Search NASA⌕ Search

SEARCH · Search NASA

Results for “site assessments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Dashboard for Marine Energy Site Assessment and Monitoring

The marine energy (ME) industry presently relies upon fragmented site assessment solutions that require high resource expenditure for deployment at each site and do not leverage the wealth of readily available tools and information. A wave energy resource assessment dashboard, currently in development, will substantially improve siting, permitting, operations, and maintenance of ME projects by providing an integrated solution that is a one-stop-shop for a developer’s needs. The Site Energy Assessment and MOnitoring Dashboard (SEAMOD) will be of commercial interest to anyone seeking to deploy an ME project and is easily expandable to include tidal and wind energy site assessments. The integrated dashboard is being developed using state-of-the-art database and cloud computing methods and data-assimilative modeling tools that can be coupled with low-cost, rapidly deployable wave buoys and environmental sensing hardware. The combined software and hardware dashboard will reduce wave energy site characterization and wave climate monitoring costs by more than 60 percent and provide assessments that meet international industry standards. To realize a thriving global ME industry, the physical environment at a potential deployment site must be understood, not only for resource characterization, but also for optimization of device and power conversion performance. SEAMOD directly addresses these needs with a commercially marketable product. SEAMOD is a low-cost solution that provides comprehensive ME resource assessments, baseline environmental monitoring, and offshore characterizations required for successful ME development. The key technical objectives for Phase I were a series of software development goals, which when implemented with monitoring solutions, produced an initial proof-of-concept low-cost wave energy resources dashboard. In Phase II, the development of the prototype SEAMOD continued. The basic framework employed was the development of a revised dashboard and monitoring tool customized for ME applications by focusing on IEC site assessment and method requirements. Development was focused on the integration of full hindcast metocean products to provide hindcast resource characterization and environmental information. The final integrated dashboard provides a low-cost solution that delivers comprehensive, scalable, industry-standard energy resource assessments and offshore characterizations required for successful ME development. The integrated dashboard offers visibility of the most recent site modeling, measurements, and historical data. The application and integration of consensus-based standards for wave energy resource assessment, as determined by the International Electrotechnical Commission (IEC), are crucial for the impact and value of SEAMOD. SEAMOD includes monthly, seasonal, and yearly statistics, as well as the total 30-year record, offering temporal resolution of the IEC parameters to aid potential developers in determining the available wave energy resources in their area of interest.

16 TIDAL AND WAVE POWER↗

PART II - Site Assessment and Characterization

This part of the book, includes site assessment and characterization case studies from remediating different areas and historical processes and operations across the Hanford Site

environmental remediation↗

Camp Lejeune Federal Fleet Tiger Team EVSE Site Assessment

The National Renewable Energy Laboratory (NREL) was contracted by the Department of Defense (DOD) Environmental Security Technology Certification Program (ESTCP) and the Department of Energy (DOE) Federal Energy Management Program (FEMP) to develop a web tool and complete pilot assessments for the installation of Electric Vehicle Supply Equipment (EVSE). NREL has deployed Tiger Teams comprising engineers and fleet experts to support DOD and DOE on several EVSE site assessments since 2015. However, the advancements developed in support of this report, including a cost-estimation tool and geospatial mapping tool, will enable a user-driven path to assess EVSE needs. This report details the site design recommendations for Camp Lejeune, North Carolina.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Responses to Deficiencies, AIHA Remote Site Assessment, September 9-10, 2020

Responses to the deficiencies found by Keith Nicholson during the American Industrial Hygiene Association external site assessment carried out remotely on September 9-10, 2020 in the Analytical Services and Instrumentation Division Analytical Laboratory (Lab ID101757).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Electric Vehicle Supply Equipment (EVSE) Site Assessment Report for the U.S. Army Corps of Engineers Chena Site Near Fairbanks, Alaska

This report presents an analysis of the requirements for charging station installation and electric vehicle operation at the US Army Corps of Engineers - Chena Site, located in a cold weather climate in the Fairbanks North Star Borough, AK. The report includes findings from a site visit, and a detailed electric vehicle (EV) charging site plan with cost estimates. Cost for three 50-ampere pedestal chargers located on the edge of the existing parking lot is estimated at $\$$53,100, and the cost of three 80-ampere chargers is estimated at $\$$89,400. The authors did not assess the cost of a heated garage. The USACE Chena site reaches extreme cold temperatures of -40 Degrees Celsius (-40 Degrees Fahrenheit) and below in a typical winter, often for days on end. Considerations of operating EVs as well as electrical vehicle supply equipment (EVSE) at this site can be applicable to other cold or extremely cold locations. Interviews with EV users in cold climates and a literature review indicated that EVs operate well but have significantly decreased range compared to 21 Degrees Celsius (70 Degrees Fahrenheit) operations. Some strategies such as prewarming the vehicle while it is plugged in and using heated seats and steering wheel instead of cabin heat, can improve cold weather performance. Storing the EV in a garage would mean the battery and cabin are automatically preheated, the battery would not age as rapidly as when the vehicle is stored outside, and problems with charging the vehicle are less likely. Lowest temperate-rated Electric Vehicle Supply Equipment (EVSE), as electric vehicle chargers are known as, are rated to -40 Degrees Celsius (-40 Degrees Fahrenheit), and sometimes malfunction. No EVSE is rated to the temperatures that USACE Chena site experienced for more than a week in winter 2023-4, of -50 Degrees Celsius (-45 Degrees Fahrenheit) and which are typical for the area. If reliability is a must, entities may want to consider a heated garage to minimize potential problems with charging equipment. There is a companion technical report to this titled "Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska" that examines the data on EV and EVSE cold-weather functionality in more detail. (Esparza, Truffer Moudra, and Hodge 2024).

