Prairie State Generating Company Site: Storage Field Development Plan

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, operational plans, and costs associated with the proposed Prairie State Energy Campus - Carbon Capture and Storage (PSEC-CCS) project in Washington County, Illinois, near Marissa. The proposed storage complex, known as the St. Peter-Everton Storage Complex, comprises the St. Peter Sandstone and Everton sandstone reservoirs, with the Maquoketa Shale serving as the primary confining unit and the Knox Group as lower confining unit. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Pennsylvanian section.

01 COAL, LIGNITE, AND PEAT↗

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS↗

2026 Site Development Plan

The 2026 edition of the Site Development Plan focuses on 30 years of infrastructure plans as they strengthen the core Science, Technology, and Engineering (ST&E) pillars of Lawrence Livermore National Laboratory (LLNL): High-Energy-Density (HED) Science, Advanced Materials and Manufacturing (AMM), and High Performance Computing (HPC).

Tran, Lucas [Lawrence Livermore National Laborator↗

Research Development and Partnership Pilot (RDPP): Developing plans and partnerships for incorporating tree reproduction to understand Earth system change

The goals for this Research Development and Partnership Pilot (RDPP) proposal were to i) learn about Department of Energy (DOE) research and use the PI’s expertise on patterns and environmental drivers of tree reproduction as a basis to make connections with individuals and research groups at DOE National Laboratories, and ii) to develop plans and form partnerships that will both enhance the PI’s research. The objectives of the proj ect were for the PI to i) participate in the Department of Energy's Office of Science program in Biological and Environmental Research training and outreach activities, ii) conduct directed fact-finding on Earth and Environmental Systems Sciences Division (EESSD) research projects and new partnerships with individuals and groups at National Laboratories, ii) conduct meetings with potential collaborators at National Laboratories to discuss EESSD-relevant research ideas, and iv) to develop a plan for future research efforts. During the period of the award, the objectives of the proposal were met, as the PI attended Environmental System Sciences meetings, American Geophysical Union meetings, SPRUCE experiment meetings, and visited the Oak Ridge National Lab. These activities led to increased understanding of the research being conducted by DOE scientists and the PI had meetings with potential collaborators to develop future research plans that leverage expertise at DOE and the research interests of the PI to increase understanding of the role of tree reproduction in future carbon allocation and in tree regeneration models in boreal ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Griffin Software Development Plan

Griffin is a MOOSE-based reactor physics application for advanced reactor multiphysics modeling and simulation. The application is developed in a consistent multiphysics environment with strong software quality assurance. Griffin inherited most of the capabilities of MAMMOTH/Rattlesnake and is adopting the capabilities from PROTEUS that are needed in the code. The toolset includes a variety of deterministic radiation transport solvers for fixed source, k-eigenvalue, ad-joint, and subcritical multiplication, as well as transient solvers for point-kinetics, improved quasi-static, and spatial dynamics. The code contains the cross-section preparation capabilities applicable to fast and thermal reactors, including TRISO-fueled reactors. Core management capabilities include core performance, fuel depletion and shuffling, equilibrium core calculation, pebble-bed reactor run-in and equilibrium core, molten-salt reactor delayed neutron precursor drift, and control rod and drum movement with cusping correction. This software development plan presents the current and future capabilities and features in Griffin for the design and analysis of non-light-water reactor systems in steady-state and transient conditions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Second Target Station Instrument Systems Research and Development Plan

This document describes the research and development (R&D) plan for Second Target Station (STS) instruments and bunker. The R&D program at STS seeks to mitigate risk and develop new technologies that will enhance performance for deployment on the eight instruments that are part of the STS project. Currently, STS is actively developing six of the eight instruments. This document is expected to be revised as the R&D program progresses and activities begin on the remaining two instruments (VERDI and EXPANSE).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Fission Battery Initiative: Research and Development Plan

The Fission Battery Initiative has been established by the Idaho National Laboratory’s (INL’s) Nuclear Science and Technology Directorate [6] to define, focus, and coordinate research and development (R&D) of technologies that can fully achieve battery-like functionality for nuclear energy systems. The notion of a “fission battery” conveys a vision focused on realizing very simple “plug-and-play” nuclear systems that can be integrated into a variety of applications requiring affordable, reliable energy in the form of electricity and/or heat and function without operations and maintenance staff. In order to formalize the desired functionality, the initiative has adopted the following key attributes to be achieved: economic, standardized, installed, unattended and reliable

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Fast Modular Reactor (FMR) - Development Plan of a New 50 MWe Gas-cooled Fast Reactor

