System Study: Emergency Power System 1998-2020

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from 1998 through 2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in the industry-wide estimates of EPS system start-only mission as well as EPS system unreliability (8-hour mission).

99 GENERAL AND MISCELLANEOUS↗

System Study: Emergency Power System 1998-2022

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Emergency Power System 1998–2018

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the EPS results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998-2024

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998–2013

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant trends were identified in the EPS results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Study: Emergency Power System 1998–2012

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2012 for selected components were obtained from the Equipment Performance and Information Exchange (EPIX). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. A statistically significant increasing trend was identified for unreliability (8 hour model) as a function of fiscal year. No statistically significant decreasing trend was identified in the EPS results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998-2014

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. An extremely statistically significant increasing trend was observed for EPS system unreliability for an 8-hour mission. A statistically significant increasing trend was observed for EPS system start-only unreliability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Adaptive Power System Emergency Control using Deep Reinforcement Learning

Power system emergency control is generally regarded as the final safety net for grid security and resiliency. Existing emergency control schemes are usually designed off-line based on either the conceived “worst” case scenarios or a few typical operation scenarios. These schemes are facing significant adaptiveness and robustness issues as increasing uncertainties and variations occur in modern electrical grids. To address these challenges, for the first time, this paper proposes a novel adaptive emergency control scheme using deep reinforcement learning (DRL), by leveraging the high-dimensional feature extraction and non-linear generalization capabilities DRL has for complex systems with high-dimensional variations. Furthermore, an open-source platform named DeepGrid has been designed for the first time to assist the DRL development and benchmarking processes in power system emergency control. Details of the platform, DRL, and emergency control schemes that use dynamic braking or under-voltage load shedding are presented. Extensive case studies performed in both two-area four-machine system and IEEE 39-Bus system have demonstrated the excellent performance and robustness of the proposed schemes.

Deep reinforcement learning, emergency control, lo↗

General description of HTR-PM emergency power system - 18415

The paper will describe the design concept of the emergency power system utilized in the high temperature gas cooled reactor project (HTR-PM) which is currently under construction in Shandong, China. As a class 1E system which is related to the safety feature of the reactor, emergency power system is responsible for providing multiple reliable power sources for nuclear safety class loads. Therefore, the structure, power source deployment, operation, maintenance and alignment of the system should meet several standards and regulations. The paper will give a detailed description about the designing process of the system which include structure design, determination of primary device parameters, and some calculation results of device capacity such as emergency diesel engine, UPS et al. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhanced Oblique Decision Tree Enabled Policy Extraction for Deep Reinforcement Learning in Power System Emergency Control

Deep reinforcement learning (DRL) algorithms have successfully solved many challenging problems in various power system control scenarios. However, their decision-making process is usually regarded as black-boxes. Furthermore, how DRL models interact with human intelligence remains an open problem. Thus, this paper proposes a policy extraction framework to extract a complex DRL model into an explainable policy. This framework includes three parts: 1) DRL training and data generation. We train an agent for a specific control task and generate data, which contains the control policy of the agent. 2) Policy extraction. We propose an information gain rate based weighted oblique decision tree (IGR-WODT) for DRL policy extraction. 3) Policy evaluation. We define three metrics to evaluate the performance of the proposed approach. A case study for the under-voltage load shedding problem shows that the IGR-WODT presents a performance enhancement compared with DRL, weighted oblique decision tree, and univariate decision tree. The proposed policy extraction method could provide an intuitive explanation of the neural network decision-making process to the dispatchers when making final decisions on power grid operation. Also, the resulted rule-based controller could replace the deep neural network-based controller in many field edge devices with limited computing resources, providing comparable performance.

deep reinforcement learning↗

Construction bidding cost of KSC's space shuttle facilities

The bidding cost of the major Space Transportation System facilities constructed under the responsibility of the John F. Kennedy Space Center (KSC) is described and listed. These facilities and Ground Support Equipment (GSE) are necessary for the receiving, assembly, testing, and checkout of the Space Shuttle for launch and landing missions at KSC. The Shuttle launch configuration consists of the Orbiter, the External Tank, and the Solid Rocket Boosters (SRB). The reusable Orbiter and SRB's is the major factor in the program that will result in lowering space travel costs. The new facilities are the Landing Facility; Orbiter Processing Facility; Orbiter Approach and Landing Test Facility (Dryden Test Center, California); Orbiter Mating Devices; Sound Suppression Water System; and Emergency Power System for LC-39. Also, a major factor was to use as much Apollo facilities and hardware as possible to reduce the facilities cost. The alterations to existing Apollo facilities are the VAB modifications; Mobile Launcher Platforms; Launch Complex 39 Pads A and B (which includes a new concept - the Rotary Service Structure), which was featured in ENR, 3 Feb. 1977, 'Hinged Space Truss will Support Shuttle Cargo Room'; Launch Control Center mods; External Tank and SRB Processing and Storage; Fluid Test Complex mods; O&C Spacelab mods; Shuttle mods for Parachute Facility; SRB Recovery and Disassembly Facility at Hangar 'AF'; and an interesting GSE item - the SRB Dewatering Nozzle Plug Sets (Remote Controlled Submarine System) used to inspect and acquire for reuse of SRB's.

