Search NASA⌕ Search

SEARCH · Search NASA

Results for “landing site selection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Mars Exploration Rover Landing Site Selection

Selection of the landing sites for the Mars Exploration Rovers has involved over 2 years of research and analysis effort that has included the participation of broad sections of the planetary sciences community through a series of open landing site workshops. The effort has included the definition of the engineering constraints based on the landing system, mapping those engineering constraints into acceptable regions and prospective sites, the acquisition of new information from Mars Global Surveyor and Mars Odyssey orbiters, the evaluation of science and safety criteria for the sites, and the downselection and final site selection based on the sites science potential and safety. The final landing sites (Meridiani Planum and Gusev crater) were selected by NASA Headquarters on April 11, 2003, prior to launch in June. This paper presents engineering requirements, and potential landing sites for Mars Exploration Rovers.

M Golombek↗

Lunar Reconnaissance Orbiter Camera Observations Relating to Science and Landing Site Selection in South Pole-Aitken Basin for a Robotic Sample Return Mission

The Moon's South Pole-Aitken basin (SPA) is a high priority target for Solar System exploration, and sample return from SPA is a specific objective in NASA's New Frontiers program. Samples returned from SPA will improve our understanding of early lunar and Solar System events, mainly by placing firm timing constraints on SPA formation and the post-SPA late-heavy bombardment (LHB). Lunar Reconnaissance Orbiter Camera (LROC) images and topographic data, especially Narrow Angle Camera (NAC) scale (1-3 mpp) morphology and digital terrain model (DTM) data are critical for selecting landing sites and assessing landing hazards. Rock components in regolith at a given landing site should include (1) original SPA impact-melt rocks and breccia (to determine the age of the impact event and what materials were incorporated into the melt); (2) impact-melt rocks and breccia from large craters and basins (other than SPA) that represent the post-SPA LHB interval; (3) volcanic basalts derived from the sub-SPA mantle; and (4) older, "cryptomare" (ancient buried volcanics excavated by impact craters, to determine the volcanic history of SPA basin). All of these rock types are sought for sample return. The ancient SPA-derived impact-melt rocks and later-formed melt rocks are needed to determine chronology, and thus address questions of early Solar System dynamics, lunar history, and effects of giant impacts. Surface compositions from remote sensing are consistent with mixtures of SPA impactite and volcanic materials, and near infrared spectral data distinguish areas with variable volcanic contents vs. excavated SPA substrate. Estimating proportions of these rock types in the regolith requires knowledge of the surface deposits, evaluated via morphology, slopes, and terrain ruggedness. These data allow determination of mare-cryptomare-nonmare deposit interfaces in combination with compositional and mineralogical remote sensing to establish the types and relative proportions of materials expected at a given site. Remote sensing compositions, e.g., FeO, also constrain the relative abundances of components. Landing-site assessments use crater and boulder distributions, and slope and terrain rugge

Jolliff, B. L.↗

Concept Mapping as a Support for Mars Landing-Site Selection

The NASA Ames' Center for Mars Exploration (CMEX) serves to coordinate Mars programmatic research at ARC in the sciences, in information technology and in aero-assist and other technologies. Most recently, CMEX has been working with the Institute for Human and Machine Cognition at the University of West Florida to develop a new kind of web browser based on the application of concept maps. These Cmaps, which are demonstrably effective in science teaching, can be used to provide a new kind of information navigation tool that can make web or CD based information more meaningful and more easily navigable. CMEX expects that its 1999 CD-ROM will have this new user interface. CMEX is also engaged with the Mars Surveyor Project Office at JPL in developing an Internet-based source of materials to support the process of selecting landing sites for the next series of Mars landers. This activity -- identifying the most promising sites from which to return samples relevant to the search for evidence of life -- is one that is expected to engage the general public as well as the science community. To make the landing site data easily accessible and meaningful to the public, CMEX is planning to use the IHMC Cmap browser as its user interface.

