Search NASA⌕ Search

SEARCH · Search NASA

Results for “infrastructure planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Integrated Facilities and Infrastructure Plan.

Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continued to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.

99 GENERAL AND MISCELLANEOUS↗

Geospatial Framework for Estimating Household Electricity Demand for Urban Infrastructure Planning in Select African Countries

Power infrastructure planning in Sub-Saharan Africa requires accurate power demand estimates. However, these estimates are lacking in most countries which compounds the effects of unreliable electricity supply. This study utilizes a methodology that was used to forecast power demand in Uganda and extends it to other African countries of interest; Kenya, Nigeria, and South Africa. The goal of the study is to create spatial power demand maps that can be used for power infrastructure planning. The proposed approach utilizes a global population database at a fine resolution of 1 km2 as the foundational input data. The analysis indicates a deficit of about 22,630 MW (South Africa), 20,213 MW (Nigeria), 4,153 MW (Kenya), and 2,508 MW (Uganda) compared to the current installed capacity to meet the highest power demand scenario.

Kotikot, Susan M.↗

Optimizing dynamic wireless charging for electric buses: A data-driven approach to infrastructure planning

The network configuration significantly impacts the performance of dynamic wireless charging (DWC) technology for electric buses. Here, this study presents a novel approach to planning charging infrastructure for public transit using data-driven nonconvex mixed-integer optimization. Integrating DWC and charging station technologies reveals a trade-off between enroute and stationary charging times. Our framework optimizes bus frequency settings and transmitter coil arrangements to minimize operational and infrastructure costs. A case study in Chattanooga, Tennessee, demonstrates the method's effectiveness in mitigating range anxiety and reducing charging expenses. This research implies that integrating DWC technology into public transit systems can enhance the feasibility and cost-effectiveness of electric bus operations, promoting sustainable urban mobility.

33 ADVANCED PROPULSION SYSTEMS↗

Evaluating the Implications of Climate Projections on Heat Hardiness Zones for Green Infrastructure Planning

Background: Green Infrastructure (GI) is widely being promoted as an adaptation strategy for urban flooding. Like urban flooding, tree species could be impacted by future climatic conditions. However, there have been limited studies on the implications of future climate on GI planning, mostly due to the lack of climate data at higher spatial resolutions. Objective: Here in this paper, we analyze the implications of climate projections on heat hardiness zones since this could impact the GI landscape in the coming years. This is an extension of our earlier work on evaluating impacts of climate projections on plant hardiness zones. Method: Using downscaled daily temperature data from ten Coupled Model Intercomparison Project Phase 5 (CMIP5) climate models for the historical (1980-2005) and projected (2025-2050) periods, we analyzed future heat hardiness zones in the watershed bounding Knox County, TN. We analyzed the implications of these outputs for the current list of suggested native and non-native tree species selected for GI in the study area. Results: All the models suggest that a considerable part of the study area will move into the next warmer heat zone. While most trees remain suitable for GI, several are at the limit of their ideal heat zones. Conclusion: The insights from this study will help to guide the selection and placement of GI across the study area. Specifically, it should help green infrastructure planners design better mitigation and adaptation strategies to achieve higher returns on investments as more cities are now investing in GI projects.

54 ENVIRONMENTAL SCIENCES↗

Environmental screening tools for assessment of infrastructure plans based on biodiversity preservation and global warming (PEIT, Spain)

Most Strategic Environmental Assessment (SEA) research has been concerned with SEA as a procedure, and there have been relatively few developments and tests of analytical methodologies. The first stage of the SEA is the 'screening', which is the process whereby a decision is taken on whether or not SEA is required for a particular programme or plan. The effectiveness of screening and SEA procedures will depend on how well the assessment fits into the planning from the early stages of the decision-making process. However, it is difficult to prepare the environmental screening for an infrastructure plan involving a whole country. To be useful, such methodologies must be fast and simple. We have developed two screening tools which would make it possible to estimate promptly the overall impact an infrastructure plan might have on biodiversity and global warming for a whole country, in order to generate planning alternatives, and to determine whether or not SEA is required for a particular infrastructure plan.

54 ENVIRONMENTAL SCIENCES↗

5-year Infrastructure plan at FNAL

Fermilab's 5-year infrastructure plan aims to create a sustainable, safe, and long-lasting pavement network by prioritizing lower-rated pavements first for regular maintenance. FNAL should address the most distressed areas promptly, to extend sitewide pavement longevity and reduce overall maintenance costs. This approach compounds improvements by freeing future year’s capital for more routine pavement maintenance. This allows greater surface areas to be addressed each year, until a sustainable cycle can be achieved. The continually improvements enhance safety, benefit employees, visitors, and equipment transportation while aligning with Fermilab's commitment to environmental responsibility.

Washington, Davion↗

SEA monitoring in Swedish regional transport infrastructure plans - Improvement opportunities identified in practical experience

Strategic Environmental Assessment (SEA) requires monitoring in order to identify unforeseen adverse effects and to enable appropriate remedial action to be taken. Guidelines on how to monitor significant environmental impacts have been developed but experience from practice is limited. This paper presents a study of environmental monitoring in Swedish regional transport infrastructure planning. The result shows that essentially no environmental monitoring is currently performed. Monitoring of the plans merely involves checking the implementation of projects and performing an economic account. At present, a new planning period has commenced for the regional transport infrastructure plans. To obtain an iterative SEA process for the new plan with integrated SEA monitoring, the following means are suggested: reinforcement of practitioners' incentives to plan and perform monitoring; integration of monitoring in the SEA process; pre-determined impact thresholds that prompt remedial action; and more efficient use of monitoring results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated charging infrastructure planning and charging scheduling for battery electric bus systems

We report studies on the electric bus system planning problem have typically focused exclusively on either the deployment of charging infrastructure or the scheduling of charging events; few have examined the impact of charging facility deployment on charging activities. Considering the interdependence of system design and operational strategies, this study proposes a two-phase optimization framework for charging infrastructure planning and charging scheduling for battery electric bus systems. An integrated optimization model is first developed to simultaneously optimize charger deployment, on-board battery capacity, and charging schedules. A charging scheduling model is further proposed and a rolling horizon approach is utilized in the second phase to optimize the real-time charging scheduling of electric buses. Compared to existing electric bus system planning methods, the proposed integrated model can reduce the total system cost by 19.5%. In addition, compared to uncontrolled charging, the proposed rolling horizon-based charging strategy can reduce the total charging cost by 68.3%.

25 ENERGY STORAGE↗

Lafayette, Colorado: Using Energy Data for Electric Vehicle Infrastructure Planning (City Energy: From Data to Decisions)

This fact sheet "Lafayette, Colorado: Using Energy Data for Electric Vehicle Infrastructure Planning" explains how the City of Lafayette used data from the U.S. Department of Energy's Cities Leading through Energy Analysis and Planning (Cities-LEAP) and the State and Local Energy Data (SLED) programs to inform its city energy planning. It is one of ten fact sheets in the "City Energy: From Data to Decisions" series.

Alternative↗

Scalable Truck Charging Demand Simulation for Cost-Optimized Infrastructure Planning

This project developed a scalable, high-resolution model to simulate medium- and heavy-duty (MHD) electric truck charging demand and assess its impact on grid infrastructure. Using generative modeling, simulation, and cost optimization, the project delivered an end-to-end software pipeline and a library of 96 real-world scenarios for the Dallas–Houston megaregion. We demonstrated a modular architecture for transportation and grid modeling, implemented cost-optimized infrastructure planning methods, and quantified grid capital, operational, and environmental costs across a wide range of truck electrification scenarios. The results have been adopted by major utility stakeholders and contributed to regional planning efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Exploring impacts of electricity tariff on charging infrastructure planning: An activity-based approach

In the past decade, electric vehicles (EVs) have gained popularity for their efficiency and environmental benefits. Advances in battery technology and charging equipment have yielded long-range EVs and fast-charging. However, many major cities lack adequate charging infrastructure for daily EV use. This study addresses this gap by integrating activity-based modeling, charging behavior simulation, and charging infrastructure optimization. The research utilizes the POLARIS agent-based transportation model to accurately capture user activities, trip patterns, and traffic flows. Additionally, the study investigates the impact of fixed and spatiotemporal electricity rate distributions on optimal charging infrastructure deployment. The framework is applied to the Chicago regional area network and analyzed under various EV ownership scenarios. Further, the results reveal significant impacts of the charging pricing strategy on user decision-making and charging demand distribution. There is also a need for consistent pricing policies in charging infrastructure planning and operational phases to avoid drops in service quality.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Quantitative approaches for including equity in risk and resilience infrastructure planning analyses

Risk and resilience assessments for critical infrastructure focus on myriad objectives, from natural hazard evaluations to optimizing investments. Although research has started to characterize externalities associated with current or possible future states, incorporation of equity priorities at project inception is increasingly being recognized as critical for planning related activities. However, there is no standard methodology that guides development of equity-informed quantitative approaches for infrastructure planning activities. Here, to address this gap, we introduce a logic model that can be tailored to capture nuances about specific geographies and community priorities, effectively incorporating them into different mathematical approaches for quantitative risk assessments. Specifically, the logic model uses a graded, iterative approach to clarify specific equity objectives as well as inform the development of equations being used to support analysis. We demonstrate the utility of this framework using case studies spanning aviation fuel, produced water, and microgrid electricity infrastructures. For each case study, the use of the logic model helps clarify the ways that local priorities and infrastructure needs are used to drive the types of data and quantitative methodologies used in the respective analyses. The explicit consideration of methodological limitations (e.g., data mismatches) and stakeholder engagements serves to increase the transparency of the associated findings as well as effectively integrate community nuances (e.g., ownership of assets) into infrastructure assessments. Such integration will become increasingly important to ensure that planning activities (which occur throughout the lifecycle of the infrastructure projects) lead to long-lasting solutions to meet both energy and sustainable development goals for communities.

community-based↗

SNL Five-Year Facilities & Infrastructure Plan FY2015-2019

Sandia’s development vision is to provide an agile, flexible, safer, more secure, and efficient enterprise that leverages the scientific and technical capabilities of the workforce and supports national security requirements in multiple areas. Sandia’s Five-Year Facilities & Infrastructure Planning program represents a tool to budget and prioritize immediate and short-term actions from indirect funding sources in light of the bigger picture of proposed investments from direct-funded, Work for Others and other funding sources. As a complementary F&I investment program, Sandia’s indirect investment program supports incremental achievement of the development vision within a constrained resource environment.

99 GENERAL AND MISCELLANEOUS↗

High-resolution climate model datasets for energy infrastructure planning in a renewable-dependent future

Electrification and renewables deployment efforts are amplifying the interdependence of the climate and energy systems. Increases in climate model resolution, which is now approaching that of reanalysis datasets and operational weather forecast models, present a unique opportunity to use future climate projections for energy infrastructure planning. In this Perspective, we review recent developments in high-resolution climate modeling, which have been driven by increased computing power and advanced software tools. We then look ahead to discuss how high-resolution climate data can be used to plan for a renewable-dependent future, and envision a unified climate-energy model framework that captures the two-way feedbacks between these interdependent systems.

climate change↗

The PHEV Charging Infrastructure Planning (PCIP) Problem

Increasing debates over a gasoline independent future and the reduction of greenhouse gas (GHG) emissions has led to a surge in plug-in hybrid electric vehicles (PHEVs) being developed around the world. The majority of PHEV related research has been directed at improving engine and battery operations, studying future PHEV impacts on the grid, and projecting future PHEV charging infrastructure requirements. Due to the limited all-electric range of PHEVs, a daytime PHEV charging infrastructure will be required for most PHEV daily usage. In this paper, for the first time, we present a mixed integer mathematical programming model to solve the PHEV charging infrastructure planning (PCIP) problem for organizations with thousands of people working within a defined geographic location and parking lots well suited to charging station installations. Our case study, based on the Oak Ridge National Laboratory (ORNL) campus, produced encouraging results, indicates the viability of the modeling approach and substantiates the importance of considering both employee convenience and appropriate grid connections in the PCIP problem.

02 PETROLEUM↗

Best Practices Utilized by The EV Project for Non-Residential Alternating Current Level 2 ?Electric Vehicle Supply Equipment Infrastructure Planning

The lack of public charging infrastructure for plug-in electric vehicles (PEVs) has been identified as a barrier to their widespread adoption. Federal and state grants have been awarded to promote public charging and encourage retail businesses to install charging infrastructure. A common question for charger installations is, “Where should the chargers be placed?” One of the objectives of the EV Project was to study the interaction of PEV drivers with the public infrastructure, so The EV Project attempted to develop a method to determine where EVSE should be placed. In the early stages of PEV sales in local markets, the options for siting publicly accessible EVSE were: • Plan locations associated with key attraction sites where PEV parking is anticipated • Directly solicit retail and public charging hosts for widespread placement • Ask the PEV drivers who were early adopters where they want public infrastructure • Identify sites near known high traffic areas

33 ADVANCED PROPULSION SYSTEMS↗

Climate-aware decision-making: lessons for electric grid infrastructure planning and operations

Abstract Climate change poses significant risks to large-scale infrastructure systems and brings considerable uncertainties that challenge historical planning approaches. Here we focus on how climate awareness might be better incorporated into planning and decision-making in the electric power sector. To do so, we consider lessons from decision science literature where researchers have specifically focused on how to make better decisions under uncertainty. We perform a three-part review: of decision science literature on best practices for decision-making under uncertainty, of industry practice documents to understand how new uncertainties may affect the types of decisions electric utilities are making today, and of literature on electricity sector planning under climate change to assess how lessons from decision science might fit into sector-specific analyses. We discuss how characterizations of uncertainty from the decision science literature might guide approaches in the electricity sector to appropriately capture climate-related uncertainties. We also distill three key ideas from the decision science literature that can be incorporated into electricity sector planning to manage these new uncertainties: robustness, adaptive planning, and multi-stakeholder engagement. We offer example recommendations for how these key ideas might be incorporated into one essential type of planning activity, capacity expansion.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated U.S. nationwide corridor charging infrastructure planning for mass electrification of inter-city trips

This study introduces an integrated modeling framework to evaluate long-term national corridor charging infrastructure requirements in the United States to support the growing inter-city charging demand with the rapid growth in the battery electric vehicle (BEV) market. The core model is an optimization model that considers spatial and temporal dimensions and models heterogeneous behaviors between travelers. The model also introduces the travelers’ inconvenience cost function by linking travelers’ acceptance of the charging infrastructure with exogenous technology and social factors. The inconvenience cost function simulates mode choice between BEVs and alternative modes by heterogenous travelers. We applied the framework to assess the inter-regional charging infrastructure requirements for the entire U.S. mainland interstate highway network. We evaluated impacts on the infrastructure design and its public acceptance with changes in policy, technology, and demographic characteristics, and we also quantified the importance of modeling full-scale inter-regional charging infrastructure requirements compared to the conventional regional level analyses.

24 POWER TRANSMISSION AND DISTRIBUTION↗