33 ADVANCED PROPULSION SYSTEMS↗

A Framework for Parametric and Predictive Uncertainty Quantification in the E3SM Land Model: Assessing Site and Observable Generalizability

Quantifying parametric uncertainty using observations from individual sites provides a critical foundation for Earth system modeling, serving as a necessary first step before scaling up to regional or global applications. This study introduces a novel computational framework designed to enhance model predictability by reducing parametric uncertainty and assessing site and observable generalizability using various observational constraints. The framework integrates five components: Model Simulation, Statistical Emulation, Global Sensitivity Analysis (GSA), Model Calibration, and Model Prediction. Using the E3SM land model, we simulated site-level land-atmosphere carbon and energy fluxes from 2003 to 2007 across five evergreen needleleaf FLUXNET sites, perturbing 26 vegetation-related model parameters. Gaussian process emulators were employed to expedite GSA and model calibration. Four critical parameters that strongly influence selected land-atmosphere fluxes were identified by GSA. Bayesian approaches were used to infer parameter probability distributions leveraging synthetic data and FLUXNET observations. The results reveal that posterior parameter distributions vary significantly across different sites and observables within the same plant functional type. Probabilistic predictions indicate that parameters calibrated at one site can enhance predictive accuracy at other sites, although site heterogeneity may sometimes outweigh parametric uncertainty. Additionally, the probabilistic predictions demonstrate that calibration for one variable can also improve predictability for other variables, thereby maximizing predictive capabilities with limited observations. This framework provides a powerful approach for reducing parametric uncertainty in Earth system models and deepening our understanding of carbon dynamics and energy cycles. Its adaptability makes it a valuable tool for broader applications in Earth system modeling.

54 ENVIRONMENTAL SCIENCES↗

lllinois Storage Corridor CarbonSAFE Phase III: Pre-drilling Site Assessment: Prairie State Generating Company

The Illinois Storage Corridor project will drill a stratigraphic test well as part of the Illinois Storage Corridor CarbonSAFE Phase 3 project near the Prairie State Generating Company coal-fired power plant near Marissa, Illinois. The pre-drilling site evaluation has considered the primary target reservoirs, the Potosi Dolomite and St. Peter Sandstone, and primary seal, the Maquoketa Group. Data to be collected from the well include core, fluid samples, in situ well tests, geophysical logs intended to provide information on lithologic, geomechanical, and geophysical characteristics to determine the feasibility for the geologic sequestration of 50 million metric tons or more of injected carbon dioxide. The planned drilling site has been evaluated using available subsurface geologic data and analyses from the Illinois Basin. These data provide lithologic and structural information, shallow groundwater resource distribution, location of known nearby wellbores, and regional drilling characteristics. The data were used to generate geologic structure and isopach maps for the target reservoir and caprock strata and for prognosing the tops of major lithologic units to aid drilling and coring procedures. The regional analyses indicate that no known structural features are expected to negatively impact the target storage reservoir or caprock. No protected and sensitive areas, groundwater resources, or existing resource development are expected to be impacted by the proposed well drilling activities. The well is planned to be drilled to a total depth of approximately 5,600 feet (1,707 m) and terminate in the Precambrian. Cores (up to 5 intervals) will be collected from the Maquoketa Group, confining units above the St. Peter Sandstone, St. Peter Sandstone, confining units of the Potosi Dolomite and the Potosi Dolomite. Water samples will be attempted to be collected from the St. Peter Sandstone and Potosi Dolomite. Potential impact on drilling progress is a lost circulation zone in the Potosi Dolomite, which has been demonstrated to have intermittent cavernous porosity from karstification elsewhere in the Illinois Basin. This document also presents a preliminary coring and sampling program, proposed logging suite, and well testing program, all of which will be reviewed during drilling.

