Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Potential Solutions to Demand Growth in Virginia: Options for Demand Flexibility [Slides]

This slide deck report presents a literature review on virtual power plants (VPPs) and a demand flexibility analysis for the state of Virginia as part of DOE's State Energy Program (SEP) technical assistance work. The literature review describes key concepts, examples, participation models, and other issues for VPPs, and the analysis section presents a state-specific demand flexibility analysis estimating the technical potential for demand response from various sectors and end-uses. These materials are meant to inform and support VA's ability to shepherd ongoing dialogue and meet energy needs in the midst of strong load growth.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Revisiting the relationship between demand growth and electricity prices

Here, in this Commentary, we aim to clarify the relationship between electricity demand and prices in the short- and longer-term. We outline three dimensions that shape this relationship: system capacity utilization, system expansion costs, and cost allocation in the rate design process. We explain why demand growth has historically been largely associated with falling electricity prices and explore arguments that future C&I demand growth may increase prices.

O'Shaughnessy, Eric [Lawrence Berkeley National La

IM3 Data Center Driven Grid Stress Dataset for the U.S. Western Interconnection

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from an open-source grid operations modeling framework - GO), for the Integrated Multisector, Multiscale Modeling (IM3) project, under varying levels of data center demand growth between 2025 and 2035 in the U.S. Western Interconnection. The scenarios and sensitivity experiments are combinations of different data center demand growth rates and energy, weather, population and economic pathways. Data center demand growth projections were sourced from the Electric Power Research Institute (EPRI). The data center demand growth projection names are: Low (3.71% annual data center demand growth) Moderate (5% annual data center demand growth) High (10% annual data center demand growth) Higher (15% annual data center demand growth) Energy, weather, population and economic pathways are informed by two Shared Socioeconomic Pathways (SSP3 and SSP5) and two Representative Concentration Pathways (RCP4.5 and RCP8.5) following the hotter general circulation model (GCM) forcing group from a set of perturbed thermodynamics simulations. The resulting pathway names are: rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 The main scenarios and sensitivity experiments are detailed below. Reference scenario: The projected grid stress and reliability results for the U.S. Western Interconnection from a previous study. This scenario does not consider data center demand growth explicitly. Data center scenario: Building on the reference scenario, this scenario considers various data center growth rates and how they impact the U.S. Western Interconnection. Data center loads are modeled as flat 8760-hr profiles. This scenario does not consider new generation and transmission capacities specifically designed to meet the new data center demands. The related folder is named "flat". Delayed generator retirements sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different levels of natural gas and nuclear generator retirement delays. The resulting scenario names are: (1) postponing 100% nuclear retirements; (2) postponing 100% nuclear and 25% natural gas retirements; (3) postponing only 50% natural gas retirements; (4) postponing 100% nuclear and 50% natural gas retirements; (5) postponing 100% nuclear and 75% natural gas retirements; and (6) postponing 100% nuclear and 100% natural gas retirements. The related folder names are: no_gen_retire_0_gas, no_gen_retire_25_gas, no_gen_retire_50_gas, no_gen_retire_50_gas_only, no_gen_retire_75_gas, and no_gen_retire_100_gas. Demand response through curtailment sensitivity experiment: Building on the data center scenario, this experiment explores the impact of different participation and compensation levels of data center demand response. The resulting scenario names are: (1) 5% demand available for curtailment with 750 $/MWh compensation; (2) 5% demand available for curtailment with 500 $/MWh compensation; (3) 5% demand available for curtailment with 250 $/MWh compensation; (4) 15% demand available for curtailment with 750 $/MWh compensation; (5) 15% demand available for curtailment with 500 $/MWh compensation; and (6) 15% demand available for curtailment with 250 $/MWh compensation. The related folder names are: dr_cost_250_drup_0_drdown_5, dr_cost_250_drup_0_drdown_15, dr_cost_500_drup_0_drdown_5, dr_cost_500_drup_0_drdown_15, dr_cost_750_drup_0_drdown_5, and dr_cost_750_drup_0_drdown_15. Combination of delayed generator retirements and demand response through curtailment sensitivity experiment: The impact of combining postponing 100% nuclear and 25% natural gas retirements with 5% demand available for curtailment with 750 $/MWh compensation is simulated. The related folder is named "dr_cost_750_drup_0_drdown_5_nuc_100_gas_25". Please refer to the README file for a detailed description of the dataset including individual files and references.

Artificial Intelligence

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)

Enhancing supply resilience for critical materials: case study of gallium supply in the United States

Accelerating energy technology development will increase demand for critical raw materials, such as gallium, that enable clean energy technologies. Processing of gallium is concentrated in mainland China (98 % of global production in 2023), resulting in high supply risks for importing countries. To investigate pathways for more resilient supply, we develop a material flow analysis and apply it to the United States, showing the impacts of future domestic primary raw material production and end-of-life (EoL) product recycling on reducing import reliance of raw gallium metal. We complement this analysis with a techno-economic assessment of North American gallium production costs under various demand growth scenarios. Our results indicate that sufficient domestic feedstocks exist to meet U.S. demand under most scenarios by 2035, while EoL recycling can supply up to 50 % under a low-demand growth scenario. Domestic primary production shows significant cost advantages over gallium recycling.

