Lab-scale testing of solvent degradation reclamation has revealed that vacuum distillation was feasible for biphasic solvent reclamation. Aspen Plus models were used to optimize the BiCAP, and a CO 2 stripping configuration introducing a secondary cold solvent feed to the stripper was identified to be the most energy efficient. A 40 kWe bench-scale, integrated BiCAP system was successfully designed, fabricated, and installed at the UIUC’s Abbott Power Plant. Parametric testing with synthetic flue gas has demonstrated that the two biphasic solvents required a more than 40% lower heat duty for CO 2 desorption as compared to the reference MEA tested on the same bench-scale skid. Slipstream testing with actual coal flue gas for a total of 31 days in two test campaigns has further demonstrated stable operation of the bench-scale skid. During the first campaign targeting 90% CO 2 removal, the heat duty averaged at 2,183 MJ/tonne of CO 2 captured and during the second campaign targeting 95% removal, the heat duty averaged at 2,450 MJ/tonne of CO 2 captured. A techno-economic analysis has revealed that for integration of the BiCAP into a 650-MWe pulverized coal-fired power plant, the parasitic power loss was reduced by ~20%, and the cost of CO 2 capture was reduced by ~21% ($36.3/tonne on a December 2018 dollar basis) compared to the U.S. Department of Energy (DOE)’s baseline Case B12B. As progression from this bench-scale development effort, a new project “Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility” was awarded by the DOE, launched in February 2023, to allow the team to further test the technology and demonstrate its technical and economic advantages at a pilot scale.

20 FOSSIL-FUELED POWER PLANTS↗