Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated planning and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Data-driven optimization of mixed-integer bi-level multi-follower integrated planning and scheduling problems under demand uncertainty

The coordination of interconnected elements across the different layers of the supply chain is essential for all industrial processes and the key to optimal decision-making. Yet, the modeling and optimization of such interdependent systems are still burdensome. Here we address the simultaneous modeling and optimization of medium-term planning and short-term scheduling problems under demand uncertainty using mixed-integer bi-level multi-follower programming and data-driven optimization. Bi-level multi-follower programs model the natural hierarchy between different layers of supply chain management holistically, while scenario analysis and data-driven optimization allow us to retrieve the guaranteed feasible solutions of the integrated formulation under various demand considerations. We address the data-driven optimization of this challenging class of problems using the DOMINO framework, which was initially developed to solve single-leader single-follower bi-level optimization problems to guaranteed feasibility. This framework is extended to solve single-leader multi-follower stochastic formulations and its performance is characterized by well-known single and multi-product process scheduling case studies. Through our data-driven algorithmic approach, we present guaranteed feasible solutions to linear and nonlinear mixed-integer bi-level formulations of simultaneous planning and scheduling problems and further characterize the effects of the scheduling level complexity on the solution performance, which spans over several hundred continuous and binary variables, and thousands of constraints.

42 ENGINEERING↗

Integrated charging infrastructure planning and charging scheduling for battery electric bus systems

We report studies on the electric bus system planning problem have typically focused exclusively on either the deployment of charging infrastructure or the scheduling of charging events; few have examined the impact of charging facility deployment on charging activities. Considering the interdependence of system design and operational strategies, this study proposes a two-phase optimization framework for charging infrastructure planning and charging scheduling for battery electric bus systems. An integrated optimization model is first developed to simultaneously optimize charger deployment, on-board battery capacity, and charging schedules. A charging scheduling model is further proposed and a rolling horizon approach is utilized in the second phase to optimize the real-time charging scheduling of electric buses. Compared to existing electric bus system planning methods, the proposed integrated model can reduce the total system cost by 19.5%. In addition, compared to uncontrolled charging, the proposed rolling horizon-based charging strategy can reduce the total charging cost by 68.3%.

25 ENERGY STORAGE↗

Integrating tactical planning, operational planning and scheduling using data-driven feasibility analysis

Supply chain operations and scheduling are well-studied problems in the literature. Although these problems are related, they are often solved sequentially. This uncoordinated approach usually leads to sub-optimal solutions. Here this paper proposes a methodology for integrating scheduling operations into the supply chain network, motivated by the available enterprise data, and feasibility analysis. Existing literature on integrated models for addressing the supply chain is reviewed and classified. Then the mathematical model formulation for each level is discussed, after which the proposed data-driven integrated framework is described. The methodology is tested on two different case studies of varying dimensions. For each case study, the solution solves a multi-objective problem with the overall aim of an optimal solution that is robust towards achieving optimal cost while keeping customer satisfaction in mind.

42 ENGINEERING↗

Graph-Based Modeling and Decomposition of Hierarchical Optimization Problems

We present a graph-theoretic modeling approach for hierarchical optimization that leverages the OptiGraph abstraction implemented in the Julia package Plasmo.jl. We show that the abstraction is flexible and can effectively capture complex hierarchical connectivity that arises from decision-making over multiple spatial and temporal scales (e.g., integration of planning, scheduling, and operations in manufacturing and infrastructures). We also show that the graph abstraction facilitates the conceptualization and implementation of decomposition and approximation schemes. Specifically, we propose a graph-based Benders decomposition (gBD) framework that enables the exploitation of hierarchical (nested) structures and that uses graph aggregation/partitioning procedures to discover such structures. In addition, we provide a Julia implementation of gBD, which we call PlasmoBenders.jl. We illustrate the capabilities using examples arising in the context of energy and power systems.