Cabrol, Nathalie A.↗

Planetary Mapping for Landing Sites Selection: The Mars Case Study

The selection of a landing site on a planetary body is a multistep process that involves both the fulfillment of several engineering constraints and the accomplishment of scientific requirements. In this chapter, we will show how the simultaneous production and exploitation of different GIS maps depicting these criteria are pivotal in the landing site selection. Indeed, all of such constraints are presently evaluated through the use of GIS-based software. To show this, we will focus on the Martian site identification outline, providing multiple real examples taken from two ongoing study cases, i.e., the Simud Vallis landing site proposed by Pajola et al. (Icarus 268:355–381, 2016a) for the ESA ExoMars rover and the Eridania landing site proposed by Pajola et al. (Icarus 275:163–182, 2016b) for the NASA Mars 2020 landing site selection.

Planetary mapping↗

The Viking landing sites - Selection and certification

During the past several years the Viking project developed plans to use Viking orbiter instruments and earth-based radar to certify the suitability of the landing sites selected as the safest and most scientifically rewarding using Mariner 9 data. During June and July 1976, the earth-based radar and orbital spacecraft observations of some of the prime and backup sites were completed. The results of these combined observations indicated that the Viking 1 prime landing area in the Chryse region of Mars is geologically varied and possibly more hazardous than expected, and was not certifiable as a site for the Viking 1 landing. Consequently, the site certification effort had to be drastically modified and lengthened to search for a site that might be safe enough to attempt to land. The selected site considered at 47.5 deg W, 22.4 deg N represented a compromise between desirable characteristics observed with visual images and those inferred from earth-based radar. It lies in the Chryse region about 900 kilometers northwest of the original site.

Masursky, H.↗

Multi-Modal Active Perception for Autonomously Selecting Landing Sites on Icy Moons

Selecting suitable landing sites is fundamental to achieving many mission objectives in planetary robotic lander missions. However, due to sensing limitations, landing sites which are both safe and scientifically valuable often cannot be determined reliably from orbit, particularly, in icy moon missions where orbital sensing data is noisy and incomplete. This paper presents an active perception approach to Entry Descent and Landing (EDL) which enables the lander to autonomously plan informative descent trajectories, acquire high quality sensing data during descent and exploit this additional information to select higher utility landing sites. Our approach consists of two components: probabilistic modeling of landing site features and approximate trajectory planning using a sampling based planner. The proposed framework allows the lander to plan long horizons paths and remain robust to noisy data. Results in simulated environments show large performance improvements over alternative approaches and show promise that our approach has strong potential to improve science return of not only icy moon missions but EDL systems in general.

autonomy↗

A Bayesian Framework for Landing Site Selection During Autonomous Spacecraft Descent

The success of a landed space exploration mission depends largely on the final landing site. Factors influencing site selection include safety, fuel-consumption, and scientific return. This paper addresses the problem of selecting the best available landing site based on these factors in real-time during autonomous spacecraft descent onto a planetary surface. The problem is modeled probabilistically using Bayesian Networks (BNs). BNs provide a means of representing the causal relationships between variables that impact the quality of a landing site. The final landing site is determined via probabilistic reasoning based on terrain safety derived from on-board sensors, available fuel based on spacecraft descent dynamics, and regions of interest defined by mission scientists.

entry, descent, landing (EDL)↗

Landing Site Selection with a Variable-Resolution SLAM-Refined Map

In many scenarios it is desirable for planetary landers to select or modify their landing sites autonomously during descent. We present a landing site selection algorithm which is optimized to work in conjunction with a Simultaneous Localization and Mapping system. Our algorithm selects landing sites based on site slope, roughness, and operator-defined interest. In addition, we generate guidance commands and approximate fuel consumption for the highest ranked sites. We validate our algorithm with LiDAR and inertial data gathered by a vertical take-off and landing vehicle.

Chen, Po-Ting↗

Constraints, Approach, and Status of Mars Surveyor 2001 Landing Site Selection

There are many similarities between the Mars Surveyor '01 (MS '01) landing site selection process and that of Mars Pathfinder. The selection process includes two parallel activities in which engineers define and refine the capabilities of the spacecraft through design, testing and modeling and scientists define a set of landing site constraints based on the spacecraft design and landing scenario. As for Pathfinder, the safety of the site is without question the single most important factor, for the simple reason that failure to land safely yields no science and exposes the mission and program to considerable risk. The selection process must be thorough and defensible and capable of surviving multiple withering reviews similar to the Pathfinder decision. On Pathfinder, this was accomplished by attempting to understand the surface properties of sites using available remote sensing data sets and models based on them. Science objectives are factored into the selection process only after the safety of the site is validated. Finally, as for Pathfinder, the selection process is being done in an open environment with multiple opportunities for community involvement including open workshops, with education and outreach opportunities. Additional information is contained in the original extended abstract.