General Atomics Electromagnetic Systems (GA-EMS) will be developing a new 50-megawatt electric (MWe) fast modular reactor (FMR), under the Department of Energy’s (DOE’s) Advanced Reactor Demonstration Program (ARDP), Advanced Reactor Concepts 2020 (ARC-20) development pathway, that provides safe, carbon free electricity, capable of incremental capacity additions. A modular design allows it to be factory-built and assembled on-site to keep the cost of capital low, while the dry-cooling facilitates siting to complement renewables in nearly any location. GA-EMS is committed to commercialization of the proposed reactor, with a demonstration by 2030, and deployment by the mid-2030s. The ultimate goal of the design is to develop flexible and dispatchable carbon-free power source for the 2035 US electricity market. The GAEMS- led team will verify that simplified characteristics (e.g., inert helium gas coolant, pellet-loaded fuel rod, installation-free of heat sink requirements, small and passive heat removal systems) of the FMR will result in a safe, maintainable, cost-effective, distributed, nuclear energygenerating station. Three key specific project objectives for the next three years include: Development of the conceptual design of the 50- MWe FMR plant, Achievement of Technology Readiness Level (TRL) 4 for key system and component technologies through in-pile tests, out-of-pile tests, and numerical experiments; and Development of robust techno-economic analysis (TEA) and pre-application licensing approach necessary for timely demonstration and eventual commercialization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Zero Power Reactor Database (ZPRD) Development Plan

Past sodium-cooled fast reactors (SFR) were built with an active experimental program in place to support the design and development work. Most of the experimental facilities in the United States that were important for SFR design were shutdown in the 1980s and 1990s. Reactor licensing and construction requires any reactor design to be verified against existing reactor facilities or experimental measurements. With the absence of those experimental facilities, modern SFR projects must rely on historical measurements to demonstrate that the engineering modeling software and data being used for the new reactor design work are reliable. There has been a considerable push in the last 6 years by both DOE and commercial companies to obtain historical experimental measurements that are relevant for SFRs, in particular those with features that are important for the new reactor designs of interest. The zero power reactor experiments carried out at Argonne National Laboratory’s critical facilities (ZPR-3, ZPR-6, ZPR-9, and ZPPR) from the 1950s to the 1980s are some of the best reactor physics experiments on SFR technology that are available today. Of particular interest today are the ZPPR-15 measurements done at the ZPPR facility for the Integral Fast Reactor project in the 1980s as they are in line with most commercial and DOE interests today. In the past 10 years, the measurements done on ZPPR-15 have been processed into both Monte Carlo (MCNP) and deterministic models (MC2-3 and DIF3D) useable for validating the engineering modeling software for key parts of the SFR design work. To achieve this, a detailed model description must be created for the experiment and the experimental measurement that the engineering modeling software is to reproduce. Then, an assessment of the uncertainty on the measured quantity which considers all of the sources of uncertainty in defining the model must be obtained and documented. The models created for ZPPR-15 provide the best validation basis available today for neutronics modeling software. Reference 2 is a good resource to understand how these models were built and how the uncertainties on the measured quantities were derived. The intention of the Zero Power Reactor Database (ZPRD), hosted at frdb.ne.anl.gov, is to make available the experimental measurements and models that have been constructed to-date. Though ZPPR-15 measurements are the primary data requested for validation needs, other measurements on ZPPR, ZPR-6, and ZPR-9 in support of the Clinch River Breeder Reactor (CRBR) and Fast Test Reactor (FFTF) should also be considered important for future software validation needs. In this manuscript, the details of available measurements on ZPR-3, ZPR-6, ZPR-9, and ZPPR facilities are summarized, and a general organization of the web interface is displayed. Many of the documents associated with the measurements are export controlled information so access to the database will also have to be controlled.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation and Control Upgrade Pilot Project: NUREG- 0711 Process Development, Planning and Analysis Activities, and Lessons Learned

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper presents the development execution of the HFE Program through completion of the Planning and Analysis Phase as defined by NUREG-0711 as well as HFE lessons learned.

99 GENERAL AND MISCELLANEOUS↗

Development Plan for Acoustic Emission and Vibration Sensors

This document discusses the need for high temperature, radiation tolerant sensors for monitoring vibration and acoustic emissions in advanced reactors and irradiation experiments. Testing of several commercial sensors using infrastructure available at Idaho National Laboratory was performed to benchmark currently available sensors as well as the test facilities. Finally, a strategy for developing sensors for more extreme environments is presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development Plan for Ultrasonic Pressure Sensors [Slides]

