A multi-stage stochastic programming model for adaptive biomass processing operation under uncertainty

Variations of physical and chemical characteristics of biomass reduce equipment utilization and increase operational costs of biomass processing. Biomass processing facilities use sensors to monitor the changes in biomass characteristics. Integrating sensory data into the operational decisions in biomass processing will increase its flexibility to the changing biomass conditions. In this paper, we propose a multi-stage stochastic programming model that minimizes the expected operational costs by identifying the initial inventory level and creating an operational decision policy for equipment speed settings. These policies take the sensory information data and the current biomass inventory level as inputs to dynamically adjust inventory levels and equipment settings according to the changes in the biomass' characteristics. We ensure that a prescribed target reactor utilization is consistently achieved by penalizing the violation of the target reactor feeding rate. A case study is developed using real-world data collected at Idaho National Laboratory's biomass processing facility. We show the value of multi-stage stochastic programming from an extensive computational experiment. Our sensitivity analysis indicates that updating the infeed rate of the system, the processing speed of equipment, and bale sequencing based on the moisture level of biomass improves the processing rate of the reactor and reduces operating costs.

09 BIOMASS FUELS↗

Multi-Stage Stochastic Programming to Joint Economic Dispatch for Energy and Reserve With Uncertain Renewable Energy

To address the uncertain renewable energy in the day-ahead optimal dispatch of energy and reserve, a multi-stage stochastic programming model is established in this paper to minimize the expected total costs. The uncertainties over the multiple stages are characterized by a scenario tree and the optimal dispatch scheme is cast as a decision tree which guarantees the flexibility to decide the reasonable outputs of generation and the adequate reserves accounting for different realizations of renewable energy. Most importantly, to deal with the “Curse of Dimensionality” of stochastic programming, stochastic dual dynamic programming (SDDP) is employed, which decomposes the original problem into several sub-problems according to the stages. Specifically, the SDDP algorithm performs forward pass and backward pass repeatedly until the convergence criterion is satisfied. At each iteration, the original problem is approximated by creating a linear piecewise function. Besides, an improved convergence criterion is adopted to narrow the optimization gaps. The results on the IEEE 118-bus system and real-life provincial power grid show the effectiveness of the proposed model and method.

economic dispatch↗

Multi-Period Active Distribution Network Planning Using Multi-Stage Stochastic Programming and Nested Decomposition by SDDIP

This paper presents a multi-period active distribution network planning (ADNP) with distributed generation (DG). The objective of the proposed ADNP is to minimize the total planning cost, subject to both investment and operation constraints. The paper proposes a multi-stage stochastic optimization model to address DG uncertainties over several periods, in which the decisions are made sequentially by only using the present-stage information. A nested decomposition method is proposed which applies the stochastic dual dynamic integer programming (SDDIP) method to address computational intractabilities of the proposed ADNP approach. The presented numerical results and discussions on a 33-bus distribution system and a large-scale 906-bus system verify the effectiveness of the proposed ADNP method and its solution method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Airport Infrastructure Planning Using Multi-Stage Stochastic Programming

The Athena project, funded by the Department of Energy, has worked to identify the critical infrastructure at Dallas Fort Worth (DFW) Airport which influences mobility between the airport and the surrounding city of Dallas. Using scalable methods that can leverage HPC resources we have developed a multi-stage stochastic infrastructure expansion model for determining parking and curb modifications to the DFW Airport over a 20-year horizon. Additionally, we have explored the impacts of congestion pricing in conjunction with infrastructure modifications. Our multi-stage stochastic model is implemented using the mpi-sppy software and solved in parallel using progressive hedging on the National Renewable Energy Laboratory's HPC system Eagle. In this talk we present results from solving this model at scale.

airport planning↗

A Multi-Stage Stochastic Risk Assessment With Markovian Representation of Renewable Power

