Search NASA⌕ Search

SEARCH · Search NASA

Results for “single pilot operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

HCCI Load Expansion Opportunities Using a Fully Variable HVA Research Engine to Guide Developments of a Production Intent Cam-Based VVA Engine: The Low Load Limit

While the potential emissions and efficiency benefits of HCCI combustion are well known, realizing the potentials on a production intent engine presents numerous challenges. In this study we focus on identifying challenges and opportunities associated with a production intent cam-based variable valve actuation (VVA) system on a multi-cylinder engine in comparison to a fully flexible, naturally aspirated, hydraulic valve actuation (HVA) system on a single-cylinder engine, with both platforms sharing the same GDI fueling system and engine geometry. The multi-cylinder production intent VVA system uses a 2-step cam technology with wide authority cam phasing, allowing adjustments to be made to the negative valve overlap (NVO) duration but not the valve opening durations. On the single cylinder HVA engine, the valve opening duration and lift are variable in addition to the NVO duration. The content of this paper is limited to the low-medium operating load region at 2000rpm. Using different injection strategies, including the NVO pilot injection approach, the single-cylinder engine is operated over a load range from 160-390 kPa net IMEP at 2000 rpm. Changes to valve opening duration on the single-cylinder HVA engine illustrate opportunities for load expansion and efficiency improvement at certain conditions. For instance, the low load limit can be extended on the HVA engine by reducing breathing and operating closer to a stoichiometric air fuel ratio (AFR) by using valve deactivation. The naturally aspirated engine used here without external EGR confirmed that as operating load increases the emissions of NOx increases due to combustion temperature. NOx emissions are found to be one limitation to the maximum load limitation, the other being high pressure rise rate. It is found that the configuration of the production intent cam-based system represents a good compromise between valve lift and duration in the low to medium load region. Changing the extent of charge motion and breathing via valve deactivation prove beneficial at moderating the pressure rise rate and combustion stability and extending the low load limit at 2000rpm on the HVA engine. It also confirms that strategies using a pilot fuel injection are beneficial at low operating loads but that as operating load is increased, the benefits of multiple injection diminish to the point where a single injection offers the best performance.

33 ADVANCED PROPULSION SYSTEMS↗

HCCI Load Expansion Opportunities using a Fully Variable HVA Research Engine to Guide Development of a Production Intent Cam-based VVA Engine: The Low Load Limit

While the potential emissions and efficiency benefits of HCCI combustion are well known, realizing the potentials on a production intent engine presents numerous challenges. In this study we focus on identifying challenges and opportunities associated with a production intent cam-based variable valve actuation (VVA) system on a multi-cylinder engine in comparison to a fully flexible, naturally aspirated, hydraulic valve actuation (HVA) system on a single-cylinder engine, with both platforms sharing the same GDI fueling system and engine geometry. The multi-cylinder production intent VVA system uses a 2-step cam technology with wide authority cam phasing, allowing adjustments to be made to the negative valve overlap (NVO) duration but not the valve opening durations. On the single cylinder HVA engine, the valve opening duration and lift are variable in addition to the NVO duration. The content of this paper is limited to the low-medium operating load region at 2000rpm. Using different injection strategies, including the NVO pilot injection approach, the single-cylinder engine is operated over a load range from 160-390 kPa net IMEP at 2000 rpm. Changes to valve opening duration on the single-cylinder HVA engine illustrate opportunities for load expansion and efficiency improvement at certain conditions. For instance, the low load limit can be extended on the HVA engine by reducing breathing and operating closer to a stoichiometric air fuel ratio (AFR) by using valve deactivation. The naturally aspirated engine used here without external EGR confirmed that as operating load increases the emissions of NOx increases due to combustion temperature. NOx emissions are found to be one limitation to the maximum load limitation, the other being high pressure rise rate. It is found that the configuration of the production intent cam-based system represents a good compromise between valve lift and duration in the low to medium load region. Changing the extent of charge motion and breathing via valve deactivation prove beneficial at moderating the pressure rise rate and combustion stability and extending the low load limit at 2000rpm on the HVA engine. It also confirms that strategies using a pilot fuel injection are beneficial at low operating loads but that as operating load is increased, the benefits of multiple injection diminish to the point where a single injection offers the best performance.