Cost analysis

Expanding Regional Airport Usage to Accommodate Increased Air Traffic Demand

Small regional airports present an underutilized source of capacity in the national air transportation system. This study sought to determine whether a 50 percent increase in national operations could be achieved by limiting demand growth at large hub airports and instead growing traffic levels at the surrounding regional airports. This demand scenario for future air traffic in the United States was generated and used as input to a 24-hour simulation of the national airspace system. Results of the demand generation process and metrics predicting the simulation results are presented, in addition to the actual simulation results. The demand generation process showed that sufficient runway capacity exists at regional airports to offload a significant portion of traffic from hub airports. Predictive metrics forecast a large reduction of delays at most major airports when demand is shifted. The simulation results then show that offloading hub traffic can significantly reduce nationwide delays.

Russell, Carl R.

Survey of projected growth and problems facing air transportation, 1975 - 1985

Results are presented of a survey conducted to determine the current opinion of people working in air transportation demand forecasting on the future of air transportation over the next ten years. In particular, the survey included questions on future demand growth, load factor, fuel prices, introduction date for the next new aircraft, the priorities of problems facing air transportation, and the probability of a substantial change in air transportation regulation. The survey participants included: airlines, manufacturers, universities, government agencies, and other organizations (financial institutions, private research companies, etc.). The results are shown for the average responses within the organization represented as well as the overall averages.

Williams, L. J.

Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.

24/7

Key Drivers for Offshore Wind Deployment in the Western United States

The western coast of the United States has abundant natural resources, including wind, sun, and water. Despite strong ocean winds, offshore wind energy (OSW) in the Western United States is in the early stages of technology development due largely to the deep water off the coast, which requires floating platforms rather than fixed‐bottom turbines. Floating OSW increases the technical difficulty of installation and thus the cost relative to both fixed‐bottom OSW and land‐based turbines. OSW is a potential generation option to help meet increasing demand on the west coast of the United States because it likely has fewer land‐use conflicts than other technologies and complements sources in the existing electricity supply by providing energy during times of high system stress. This paper examines the possible drivers and barriers to OSW deployment on the West Coast using the National Laboratory of the Rockies' state‐of‐the‐art capacity expansion model and the Regional Energy Deployment System (ReEDS) model. We use ReEDS to explore a multitude of future scenarios looking at key drivers for OSW deployment, including variations on the cost of OSW, electricity demand growth, and the availability of competing technologies to examine the factors that may play a role in OSW growth. Assuming coastal state policies such as renewable portfolio and clean energy standards remain in place, we find that OSW can play a role in meeting electricity demand and provide energy during stressful grid conditions and find that deployment from the least‐cost investment model ranges from 7.6 to 38 GW by 2045.

17 WIND ENERGY

Projecting Future Scheduled Airline Demand, Schedules and NGATS Benefits Using TSAM

The Transportation Systems Analysis Model (TSAM) developed by Virginia Tech s Air Transportation Systems Lab and NASA Langley can provide detailed analysis of the effects on the demand for air travel of a full range of NASA and FAA aviation projects. TSAM has been used to project the passenger demand for very light jet (VLJ) air taxi service, scheduled airline demand growth and future schedules, Next Generation Air Transportation System (NGATS) benefits, and future passenger revenues for the Airport and Airway Trust Fund. TSAM can project the resulting demand when new vehicles and/or technology is inserted into the long distance (100 or more miles one-way) transportation system, as well as, changes in demand as a result of fare yield increases or decreases, airport transit times, scheduled flight times, ticket taxes, reductions or increases in flight delays, and so on. TSAM models all long distance travel in the contiguous U.S. and determines the mode choice of the traveler based on detailed trip costs, travel time, schedule frequency, purpose of the trip (business or non-business), and household income level of the traveler. Demand is modeled at the county level, with an airport choice module providing up to three airports as part of the mode choice. Future enplanements at airports can be projected for different scenarios. A Fratar algorithm and a schedule generator are applied to generate future flight schedules. This paper presents the application of TSAM to modeling future scheduled air passenger demand and resulting airline schedules, the impact of NGATS goals and objectives on passenger demand, along with projections for passenger fee receipts for several scenarios for the FAA Airport and Airway Trust Fund.

Dollyhigh, Samuel

Evolutionary growth for Space Station Freedom electrical power system

Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased space station user requirements and advancing technologies. The space station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial space station systems such as guidance navigation and control, external thermal, truss structural stiffness, computational capabilities and storage which must be planned-in in order to facilitate the addition of the solar dynamic modules.

Marshall, Matthew F.