Probabilistic forecasts provide a distribution of possible outputs and so can capture the uncertainty and variability of Variable Renewable Energy (VRE). However, taking advantage of uncertainty information has practical challenges that make it difficult to integrate probabilistic forecasting into control room decision-making. This paper proposes a novel use-case for probabilistic forecasts by incorporating them into the hour-ahead operations for situational awareness via a risk-averse multi-stage stochastic program. We employ a Markovian representation of the probabilistic forecasts that enables the formulation of the multi-stage problem and avoids a scenario generation phase. We test the model on a realistically sized system to assess risk and showcase the capability of using probabilistic renewable forecast as input to produce probabilistic output forecasts of future system states. The results show that the model can capture time consistency in the reserves and Area Control Error (ACE) forecast. The solution times are adequate for risk profiling in hour-ahead timescales.

forecasting↗

Scalable Energy System Expansion Under Uncertainty Using Multi-Stage Stochastic Optimization

The intermittent nature of power from renewable energy sources poses new challenges for electrical grids. This is due to the variable and uncertain nature of the power output from these resources. These features of renewable generation are becoming more relevant to energy system planning as grids reach higher penetration levels of renewable energy. In this presentation we present approaches for energy system planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using multi-stage stochastic programming and the progressive hedging algorithm, we compute energy system expansion decisions on modified versions of the RTS-GMLC test system augmented with large amounts of renewable generation.

MATHEMATICS AND COMPUTING↗

Scalable Energy System Expansion Under Uncertainty Using Multi-Stage Stochastic Optimization

The intermittent nature of renewable energy sources poses challenges for electrical grids. This is due to the variable and uncertain nature of the power output from these resources. These features of renewable generation are more relevant to energy system planning as grids reach higher penetration levels of renewable energy. We present approaches for energy system planning based on scalable computational approaches which enable explicit consideration of operational uncertainties in the planning process. Using multi-stage stochastic programming and the progressive hedging algorithm, we compute energy system expansion decisions on modified versions of the RTS-GMLC test system.

electrical↗

BBPH: Using progressive hedging within branch and bound to solve multi-stage stochastic mixed integer programs

Progressive hedging, though an effective heuristic for solving stochastic mixed integer programs (SMIPs), is not guaranteed to converge in this case. Here, we describe BBPH, a branch and bound algorithm that uses PH at each node in the search tree such that, given sufficient time, it will always converge to a globally optimal solution. Additionally, to providing a theoretically convergent “wrapper” for PH applied to SMIPs, computational results demonstrate that for some difficult problem instances branch and bound can find improved solutions after exploring only a few nodes.

97 MATHEMATICS AND COMPUTING↗

Deep Reinforcement Scheduling of Energy Storage Systems for Real-time Voltage Regulation in Unbalanced LV Networks with High PV Penetration

The ever-growing higher penetration of distributed energy resources (DERs) in low-voltage (LV) distribution systems brings both opportunities and challenges to voltage support and regulation. This paper proposes a deep reinforcement learning (DRL)-based scheduling scheme of energy storage systems (ESSs) to mitigate system voltage deviations in unbalanced LV distribution networks. The ESS-based voltage regulation problem is formulated as a multi-stage quadratic stochastic program, with the objective of minimizing the expected total daily voltage regulation cost while satisfying operational constraints. While existing voltage regulation methods are mostly focused on onetime- step control, this paper explores a day-horizon systemwide voltage regulation problem. In other words, the size of action and state spaces are extremely high-dimensional and need to be delicately handled. Furthermore, in order to overcome the difficulty of modeling uncertainties and develop a realtime solution, a learn-to-schedule feedback control framework is proposed by adapting the problem to a model-free DRL setting. The proposed algorithm is tested on a customized 6-bus system and a modified IEEE 34-bus system. Simulation results validate the effectiveness and near-optimality of voltage regulation by ESS in comparison with a deterministic quadratic program solution.

Wang, Shengyi↗

Obtaining lower bounds from the progressive hedging algorithm for stochastic mixed-integer programs

We present a method for computing lower bounds in the progressive hedging algorithm (PHA) for two-stage and multi-stage stochastic mixed-integer programs. Computing lower bounds in the PHA allows one to assess the quality of the solutions generated by the algorithm contemporaneously. The lower bounds can be computed in any iteration of the algorithm by using dual prices that are calculated during execution of the standard PHA. In conclusion, we report computational results on stochastic unit commitment and stochastic server location problem instances, and explore the relationship between key PHA parameters and the quality of the resulting lower bounds.

