Search NASA⌕ Search

SEARCH · Search NASA

Results for “design certification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Structural Design Challenges in Design Certification Applications for New Reactors

The licensing framework established by the U.S. Nuclear Regulatory Commission under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” provides requirements for standard design certifications (DCs) and combined license (COL) applications. The intent of this process is the early reso- lution of safety issues at the DC application stage. Subsequent COL applications may incorporate a DC by reference. Thus, the COL review will not reconsider safety issues resolved during the DC process. However, a COL application that incorporates a DC by reference must demonstrate that relevant site-specific de- sign parameters are confined within the bounds postulated by the DC, and any departures from the DC need to be justified. This paper provides an overview of structural design chal- lenges encountered in recent DC applications under the 10 CFR Part 52 process, in which the authors have participated as part of the safety review effort.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Seismic Analysis Issues in Design Certification Applications for New Reactors

The licensing framework established by the U.S. Nuclear Regulatory Commission under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” provides requirements for standard design certifications (DCs) and combined license (COL) applications. The intent of this process is the early reso- lution of safety issues at the DC application stage. Subsequent COL applications may incorporate a DC by reference. Thus, the COL review will not reconsider safety issues resolved during the DC process. However, a COL application that incorporates a DC by reference must demonstrate that relevant site-specific de- sign parameters are within the bounds postulated by the DC, and any departures from the DC need to be justified. This paper provides an overview of several seismic analysis issues encountered during a review of recent DC applications under the 10 CFR Part 52 process, in which the authors have participated as part of the safety review effort.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NGNP Nuclear-Industrial Facility and Design Certification Boundaries White Paper

The Next Generation Nuclear Plant (NGNP) Project was initiated at Idaho National Laboratory by the U.S. Department of Energy pursuant to the 2005 Energy Policy Act and based on research and development activities supported by the Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of the high temperature gas-cooled reactor (HTGR) technology. The HTGR is helium cooled and graphite moderated and can operate at reactor outlet temperatures much higher than those of conventional light water reactor (LWR) technologies. Accordingly, it can be applied in many industrial applications as a substitute for burning fossil fuels, such as natural gas, in addition to producing electricity, which is the principal application of current LWRs. These varied industrial applications may involve a standard HTGR modular design using different Energy Conversion Systems. Additionally, some of these process heat applications will require process heat delivery systems to lie partially outside the HTGR operator’s facility.

99 GENERAL AND MISCELLANEOUS↗

AP1000{sup R} licensing and deployment in the United States

In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The AP1000{sup R} China projects move forward to construction completion and equipment installation

The AP1000 design is the only Generation III+ technology to receive design certification from the U.S. Nuclear Regulatory Commission. This evolutionary design provides the highest safety and performance standards and has several distinct advantages over other designs, including improved operations and reduced construction schedule risks through the use of modern, modular, engineering principles that allow construction and fabrication tasks traditionally performed in sequence to be undertaken in parallel. Since the first granting of Design Certification in 2005 by the NRC, the AP1000 design has been modified to meet emergent NRC requirements such as those requiring the design to withstand the impact of an aircraft crash. Both domestic and foreign utilities have turned to the Westinghouse AP1000 plant design to meet their near - and long-term sustainable energy needs. The first ever deployment of this advanced U.S. nuclear power technology began in China in 2007 with the award of a contract to build four AP1000 units, constructed in pairs at the coastal sites of Sanmen (Zhejiang Province) and Haiyang (Shandong Province). Currently, all four units are at an advanced stage of construction. The commercial operation date for Sanmen Unit 1 is November 2013 followed by Haiyang Unit 1 being operational in May 2014. Construction and equipment manufacture is at an advanced stage. Sanmen Unit 1 equipment that has been delivered includes the reactor vessel, the reactor vessel closure head, the passive residual heat removal heat exchanger, the integrated head package, the polar crane, and the refueling machine. The steam generators are also completed. The RV was installed within the containment vessel building in September 2011. The installation of this major equipment will allow the setting of the containment vessel top head. Haiyang Unit 1 is also achieving significant progress. Significant benefits continue to be realized as a result of lessons learned and experience gained from the first-of-a-kind activities for Sanmen Unit 1 and AP1000 equipment design and manufacturing. For example, the nuclear island basemat at Haiyang Units 1 and 2 and Sanmen Unit 2 was laid in less time than that of Sanmen Unit 1, the ultra-large steam generator and RV forging lead times were reduced for the follow on units, and the fabrication of the auxiliary building module for Haiyang Unit 1 took less time than for the Sanmen first unit. These benefits are also being realized by the United States AP1000 project construction and fabrication modules, and equipment. Some difficulties arise from building this first-of-a-kind (advanced passive) type of plant; however, these difficulties are being overcome and the overall schedule remains achievable. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Shortening the Design and Certification Cycle for Additively Manufactured Materials by Improved Mesoscale Simulations and Validation Experiments: Fiscal Year 2019 Status Report.

This report outlines the fiscal year (FY) 2019 status of an ongoing multi-year effort to develop a general, microstructurally-aware, continuum-level model for representing the dynamic response of material with complex microstructures. This work has focused on accurately representing the response of both conventionally wrought processed and additively manufactured (AM) 304L stainless steel (SS) as a test case. Additive manufacturing, or 3D printing, is an emerging technology capable of enabling shortened design and certification cycles for stockpile components through rapid prototyping. However, there is not an understanding of how the complex and unique microstructures of AM materials affect their mechanical response at high strain rates. To achieve our project goal, an upscaling technique was developed to bridge the gap between the microstructural and continuum scales to represent AM microstructures on a Finite Element (FE) mesh. This process involves the simulations of the additive process using the Sandia developed kinetic Monte Carlo (KMC) code SPPARKS. These SPPARKS microstructures are characterized using clustering algorithms from machine learning and used to populate the quadrature points of a FE mesh. Additionally, a spall kinetic model (SKM) was developed to more accurately represent the dynamic failure of AM materials. Validation experiments were performed using both pulsed power machines and projectile launchers. These experiments have provided equation of state (EOS) and flow strength measurements of both wrought and AM 304L SS to above Mbar pressures. In some experiments, multi-point interferometry was used to quantify the variation is observed material response of the AM 304L SS. Analysis of these experiments is ongoing, but preliminary comparisons of our upscaling technique and SKM to experimental data were performed as a validation exercise. Moving forward, this project will advance and further validate our computational framework, using advanced theory and additional high-fidelity experiments.

36 MATERIALS SCIENCE↗

Establishing Regulatory Jurisdictional Boundaries at Collocated Advanced-Reactor Facilities

This white paper discusses establishing and applying nuclear facility jurisdictional boundaries at advanced-nuclear-reactor facilities. It was written for industry review and evaluation with possible consideration by the U.S. Nuclear Regulatory Commission (NRC) for subsequent regulatory action. The paper proposes a regulatory basis for establishing jurisdictional boundaries at operational advanced (i.e., non-light water) reactor installations at sites proximate to and sharing systems with non-NRC regulated facilities (e.g., users of process heat, fossil-plant retrofits, microgrid electrical power, desalination, etc.). Advanced-reactor technologies can be applied to support many industrial applications to replace the burning of fossil fuels as well as produce steam for electricity. The principal application of the current light-water reactor fleet is electricity generation. These varied industrial applications may involve an advanced-reactor design in combination with different site-specific energy-conversion systems. Some of these process-heat applications will require process-heat delivery systems to lie partially outside the advanced-reactor operator’s facility. Energy conversion systems are conventional, non-nuclear equipment and buildings. Given these varied applications, there should be a clear understanding between the advanced-reactor applicant and the NRC regarding a nominal demarcation between those systems that reside within the nuclear facility under the regulatory jurisdiction of the NRC (i.e., within the scope of a 10 Code of Federal Regulations (CFR) 50 operating license or Part 52 design certification and a combined license) and those that fall outside the scope of the NRC (e.g., an industrial facility). Additionally, it is important to have a clear understanding regarding the plant scope that should be addressed in an advanced-reactor facility Part 52, design certification application and the part of the plant scope that could be addressed as part of a site specific combined license application.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