Brown, Joseph Andrew↗

Multi-Stage and Multi-Timescale Robust Co-Optimization Planning for Reliable and Sustainable Power Systems. Final Report

In this project, Clarkson University, in collaboration with Southern Methodist University and University of Pittsburgh, conducted the research to model, design, and implement a sophisticated generation and transmission co-optimization planning decision tool, called Multi-stage and Multi-timescale robust Co-Optimization Planning (MMCOP). The MMCOP decision tool intends to facilitate generation and transmission co-optimization planning of emerging power systems, while mitigating risks and uncertainties in both short-term operation dynamics and long-term policy and technology changes. Long-term power system planning aims at optimizing asset utilization by investing in a proper mix of various generation technologies and transmission lines to supply the future load growth. In particular, the Clean Power Plan (CPP), which is designed to combat climate change and reduce carbon emissions by setting a national limit on carbon pollution from power plants, may dramatically change the landscape of the power industry by further promoting clean energy and phasing out emissions-intensive generation technologies. In addition, novel non-wire alternatives (e.g., demand response (DR), distributed generation (DG), energy efficiency (EE), and smart grid technologies) and the computational complexity for large-scale systems significantly complicate the system planning procedure even further. However, existing conventional planning approaches neglect short-term variability and uncertainty of renewable energy, hourly chronological operation details, and physical nonlinear characteristics of the alternating current transmission network. As a result, existing conventional planning approaches may not work properly, and power systems reliability could be in jeopardy. In observing the limitations of existing conventional planning approaches and addressing new challenges of emerging power systems, the main scope of this project to develop co-optimization planning models within a multi-stage and multi-timescale framework. In particular, random contingencies, key uncertainty factors, and AC power flows are included to derive expansion plans while considering both long-term reliability and short-term flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Overview of the NASA F-18 High Alpha Research Vehicle

This paper gives an overview of the NASA F-18 High Alpha Research Vehicle. The three flight phases of the program are introduced, along with the specific goals and data examples taken during each phase. The aircraft configuration and systems needed to perform the disciplinary and inter-disciplinary research are discussed. The specific disciplines involved with the flight research are introduced, including aerodynamics, controls, propulsion, systems, and structures. Decisions that were made early in the planning of the aircraft project and the results of those decisions are briefly discussed. Each of the three flight phases corresponds to a particular aircraft configuration, and the research dictated the configuration to be flown. The first phase gathered data with the baseline F-18 configuration. The second phase was the thrust-vectoring phase. The third phase used a modified forebody with deployable nose strakes. Aircraft systems supporting these flights included extensive instrumentation systems, integrated research flight controls using flight control hardware and corresponding software, analog interface boxes to control forebody strakes, a thrust-vectoring system using external post-exit vanes around axisymmetric nozzles, a forebody vortex control system with strakes, and backup systems using battery-powered emergency systems and a spin recovery parachute.

Bowers, Albion H.↗

Enhanced Component Performance Study: Emergency Diesel Generators 1998-2020

This report presents an enhanced performance evaluation of emergency power system (EPS) and high-pressure core spray (HPCS) emergency diesel generators (EDGs) at U.S. commercial nuclear power plants. This report evaluates component performance over time using (1) Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS) data from 1998 through 2020 and (2) maintenance unavailability performance data from Mitigating Systems Performance Index (MSPI) Basis Document data from 2002 through 2020. The objective is to show estimates of current failure probabilities and rates related to EDGs, trend these data on an annual basis, determine if the current data are consistent with the probability distributions currently recommended for use in NRC probabilistic risk assessments, show how the reliability data differ for different EDG manufacturers and for EDGs with different ratings; and summarize the subcomponents, causes, detection methods, and recovery associated with each EDG failure mode. The EDG failure modes considered are fail to start (FTS), fail to load and run (FTLR), and fail to run after one hour of operation (FTR>1H). Engineering analyses were performed with respect to time period and failure mode without regard to the actual number of EDGs at each plant. The factors analyzed are: subcomponent, failure cause, detection method, recovery, manufacturer, and EDG rating. The following increasing trends were identified for EDGs for the most recent 10-year period: • HPCS EDG FTS failure probability • EPS and HPCS EDG frequency of start demands (demands per reactor year) • EPS and HPCS EDG frequency of FTLR demands. The following decreasing trends were identified for EDGs for the most recent 10-year period: • EPS EDG FTS failure probability • EPS EDG FTLR failure probability • EPS EDG unavailability • EPS and HPCS EDG frequency of FTLR events (failures per reactor year).

99 GENERAL AND MISCELLANEOUS↗