The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

Schedule↗

Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P-CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P-CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects. Because NASA implements a diverse and unique portfolio of projects, those projects have traditionally created project-specific systems to manage planning and performance analysis. However, establishment and implementation of a project management system that is common across all centers and mission directorates will facilitate the adoption of best business practices. In addition, the application of timely and predictive analysis, as well as, providing all stakeholders with greater insight into project performance will enhance opportunities for project success. For more detailed information, refer to the NASA EVM System Description; Integrated Baseline Review (IBR) Handbook; EVM Implementation Handbook; Schedule Management Handbook; Work Breakdown Structure (WBS) Handbook; and other agency/industry documentation. In addition, you may contact your local center’s EVM Focal Points. All this information and more can be found at and/or the NASA Engineering Network located at https://nen.nasa.gov/web/pm.

Christopher Lewis Sadler↗

Performance measurement: A tool for program control

Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

Abell, Nancy↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts.

Project↗

Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

Koenig, John C.↗

Project Management Using Modern Guidance, Navigation and Control Theory

Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.

Hill, Terry R.↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide EVM guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts, and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical, cost and schedule problems as well as the intended course and success of corrective actions.

Christopher Lewis Sadler↗

A strategy of cost control for Mariner Venus/Mercury 1973

The spacecraft launched by NASA on November 3, 1973 to explore Venus and Mercury proved a notable success as a development project both in space and on the ground. This article on the development points our management approaches and techniques that kept schedules and controlled costs, the intent being to stimulate thought about how to do the same with future spacecraft and payloads. The Mariner Venus/Mercury '73 (MVM '73) project kept within its originally established goals for schedule, performance, and cost. Underlying this development success was the availability of the Mariner technology. But meeting the goals demanded management determination, planning, and discipline to make optimum use of state-of-the-art technology--on the part of people at NASA, JPL, and The Boeing Co. (the contractor).

Biggs, John R.↗

Shuttle Propulsion System Major Events and the Final 22 Flights

Numerous lessons have been documented from the Space Shuttle Propulsion elements. Major events include loss of the Solid Rocket Boosters (SRB's) on STS-4 and shutdown of a Space Shuttle Main Engine (SSME) during ascent on STS-51F. On STS-112 only half the pyrotechnics fired during release of the vehicle from the launch pad, a testament for redundancy. STS-91 exhibited freezing of a main combustion chamber pressure measurement and on STS-93 nozzle tube ruptures necessitated a low liquid level oxygen cut off of the main engines. A number of on pad aborts were experienced during the early program resulting in delays. And the two accidents, STS-51L and STS-107, had unique heritage in history from early program decisions and vehicle configuration. Following STS-51L significant resources were invested in developing fundamental physical understanding of solid rocket motor environments and material system behavior. And following STS-107, the risk of ascent debris was better characterized and controlled. Situational awareness during all mission phases improved, and the management team instituted effective risk assessment practices. The last 22 flights of the Space Shuttle, following the Columbia accident, were characterized by remarkable improvement in safety and reliability. Numerous problems were solved in addition to reduction of the ascent debris hazard. The Shuttle system, though not as operable as envisioned in the 1970's, successfully assembled the International Space Station (ISS). By the end of the program, the remarkable Space Shuttle Propulsion system achieved very high performance, was largely reusable, exhibited high reliability, and was a heavy lift earth to orbit propulsion system. During the program a number of project management and engineering processes were implemented and improved. Technical performance, schedule accountability, cost control, and risk management were effectively managed and implemented. Award fee contracting was implemented to provide performance incentives. The Certification of Flight Readiness and Mission Management processes became very effective. A key to the success of the propulsion element projects was related to relationships between the MSFC project office and support organizations with their counterpart contractor organizations. The teams worked diligently to understand and satisfy requirements and achieve mission success.

Owen, James W.↗

Earned Value Management (EVM): Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects.

Control Account Manager↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Source record↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Planning Package↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Schumann, Deborah C.↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Christopher Lewis Sadler↗

NASA Earned Value Management (EVM) Update

Earned Value Management (EVM) is an integrated management control system for assessing, understanding and qualifying what a project is achieving with the resoures. EVM integrates technical cost and schedules with risk management. It allows objective assessment and quantification of current project performance, and helps predict future performance-based trents.

Kerby, Jerald↗

A Statistical Project Control Tool for Engineering Managers

This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

Bauch, Garland T.↗