Small Hydro Power Plants with Integrated BESS for Enhance Resiliency

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a black start- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFM controlled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Complementary relationship between small-hydropower and increasing penetration of solar photovoltaics: Evidence from CAISO

To achieve the 100% green electricity goal, we need to understand the relationship between resources in the market and identify the flexible clean resources (i.e., hydropower) to integrate power from wind and photovoltaic (PV). This paper reveals a complementary relationship between small hydropower plants and solar PVs in the California Independent System Operator (CAISO) based on the system-wide hourly generation data from 2013 to 2017. When the solar PV increases its portion in the generation mix by 1%, small hydro will increase its portion by 0.01–0.06%. Such response is obvious in the net demand peak hours, both morning and evening. The low operation cost, flexibility, and dispatchability of small hydro in CAISO explain this complementarity. Due to its benefit in emission and low Levelized Cost of Electricity (LCOE), it is suggested to consider more small hydro projects to accommodate additional PV capacity for the 100% green electricity goal. Our estimation indicates that the current feasible potential of small hydro is sufficient, if the relation stays the same over years. If developers can mitigate the environmental impact, more technical potential will become feasible. Thus, small hydro could integrate more solar PV and reduce the demand for natural gas plants and batteries.

13 HYDRO ENERGY↗

ORNL Hydropower Cost Database Extract from FERC Form-1

The ORNL FERC Form 1 Hydropower Cost Database Extract is a cleaned and compiled version of the hydropower component of the Federal Energy Regulatory Commission’s (FERC) Electric Utility Annual Report, also known as Form-1. The database includes conventional and pumped storage hydropower plants owned by non-federal major utilities that submitted the Form 1 data from 1994-2020, representing about 22% of existing conventional hydropower capacity and 61% of pumped storage capacity. The database includes the escalation factors and describes the methods used to scale costs to a common data year, as well as tables of identifiers necessary to link the hydropower plants to two other relevant databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets database. This database provides historical capital and operating costs for three schedules/classes defined in Form 1: Large Hydro, Pumped Storage Hydro, and Small Hydro. The Large Hydro and Pumped Storage Hydro data include cost items, such as land, structures, facilities, etc.

13 HYDRO ENERGY↗

Prefabricated Standard Modular Hydropower Installations for Low-cost Small Hydropower

The goal of the present project was to investigate the potential savings in greenfield hydropower project costs across sites having vastly different characteristics. Littoral Power Systems, Inc. (LPS) undertook the project described herein to explore the promise of Standard Modular Hydropower (SMH) to transform the processes of site identification, conceptual design, detailed design, and construction planning to support low- cost, environmentally attractive development of small hydropower facilities at new stream- reaches. This report includes descriptions of the work to develop these processes, the resulting facility designs achieved using these processes and the projected economics. Installation cost estimates for the resulting conceptual greenfield facility design at two different locations come in at $\$3,419$/kW for Balcony Falls and $\$2,124$/kW for LPS 566. The installation time from site preparation to commissioning-ready is estimated to be 58 weeks for the conceptual facility at Balcony Falls and 42 weeks for the conceptual facility at LPS 566. A real challenge to any hydropower facility – not only the two cases studied here – is that environmental and social conditions can change, and as such, the facility may be required to change. The h-Modulor modules connect uniquely and are structurally independent, enabling site configurations to be changed on the fly, as needed. These results show that LPS's h-Modulor SMH approach delivers an attractive balance between efficiency, economics, and environmental sustainability for small hydro greenfield sites.

13 HYDRO ENERGY↗

Optimizing Power Reclamation of Micro Hydro Turbines in WWTPs Aeration Basins

Abstract This study investigates the optimum operating conditions and design configurations that can optimize the power reclaimed by small hydro turbines derived by the rising water-bubble current. The rising current is generated by the compressed air introduced by the diffusers at the bottom of aeration basins of Wastewater Treatment Plants (WWTPs). While optimizing the power production, the standard oxygen transfer efficiency (SOTE) is monitored since it is a significant parameter that cannot be sacrificed in the operation of WWTPs. Using one set of turbine blades, it was found out that the highest velocity is obtained in the upper half of the water column (70% - 80%). In contrast, the lowest velocities were obtained just above the air diffuser and at the water surface. Testing started with using a single turbine (ST) to determine the location of the optimum power reclaimed at each tested airflow (1.18, 1.42, 1.65, and 1.89 L/s). Then using double turbine (DT) and triple turbine (TT) to compare their performance to the ST’s maximum power increased power reclamation. The maximum percentage of increase in power reclamation for DT is 19.59%, while it is 20.24% in the case of TT. At a commonly used airflow in WWTPs (1.42 L/s), the optimum configurations of DTs and TTs were selected to investigate the effect of having the proposed setup on the SOTE. For membrane diffusers, DTs and TTs limited the dispersion of the air bubbles in the tank, therefore, reducing the SOTE (8.3% for DT and 3.7% for the TT). The ceramic and sharp-nub diffusers were also tested versus rubber membrane ones to determine the effect of using the ceramic and sharp-nub diffusers on the power reclamation and SOTE. Ceramic diffusers neither achieve higher power reclamation than the membrane nor increases the SOTE. In contrast, sharp-nub diffusers increase the SOTE for all configurations compared to membranes, but this came into account of power reclamation, where sharp-nub diffusers cause a DT and a TT to produce less power than ST does.