97 MATHEMATICS AND COMPUTING↗

Perspectives on future research directions in green manufacturing for discrete products

With the increasing concern due to climate change caused by a higher atmospheric concentration of CO 2 and other greenhouse gases, reducing environmental impact is becoming more important for every part of society. Manufacturing is responsible for a significant amount of energy/material consumption and environmental burden and, therefore, has a great opportunity to reduce its impact through green manufacturing. Green manufacturing presents opportunities across the manufacturing enterprise to increase the efficient usage of energy and material resources. These opportunities include designing products to consume fewer materials and energy during manufacturing and use, incorporating more efficient manufacturing processes, streamlining and optimizing manufacturing schedules and plans, and circularizing products. The goal of this paper will be to provide a perspective from the authors on the opportunities that exist within green manufacturing for discrete products through a review of pertinent topics and future directions. The paper will focus on processes, manufacturing equipment, manufacturing systems, recovering value at a product’s end-of-life, and additional thoughts that include metrics and indicators, techno-economic assessment, and a discussion of efficiency and effectiveness. Key findings from this review include a need for social indicators and renewable energy considerations in scheduling and process planning, integrating Industry 4.0 into circular economy along with social and institutional dimensions, consistency in the ability to measure and conceptualize metrics and indicators, a detailed evaluation of the life cycle impacts and cost of Addit Manuf, and more human and environment-oriented considerations for smart manufacturing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Production Agency Quality Assurance Management Execution Strategy [Thesis]

There are multiple federal directives that Los Alamos National Laboratory (LANL) must follow for the proper implementation of quality assurance, strategic planning, and execution of manufacturing and surveillance operations. Recent assessments identified that manufacturing in all processing areas is dynamic due to influencing scope changes, design modifications, funding adjustments, and staff attrition. In response, this project was started to develop a comprehensive PAQ execution strategy to support the success of LANL’s manufacturing mission. This project’s method for developing an updated architecture was to create an integrated, flexible, reliable, and agile strategic process. The execution plan has five deliverables: 1) an integrated schedule view of PAQ work scope, 2) a resource management plan that aligns with the required scope, 3) a metrics monitoring dashboard, 4) a project management plan for sustaining NAP 401.1A implementation, and 5) a risk management plan. The research design is a mixed-method approach focused on data collection for each deliverable. The methodology entails qualitative and quantitative research, metrics monitoring, data analysis, and the creation of a dashboard. The qualitative methods used include literature reviews and interviews. The quantitative methods include resource, financial, schedule and survey data analysis. Preliminary and final results were peer reviewed by subject matter experts both within the ALDWP organization and deployed support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Winning Asset Management Improvement Team: Maintenance Planning and Scheduling in a Highly Regulated Environment

The Y-12 National Complex (Y-12) site has numerous aging facilities that are crucial to the Department of Energy and the national security strategy for the nation. Y-12’s commitment to safety and regulatory compliance is of the highest importance. The commitment to meet the national security mission also creates additional rigor and complexity to the everyday maintenance and planning process. Y-12 is a collection of many facilities, both old and new, nestled between two ridges in Oak Ridge, TN. Y-12 was made with the short-term focus of ending “The Great War” through the creation of the worlds’ first atomic bomb. Almost eighty (80) years have passed since the groundbreaking, with the mission of the site changing from decade to decade. While the mission has changed, the way Y-12 employees continuously meet the challenge has not. The site was created to react and overcome; Y-12 still takes pride in the ability to react and overcome. The difference is the site is no longer ignorant to the need for a better way to manage the aging facilities and infrastructure. Shear willpower and determination was once the way to reach the objectives, but as a wise man once said, “Work smarter, not harder.” The business case for change started within the senior leadership at Y-12. A team of managers sat down and dictated objectives to provide a clear scope for the maintenance planning and scheduling optimization team, to include our Eruditio integrated blended learning coaches. In addition to providing the direction, they also made themselves available for escalation of issues in the event the team ran in to road blocks.

99 GENERAL AND MISCELLANEOUS↗

In-Kind Contributions: The PIP-II Project at Fermilab

The Proton Improvement Plan II (PIP-II) Project is the first U.S. accelerator project that has significant contributions from international partners. A project management framework was created to fully integrate and make consistent across all partners the design, development, and delivery of In-Kind Contributions (IKC) into PIP-II. This framework consists of planning documentation, procedures, and communication and assessment processes to control schedule, risk, quality, and technical integration over the lifetime of the project. The purpose of this paper is to present the PIP-II IKC model put in place to properly integrate the IKC deliverables into the PIP-II Linac and share experience and lessons learned from its early implementation.

