Search NASA⌕ Search

SEARCH · Search NASA

Results for “flexible power operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dispatch analysis of flexible power operation with multi-unit small modular reactors

The relevance of nuclear power plant flexible power operation (FPO) is rising due to increased penetration of variable renewables. Small Modular Reactors (SMRs) such as NuScale are envisaged to have multiple units on one site. This provides opportunities for coordinating FPO between units, but also introduces challenges as common services (e.g., refueling equipment) must be shared between units and fuel loadings may be standardized. It is therefore important to quantify whether FPO with SMRs is economically beneficial. Here, this paper quantifies the economics of FPO on different timescales to analyze refueling outages of such multi-unit SMRs. A 24-h price-taker profit maximization of SMR operation is first solved considering revenues from wholesale power and ancillary service (AS) markets. The results are then used to find the most profitable operation strategy over several years for multiple units at the site accounting for the physics and materials limits on NPP operation, including refueling outages. Results show a small but appreciable participation of nuclear into AS, contributing 4% of revenues. Due to the longer fuel cycle, over a decade of operation the units’ refueling outages drifted by 3 months, ultimately leading to refueling during summer.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhancement of operational Flexibility of Power Plants Using IN740

Headers are crucial components within diverse industries, especially in the energy sector, as they enable the efficient transfer of fluids. The selection of materials for headers is determined by their specific applications; for example, Grade 91 and Grade 92 steels are commonly utilized. In our research, we recommend the adoption of INCONEL alloy 740 due to its exceptional robustness and heat-resistant characteristics. One critical parameter in header systems is the heat transfer coefficient, which directly influences the efficiency of heat exchange processes and can thereby impact the structural integrity of the headers. This coefficient is closely linked with factors such as the Nusselt number, which is influenced by fluid flow characteristics and thermal properties. The flow direction within headers, whether unidirectional or multidirectional—significantly affects the overall dynamics of heat transfer. This research focuses on exploring the behavior of headers, a specific pipeline system component, using ANSYS simulation software. The study aims to predict heat transfer and mechanical behavior within headers under various conditions through steady-state and transient simulations (parts 1 and 2 of the report). Key parameters such as heat transfer coefficient, velocity, and temperature are examined with the goal of optimizing header design. Part 3 of the report addresses the critical yet underexplored relationship between pressure drop and heat transfer coefficients in the transient flow regime within headers, specifically focusing on smooth horizontal circular tubes. Limited experimental work has been conducted in this area, prompting the need for comprehensive analysis. By leveraging machine learning techniques, this research aims to establish a correlation between pressure drop and heat transfer across various flow conditions, including laminar, transient, quasi-turbulent, and turbulent regimes. The data utilized for this analysis were meticulously gathered from existing literature, capturing simultaneous measurements of pressure drops and heat transfer. Part 4: In the context of power plants, header pipes are essential components that significantly influence system performance by facilitating the collection and distribution of steam. This report highlights the critical role of header pipes in enhancing reliability, efficiency, and overall power plant performance. A key aspect of this investigation is shape optimization, which aims to maximize performance while minimizing material usage. By focusing on shape optimization, this research contributes to improved efficiency and a reduced environmental footprint for power plant installations. The methodology developed in this study emphasizes optimizing header shapes to decrease reliance on expensive alloy materials and lower maintenance costs. Furthermore, a case study was conducted using a header from an operational power plant to validate the proposed optimization techniques. Finally, part 5 addresses the challenges associated with flexible operations in boiler systems, the study outlines several strategies for enhancing the durability and reliability of steam headers. Key approaches include material selection, which involves utilizing advanced materials with superior high-temperature properties and enhanced fatigue resistance to extend the lifespan of steam headers. Design modifications are also recommended, focusing on implementing changes that mitigate thermal stress and cyclic loading to reduce the likelihood of failures under varying operating conditions. Additionally, the study emphasizes the importance of regular inspection and monitoring by establishing rigorous protocols to detect early signs of damage, allowing for timely maintenance and minimizing the risks of catastrophic failures. Furthermore, operational guidelines are developed to minimize the frequency and severity of thermal transients, ensuring stable and efficient operations. Collectively, these strategies provide a robust framework for overcoming the unique challenges posed by flexible operation in boiler systems, ultimately contributing to improved reliability and performance in power plant operations. Through this comprehensive approach, the study not only enhances the understanding of pressure drop and heat transfer relationships but also promotes advancements in design and operation that will benefit the entire power generation industry.

01 COAL, LIGNITE, AND PEAT↗

Design and experimental testing of a 150 kWh thermal battery using thermosiphons embedded in a concrete matrix for power plant flexible operation

One of the options for achieving the global temperature limitation of 1.5 °C target, for the mitigation of global warming, is based on the better penetration of renewables into the electrical grid. This has imposed a burden to fossil fuel fired power plants since they are required to operate away from their baseload mode to compensate for the inherent intermittence of the renewable power. Integrating energy storage with fossil plants is an option to achieve their needed flexibility. A cost competitive energy storage option for the solution is based on storing sensible heat in concrete. Here, this paper reports research results and development of a thermal battery cell (TBC) capable of operating at temperatures up to 425 °C. A novel concept consisting of a concrete matrix for sensible heat storage, engineered to provide enhanced thermal and mechanical properties, and twenty-two thermosiphon elements, engineered for dual action were designed and fabricated into a single thermal energy storage (TES) module. Research for the development of the components for the TBC was performed in the laboratory. Efficient heat transfer, to/from the storage media, was demonstrated under several charging and discharging conditions with a thermal storage capacity of 150 kWh th and a rapid discharge, making the TBC suitable for fast ramping when integrated with a fossil fuel fired power plant. Efficient radial heat transfer to the concrete was observed due to the well designed spacing and location of thermosiphons in the radial direction. A minimal temperature difference of 2 °C, between the thermosiphons bottom and top was obtained, demonstrating the isothermicity of those elements. An overall end-to-end TBC energy-to-energy round trip efficiency of 70% was achieved.

25 ENERGY STORAGE↗

Optimal Economic Dispatch and Load-Following Strategies for Nuclear Integrated Energy Systems

The need for distributed and adaptable energy resources that can handle the growing unpredictability in both supply and demand is rising as the power system continues to modernize. In order to satisfy those needs and maintain grid resilience, nuclear power plants can dynamically control their output, despite typically being used as baseload generators. By incorporating energy storage and renewable energy sources, nuclear integrated energy systems are designed to satisfy the electrical and thermal demands of different end-user applications while ensuring flexible power operation. These systems generate revenue by participating in both wholesale and ancillary services electricity markets, as well as commodity markets for various byproducts generated from coupled industrial processes. This study addresses the economic dispatch efficiency of a tightly coupled nuclear integrated energy system comprising a gigawatt-scale light water reactor, commercialized in the U.S., a high-temperature steam electrolysis unit, a district heating network, and specified electrical loads. To demonstrate the nuclear power plant’s flexibility within the day-ahead unit commitment and economic dispatch framework, while maintaining equilibrium even during periods of refueling outages, this paper develops a mixed-integer linear programming framework that models the subsystems and components of its nuclear steam supply system. A systematic comparative analysis of flexible versus baseload nuclear power plant operation under varying levels of renewable energy integration indicates that flexible operation enhances system profitability by more than 18% while also increasing energy storage utilization, improving reactor responsiveness to load fluctuations, and allowing for greater participation across numerous electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Expansion of Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Electrolysis Hydrogen Production Plants

This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Power Operation and Generation (FPOG) program that presented generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors to support the co-location of a high temperature hydrogen electrolysis facility (HTEF). Probabilistic and deterministic hazards assessments and risk analyses are leveraged throughout this report. Several improvements and new analyses are included in this report. First, higher amounts of detail in the specifications of the generic HTEFs are used to produce scaled results for a 100, 500, and 1000 MW nominal hydrogen production facility. An additional hazard assessment of 1000 kg of hydrogen storage is performed. The facility hazards and footprint are assessed to determine the safe distance required for placement near the nuclear power plant (NPP). Second, specific designs for corresponding HESs for the different levels of support required by the HTEFs are analyzed in the PRA model. Third, a hazards analysis of the specified HTEFs leads not only to effects of the quantified risk assessment for the NPP, but also qualitative hazards assessment for the community. Finally, a seismic analysis and a high winds analysis have each been added to the PRA. The results investigate the applicability of the potential licensing approaches which do not require a full United States (U.S.) Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic and include listed assumptions. The HTEF design built for this project has further eliminated many conservative assumptions from the prior PRAs in this series. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 7.7%. The PRA results for core damage frequency and large early release frequency support the use of NRC Regulation Guide 1.174 as further risk information that supports a change without a full licensing amendment review. The hazard analyses and PRA confirm the need for engineered blast barriers of storage tanks and the common production header leaving the HTEF. The hazards analyses and PRA also confirm with high confidence that using the assumptions of design in this report that the safety case for licensing an HES addition and an HTEF sited with its unprotected high-pressure stage components 187 meters from the NPP’s transmission towers (the most fragile structure, system, and component) is strong.

08 HYDROGEN↗

Small-Signal Stability Constrained Optimal Power Flow of Inverter-Dominated Power Systems with Flexible Operation Mode Selection

Given the intermittence and low inertia nature of inverter-based resources (IBRs), modern power systems with high penetration of IBRs challenge the conventional optimal power flow (OPF) analysis and the system may experience unexpected failures if stability constraints are not incorporated. This study proposes a small-signal stability-constrained OPF (SSSC-OPF) with flexible operation mode selection between grid-forming (GFM) and grid-following (GFL) modes for IBRs to address these challenges. The approach aims to maintain system stability with a sufficient stability margin while minimizing operation costs. The effectiveness of the proposed method is validated through extensive case studies on the IEEE 14-bus system. The results demonstrate that the proposed method is able to support system-level power flow analysis, reduce generation costs, and ensure stability under various disturbances.

grid-following↗

Universal Passive Synchronization Method for Grid-Forming Inverters Without Mode Transition

Power systems are transforming with increasing levels of inverter-based resources (IBRs). This transformation requires critical roles of grid-forming (GFM) inverters replacing synchronous generators for bulk power system stabilization and ancillary services, also allowing flexible power system operation, such as microgrid that is operated by multiple GFM IBRs to achieve system resilience against contingencies. To realize the resilient power systems allowing flexible in-and-out operation of GFM IBRs potentially programmed with different primary controls, a synchronization method universally applicable, i.e., independent of control types, would be beneficial to ease the integration process, but it has not been actively studied. To fill the gap, this paper proposes a universal synchronization method that achieves a passive synchronization to enable a smooth transition in a grid with off-nominal system parameters, i.e., voltage and frequency. The logic proposed requires no modification on the primary control, thus applicable to any type of GFMs with a voltage reference input. To validate the concept, a simulation of an IEEE 13-bus benchmark system modified with 3 GFM inverters is presented. It simulates an inverter-driven black start scenario in which GFM inverters autonomously turn on and connect to the grid under heavy loading, using the synchronization logic. The case study demonstrates that GFM inverters can tune their voltage reference to smoothly synchronize without severe transients, and contribute to a seamless black start of the grid under unbalanced load conditions. Two GFM methods - Droop and dispatchable virtual oscillator control - are used for the demo to validate feasibility and interoperability of the passive synchronization.

black start↗

Flexible Operation of Natural Gas Power Plants in Texas: Startup and Shutdown Durations and Nitrogen Dioxide Emissions

This dataset provides insights into historical flexible operation of natural gas power plants in Texas, with a focus on startup and shutdown events. The dataset includes tables summarizing startup and shutdown durations as well as nitrogen oxide (NOx) emission factors during these events, and compares these emission factors with those observed during all other operating phases (referred to here as “steady-state operation”). The dataset is derived using the U.S. Environmental Protection Agency (EPA)’s Clean Air Markets Program Data (CAMPD). Historical hourly data from 2015–2024, including electricity generation, heat input, and NOx emission factors, are used for natural gas combined cycle units, combustion turbine units, and steam turbine units in Texas. This work was authored by the National Laboratory of the Rockies, operated by the Alliance for Energy Innovation, LLC, for the U.S Department of Energy (DOE) under contract no. DE-AC36-08GO28308. Funding was provided by the U.S. Department of Energy as part of its Grid Modernization Laboratory Consortium, a strategic partnership between DOE and the national laboratories to bring together leading experts, technologies, and resources to collaborate on the goal of modernizing the nation’s grid. The views expressed in the dataset do not necessarily represent the views of the DOE or the U.S. Government.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Environmental Validation of Materials and Design Concepts to Enable Operational Flexibility of Existing Coal Power Plants

Increasingly, coal-fired power plants are required to balance power grids by compensating for the variable electricity supply from renewable energy sources. Fossil-fueled power plants, originally designed to be base loaded, will increasingly need to operate on a load following or cyclic basis. This demanding requirement for operational flexibility will need to be evaluated for resilience to frequent start-ups, meeting major and rapid load changes, and providing frequency control duties. Our research objective was to evaluate and improve flexibility of existing power plants by improving and redesigning components and defining new operational strategies, with acceptable impacts on component life, efficiency and emissions.