97 MATHEMATICS AND COMPUTING↗

Charging Decision Making for Automated Electric Vehicles

Abstract: Overview/Significance With the emerging of autonomous driving and its application in electric vehicles, the charging decision making should be taken over by the vehicles. Autonomous electric vehicles will require the capability to make charging decisions according to the battery energy state, the travel demand and also the available charging infrastructure. The introduction of autonomous driving technology would remove the challenge of co-locating charging infrastructure with driver destinations and presents a driver-free method for EVs to reach nearby charging stations. This will significantly change the charging behavior of electric vehicles. EV driver will no longer need to be present at charging stations for charging actions. Automated EVs can drive to nearby charging stations to perform charging actions by themselves when necessary. Meanwhile, connected vehicles technology makes electric vehicles have the capability to sense and obtain pertinent information from nearby charging station networks and then calculate the corresponding costs and availability for charging. All these promising capabilities bring new opportunities to construct an automatic charging decision making system and improve energy efficiency of charging actions for automatic electric vehicles. Abstract: Methodology This research introduces optimization tools and case studies on charging decision making for automated electric vehicles under personal usage scenario. The designed optimization tools aim to provide charging strategies, i.e. the optimal choice of charging station outside home and the amount of charged energy, by considering constraints from personal daily itineraries and existing charging infrastructure. Abundant real world EV data is utilized to construct stochastic energy consumption prediction model under realistic driving conditions. Advanced dynamic programming technology is utilized to model and solve the potential multi-stage decision making process by considering realistic uncertainties of EV energy cost and dynamics of itinerary information. Large-scale simulation studies using Chicago itinerary data are demonstrated to illustrate energy benefits from automatic charging decision making for future autonomous EVs. Abstract: Results/Conclusions Optimal automatic charging decision making and its energy benefits have been studied for personal automated electric vehicles. A data-driven method based on large amount of real-world data and the corresponding real-time update algorithm have been proposed to construct multi-channel stochastic energy consumption prediction model. Based on the energy cost prediction, dynamic multi-stage charging decision-making models are established for optimal strategies during a daily itinerary. Derived charging strategies can minimize the monetary and energy cost of charging actions for autonomous vehicles. Simulations and case studies show the potential ability of autonomous electric vehicles to reduce the range anxiety and charging infrastructure dependency. Automatic charging decision making can mitigate the pain from electric vehicle charging necessity outside home. In conclusion, automated electric vehicles equipped with an appropriate automatic charging decision making system will help EV driver to relieve from heavy time cost of recharging, reduce the energy cost of performing charging actions and improve the energy efficiency in future electrified transportation system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Strategic planning for power system restorations

This paper considers the power system restoration planning problem (PSRPP) for disaster recovery, a fundamental problem faced by all populated areas. PSRPPs are complex stochastic optimization problems that combine resource allocation, warehouse location, and vehicle routing considerations. Furthermore, electrical power systems are complex systems whose behavior can only be determined by physics simulations. Moreover, these problems must be solved under tight runtime constraints to be practical in real-world disaster situations. This work is three fold: (1) it formalizes the specification of PSRPPs; (2) introduces a simple optimization-simulation hybridization necessary for solving PSRPPs; and (3) presents a complete restoration algorithm that utilizes the strengths of mixed integer programming, constraint programming, and large neighborhood search. This paper studied a novel problem in the field of humanitarian logistics, the Power System Restoration Problem (PSRPP). The PSRPP models the strategic planning process for post disaster power system recovery. The paper proposed a multi-stage stochastic hybrid optimization algorithm that yields high quality solutions to real-world benchmarks provided by Los Alamos National Laboratory (LANL). The algorithm uses a variety of technologies, including MIP, constraint programming, and large neighborhood search, to exploit the structure of each individual optimization subproblem. The experimental results on hurricane disaster benchmarks indicate that the algorithm is practical from a computational standpoint and produce significant improvements over existing relief delivery procedures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimizing green infrastructure placement under precipitation uncertainty