43 PARTICLE ACCELERATORS↗

Developing a Reduced 240-Bus WECC Dynamic Model for Frequency Response Study of High Renewable Integration

The ongoing changes in the generation resource mix, driven by the rapid adoption of inverter-based resources (IBR) as well as the early retirement of synchronous generators, are bringing new challenges to the planning and operation of bulk electric power systems. Consequently, there is an increasing need to understand, design, and quantify the reliability service provision from IBRs by performing integrated scheduling and dynamic simulations. However, test systems that have consistent scheduling and dynamic models rarely exist largely because of the decoupled nature of the two simulations on a synchronous generator-dominated system. This paper develops the dynamic model of a reduced Western Electricity Coordinating Council (WECC) system. In conjunction with the existing scheduling model, it is suitable for integrating scheduling and dynamic simulations. The reduced 240-bus WECC model reflects the generation resource mix of the Western Interconnection as of 2018. Moreover, the developed dynamic model is validated against field frequency events measured by FNET/GridEye and preserves the dominant inter-area oscillation mode in WECC.

dynamic simulation↗

Towards Net Zero: Modeling Approach to the Right-Sized Facilities

As the concentration of greenhouse gases (GHGs) in the atmosphere increases, the concerns about carbon emissions are growing. Several net-zero initiatives are taking place around the globe to achieve a balance between the GHGs put into the atmosphere and those taken out. While most efforts present a sectorized approach, this paper describes the importance of integrating information across different sectors for effective modeling of carbon emissions and holistic reduction opportunity analysis. Using the Idaho National Laboratory (INL) campus as a test case, this work provides a web-based tool for INL stakeholders to use when engaging in strategic planning to achieve carbon emissions reduction. This net-zero engineering support tool (NEST) uses historical data as foundational information for applying the modeling framework. Prediction of CO 2 emissions throughout project completion integrates various approaches and schedules aimed at energy conservation, fleet decarbonization, and other GHG reduction activities. Using NEST, stakeholders can visualize carbon emissions, electricity consumption, and costs for decision making when planning the pathway for reaching carbon net zero. The INL’s initiative to transition into an EV fleet was used to demonstrate the developed framework and the advantages of using NEST. It was shown that electrifying different fossil-fueled campus vehicles before 2030 with aggressive replacement schedules require high annual capital expenditure (CAPEX), which may not be available. The tool allows decision makers to test different replacement schedules and prioritize those that yield CAPEX below a certain threshold while meeting target milestones. While the demonstration focused on vehicle electrification, the developed framework lays the foundation for further quantitative analysis of other GHG reduction activities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2022 FORCE Development Status Update

Integrated energy systems (IESs) are essential for decarbonizing electricity and industrial sectors and fully exploiting these systems requires sophisticated planning, scheduling, and dispatching tools to maximize their socio-economic benefits. The Framework for Optimization of Resources and Economics (FORCE) is a tool suite developed at Idaho National Laboratory and is dedicated to making robust analyses of IESs easier for analysts and researchers. The report summarizes the improvements and updates to FORCE during the most recent development cycle. Particularly, we demonstrate improvements to user accessibility, stochastic time-series analysis, and vertical integration with the software tools provided in FORCE.

97 MATHEMATICS AND COMPUTING↗

Multi-Timescale Integrated Dynamics and Scheduling for Solar (MIDAS-Solar) (Final Technical Report)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)

100% Renewables↗

Final Report for ARPA-E LOCOMOTIVES Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) Project

The Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) is a unique, fully integrated, open-source software tool used to evaluate strategies for cost-effectively deploying advanced locomotive technologies and associated infrastructure. ALTRIOS simulates freight-demand-driven train scheduling, mainline meet-pass planning, locomotive dynamics, train dynamics, energy conversion efficiencies, and energy storage dynamics of line-haul train operations. Because new locomotives represent a significant long-term capital investment and new technologies must be thoroughly demonstrated before deployment, this tool provides guidance on the risk/reward trade-offs and operation integration of different technology rollout strategies. An open, integrated simulation tool is valuable for identifying future research needs and making decisions on technology development, routes, and train selection. This final report details the ALTRIOS software architecture, major modules and components, and data validation process. It demonstrates the software's utility through a 30-year rollout case study targeting high penetration of advanced powertrain technologies by 2050 for two BNSF Railway routes: loaded taconite ore trains from Hibbing, Minnesota, to Superior, Wisconsin, and mixed-freight trains from Superior to Minneapolis, Minnesota.