Evolutionary growth for Space Station Freedom electrical power system

Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased Space Station user requirements and advancing technologies. The Space Station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial Space Station systems such as guidance, navigation, and control, external thermal, truss structural stiffness, computational capabilities and storage, which must be planned-in, in order to facilitate the addition of the solar dynamic modules.

Marshall, Matthew Fisk

Principles and Guidelines for Duty and Rest Scheduling in Commercial Aviation

The aviation industry requires 24-hour activities to meet operational demands. Growth in global long-haul, regional, overnight cargo, and short-haul domestic operations will continue to increase these round-the-clock requirements. Flight crews must be available to support 24-hour-a-day operations to meet these industry demands. Both domestic and international aviation can also require crossing multiple time zones. Therefore, shift work, night work, irregular work schedules, unpredictable work schedules, and dm zone changes will continue to be commonplace components of the aviation industry. These factors pose known challenges to human physiology, and because they result in performance-impairing fatigue, they pose a risk to safety. It is critical to acknowledge and, whenever possible, incorporate scientific information on fatigue, human sleep, and circadian physiology into 24-hour aviation operations. Utilization of such scientific information can help promote crew performance and alertness during flight operations and thereby maintain and improve the safety margin.

Dinges, David F.

Evaluating grid stress and reliability in future electricity grids across a range of demand, generation mix, and weather trends

The reliability of power grids in the future will depend on how system planners account for the integration of new technologies, extreme weather events, and uncertainties in demand growth from increased electrification and data centers. This study introduces an open-source, multisectoral, multiscale modeling framework that projects grid stress and reliability trends between 2020 and 2055 in the Western Interconnection of the United States. The framework integrates global to national energy-water-land dynamics with power plant siting and hourly grid operations modeling. We analyze future wholesale electricity price shocks and unserved energy events across eight scenarios spanning a range of population growth and economic change, generation mixes, and weather conditions. Our results show future grids with high percentage of non-renewable generation and strong economic growth are characterized by higher reliability and lower wholesale electricity prices than lower growth scenarios because of larger reliance on dispatchable generators and lower fossil fuel extraction costs. Scenarios with high percentage of renewable resources have lower median but more volatile wholesale electricity prices as well as more frequent and severe unserved energy events compared to scenarios relying more on dispatchable generators. These events occur because higher proportion of solar and wind energy causes net demand curves to deepen during midday (duck curves get progressively severe), exacerbating the challenge of meeting demand during summer evening peaks. This study suggests that robust and co-optimized transmission and energy storage planning could help maintain low wholesale electricity prices and high reliability levels in future electricity grids across uncertainties in generation mixes.

Electric grid reliability

Investigating the Nature of and Methods for Managing Metroplex Operations

A combination of traffic demand growth, Next Generation Air Transportation System (NextGen) technologies and operational concepts, and increased utilization of regional airports is expected to increase the occurrence and severity of coupling between operations at proximate airports. These metroplex phenomena constrain the efficiency and/or capacity of airport operations and, in NextGen, have the potential to reduce safety and prevent environmental benefits. Without understanding the nature of metroplexes and developing solutions that provide efficient coordination of operations between closely-spaced airports, the use of NextGen technologies and distribution of demand to regional airports may provide little increase in the overall metroplex capacity. However, the characteristics and control of metroplex operations have not received significant study. This project advanced the state of knowledge about metroplexes by completing three objectives: 1. developed a foundational understand of the nature of metroplexes; 2. provided a framework for discussing metroplexes; 3. suggested and studied an approach for optimally managing metroplexes that is consistent with other NextGen concepts

Atkins, Stephen

Infrastructure and resource development needs to support a significant expansion of US nuclear capacity

In December 2023, the United States pledged at a United Nations conference to triple nuclear energy by 2050. In May of 2025 a new administration announced plans to quadruple nuclear energy by 2025, setting a new target that requires understanding the key infrastructure and resources needed to achieve large-scale deployment. This study attempts to quantify “what it takes” to deploy an additional 200 GWe of nuclear capacity. It projects demand levels for workforce, fuel, uranium mining and enrichment, waste management, supply chain, land, licensing, and water. Demand growth is also contextualized. For example, the peak number of construction workers required is approximately 215,000, a 37 % increase in the current US utility construction workforce. Up to 80,000 MT/year of mined uranium will be needed, necessitating a 60-fold increase in US mining production or a doubling of global mining if sourced externally. Advanced reactor fuels, uranium mining, and nuclear-grade equipment production would need substantial expansion. Operational workforce, enrichment needs, and licensing submissions also face significant increases. Although water consumption may see relatively lower increases, securing water rights poses unique challenges. This study consolidates various demand metrics in a broad context, highlighting the necessity of early preparations, such as workforce training, to support a tripling of nuclear energy. While it outlines the demand-side requirements, it does not assess the difficulties of ramping up or other supply-side issues. The findings also shed light on the impact of reactor size and reactor technology on various demand metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION