Search NASA⌕ Search

SEARCH · Search NASA

Results for “hardware reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Neural Networks Based Approach to Enhance Space Hardware Reliability

This paper demonstrates the use of Neural Networks as a device modeling tool to increase the reliability analysis accuracy of circuits targeted for space applications. The paper tackles a number of case studies of relevance to the design of Flight hardware. The results show that the proposed technique generates more accurate models than the ones regularly used to model circuits.

Neural Networks↗

Software Reliability 2002

In FY01 we learned that hardware reliability models need substantial changes to account for differences in software, thus making software reliability measurements more effective, accurate, and easier to apply. These reliability models are generally based on familiar distributions or parametric methods. An obvious question is 'What new statistical and probability models can be developed using non-parametric and distribution-free methods instead of the traditional parametric method?" Two approaches to software reliability engineering appear somewhat promising. The first study, begin in FY01, is based in hardware reliability, a very well established science that has many aspects that can be applied to software. This research effort has investigated mathematical aspects of hardware reliability and has identified those applicable to software. Currently the research effort is applying and testing these approaches to software reliability measurement, These parametric models require much project data that may be difficult to apply and interpret. Projects at GSFC are often complex in both technology and schedules. Assessing and estimating reliability of the final system is extremely difficult when various subsystems are tested and completed long before others. Parametric and distribution free techniques may offer a new and accurate way of modeling failure time and other project data to provide earlier and more accurate estimates of system reliability.

Wallace, Dolores R.↗

Failure analysis of solid rocket apogee motors

The analysis followed five selected motors through initial design, development, test, qualification, manufacture, and final flight reports. An audit was conducted at the manufacturing plants to complement the literature search with firsthand observations of the current philosophies and practices that affect reliability of the motors. A second literature search emphasized acquisition of spacecraft and satellite data bearing on solid motor reliability. It was concluded that present practices at the plants yield highly reliable flight hardware. Reliability can be further improved by new developments of aft-end bonding and initiator/igniter nondestructive test methods, a safe/arm device, and an insulation formulation. Minimum diagnostic instrumentation is recommended for all motor flights. Surplus motors should be used in margin testing. Criteria should be established for pressure and zone curing. The motor contractor should be represented at launch. New design analyses should be made of stretched motors and spacecraft/motor pairs.

Martin, P. J.↗

Evaluation methodologies for an advanced information processing system

The system concept and requirements for an Advanced Information Processing System (AIPS) are briefly described, but the emphasis of this paper is on the evaluation methodologies being developed and utilized in the AIPS program. The evaluation tasks include hardware reliability, maintainability and availability, software reliability, performance, and performability. Hardware RMA and software reliability are addressed with Markov modeling techniques. The performance analysis for AIPS is based on queueing theory. Performability is a measure of merit which combines system reliability and performance measures. The probability laws of the performance measures are obtained from the Markov reliability models. Scalar functions of this law such as the mean and variance provide measures of merit in the AIPS performability evaluations.

Schabowsky, R. S., Jr.↗

PRESAGE: Protecting Structured Address Generation against Soft Errors

Modern computer scaling trends in pursuit of larger component counts and power efficiency have, unfortunately, lead to less reliable hardware and consequently soft errors escaping into application data ("silent data corruptions"). Techniques to enhance system resilience hinge on the availability of efficient error detectors that have high detection rates, low false positive rates, and lower computational overhead. Unfortunately, efficient detectors to detect faults during address generation (to index large arrays) have not been widely researched. We present a novel lightweight compiler-driven technique called PRESAGE for detecting bit-flips affecting structured address computations. A key insight underlying PRESAGE is that any address computation scheme that flows an already incurred error is better than a scheme that corrupts one particular array access but otherwise (falsely) appears to compute perfectly. Enabling the flow of errors allows one to situate detectors at loop exit points, and helps turn silent corruptions into easily detectable error situations. Our experiments using PolyBench benchmark suite indicate that PRESAGE-based error detectors have a high error-detection rate while incurring low overheads.