33 ADVANCED PROPULSION SYSTEMS↗

Efficacy of a Radiation Absorbing Shield in Reducing Dose to the Interventionalist During Peripheral Endovascular Procedures: A Single Centre Pilot Study

PurposeThis prospective pilot study was undertaken to evaluate the feasibility and effectiveness of using a radiation absorbing shield to reduce operator dose from scatter during lower limb endovascular procedures.Materials and MethodsA commercially available bismuth shield system (RADPAD) was used. Sixty consecutive patients undergoing lower limb angioplasty were included. Thirty procedures were performed without the RADPAD (control group) and thirty with the RADPAD (study group). Two separate methods were used to measure dose to a single operator. Thermoluminescent dosimeter (TLD) badges were used to measure hand, eye, and unshielded body dose. A direct dosimeter with digital readout was also used to measure eye and unshielded body dose. To allow for variation between control and study groups, dose per unit time was calculated.ResultsTLD results demonstrated a significant reduction in median body dose per unit time for the study group compared with controls (p = 0.001), corresponding to a mean dose reduction rate of 65 %. Median eye and hand dose per unit time were also reduced in the study group compared with control group, however, this was not statistically significant (p = 0.081 for eye, p = 0.628 for hand). Direct dosimeter readings also showed statistically significant reduction in median unshielded body dose rate for the study group compared with controls (p = 0.037). Eye dose rate was reduced for the study group but this was not statistically significant (p = 0.142).ConclusionInitial results are encouraging. Use of the shield resulted in a statistically significant reduction in unshielded dose to the operator’s body. Measured dose to the eye and hand of operator were also reduced but did not reach statistical significance in this pilot study.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Savannah River National Laboratory Collaborative Innovation Pilot Team - 17560

The Collaborative Innovation (COIN) program was established by the Savannah River National Laboratory (SRNL) in March 2016. The goal of the SRNL COIN program is to identify innovative options to significantly reduce program and project risks (improve safety, reduce schedule and cost) of high priority Department of Energy Environmental Management, National Nuclear Security Administration, and Nuclear Energy missions. The COIN Advisory Board selected as the target outcome of the first COIN effort a 50% improvement to the Savannah River Site (SRS) H-Canyon spent nuclear fuel (SNF) processing 'baseline,' or current plan, as defined in the SRS Nuclear Materials Planning Roadmap. A small team of SRNL and Savannah River Nuclear Solutions personnel with pertinent experience and expertise was co-located and largely sequestered for eight weeks to identify improvements to H-Canyon processing of SNF. Following the process defined in the SRNL COIN Charter, the COIN Pilot Team analyzed the baseline for processing SNF through H Canyon; generated alternative ideas; tested seemingly viable ideas by reaching out to other subject-matter experts; and identified options for consideration for implementation by the COIN Advisory Board. The COIN Pilot produced a number of important outcomes, including important lessons learned for subsequent COIN efforts. The two principal outcomes are these: 1. The COIN Pilot Team conducted a comprehensive examination of the individual unit operations, the integrated system, and external interfaces to produce a timeline of H-Canyon processing and sampling times that had not previously existed. The general timeline served as the baseline from which the Pilot Team identified processing improvements. In addition, the timeline has already been employed in other planning efforts. 2. The COIN Pilot Team determined that innovations to the H-Canyon Dissolving unit operation alone could increase the number of SNF bundles processed through H Canyon by the target of 50%, but with little margin for error. To ensure that the gains in throughput in the Dissolving unit operation would be maintained throughout the facility, the Pilot Team identified four additional improvements to create greater efficiency and flexibility in downstream H-Canyon unit operations. The COIN Pilot Team's innovations reduce the processing time of a single batch of SNF through H Canyon from about 70 days to about 50 days. This talk will review the COIN process and the results of the pilot of the process. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessing the Geomechanical Response of CO 2 Disposal in Flood Basalt Reservoirs

In this work, we complete a multi-scale investigation of the physical processes governing geologic CO 2 sequestration in basalt reservoirs. This work integrates (i) laboratory measurements of relative permeability in a basalt fracture, (ii) theoretical modeling to understand how relative permeability uncertainty affects geomechanical performance attributes of basalt reservoirs, (iii) outcrop-scale simulation to identify the characteristics of vertical CO 2 flow in a basalt fracture network, and (iv) regional-scale assessment of permeability architecture in the Columbia River Basalt Group (CRBG). These individual studies are combined into a site-scale stochastic model of geologic CO 2 sequestration in the Columbia River Plateau, which shows how bulk and relative permeability variability affects geomechanical reservoir integrity and storage capacity of flood basalt reservoirs. This project resulted in a novel laboratory technique that combines X-ray CT and micro-PET scanning to calculate the relative permeability curves for a horizontal fracture in basalt. We also discovered that permeability on the Columbia River Plateau exhibits directionally-dependent spatial correlation, which our analysis suggests is a result of loading-induced subsidence. This analysis further discovered that permeability in the CRBG may increase at depth due to bending moment stresses. In the context of CO 2 sequestration, this result implies that storage capacity and injectivity may actually increase at depths beyond ~1 km. Our outcrop-scale investigation found that buoyant, free-phase CO 2 tends to accumulate at fracture intersections, which inhibits vertical flow over 10+ year timescales and may facilitate both physical and chemical trapping as fluid mobility decreases. At the site-scale, we find that in flood basalt reservoirs the spatial configuration of reservoir permeability exhibits substantial control on CO 2 injectivity. We utilized known borehole geology from the Wallula Basalt Sequestration Pilot Project to develop 50 equally probable permeability configurations and found that a single injection well operating at 95% of the borehole breakout pressure can deliver 0.12 to 2.0 million metric tons of CO 2 per year (MMT CO 2 per year). This maximum injection rate can support a 1,000 MW gas-fired power plant with a single injection well.

58 GEOSCIENCES↗

Demonstration of High-Temperature Calcium-Based Thermochemical Energy Storage System for use with Concentrating Solar Power Facilities

Thermochemical energy storage (TCES) systems offer several advantages over sensible heat storage via molten salts for concentrating solar power (CSP) including: energy density, cost, indefinite storage time, and no risk of freezing. SR’s TCES system utilizes a CaO-based carbonation reaction at high temperature in a fixed bed heat exchanger reactor. The SunShot APOLLO project focuses on the validation of the calcium oxide sorbent for capacity, durability, system economics, and demonstration of the system at a small pilot scale, including system control and operation in simulated on-sun conditions, discharging at 720°C. Under phase I SR completed evaluation of the sorbent loaded in a single-channel heat exchanger reactor. The major accomplishments of phase II are: Design, fabrication and commissioning of a 4 kWhth pilot plant (50x capacity increase from previous bench scale) with a closed-loop CO 2 system, and a commercially relevant heat exchange reactor. The heat exchange reactor has been designed with state-of-the-art modeling tools to ensure 1) sufficient lifetime of the Incoloy body and 2) performance of the packed bed reactor will be adequate to meet the milestones. The rest of the pilot system has been designed with off-the shelf components to maximize reliability and cost effectiveness. The system is highly instrumented and capable of time resolved, independent measurements of the heat and mass balances respectively. Major developments in the technoeconomic analysis (TEA) include 1) reduction of the cost of membrane gas storage for the near-term and future systems and 2) integration with liquid metal receivers and particle receivers for higher decarbonation temperatures and pressures which reduced the cost of gas compression and increased system efficiency. The result are three scenarios with costs bases of 21.9 dollars, 14.3 dollars, and 10.9 dollars/kWhth corresponding to a real LCOE of 59, 57, 56 dollars/MWhe, respectively. The basic operations of the energy storage system were demonstrated for carbonation (discharging) and decarbonation (charging) over short time periods. Excellent control of the CO 2 mass balance across the reactor was achieved with mass flow controllers and the basic operation of the level control of the CO 2 gas bladder was achieved. The system was apparently free from leaks and operated continuously for 18 days with no mechanical failures, thus meeting milestone 2.5.5. The major shortcomings of the system had to do with the controls which prevented us from deep cycling and or reaching high cycles. We were unable to decarbonate (charge) the system for more than a few minutes at a time, which was much shorter than the design target of 10 hrs. This issue could not be resolved due to facility availability and contract closure. One major finding is that CaO-based TCES is most cost efficient when charged with HTF (heat transfer fluid) temperatures >850°C to reach the round-trip exergy efficiency and system cost targets which are higher temperatures than those considered for Gen 3 CSP. Many of the balance of plant components do not exist today, however we are encouraged by our findings that in general with more work we are able to reduce the capital cost, for example with the membrane gas storage, which is an innovative component in itself. The CaO-based TCES system has potential to meet the latest SunShot 2030 goals of LCOE at 50 dollars/MWhe with capital costs of <11/kWhth.

14 SOLAR ENERGY↗

Demonstration of High-Temperature Calcium-Based Thermochemical Energy Storage System for use with Concentrating Solar Power Facilities

Thermochemical energy storage (TCES) systems offer several advantages over sensible heat storage via molten salts for concentrating solar power (CSP) including: energy density, cost, indefinite storage time, and no risk of freezing. SR’s TCES system utilizes a CaO-based carbonation reaction at high temperature in a fixed bed heat exchanger reactor. The SunShot APOLLO project focuses on the validation of the calcium oxide sorbent for capacity, durability, system economics, and demonstration of the system at a small pilot scale, including system control and operation in simulated on-sun conditions, discharging at 720°C. Under phase I SR completed evaluation of the sorbent loaded in a single-channel heat exchanger reactor. The major accomplishments of phase II are: Design, fabrication and commissioning of a 4 kWhth pilot plant (50x capacity increase from previous bench scale) with a closed-loop CO 2 system, and a commercially relevant heat exchange reactor. The heat exchange reactor has been designed with state-of-the-art modeling tools to ensure 1) sufficient lifetime of the Incoloy body and 2) performance of the packed bed reactor will be adequate to meet the milestones. The rest of the pilot system has been designed with off-the shelf components to maximize reliability and cost effectiveness. The system is highly instrumented and capable of time resolved, independent measurements of the heat and mass balances respectively. Major developments in the technoeconomic analysis (TEA) include 1) reduction of the cost of membrane gas storage for the near-term and future systems and 2) integration with liquid metal receivers and particle receivers for higher decarbonation temperatures and pressures which reduced the cost of gas compression and increased system efficiency. The result are three scenarios with costs bases of 21.9 dollars, 14.3 dollars, and 10.9 dollars/kWh th corresponding to a real LCOE of 59, 57, 56 dollars/MW he , respectively. The basic operations of the energy storage system were demonstrated for carbonation (discharging) and decarbonation (charging) over short time periods. Excellent control of the CO 2 mass balance across the reactor was achieved with mass flow controllers and the basic operation of the level control of the CO 2 gas bladder was achieved. The system was apparently free from leaks and operated continuously for 18 days with no mechanical failures, thus meeting milestone 2.5.5. The major shortcomings of the system had to do with the controls which prevented us from deep cycling and or reaching high cycles. We were unable to decarbonate (charge) the system for more than a few minutes at a time, which was much shorter than the design target of 10 hrs. This issue could not be resolved due to facility availability and contract closure. One major finding is that CaO-based TCES is most cost efficient when charged with HTF (heat transfer fluid) temperatures >850°C to reach the round-trip exergy efficiency and system cost targets which are higher temperatures than those considered for Gen 3 CSP. Many of the balance of plant components do not exist today, however we are encouraged by our findings that in general with more work we are able to reduce the capital cost, for example with the membrane gas storage, which is an innovative component in itself. The CaO-based TCES system has potential to meet the latest SunShot 2030 goals of LCOE at 50 $/MW he with capital costs of <11/kWh th .

14 SOLAR ENERGY↗

ARC: A compact, high-field, fusion nuclear science facility and demonstration power plant with demountable magnets

The affordable, robust, compact (ARC) reactor is the product of a conceptual design study focused on reducing the size, cost, and complexity of a combined fusion nuclear science facility (FNSF) and demonstration fusion Pilot power plant. ARC is a ~200–250 MWe tokamak reactor with a major radius of 3.3 m, a minor radius of 1.1 m, and an on-axis magnetic field of 9.2 T. ARC has rare earth barium copper oxide (REBCO) superconducting toroidal field coils, which have joints to enable disassembly. This enables the vacuum vessel to be replaced quickly, mitigating first wall survivability concerns, and permits a single device to test many vacuum vessel designs and divertor materials. The design point has a plasma fusion gain of Q p ≈ 13.6, yet is fully non-inductive, with a modest bootstrap fraction of only ~63%. Thus ARC offers a high power gain with relatively large external control of the current profile. This highly attractive combination is enabled by the ~23 T peak field on coil achievable with newly available REBCO superconductor technology. External current drive is provided by two innovative inboard RF launchers using 25 MW of lower hybrid and 13.6 MW of ion cyclotron fast wave power. The concluding efficient current drive provides a robust, steady state core plasma far from disruptive limits. ARC uses an all-liquid blanket, consisting of low pressure, slowly flowing fluorine lithium beryllium (FLiBe) molten salt. The liquid blanket is low-risk technology and provides effective neutron moderation and shielding, excellent heat removal, and a tritium breeding ratio ≥ 1.1. The large temperature range over which FLiBe is liquid permits an output blanket temperature of 900 K, single phase fluid cooling, and a high efficiency helium Brayton cycle, which allows for net electricity generation when operating ARC as a Pilot power plant.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Industrial Gas Turbine Engine Catalytic Pilot Combustor-Prototype Testing

PCI has developed and demonstrated its Rich Catalytic Lean-burn (RCL®) technology for industrial and utility gas turbines to meet DOE's goals of low single digit emissions. The technology offers stable combustion with extended turndown allowing ultra-low emissions without the cost of exhaust after-treatment and further increasing overall efficiency (avoidance of after-treatment losses). The objective of the work was to develop and demonstrate emission benefits of the catalytic technology to meet strict emissions regulations. Two different applications of the RCL® concept were demonstrated: RCL® catalytic pilot and Full RCL®. The RCL® catalytic pilot was designed to replace the existing pilot (a typical source of high NOx production) in the existing Dry Low NOx (DLN) injector, providing benefit of catalytic combustion while minimizing engine modification. This report discusses the development and single injector and engine testing of a set of T70 injectors equipped with RCL® pilots for natural gas applications. The overall (catalytic pilot plus main injector) program NOx target of less than 5 ppm (corrected to 15% oxygen) was achieved in the T70 engine for the complete set of conditions with engine CO emissions less than 10 ppm. Combustor acoustics were low (at or below 0.1 psi RMS) during testing. The RCL® catalytic pilot supported engine startup and shutdown process without major modification of existing engine controls. During high pressure testing, the catalytic pilot showed no incidence of flashback or autoignition while operating over a wide range of flame temperatures. In applications where lower NOx production is required (i.e. less than 3 ppm), in parallel, a Full RCL® combustor was developed that replaces the existing DLN injector providing potential for maximum emissions reduction. This concept was tested at industrial gas turbine conditions in a Solar Turbines, Incorporated high-pressure (17 atm.) combustion rig and in a modified Solar Turbines, Incorporated Saturn engine rig. High pressure single-injector rig and modified engine rig tests demonstrated NOx less than 2 ppm and CO less than 10 ppm over a wide flame temperature operating regime with low combustion noise (<0.15% peak-to-peak). Minimum NOx for the optimized engine retrofit Full RCL® designs was less than 1 ppm with CO emissions less than 10 ppm. Durability testing of the substrate and catalyst material was successfully demonstrated at pressure and temperature showing long term stable performance of the catalytic reactor element. Stable performance of the reactor element was achieved when subjected to durability tests (>5000 hours) at simulated engine conditions (P=15 atm, Tin=400C/750F.). Cyclic tests simulating engine trips was also demonstrated for catalyst reliability. In addition to catalyst tests, substrate oxidation testing was also performed for downselected substrate candidates for over 25,000 hours. At the end of the program, an RCL® catalytic pilot system has been developed and demonstrated to produce NOx emissions of less than 3 ppm (corrected to 15% O2) for 100% and 50% load operation in a production engine operating on natural gas. In addition, a Full RCL® combustor has been designed and demonstrated less than 2 ppm NOx (with potential to achieve 1 ppm) in single injector and modified engine testing. The catalyst/substrate combination has been shown to be stable up to 5500 hrs in simulated engine conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1↗

Development of a Validation Approach for an Integrated Waste Glass Melter Model

Integrated models are being developed to represent the physics occurring within the high-level and low-activity waste melters that will be used to vitrify legacy tank waste at the Hanford site. These models couple the melt pool, cold cap, and plenum region within a single computational domain. Validation of the models is essential to ensure the reliability of the numerical predictions of the operational melters. Experimental data from laboratory- and pilot-scale tests are thus being used to inform and validate various aspects of the melter model. This study presents a tiered approach to model validation consisting of a series of progressively more complex test cases designed to model the physics occurring in the full-scale system. A hierarchical methodology has been developed to segregate and simplify the physical phenomena affecting the multiphase flow and heat transfer within a waste glass melter. Finally, four hierarchical levels are defined in a validation pyramid and built up in levels of increasing complexity from unit problems to subsystem cases, to pilot-scale systems, and then to the full-scale system.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot testing of CO2 capture from a coal-fired power plant—Part 2: Results from 1-MWe pilot tests

Abstract Using a 1-MWe slipstream pilot plant, solid-sorbent-based post-combustion CO2 capture was tested at a coal-fired power plant. Results from pilot testing were used to develop a preliminary full-scale commercial design. The sorbent selected for pilot-scale evaluation during this project consisted of an ion-exchange resin that incorporated amines covalently bonded to the substrate. A unique temperature-swing-absorption (TSA) process was developed that incorporated a three-stage fluidized-bed adsorber integrated with a single-stage fluidized-bed regenerator. Overall, following start-up and commissioning challenges that are often associated with first-of-a-kind pilots, the pilot plant operated as designed and expected, with a few key exceptions. The two primary exceptions were associated with: (i) handling characteristics of the sorbent, which were sufficiently different at operating temperature than at ambient temperature when design specifications were established with lab-scale testing; and (ii) CO2 adsorption in the transport line between the regenerator and adsorber that preloaded the sorbent with CO2 prior to entering the adsorber. Results from the pilot programme demonstrate that solid-sorbent-based post-combustion capture can be utilized to achieve 90% CO2 capture from coal-fired power plants.

Sjostrom, Sharon↗

Search for Double Beta Decays of Xe134 with EXO-200 Phase II

EXO-200 was a leading double beta decay experiment consisting of a single-phase, enriched liquid xenon time projection chamber filled with an admixture of 80.672% ^{136}Xe and 19.098% ^{134}Xe. The detector operated at the Waste Isolation Pilot Plant between 2010 and 2018 and was designed to search for double beta decay of ^{136}Xe. Data were acquired in two phases separated by a period of detector upgrades. We report on the search for 0νββ and 2νββ decay of ^{134}Xe with Phase II EXO-200 data, with median 90% CL exclusion sensitivity to half-life T_{1/2}^{0ν}≥3.7×10^{23} yr and T_{1/2}^{2ν}≥2.6×10^{21} yr, respectively. No statistically significant signal is observed for either decay mode. We set a world-leading lower limit on the half-life of the neutrinoless decay mode of ^{134}Xe of T_{1/2}^{0ν}≥8.7×10^{23} (90% CL) and the second strongest constraint on the two-neutrino decay of T_{1/2}^{2ν}≥2.9×10^{21} (90% CL), a threefold improvement over the EXO-200 Phase I measurement. New constraints are also set for the 2νββ and 0νββ decays of ^{134}Xe to the lowest excited state of ^{134}Ba.

Al Kharusi, S↗

Power control apparatus and methods for electric vehicles

Electric vehicle (EV) charging apparatus and methods are described which allow the sharing of charge current between multiple vehicles connected to a single source of charging energy. In addition, this charge sharing can be performed in a grid-friendly manner by lowering current supplied to EVs when necessary in order to satisfy the needs of the grid, or building operator. The apparatus and methods can be integrated into charging stations or can be implemented with a middle-man approach in which a multiple EV charging box, which includes an EV emulator and multiple pilot signal generation circuits, is coupled to a single EV charge station.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimizing the Operational Parameters of an Electrochemical Purification Cell for Corrosion Mitigation in CSP Plants During Operation: Preprint

To make concentrating solar power (CSP) cost-competitive, the next generation of CSP plants will increase efficiency by operating at a higher temperature, which will require a new thermal energy storage material. One option for the thermal energy storage material is a ternary chloride salt that is stable at the temperatures required, but reacts easily with the atmosphere to form MgOHCl, a corrosive impurity. If left unchecked, this impurity will corrode the containment alloys, potentially leading to dangerous spills. We are working to design an electrochemical purification cell to remove MgOHCl from the molten chloride salt during CSP plant operation. In this paper, we use predictive modeling to assess the rate at which purification must occur. Additionally, we analyze possible process flow pathways for the molten chloride salts. Ultimately, we determine that implementation of a single reactor through which all chloride salts flow is the most efficient design to reduce impurity concentration below 0.1 mol % impurity.

concentrating solar power↗

Pilot microbial electrolysis cell closes the hydrogen loop for hydrothermal wet waste conversion to jet fuel

The global shift toward net-zero emissions necessitates resource recovery from wet waste. In this study, we demonstrate the first feasibility of combining pilot-scale microbial electrolytic cells (MECs) with hydrothermal liquefaction (HTL) for simultaneous post-hydrothermal liquefaction wastewater (PHW) treatment and efficient hydrogen (H₂) production to meet biocrude upgrading requirements. Long-term single reactor operation revealed that fixed anode potential enabled rapid startup, and low catholyte pH and high salinity were effective in suppression of cathodic methanogenesis and acetogenesis – resulting in high current density of 16.6 A m –2 and 9.3 A m –2 when feeding synthetic wastewater and PHW respectively. Additionally, the anode biofilm exhibited spatial variations in response to local environmental conditions. In conclusion, onsite parallel or serial operations of multiple MECs showed good performance using actual PHW with a record-high H 2 production rate of 0.5 L L R day –1 for MEC over 10 liters scale, and the optimal chemical oxygen demand (COD)-to-H 2 yield reached 0.127 kg-H 2 per kg-COD, supporting a self-sufficient, closed-loop upgrade to jet fuel.

08 HYDROGEN↗

Alternative Canister Processing Operations at an Interim Storage Facility - 16617

The US Department of Energy (DOE) is laying the groundwork for implementing interim storage of spent nuclear fuel (SNF) in response to recommendations by the Blue Ribbon Commission on America's Nuclear Future in their report to the Secretary of Energy published January 2012. These efforts include planning for a Pilot Interim Storage Facility (ISF) and a Larger ISF. In March 2014, the DOE employed the CB and I team to evaluate design alternatives for cask handling operations and storing SNF at an ISF. The report, 'Generic Design Alternatives for Dry Storage of Used Nuclear Fuel', (Alternatives Report) evaluates different aspects of an ISF, including a study on alternative approaches for processing SNF canisters such as different cask handling methods and configurations which might be used to transfer canisters from shipping casks into storage locations at an ISF. The purpose of this paper is to report on the development of alternative cask handling operations that have been evaluated for the receipt and storage of the SNF at an initial Pilot ISF and a Larger ISF. This design study is relevant for host communities considering near-term development of a Pilot ISF. DOE-sponsored system analyses indicate that a processing rate of up to 3,000 MTU/yr (approximately 230 to 300 canisters) would be needed for a single Larger ISF (less if more than one ISF were developed) to remove SNF from commercial nuclear plants in a reasonable amount of time. The study evaluated different canister processing operation methodologies in order to reduce the complexity, cost, and personnel exposure associated with processing operations at an ISF. The conclusions from this design study could help to inform the selection of future canister processing operations for an ISF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Thermal and Chemical Effets on Negative Valve Overlap Period Energy Recovery for Low-Temperature Gasoline Combustion

A central challenge for efficient auto-ignition controlled low-temperature gasoline combustion (LTGC) engines has been achieving the combustion phasing needed to reach stable performance over a wide operating regime. The negative valve overlap (NVO) strategy has been explored as a way to improve combustion stability through a combination of charge heating and altered reactivity via a recompression stroke with a pilot fuel injection. The study objective was to analyze the thermal and chemical effects on NVO-period energy recovery. The analysis leveraged experimental gas sampling results obtained from a single-cylinder LTGC engine along with cylinder pressure measurements and custom data reduction methods used to estimate period thermodynamic properties. The engine was fueled by either iso-octane or ethanol, and operated under sweeps of NVO-period oxygen concentration, injection timing, and fueling rate. Gas sampling at the end of the NVO period was performed via a custom dump-valve apparatus, with detailed sample speciation by in-house gas chromatography. The balance of NVO-period input and output energy flows was calculated in terms of fuel energy, work, heat loss, and change in sensible energy. Experiment results were complemented by detailed chemistry single-zone reactor simulations performed at relevant mixing and thermodynamic conditions, with results used to evaluate ignition behavior and expected energy recovery yields. For the intermediate bulk-gas temperatures present during the NVO period (900-1100 K), weak negative temperature coefficient behavior with iso-octane fueling significantly lengthened ignition delays relative to similar ethanol fueled conditions. Faster ethanol ignition chemistry led to lower recovered fuel intermediate yields relative to similar iso-octane fueled conditions due to more complete fuel oxidation. From the energy analysis it was found that increased NVO-period global equivalence ratio, either from lower NVOperiod oxygen concentrations or higher fueling rates, in general led to a greater fraction of net recovered fuel energy and work as heat losses were minimized. These observations were supported by complementary single-zone reactor model results, which further indicated that kinetic time-scales favor chemical energy-consuming exothermic oxidation over slower endothermic reformation. Nonetheless, fuel energy recovery close to the thermodynamic equilibrium solution was achieved for baseline conditions that featured 4% NVO-period oxygen concentration.

ethanol↗