20 FOSSIL-FUELED POWER PLANTS↗

Impact of Spatial Variation in Flexibility on System Operations in Electric Power Systems

With the expansion of renewable energy resources in the electric power systems, having flexibility in the setup will allow to maintain the system's reliability and prevailing operations. Such flexibility can be extracted from utility operated and/or consumer owned devices, such as, storage devices, electric vehicles, etc. For the demand side, generally consumer preferences, incentives, etc. enact on the availability of the flexibility; besides, both the spatial and temporal dimension dictates the degree of the flexibility. Consequently, the optimal dispatch of the grid resources might appear intractable as the considerable amount of flexibility are obliquely stemming from the ungovernable consumer devices. Thus characterizing the consequences of diverged feasible flexibility in the system is crucial for operations. In this paper, a procedure is developed to quantify the degree of flexibility of power systems in terms of resource dispatch reconfiguration. Specifically, we develop optimization problems to attain equivalent resource configurations for the power systems to evaluate the spatial volatility of the network and asses the flexibility of the system. The developed process is then validated using numerical simulations for IEEE-30 bus test system.

Sadnan, Rabayet↗

Component level modeling of materials degradation for insights into operational flexibility of Existing Coal Power Plants

Increasingly, coal-fired power plants are required to balance power grids by compensating for the variable electricity supply from renewable energy sources. Fossil-fueled power plants, originally designed to be base loaded, will increasingly need to operate on a load following or cyclic basis. This demanding requirement for operational flexibility needs insights into accelerated material degradation arising due to the harsh operating conditions (e.g., fatigue, early oxide exfoliation due to stresses) along with current damage mechanisms (fireside corrosion, creep and erosion) observed in service. Our research objective is to develop component level modeling toolkit for materials-based degradation for two key mechanisms that can accelerate with cyclic operations. In more detail, this includes the fireside corrosion/steam oxidation/erosion/creep/fatigue of superheaters/reheaters and steam pipework and also the water droplet erosion/ fatigue of last stage steam turbine blades degradation mechanisms, that demand routine and sometimes unplanned maintenance and repair. The innovation is in developing a computational fluid dynamics/finite element (CFD/FE) modeling toolkit for the component level models of the boilers and low-pressure steam turbines in coal power plants that can tackle multidisciplinary failure mechanisms occurring concurrently for extreme environment materials. Lifetime assessment in such environments also needs to account for the unit-specific analyses, operational history and fuel feedstock; this can only be obtained by destructive analysis of components. This, in turn, enables validation of the model toolkits utilizing service feedback data, improving the probability of time/temperature dependent life prediction.

20 FOSSIL-FUELED POWER PLANTS↗

Enhanced cooling tower technology for power plant efficiency increase and operating flexibility

The Final Report describes the results of the work completed during the “Enhanced Cooling Tower Technology for Power Plant Efficiency Increase and Operating Flexibility” project. The objectives of work were to develop and demonstrate the prototype (up to 100 kWth) of an economically viable “all weather” Sub-Dew Point Cooling Tower (SDPCT) with inlet air cooling and dehumidification including testing in laboratory-controlled environment for simulating various ambient conditions. The inlet air is cooled and dehumidified by a Pressure Dehumidifying System (PDHS) installed at the cooling tower inlet.

20 FOSSIL-FUELED POWER PLANTS↗

Role of Inverter-Based Resources (IBRs) in Energizing Remote Generating Stations

The increasing integration of Inverter-Based Resources (IBRs) into the system has brought significant focus on their role in blackstart and restoration procedures. Their advantageous features, such as low startup power requirements, operational flexibility across a wide range of power factors, rapid controllability, and the ability to energize a network at lower voltage levels necessitate a reassessment of existing restoration protocols. This paper seeks to showcase how IBRs can utilize their grid-forming capabilities to provide power to a remote generating station through detailed EMT simulation studies using data collected from an existing portion of a network.

blackstart procedure↗