Search NASA⌕ Search

SEARCH · Search NASA

Results for “project proposals”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation questionnaire, and a scoring formula.

Jones, Harry↗

Hybrid Power Plants: Status of Installed and Proposed Projects [Slides]

As battery prices fall and wind and solar generation rises, power plant developers are increasingly combining wind and solar projects with on-site batteries, creating “hybrid” power plants. But hybrid or co-located plants have been part of the U.S. electricity mix for decades, with widely ranging configurations that extend beyond pairing a generator with a battery. This new summary tracks and maps existing hybrid and co-located plants across the United States while also synthesizing data from generation interconnection queues to illustrate developer interest in the next wave of plants. The scope is inclusive of co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and also full hybrids that feature co-location and co-control. The focus is on larger, 1 MW+ systems: smaller (often behind-the-meter) projects are also increasingly common, but are not included in the data synthesis. Based in part on EIA Form 860 data, there were at least 125 co-located hybrid plants (>1 MW) already operating across the United States at the end of 2019, totaling over 14 GW of aggregate capacity. Some of the most common configurations include wind+storage (13 projects, 1,290 MW wind, 184 MW storage), PV+storage (40 projects, 882 MW PV, 169 MW storage), and fossil+storage (10 projects, 2,414 MW fossil, 91 MW storage). Data from interconnection queues demonstrates the considerable commercial interest that exists in hybrid power plants, especially solar co-located with storage. By the end of 2019, there were at least 367 GW of solar plants in the nation’s queues; 102 GW (~28%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage. For wind, 225 GW of capacity sat in the queues, with 11 GW (~5%) proposed as a hybrid, again most-often pairing wind with storage. The proposed solar+storage plants are located throughout the United States, but with California and the non-ISO West being the most prominent areas of commercial interest. Proposed wind+storage and standalone storage plants also center to a degree on these regions of the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Gradio: Project proposal for satellite gradiometry

A gradiometric approach, rather than the more complicated satellite to satellite tracking, is proposed for studying anomalies in the gravitational fields of the Earth and, possibly, other telluric bodies. The first analyses of a gradiometer based on four of ONERA's CACTUS or SUPERCACTUS accelerometers are summarized. it is shown that the obstacles to achieving the required accuracy are not insuperable. The device will be carried in a 1000 kg lens shaped satellite in a heliosynchronous orbit 200 to 300 km in altitude. The first launching is planned for the end of 1987.

Balmino, G.↗

Advanced spacecraft fire safety: Proposed projects and program plan

A detailed review identifies spacecraft fire safety issues and the efforts for their resolution, particularly for the threats posed by the increased on-orbit duration, size, and complexity of the Space Station Freedom. Suggestions provided by a survey of Wyle consultants and outside fire safety experts were combined into 30 research and engineering projects. The projects were then prioritized with respect to urgency to meet Freedom design goals, status of enabling technology, cost, and so on, to yield 14 highest priority projects, described in terms of background, work breakdown structure, and schedule. These highest priority projects can be grouped into the thematic areas of fire detection, fire extinguishment, risk assessment, toxicology and human effects, and ground based testing. Recommendations for overall program management stress the need for NASA Headquarters and field center coordination, with information exchange through spacecraft fire safety oversight committees.

Youngblood, Wallace W.↗

Irrigated rice area estimation using remote sensing techniques: Project's proposal and preliminary results

The development of a methodology for annual estimates of irrigated rice crop in the State of Rio Grande do Sul, Brazil, using remote sensing techniques is proposed. The project involves interpretation, digital analysis, and sampling techniques of LANDSAT imagery. Results are discussed from a preliminary phase for identifying and evaluating irrigated rice crop areas in four counties of the State, for the crop year 1982/1983. This first phase involved just visual interpretation techniques of MSS/LANDSAT images.

Parada, N. D. J.↗

A Renewably Powered Hydrogen Generation and Fueling Station Community Project

The proposed project goal is to encourage the use of renewable energy and clean fuel technologies for transportation and other applications while generating economic development. This can be done by creating an incubator for collaborators, and creating a manufacturing hub for the energy economy of the future by training both white- and blue-collar workers for the new energy economy. Hydrogen electrolyzer fueling stations could be mass-produced, shipped and installed in collaboration with renewable energy power stations, or installed connected to the grid with renewable power added later.

Lyons, Valerie J.↗

Space Studies Board Annual Report, 2003

The Space Studies Board is a unit of the NRC's Division on Engineering and Physical Sciences (DEPS), and it reports to the Division for oversight. DEPS is one of six major program units of the NRC through which the institution conducts its operations on behalf of the National Academy of Sciences, the National Academy of Engineering, and the Institute of Medicine. Within DEPS there are a total of 14 boards that cover a broad range of physical science and engineering disciplines and mission areas. Members of the DEPS Committee on Engineering and Physical Sciences provide advice on Board membership and advise on proposed new projects to be undertaken by the Board or its committees. Every 3 years the DEPS Committee also reviews the overall operations of each of its boards. The last review of the SSB was in 2001. The Board meets three times per year to review the activities of its committees and task groups and to be briefed on and discuss major space policy issues. An internal executive committee composed of seven at-large members of the Board meets at least once a year and may convene via conference call at other times to plan for SSB activities and to advise the chair between meetings. All projects proposed to be conducted by standing committees or ad hoctask groups must first be reviewed and approved by the Board or its executive committee, and the Board monitors the progress of the projects throughout the course of the studies.

National Aeronautics and Space Administration(NASA↗

U328 Electrical Reliability Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL’s) Project Management Office (PMO) is planning to install an underground electrical duct bank at the 3200 block of the Livermore Site (project). The proposed project will include a new electrical substation and feeders, demolition and replacement of the U328C utility building with a new structure to the west, re-routing of utilities, and update of the parking lot. This Sampling and Analysis Plan (SAP) outlines the procedures to collect and evaluate environmental samples for disposition of the excavated soil during the project and geotechnical samples for pavement design. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2022), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) process (EPA, 2006). In addition to the environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection and evaluation of the geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Enhancing Oxygen Stability in Low-Cobalt Layered Oxide Cathode Materials by Three-Dimensional Targeted Doping

In this project, we propose to develop a new concept and a generic platform that can lead to the greatly enhanced stabilization of all high-energy cathode materials, and in particular high-nickel (Ni) and low-cobalt (Co) oxides. The new concept is a 3D doping technology that hierarchically combines surface and bulk doping. We will use surface doping to stabilize the surface of primary particles and also introduce dopants in the bulk to further enhance oxygen stability, conductivity, and structural stability in low-Co oxides under high voltage and deep discharging operating conditions. This new concept not only will deliver a low-cost, high-energy cathode but also will provide a generic method that can stabilize all high-energy cathodes. The proposed novel 3D doping approach is poised to resolve some longstanding challenges in fundamental doping effects on battery materials as well as to reduce Li-ion batteries’ cost and improve their safety, energy density, and lifetime. To tackle this problem, we have formed a highly complementary multi-university/national labs/industry team to enable a doping-central and systematic investigation of low-Co materials and create a knowledge base for many electrode materials to be used in advanced electric vehicles. The successful execution of the proposed project relies on five components that can be carried out by the complementary team members: (1) a theoretical investigation of the surface and bulk stabilizing dopants (Persson), (2) a precise synthesis of materials with targeted doping (Lin and Xin), (3) development of electrolytes for high-Ni low-Co oxides (Xu), (4) multi-scale characterization of the structures and their interfaces by scanning transmission electron microscopy (SEM) and synchrotron X-ray imaging and spectroscopy tools (Xin and Lin), and (5) pouch cell-level integration (Fan). The UCI-led project will enable a doping-central and systematic investigation of low-Co materials and create a knowledge base for many electrode materials to be used in advanced electric vehicles.

25 ENERGY STORAGE↗

Lunar scout: A Project Artemis proposal

The results of a student project to design a lunar lander in the context of a specifically defined mission are presented. The Lunar Scout will be launched from Cape Canaveral, Florida onboard a Delta II launch vehicle. The Delta II will carry the lander and its payload to a 1367 km orbit. Once it reaches that altitude, a STAR 48A solid rocket motor will kick the spacecraft into a lunar trajectory. After burnout of the lunar insertion motor, it will be jettisoned from the spacecraft. The flight from the earth to the moon will take approximately 106.4 hours. During this time the battery, which was fully charged prior to launch, will provide all power to the spacecraft. Every hour, the spacecraft will use its sun sensors and star trackers to update its position, maintain some stabilization and relay it back to earth using the dipole antennas. At the start of its lunar trajectory, the spacecraft will fire one of its 1.5 N thrusters to spin in at a very small rate. The main reason for this is to prevent one side of the spacecraft from overheating in the sun. When the spacecraft nears the moon, it will orient itself for the main retro burn. At an altitude of 200 km, a 4400 N bipropellant liquid thruster will ignite to slow the spacecraft. During the burn, the radar altimeter will be turned on to guide the spacecraft. The main retro rocket will slow the lander to 10 m/s at an approximate altitude of 40 km above the moon. From there, the space craft will use four 4.5 N hydrazine vertical thrusters and 1.5 N horizontal thrusters to guide the spacecraft to a soft landing. Once on the ground, the lander will shutoff the radar and attitude control systems. After the debris from the impact has settled, the six solar panels will be deployed to begin recharging the batteries and to power up the payload. The feedhorn antenna will then rotate to fix itself on the earth. Once it moves, it will stay in that position for the spacecraft's lifetime. The payload will then be activated to begin the lunar mission.

