Search NASA⌕ Search

SEARCH · Search NASA

Results for “outage scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Deep Space Optical Link ARQ Performance Analysis

Substantial advancements have been made toward the use of optical communications for deep space exploration missions, promising a much higher volume of data to be communicated in comparison with present -day Radio Frequency (RF) based systems. One or more ground-based optical terminals are assumed to communicate with the spacecraft. Both short-term and long-term link outages will arise due to weather at the ground station(s), space platform pointing stability, and other effects. To mitigate these outages, an Automatic Repeat Query (ARQ) retransmission method is assumed, together with a reliable back channel for acknowledgement traffic. Specifically, the Licklider Transmission Protocol (LTP) is used, which is a component of the Disruption-Tolerant Networking (DTN) protocol suite that is well suited for high bandwidth-delay product links subject to disruptions. We provide an analysis of envisioned deep space mission scenarios and quantify buffering, latency and throughput performance, using a simulation in which long-term weather effects are modeled with a Gilbert -Elliot Markov chain, short-term outages occur as a Bernoulli process, and scheduled outages arising from geometric visibility or operational constraints are represented. We find that both short- and long-term effects impact throughput, but long-term weather effects dominate buffer sizing and overflow losses as well as latency performance.

optical space communications↗

Deep Space Optical Link ARQ Performance Analysis

Substantial advancements have been made toward the use of optical communications for deep space exploration missions, promising a much higher volume of data to be communicated in comparison with present-day Radio Frequency (RF) based systems. One or more ground-based optical terminals are assumed to communicate with the spacecraft. Both short-term and long-term link outages will arise due to weather at the ground station(s), space platform pointing stability, and other effects. To mitigate these outages, an Automatic Repeat Query (ARQ) retransmission method is assumed, together with a reliable back channel for acknowledgement traffic. Specifically, the Licklider Transmission Protocol (LTP) is used, which is a component of the Disruption-Tolerant Networking (DTN) protocol suite that is well suited for high bandwidth-delay product links subject to disruptions. We provide an analysis of envisioned deep space mission scenarios and quantify buffering, latency and throughput performance, using a simulation in which longterm weather effects are modeled with a Gilbert-Elliot Markov chain, short-term outages occur as a Bernoulli process, and scheduled outages arising from geometric visibility or operational constraints are represented. We find that both short- and long-term effects impact throughput, but long-term weather effects dominate buffer sizing and overflow losses as well as latency performance.

buffer analysis↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement

Distribution system resilience enhancement is an important topic to ensure customers have access to power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecast. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Economic Risk-Informed Maintenance Planning and Asset Management (Final Report)

The proposed work will provide a holistic framework for cost-minimizing risk-informed maintenance planning, including inspection, in light water reactors (LWRs). Specifically, we develop a two-tier framework that (a) coarsely minimizes the total maintenance cost during the remaining normal operating cycle of the plant prior to the next scheduled outage (long-term), subject to safety requirements, and (b) uses the outputs of the first model to develop a secondary optimization model to finely schedule maintenance activities to maximize the financial impact of these activities in the next week (short-term).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING↗

Consumer safety-oriented scheduling of rotating power outages during heat waves

Extreme heat events have widespread effects on power systems, reducing available generation capacity, limiting transmission capabilities, and causing unusual demand patterns on the consumer side. As these combined effects expose bulk transmission systems to potential large-scale blackouts, utilities may be required to schedule and apply rotating outages, by temporarily and alternately disconnecting distribution substations to reduce overload. However, utilities lack mechanisms to inform these events, exacerbating the negative effects of heat waves on affected communities. This paper introduces a novel framework for scheduling rotating outages during heat waves while considering impacts on consumers’ safety. Instead of random sequential load shedding, we propose a methodology to rotate power outages considering a metric that quantifies the indoor overheating risk of groups of consumers during a power outage. The overheating risk is derived from a detailed building simulation using CityBES, where the buildings are modeled based on available data—use type, year built, floor area, number of stories, location—while presence of air conditioning and occupancy are calibrated from smart meter data. Based on the metric, an algorithm to schedule the rotating outages is applied to prioritize feeders for disconnection at each hour according to their overheating risk to meet a utility load reduction target. Applied to two substations and seven feeders in the Portland General Electric territory, the results show that this approach effectively leads to the lowest overheating risk during the resulting outage schedules, with an average 10.1% lower overheating compared to uninformed schedules.

Building thermal simulation↗

Preventive Power Outage Estimation Based on a Novel Scenario Clustering Strategy

The increasing occurrence of extreme weather events is challenging power grid operation. For extreme weather events, the system operator is responsible for estimating the power outages and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The outputs of an outage prediction model tool are used to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers repair crews and mobile energy resources (MERs). Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative profiles which the system operator can focus on. Finally, case studies on a distribution system evaluate the damage caused by an extreme weather event and verify the effectiveness of the proposed scenario clustering strategy.