33 ADVANCED PROPULSION SYSTEMS↗

Release a public version of HERON (HERON 2.0) with improved algorithms for the treatment of energy storage

Integrated energy systems (IESs) are essential for decarbonizing electricity and industrial sectors and fully exploiting these systems requires sophisticated planning, scheduling, and dispatching tools to maximize their socio-economic benefits. The Holistic Energy Resource Optimization Network (HERON) is a generic software plugin for the Risk Analysis Virtual Environment (RAVEN) to perform stochastic technoeconomic analysis of IES with economic drivers. This report summarizes the updates made to HERON 2.0. Particularly, we demonstrate one of the added features, Function-based Control Mechanics, by comparing a price-based dispatch strategy with the original perfect foresight baselines. Our case studies successfully demonstrate that the model is capable to incorporate artificial control algorithm into the dispatch of IES components. In addition, our results from the price-based strategy indicate that the control strategies of IES components are key to the economic and temporal performance of our model; therefore, more sophisticated dispatch strategies are required to improve the model performance.

25 ENERGY STORAGE↗

ALTRIOS - Advanced Locomotive Technology and Rail Infrastructure Optimization System

The Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) is a unique, fully integrated, open-source software tool to evaluate strategies for deploying advanced locomotive technologies and associated infrastructure for cost-effective decarbonization. ALTRIOS simulates energy conversion and storage dynamics, locomotive and train dynamics, meet-pass planning (detailed train timetabling), and freight-demand-driven train scheduling in a Pareto optimization. Because new locomotives represent a significant long-term capital investment and new technologies must be thoroughly demonstrated before deployment, this tool provides guidance on the risk/reward tradeoffs of different technology rollout strategies. An open, integrated simulation tool will be invaluable for identifying future research needs and making decisions on technology development, routes, and train selection. ALTRIOS development is a collaboration between NREL, the University of Illinois Urbana-Champaign (UIUC) RailTEC, Southwest Research Institute (SwRI), and BNSF.

ADVANCED PROPULSION SYSTEMS,MATHEMATICS AND COMPUT↗

ALTRIOS (Advanced Locomotive Technology and Rail Infrastructure Optimization System) [SWR-22-54]

The Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) is a unique, fully integrated, open-source software tool to evaluate strategies for deploying advanced locomotive technologies and associated infrastructure for cost-effective decarbonization. ALTRIOS simulates freight-demand driven train scheduling, mainline meet-pass planning, locomotive dynamics, train dynamics, energy conversion efficiencies, and energy storage dynamics of line-haul train operations. Because new locomotives represent a significant long-term capital investment and new technologies must be thoroughly demonstrated before deployment, this tool provides guidance on the risk/reward tradeoffs of different technology rollout strategies. An open, integrated simulation tool is invaluable for identifying future research needs and making decisions on technology development, routes, and train selection. ALTRIOS was developed as part of a collaborative effort by a team comprising the National Renewable Energy Laboratory (NREL), University of Illinois Urbana-Champaign (UIUC), Southwest Research Institute (SwRI), and BNSF Railway. Python Package: https://pypi.org/project/altrios/ Rust Crate: https://crates.io/crates/altrios-core

Baker, Chad↗

Grid-Enhanced, Mobility-Integrated Network Infrastructures for Extreme Fast Charging (GEMINI-XFC)

GEMINI-XFC will use first-of-a-kind integrated high-fidelity grid and transport modeling to identify effective pathways for widespread electrification, to design and evaluate integrated vehicle-grid control schemes, and to optimize electric vehicle integration at a full regional scale with individual customer resolution. Control variables will include: Charging station design and planning (where and what kind of charging stations); EV route scheduling considering grid "status"; and Dispatch of behind-the-meter energy storage and legacy voltage control actuators (on-load tap changes, voltage regulators, capacitors).

DIRECT ENERGY CONVERSION,POWER TRANSMISSION AND DI↗

Floating Offshore Wind US Manufacturing and Commercialization (CRADA Final Report)

Create a detailed manufacturing, assembly, load-out, transportation, upending, turbine integration, and offshore transportation plan for a hypothetical project in one of the California lease areas off the central coast. Develop a detailed schedule and cost estimation for each step of the process and compare with conventional floating platform designs.

17 WIND ENERGY↗