01 COAL, LIGNITE, AND PEAT↗

Golden Gate National Recreation Area Federal Fleet Tiger Team EVSE Site Assessment

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for the Golden Gate National Recreation Area, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Grand Teton National Park Federal Fleet Tiger Team EVSE Site Assessment

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for the Grand Teton National Park (GRTE) that can ultimately be incorporated into the overall Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Yellowstone National Park Federal Fleet Tiger Team EVSE Site Assessment [Slides]

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for Yellowstone National Park, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Multi-site assessment of the potential of fine resolution red-edge vegetation indices for estimating gross primary production

Gross primary production (GPP) models driven by fine resolution remote sensing data characterize the spatial and temporal heterogeneities in plant photosynthesis, which is largely dependent on biome-specific maximum photosynthetic capacity. The red-edge reflectance, sensitive to leaf chlorophyll content, is a good proxy of maximum photosynthetic capacity. More importantly, studies show that the red-edge reflectance-related chlorophyll content index (CIr) multiplied by the incident photosynthetic active radiation (PAR in ) strongly correlates to GPP estimated at carbon flux towers (GPP flux ). Yet, to the best of our knowledge, there is no systematic study investigating the general relationship between fine spatial resolution CIr and GPP among biomes and the relationship between CIr and maximum photosynthetic capacity in GPP models. To provide an overview on incorporating space-borne CIr into a GPP model, we applied fine resolution Sentinel-2-derived CIr and GPP flux over 57 flux sites representative of 10 biomes. We investigated the relationship between CIr and GPP flux , and the spatio-temporal relationship between CIr and ecosystem maximum photosynthetic capacity indicated by the potential ecosystem light use efficiency (LUE pot ). We also evaluated the relationship between other five vegetation indices (VIs) and GPP flux . Results showed that the CIr multiplied by PARin has a higher agreement (R 2 > 0.5) with GPP than other VIs. A universal relationship exists between the CIr multiplied by PARin and GPP, except for forest biomes. The CIr also strongly (R 2 > 0.5) relates to the LUE pot during the peak of the growing season. The CIr has a low spatial variance (CV = 0.25) among biomes, highlighting that CIr can be a proxy of maximum photosynthetic capacity in GPP models that do not require biome-dependent coefficients. This study provides insight for incorporating CIr into GPP models and better quantifying global terrestrial photosynthesis.

59 BASIC BIOLOGICAL SCIENCES↗

Pre-drilling Site Assessment: One Earth Energy

The Illinois Storage Corridor project will drill a test well in Ford County, IL, near the One Earth Energy facility in Gibson City, IL. Lithologic, geomechanical, and geophysical data collected from samples testing and an extensive geophysical logging suite will be used to determine the feasibility of the geologic sequestration of 50 million tonnes or more of injected carbon dioxide at this location. The primary target reservoir and caprock to be investigated for the Illinois Storage Corridor project are the Mt. Simon Sandstone and Eau Claire Formation, respectively, which together constitute a storage complex that has already been successfully used for natural gas storage in east-central Illinois and for geologic sequestration of carbon dioxide in south-central Illinois. The Lower Mt. Simon, which includes a high- porosity and -permeability arkosic layer, is being targeted as the primary storage zone. Regional maps of this unit indicate that the Lower Mt. Simon is expected to have excellent reservoir characteristics and high net thickness at the drill site.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Building Capacity: Solar Photovoltaics Site Assessment and Feasibility Study

While Bhutan is abundant with clean energy hydropower, there are dry months in winter when solar energy could reduce expensive power inputs and bolster Bhutan's energy resilience and independence. As the country explores solar photovoltaic (PV) development as an option to achieve that goal, grid planners and renewable energy experts are partnering with the South Asia Group for Energy (SAGE) to determine the benefits and challenges of building solar energy systems in Bhutan.

14 SOLAR ENERGY↗

On the use of NMR distance measurements for assessing surface site homogeneity

The past few decades have seen tremendous growth in the area of single-site heterogeneous catalysis, which aims to combine the best aspects of homogeneous and heterogeneous catalysis, namely molecular-level site control and ease of separation/recycling. Despite this, we still do not have a means of assessing site homogeneity and whether the produced catalyst is indeed a “single-site”. Recent developments have enabled the use of NMR-based distance measurements to determine the conformations and configurations of surface sites, leading to the question whether such measurements can be used to distinguish materials containing either single or multiple surface sites with otherwise indistinguishable NMR properties. Here, we describe a Monte Carlo-based multi-structure search algorithm and its application to the determination of multi-site structures from supported metal complexes. The sensitivity of REDOR data to the existence of multiple sites is assessed using synthetic data and prior literature examples are revisited to determine whether the single-site approximation was indeed appropriate. We lastly apply this new methodology to differentiate the configurations of zirconocene complexes grafted onto alumina supports that were thermally treated at different temperatures.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