Increased urbanization, infrastructure degradation, and climate change threaten to overwhelm stormwater systems across the nation, rendering them ineffective. Green Infrastructure (GI) practices are low cost, low regret strategies that can contribute to urban runoff management. However, questions remain as to how to best distribute GI practices through urban watersheds given precipitation uncertainty and the variable hydrological responses to them. We develop stochastic programming models to determine the optimal placement of GI practices across a set of candidate locations in a watershed to minimize the total expected runoff under medium-term precipitation uncertainties. Specifically, we first develop a two-stage stochastic programming model. Next, we reformulate this model using perturbed parameters to reduce the requisite computational time and extend it to multi-stage. In addition, we introduce constraints that allow for incorporating sub-catchment-level runoff reduction considerations. Furthermore, we account for hydrological connectivity in the watershed using an underlying acyclic connectivity graph of sub-catchments and incorporate various practical considerations into the models. In addition, we develop a systemic approach to downscale the existing daily precipitation projections into hourly units and efficiently estimate the corresponding hydrological responses. These advancements are brought together in a case study for an urban watershed in a mid-sized city in the U.S., where we perform sensitivity analyses, evaluate the importance of the considered constraints, and provide insights.

54 ENVIRONMENTAL SCIENCES↗

Scalable Transmission Expansion Under Uncertainty Using Three-Stage Stochastic Optimization

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and uncertain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty.

multi-stage stochastic optimization↗

Data and Multistage Optimization for the New Grid

Three essential capabilities for using exascale computing resources on next generation power grid applications are: generating large renewable energy datasets, modeling damage and operations during and after extreme events, and employing multi-stage optimization for infrastructure planning. Powerscenarios, developed as part of the ExaSGD project, addresses these capabilities by enabling users to build synthetic wind farms for large test systems using numerical weather prediction-based data sources. We share examples of using Powerscenarios to build out wind farms on the ACTIVSg2000 test system, to enable simulated operations and emergency asset allocation during a hurricane strike, and to compute multi-stage infrastructure buildouts.

economic dispatch↗

A REDUCED ORDER MODELING APPROACH TO PROBABILISTIC CREEP-DAMAGE PREDICTIONS IN FINITE ELEMENT ANALYSIS

This paper introduces a computationally efficient Reduced Order Modeling (ROM) approach for the probabilistic prediction of creep-damage failure. Component-level probabilistic simulations are needed to assess the reliability and safety of high-temperature components. Full-scale probabilistic creep-damage modeling in finite element (FE) approach is computationally expensive requiring many hundreds of simulations to replicate the uncertainty of component failure. To that end, ROM is proposed to minimize the elevated computational cost while controlling the loss of accuracy. It is proposed that full-scale probabilistic simulations can be completed in 1D at a reduced cost, the extremum conditions extracted, and those conditions applied for lower-cost 2D/3D probabilistic simulations of components that capture the mean and uncertainty of failure. The probabilistic Sine-hyperbolic (Sinh) model is selected which in previous work was calibrated to alloy 304 stainless steel. The Sinh model includes probability density functions (pdfs) for test condition (stress and temperature), initial damage (i.e. microstructure), and material properties uncertainty. The Sinh model is programmed into ANSYS finite element software using the USERCREEP.F material subroutine. First, the Sinh model and FE code are subject to verification and validation to ensure the accuracy of the simulations. Numerous Monte Carlo simulations are executed in a 1D model to generate probabilistic creep deformation, damage, and rupture data. This data is analyzed and the probabilistic parameters corresponding to extreme creep response are extracted. The ROM concept is applied where only the extreme conditions are applied in the 2D probabilistic prediction of a component. The probabilistic predictions between the 1D and 2D geometry is compared to assess ROM for creep. The accuracy of the probabilistic prediction employing the ROM approach will potentially reduce the time and cost of simulating complex engineering systems. Future studies will introduce multi-stage Sinh, stochasticity, and spatial uncertainty for improved prediction.

36 MATERIALS SCIENCE↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