Sharma, Vishal C.↗

Challenges of Sustaining the International Space Station Through 2020 and Beyond: Reassessing Confidence Targets for System Availability

The International Space Station (ISS) was originally designed to operate until 2015 with a plan for deorbiting the ISS in 2016. Currently, the international partnership has agreed to extend the operations until 2020 and discussions are underway to extend the life even further to 2028. Each partner is responsible for the sustaining engineering, sparing, and maintenance of their own segments. National Aeronautics and Space Administration's (NASA's) challenge is to purchase the needed number of spares to maintain the functional availability of the ISS systems necessary for the United States On-Orbit Segment s contribution. This presentation introduces an analytical approach to assessing uncertainty in ISS hardware necessary to extend the life of the vehicle. Some key areas for consideration are: establishing what confidence targets are required to ensure science can be continuously carried out on the ISS, defining what confidence targets are reasonable to ensure vehicle survivability, considering what is required to determine if the confidence targets are too high, and whether sufficient number of spares are purchased. The results of the analysis will provide a methodological basis for reassessing vehicle subsystem confidence targets. This analysis compares the probability of existing spares exceeding the total expected unit demand of the Orbital Replacement Unit (ORU) in functional hierarchies approximating the vehicle subsystems. In cases where the functional hierarchies' availability does not meet subsystem confidence targets, the analysis will further identify which ORUs may require additional spares to extend the life of the ISS. The resulting probability is dependent upon hardware reliability estimates. However, the ISS hardware fleet carries considerable epistemic uncertainty which must be factored into the development and execution of sparing risk postures. In addition, it is also recognized that uncertainty in the assessment is due to disconnects between modeled functions and actual subsystem operations. Perhaps most importantly, it is acknowledged that conservative confidence targets per subsystem are currently accepted. This presentation will also discuss how subsystem confidence targets may be relaxed based on calculating the level of uncertainty for each corresponding ORU-function. The presentation will conclude with the various strengths and limitations for implementing the analytical approach in sustaining the ISS through end of life; 2020 and beyond.

Lutomski, Michael G.↗

Challenges of Sustaining the International Space Station through 2020 and Beyond: Including Epistemic Uncertainty in Reassessing Confidence Targets

This paper introduces an analytical approach, Probability and Confidence Trade-space (PACT), which can be used to assess uncertainty in International Space Station (ISS) hardware sparing necessary to extend the life of the vehicle. There are several key areas under consideration in this research. We investigate what sparing confidence targets may be reasonable to ensure vehicle survivability and for completion of science on the ISS. The results of the analysis will provide a methodological basis for reassessing vehicle subsystem confidence targets. An ongoing annual analysis currently compares the probability of existing spares exceeding the total expected unit demand of the Orbital Replacement Unit (ORU) in functional hierarchies approximating the vehicle subsystems. In cases where the functional hierarchies availability does not meet subsystem confidence targets, the current sparing analysis further identifies which ORUs may require additional spares to extend the life of the ISS. The resulting probability is dependent upon hardware reliability estimates. However, the ISS hardware fleet carries considerable epistemic uncertainty (uncertainty in the knowledge of the true hardware failure rate), which does not currently factor into the annual sparing analysis. The existing confidence targets may be conservative. This paper will also discuss how confidence targets may be relaxed based on the inclusion of epistemic uncertainty for each ORU. The paper will conclude with strengths and limitations for implementing the analytical approach in sustaining the ISS through end of life, 2020 and beyond.

Anderson, Leif↗

Investigation of the Use of Dynamic Probabilistic Risk Assessment Methodologies for Identifying Digital I&C System Common Cause Failures

Digital Instrumentation and Control (I&C) systems have a key role in nuclear power plants in the upgrade of aging analog systems. Digital systems improve plant safety and reliability through features such as increased hardware reliability and stability and improved failure detection capability. There is no consensus on which of the current probabilistic risk assessment methods are most suitable for use in the reliability analysis of digital I&C systems. While the traditional event-tree/fault-tree (ET/FT) approach is still used for their reliability modeling, there are concerns regarding this approach in properly accounting for dynamic interactions among system components since potentially significant dependencies among failure events may not be identified and/or their likelihood may not be properly quantified. Dynamic methodologies are expected to provide a much more accurate representation of probabilistic evolution of the I&C systems in time due to their capability to more properly account for complex interactions than the static approach. The applicability of dynamic PRA methodologies for digital I&C system is investigated using the criteria presented in the NUREG/CR-6901, and the comparisons made in NUREG/CR-6901 are updated in light of the latest studies. The Dynamic Event Tree (DET) approach has been identified as one of the top dynamic methods when evaluated against the requirements for the reliability modeling of digital I&C systems. The DET method is a strong candidate for integration into existing PRA studies, as it bears many similarities to the traditional ET approach. In this study, the DET approach has been applied to the Plant Protection System of the APR1400 design, and the results are compared to results from its available traditional ET/FT analysis. Possible approaches to evaluate and quantify the effects of common cause failures on system safety using dynamic methods are also examined.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Model Based Engineering for Software Assurance

NASA's successful development of next generation space vehicles, habitats, and robotic systems will require reliable hardware and software systems. The aim of this initiative is to develop modeling methodology and tools to support Model-Based Systems Engineering (MBSE) for software assurance and reliability analysis. This effort expands the Unified Modeling Language (UML) software design models to include fault data for the extraction of Failure Modes and Effects Criticality Analysis (FMECA) and Fault Tree Analysis (FTA) for software. We explored different modeling approaches to integrate the UML software design models with the Systems Modeling Language (SysML) system models to generate an integrated model and reliability tools that take into account software and hardware interfaces.The benefits of this concept directly affect the safety community with quick turnarounds to produce software assurance and reliability analysis artifacts and the ability to visualize failure effects, both hardware and software. The result is enhanced system design integrity and early identification of system risks. This initiative will enable software assurance activities early in the system design lifecycle, facilitating the discovery of design weaknesses and enhancing the capability to produce safe, hazard-free systems

Wang, Lui↗

Artemis Missions Probabilistic Risk Assessment (PRA) & Reliability Assessment Overview

To show how NASA’s Moon-to-Mars (M2M) program can use hardware reliability assessments and comprehensive Probabilistic Risk Assessments (PRAs) to estimate risk of future missions and manage risk via safety and mission success requirements from the top down, so that this risk can be balanced with other program metrics like cost and schedule. These PRAs and reliability assessments can be used during the concept, design, and operational phases of development. This presentation also provides some thoughts on how the NASA process can be utilized for a lunar surface power grid development.

PRA↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

A Robust, Low-Cost Virtual Archive for Science Data

Despite their expense tape silos are still often the only affordable option for petabytescale science data archives, particularly when other factors such as data reliability, floor space, power and cooling load are accounted for. However, the complexity, management software, hardware reliability and access latency of tape silos make online data storage ever more attractive. Drastic reductions in low-cost mass-market PC disk drivers help to make this more affordable (approx. 1$/GB), but are challenging to scale to the petabyte range and of questionable reliability for archival use, On the other hand, if much of the science archive could be "virtualized", i.e., produced on demand when requested by users, we would need store only a fraction of the data online, perhaps bringing an online-only system into in affordable range. Radiance data from the satellite-borne Moderate Resolution Imaging Spectroradiometer (MODIS) instrument provides a good opportunity for such a virtual archive: the raw data amount to 140 GB/day, but these are small relative to the 550 GB/day making up the radiance products. These data are routinely processed as inputs for geophysical parameter products and then archived on tape at the Goddard Earth Sciences Distributed Active Archive (GES DAAC) for distributing to users. Virtualizing them would be an immediate and signifcant reduction in the amount of data being stored in the tape archives and provide more customizable products. A prototype of such a virtual archive is being developed to prove the concept and develop ways of incorporating the robustness that a science data archive requires.

Lynnes, Christopher↗

Project Longshot: A mission to Alpha Centauri

Project Longshot, an exercise in the Advanced Design Program for Space, had as its destination Alpha Centauri, the closest star system to our own solar system. Alpha Centauri, a trinary star system, is 4.34 light years from earth. Although Project Longshot is impossible based on existing technologies, areas that require further investigation in order to make this feat possible are identified. Three areas where advances in technology are needed are propulsion, data processing for autonomous command and control functions, and reliability. Propulsion, possibly by antimatter annihilation; navigation and navigation aids; reliable hardware and instruments; artificial intelligence to eliminate the need for command telemetry; laser communication; and a reliable, compact, and lightweight power system that converts energy efficiently and reliably present major challenges. Project Longshot promises exciting advances in science and technology and new information concerning the universe.

West, Curtis↗

Rocket engine propulsion 'system reliability'

A system reliability approach is discussed which is based on a quantitative assessment of both the engine system and hardware reliability during the design process. The approach makes it possible to evaluate design trades as the design matures. It is concluded that the system reliability assessment approach offers the following benefits. The uncertainty of each design variable is explicitly considered in the analysis process. The most significant design variables are ranked in order of their effect on reliability. Design trades can be assessed for reliability impact. It is concluded that the approach facilitates communication between disciplines and thus aids in concurrent engineering.

O'Hara, K. J.↗