MATHEMATICS AND COMPUTING,POWER TRANSMISSION AND D↗

Preventive Power Outage Estimation Based on A Novel Scenario Clustering Strategy: Preprint

The increasing occurrence of extreme weather events is challenging the power grid operation. In front of the extreme weather, the system operator is responsible for estimating the power outage and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The predicted vulnerable lines of an outage prediction model tool are utilized to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers the schedule of repair crews and mobile energy resources. Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative ones for straightforward analysis. Finally, case studies on a distribution system evaluate the damage level brought by extreme weather and verify the effectiveness of the proposed scenario clustering strategy.

mobile energy resources↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement

Distribution system resilience enhancement is an important topic to ensure customers have access to power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecast. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement: Preprint

Distribution system resilience enhancement is an important topic to ensure customers have access to the power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecasts. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Dispatch analysis of flexible power operation with multi-unit small modular reactors

The relevance of nuclear power plant flexible power operation (FPO) is rising due to increased penetration of variable renewables. Small Modular Reactors (SMRs) such as NuScale are envisaged to have multiple units on one site. This provides opportunities for coordinating FPO between units, but also introduces challenges as common services (e.g., refueling equipment) must be shared between units and fuel loadings may be standardized. It is therefore important to quantify whether FPO with SMRs is economically beneficial. Here, this paper quantifies the economics of FPO on different timescales to analyze refueling outages of such multi-unit SMRs. A 24-h price-taker profit maximization of SMR operation is first solved considering revenues from wholesale power and ancillary service (AS) markets. The results are then used to find the most profitable operation strategy over several years for multiple units at the site accounting for the physics and materials limits on NPP operation, including refueling outages. Results show a small but appreciable participation of nuclear into AS, contributing 4% of revenues. Due to the longer fuel cycle, over a decade of operation the units’ refueling outages drifted by 3 months, ultimately leading to refueling during summer.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Methods and Tools To Assess Robustness of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plant (NPP) operating cycle. Refueling outages are extremely costly for an NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities within 30 days on average. Despite detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjustment. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but are often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. This paper focuses on developing tools and methods to support NPPs with outage schedule optimization and it describes the initial development of tools to support outage management that leverage computational and machine learning methods.

97 - MATHEMATICS AND COMPUTING↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bonneville, Power Administration Timing System

Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

Martin, Kenneth E.↗

Cybersecurity Anomaly Detection in SCADA-Assisted OT Networks Using Ensemble-Based State Prediction Model

The cybersecurity threats of power system gradually grow due to the increased sophisticated interactions between Information Technology (IT) and Operational Technology (OT) networks. False data injection attack (FDIA) that aims to compromise the Supervisory Control and Data Acquisition (SCADA) measurement and disturb the system operation is one of such cyber threats. Such attacks can potentially lead to significant operational issues at the control centers and substations, and hence, result in severe physical consequences. To avoid catastrophic failure across the power grid resulting from these attacks, it is essential to arm the OT network with real-time vulnerability assessment tools. To this end, this paper outlines various drawbacks of the Purdue architecture model to defend against cyberattacks in the OT network. Furthermore, a novel ensemble-based state prediction model is proposed to detect cybersecurity anomalies in SCADA assisted OT networks. The proposed model uses control center level generation and load forecasts, scheduled, and forced outages, power flow solutions, and the substation level historical data. The hypothesis of the proposed scheme relies on the fact that additional control center and substation data can hardly be accessed and compromised by attackers. One of the vital features of the proposed scheme is an hour-ahead prediction of the operational feasibility of the SCADA measurement range at the control center and substation in real time helps in detecting anomalies in measurements across both substation and the control center.

24 POWER TRANSMISSION AND DISTRIBUTION↗

S-band and Ku-band return service interference between TDRSS users

The Tracking Data Relay Satellite System (TDRSS) return service performance can be degraded by interference from another user when two or more spacecraft communicate with the same Tracking Data Relay Satellite (TDRS) at the same time. This paper describes the S-band and Ku-band return service self interference environment expected in the 1996 - 2010 timeframe and shows the self-interference expected for selected TDRSS users based on Communications Link Analysis and Simulation System (CLASS) Automated Conflict Resolution System (ACRS) and Interference Monitor (IM) tools. The results show: which user links are susceptible to interference from other users, the interference statistics, and whether or not interference can be avoided with appropriate interference mitigation techniques such as scheduling, cross-polarization, or Pseudo random Noise (PN) spreading. The analysis results enable Space Network (SN) managers to determine the impacts of self-interference on the TDRSS service availability. They also enable project offices to determine whether they should select return service communications parameters, such as polarization and PN spreading, to minimize the probability of being impacted by self-interference; try to schedule TDRSS support around other user spacecraft communications schedules; or accept communication outages due to self-interference.

Harrell, Linda↗

NASCOM network ground communications availability report

A performance analysis of NASCOM Network circuits is presented. An objective of 99.80 percent availability has been established for all network circuits and an acceptable level of 99.50. A network narrative summary for the current month includes changes in network configurations, current month's totals for modes of service and trouble category losses, a discussion of trends, and significant losses that affected the performance indexes of individual or groups of circuits. A table and narrative summary of those circuits that failed to meet the objective of 99.80% availability for all network circuits and an acceptable level of 99.50. Lost time and interruption tables showing all circuits affected by outages, by trouble category, with their total time and events, scheduled operating hours, and individual availability indexes also are included. Selected circuits whose availabilities have or continue to affect the overall network availability are also analyzed.

Source record↗