Golombek, M.↗

A perspective of landing-site selection

The problems that now confront Mars Pathfinder are much the same as those that confronted Viking, but more and better information exists today. Like Viking, Mars Pathfinder must select a landing site compatible with lander and rover designs as evidenced by available data (Viking images, radar and thermal observations, albedo and color observations, visible-infrared spectra, etc.). Most regions at low elevations probably contain favorable sites, but some sites at low elevations with weak quasispecular echoes and low thermal inertias may be unfavorable.

Moore, Henry J.↗

Broad Perspectives on Mars Landing Site Selection: Geological Factors from Centimeter to Kilometer Scales

Selection of a landing site for the '03 and later Mars surface missions represents a balance between potential science results and landing site safety. Although safety has to be the prime consideration, it is the melding together of spacecraft hazard analysis with science analysis that provides the key to understanding the nature of the surface for determining both its safety for landing and its scientific potential. Our goal here is to discuss the geological factors that go into a determination of site safety, at scales from centimeters up to kilometers, and to understand the implications for the resulting scientific return that can be expected.

Jakosky, B. M.↗

Atmospheric Constraints on Landing Site Selection

The Martian atmosphere is a significant part of the environment that the Mars Exploration Rovers (MER) will encounter. As such, it imposes important constraints on where the rovers can and cannot land. Unfortunately, as there are no meteorological instruments on the rovers, there is little atmospheric science that can be accomplished, and no scientific preference for landing sites. The atmosphere constrains landing site selection in two main areas, the entry descent and landing (EDL) process and the survivability of the rovers on the surface. EDL is influenced by the density profile and boundary layer winds (up to altitudes of 5 to 10 km). Surface survivability involves atmospheric dust, temperatures and winds. During EDL, the atmosphere is used to slow the lander down, both ballistically and on the parachute. This limits the maximum elevation of the landing site to -1.3 km below the MOLA reference aeroid. The landers need to encounter a sufficiently dense atmosphere to be able to stop, and the deeper the landing site, the more column integrated atmosphere the lander can pass through before reaching the surface. The current limit was determined both by a desire to be able to reach the hematite region and by a set of atmosphere models we developed for EDL simulations. These are based on Thermal Emission Spectrometer (TES) atmospheric profile measurements, Ames Mars General Circulation Model (MGCM) results, and the 1-D Ames GCM radiative/convective model by J. Murphy. The latter is used for the near surface diurnal cycle. The current version of our model encompasses representative latitude bands, but we intend to make specific models for the final candidate landing sites to insure that they fall within the general envelope. The second constraint imposed on potential landing sites through the EDL process is the near surface wind. The wind in the lower approximately 5 km determines the horizontal velocity that the landers have when they land. Due to the mechanics of the landing process, the total velocity (including both the horizontal and vertical components) determines whether or not the landers are successful. Unfortunately, the landing system has no easy way to nullify any horizontal velocity imparted by the wind, so the landing sites selected need to have as little wind as possible. In addition to the mean wind velocity, the landing system is sensitive to vertical wind shear in the lowest kilometer or so. Wind shear can deflect the retro rockets (RADs) from their nominal vertical orientation producing unwanted horizontal spacecraft velocities. Both mean velocity and wind shear are dominated by the the local topography and other surface properties (in particular albedo and thermal inertia which control the surface temperature). This is seen even in simplified 2-D mesoscale models. The effects in a fully 3-D model are expected to he even more topographically dependent. In particular there is potential for wind channeling in canyons and other terrain features. Boundary layer winds and wind shear are currently being modeled based on terrestrial data and boundary layer scaling laws modified for Martian conditions. We hope to supplement this with mesoscale model results (from several sources) once the number of landing sites is reduced to a manageable number.

Kass, David M.↗

Data-driven surface traversability analysis for Mars 2020 landing site selection

This paper is to describe the engineering challenges in the surface mobility of the Mars 2020 Rover mission that are considered in the landing site selection process, introduce new automated traversability analysis capabilities, and present the preliminary analysis results for top candidate landing sites.

Heverly, Matthew↗