Current light water reactors (LWRs) utilize differential pressure cells, based on strain gauges, which are remotely located from the reactor vessel via impulse lines. These pressure sensors are used to measure liquid level within the vessel and to give a general indication of system health with regard to leaks and flow system fouling. The advanced reactor types currently under development generally operate at higher temperatures than light-water reactors and utilize coolants that may be highly corrosive (i.e., liquid metals). They will use pressure measurements for varied measurands, such as level and flow rate, as well as indications of accident conditions or off-normal operating conditions. More robust pressure sensors are needed to address these more challenging conditions.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

C$^3$ Demonstration Research and Development Plan

C$^3$ is an opportunity to realize an e$^+$e$^-$ collider for the study of the Higgs boson at $\sqrt{s} = 250$ GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C$^3$ is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C$^3$ is the main linac. This white paper presents the staged approach towards a facility to demonstrate C$^3$ technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The white paper also includes discussion on the approach for technology industrialization, related HEP R&D activities that are enabled by C$^3$ R&D, infrastructure requirements and siting options.

43 PARTICLE ACCELERATORS↗

Power Supply Options for the Marpi Landfill, Saipan: Comprehensive Feasibility Study

The Marpi Landfill (“Marpi” or “the landfill”), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by a single on-site diesel generator that only operates when the landfill is open and staffed. The project team, composed of representatives of the Department of Public Works and the Office of Planning and Development (OPD), aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location to increase the use of sustainable energy and to ensure environmentally compliant landfill operations. This is consistent with the sustainable development goals documented in the 2021–2030 Comprehensive Sustainable Development Plan (OPD 2021), including Goal #12 (ensure environmentally compliant waste management facilities) and Goal #7 (renewable energy deployment). Further, the CNMI has a 20% target for renewable energy consumption by 2030, as documented in the 2021–2030 Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (Public Law 18-62). To accomplish these goals, the Federal Emergency Management Agency, through its Interagency Reimbursable Work Agreement with the U.S. Department of Energy, funded a feasibility study and follow-up study in 2023–2024 to assess and prioritize power supply options for the landfill. This report combines the results from both feasibility studies.

14 SOLAR ENERGY↗

Regulatory Research Planning for Micro-Reactor Development

A limited-scope Regulatory Research Development Plan (RRDP) is being developed to link important advanced non light water nuclear microreactor technology research and development (R&D) activities sponsored by the U.S. Department of Energy’s Office of Nuclear Energy (DOE NE), Science, and Technology to regulatory requirements and critical licensing needs likely to impact the deployment of a domestic commercial microreactor fleet. This document is a precursor to that forthcoming limited scope microreactor RRDP. This report is being published to aid in the identification of key fiscal year (FY) 2022 topical research opportunities (as conveyed to the RRDP development team) by respondent microreactor developers and suppliers in consideration of micro-reactor regulatory needs and challenges noted by industry, DOE, and Nuclear Regulatory Commission (NRC) stakeholders. Although this document does not contain the regulatory effects analysis and R&D recommendations that is expected in the final RRDP, this document is being released now to assist DOE researchers and investigators in FY22 research planning activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CarbonSAFE Phase II: Optimizing Alabama’s CO 2 Storage in Shelby County, Alabama (Project OASIS), Milestone M3 - Site Specific Drilling Report

The Phase II Storage Complex Feasibility project, entitled "Optimizing Alabama's CO 2 Storage in Shelby County, Alabama (Project OASIS)," is a part of the DOE/NETL's CarbonSAFE initiative. The Project is managed by the Southern States Energy Board (SSEB), and includes participation from Advanced Resources International, Inc. (ARI), Crescent Resource Innovation, Southern Company, Alabama A&M University, Auburn University, and Oklahoma State University. Project OASIS is working to establish the foundation for a commercial-scale geologic storage complex for CO 2 captured from Plant Gaston (home of the National Carbon Capture Center) and surrounding industrial sources of CO 2 located in Shelby County, Alabama. The Project objectives are: • Demonstrate that the subsurface saline formations at the storage complex can store commercial volumes of CO 2 safely and permanently. • Develop a comprehensive Community Benefits Plan. • Develop the infrastructure framework for a CO 2 storage hub. • Develop a rigorous risk registry and to conduct a comprehensive risk assessment. • Develop a monitoring plan. • Develop a comprehensive site characterization plan to support an Underground Injection Control Class VI Permit in a future Phase III program. • Evaluate the commercial viability of the project. Project OASIS is about 30 miles southeast of Birmingham, Alabama within a geologic province called the Valley and Ridge (Figure 1.1). The Valley and Ridge Province comprises a sequence of Paleozoic carbonate and clastic rocks that underwent structural deformation during the Alleghanian Orogeny. Storage prospects occur in relatively flat lying structural panels located between thrust faults. Available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage. This includes geological and geophysical evaluations, reservoir engineering analyses, and risk assessments.

20 FOSSIL-FUELED POWER PLANTS↗