Source record↗

Land use project (comparison of LANDSAT with aircraft-derived land cover data for a proposed highway project)

The Maryland Automated Geographic Information System is described as well as the development of a general land cover classification with level 2 separation for vegetation categories for a 95,000-acre study area in Howard and Anne Arundel Counties. An accuracy analysis was performed on two subsections of the entire study area. The 1:24,000 scale land use map and the high in altitude infrared photography were determined to the best source of ground truth for the analysis. Results show that (1) delineation of deciduous and coniferous forested areas from LANDSAT data compared well with results from infrared photography; (2) general classification of agricultural areas showed acceptable results; (3) delineation of residential areas had the highest error rates (difference in interpretation and cover type assignment methods was a primary factor); and (4) LANDSAT-derived land cover data is to be used as an ancillary data source in a Maryland statewide land cover inventory.

Rugoski, T.↗

Overview of Proposed Summer Project [Slides]

The following are visual aids developed to assist in initial discussion with an intern about their proposed Summer 2021 project. Project Goal: Develop a user friendly code to assess pressure load on a geometry of interest to understand the rigid body effects, and compare to more complex approaches

97 MATHEMATICS AND COMPUTING↗

Summary Analysis of Different Offshore Wind Capacity Density Drivers in Proposed U.S. Projects and Impacts on Progress Towards State and Federal Deployment Targets

Understanding the density of offshore wind development - or the "capacity density" - is important for state and federal offshore wind planning efforts and to track progress towards policy goals. NREL has traditionally assumed a capacity density of 3 megawatts per square kilometer (MW/km2) when estimating the U.S. project pipeline (Musial et al. 2022), but capacity densities for existing European offshore wind farms ranged from 2-19 MW/km2 (Borrmann et al. 2018). We track the expected capacity densities of the proposed U.S. projects in the East Coast and make an analysis by state and by developer to identify what are the capacity density norms in the industry and whether the state in which the development efforts are taking place has some impact on capacity density. We also analyze the effects of the area occupied by station keeping systems on capacity density for lease areas dedicated to floating projects and provide a list of main capacity density drivers. This summary analysis sets a baseline to study how different capacity density drivers could impact the progress towards state and federal deployment targets. Given the currently delineated Renewable Energy Areas in the Outer Continental Shelf (OCS) and the basis from the summary analysis, we estimate the expected offshore wind deployment over time federally and by state and compare it to the state and federal deployment targets. The proposed analysis helps identify gaps and needs to meet state and federal targets, which provides sufficient information to propose strategic supply chain and policy planning with the objective of meeting deployment goals.

capacity density↗

High-density SSiC 3D-printed Lattices for Compact HTHP Aero-engine Recuperators

The proposed project utilizes advanced ceramic-based 3D-printing technology to develop light, low-cost, ultra-compact, high-temperature high-pressure (HTHP) heat exchangers (HX) for the harsh oxidizing environment of aircraft gas-turbine engines. Typical 3D printing technologies (powder bed or lithographic techniques) cannot produce large high-density, monolithic ceramic material with intricate internal features and channels required for high-temperature, high-pressure recuperators. Furthermore, typical 3D printing technologies are not yet economical for large high-density components. A high-density material is required for hermeticity, high-temperature strength, and oxidation, corrosion, and wear resistance. The team has invented an extrusion-based additive manufacturing technology (referred to as robocasting) and developed processing techniques to tailor composition and rheological mix properties for rapid 3D printing of high-density alumina and SiC parts. The goal of the proposed project is to use robocasting technology to demonstrate commercializable high-density 3D-printed ceramic HX modules with high durability and quality, thereby reducing the risk of thermo-mechanical failure under extreme environments. In addition, the proposed project improves the quality of the ceramic 3D-printing process over a large printed area and HTHP operating conditions. Ceramic 3D printing technology also provides a means to create advanced topologies that are unobtainable with conventional manufacturing.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Handheld Universal Lunar Camera

The Handheld Universal Lunar Camera (HULC) project is a proposed project to fly a commercial off the Shelf (COTS) unit to be used in all aspects of the Artemis Program. This will include use on Orion, Gateway, Human Lander, and on EVA operations at all locations, which will include lunar surface use. The HULC is planned to be COTS with minimal modification; extensive testing must be done to ensure usability in lunar environments.

Jacob Trull↗