Energy & Fuels↗

A Component-Level Bottom-Up Cost Model for Pumped Storage Hydropower

Pumped Storage Hydropower (PSH) is currently the largest source of utility-scale electricity storage in the U.S. and worldwide. As the accelerating deployment of variable renewable technologies creates opportunity and value for energy storage, it has become increasingly important to characterize PSH costs to understand how it competes. Site-specific considerations and limited cost data in the public domain make it difficult to estimate capital costs for potential new PSH sites. This report documents a spreadsheet-based tool that addresses this challenge and creates a component-level bottom-up cost model for PSH that can be made publicly available for widespread use. It uses detailed site-level physical characteristics and design specifications to calculate key performance and cost parameters for individual components and the project as a whole. The model was developed in consultation with HDR, Inc. and Small Hydro Consulting to ensure it aligns with industry expectations. It enables PSH cost exploration across a wide range of system assumptions and could be customized or extended for the needs of a variety of users.

cost model↗

Examining the Net Revenue and Downstream Flow Impact Trade-Offs for a Network of Cascading, Small-Scale Hydropower Facilities: Preprint

In this work, we used a price-taker model to investigate the trade-offs between net revenue and downstream flow impacts for a network of small, cascading hydro facilities. The network consisted of 36 facilities, each with a small amount of local storage (between 2 and 45 minutes). Generator sizes ranged between 0.5 and 1 MW, nominal, and the total capacity of the network was 33.5 MW. We used a multi-integer linear programing model to maximize the net revenue of the combined network subject to operating and environmental constraints. Net revenue optimizations relied on historic price data, and dry, typical, and wet years were studied to help ensure robustness. Energy and ancillary service sales were included in the net revenue calculations, and both unit commitment and dispatch simulations were performed. We found that limiting the downstream flows to ±50% of the river’s natural flows had a negligible impact on net revenues (<1% reduction), irrespective of hydrologic conditions, and even when downstream flows were limited to ±5%, net revenues were only impacted by 4%. These outcomes are significant because they demonstrate how an array of small-scale hydropower facilities can be operated to have minimal impact on natural stream flows—addressing a critical environmental concern.

downstream flow↗

Enhancing Local Grid Resilience with Small Hydropower Hybrids: Proving the concept through demonstration, simulation, and analysis with Idaho Falls Power

Large hydropower, connected to the transmission system and typically possessing significant ability to balance grid frequency, has long been central to black start plans in regions where it is present. Small hydropower possesses most of the attributes required for black start but is often connected to distribution or sub-transmission systems and has less ability to balance grid frequency. Integrating energy storage such as batteries or ultracapacitors increases the combined asset’s ability to balance frequency. This asset integration enables a bottom-up grid restoration paradigm in which critical electric loads on the local distribution system can be powered even when the regional transmission system is down. This report presents a field demonstration conducted with Idaho Falls Power that proved this concept. The contribution of energy storage in restoring the small hydro-dominated distribution grid and its operational sensitivity across different control settings are further analyzed using high-fidelity simulations. Readers will learn about technical details on the field demonstration setup, energy storage contribution to black start, detailed simulation steps of islanded distribution grid restoration, and usage of field demonstration measurements for transient model refinements. Collectively this report points to a great opportunity for small hydropower to enhance resilience of local electric grids.

13 HYDRO ENERGY↗

In-Conduit Hydropower for Public Water Supply Systems: Development Challenges and Costs

Conduit hydropower leverages existing water infrastructure to provide energy solutions, though deployment has been slow. A 2022 US Department of Energy (DOE)–funded report led by Oak Ridge National Laboratory (ORNL) summarizes a reconnaissance-level study of hydropower potential at national conduits (Kao et al., 2022). The report includes power and energy estimates across three major sectors of conduit hydropower potential: municipal, agricultural, and industrial. Water resources include public water supply systems (municipal and industrial), irrigation canal systems (agricultural), thermoelectric cooling systems (industrial), and wastewater systems (municipal and industrial). In total, 1.41 GW of power potential was estimated nationwide. Subsequently, DOE has funded ORNL through the Conduit Hydropower Engineering, Evaluation, and Technology Acceleration project (CHEETA) to improve deployment potential for conduit hydropower. Work thus far has focused on “in-conduit” hydropower (ICH)—or “in-pipe” hydropower—for public water supply systems, though the project is planning to cover conduit hydropower more broadly. The timeline of ORNL’s conduit hydropower related research and development (R&D) is shown in Figure 1. The results of CHEETA should benefit the hydropower industry by providing insights into costs, barriers, and other considerations that impact project development. The hydropower industry and municipal/industrial conduit stakeholders will use the output to inform development decisions and advance low-impact hydropower growth in the US.

13 HYDRO ENERGY↗

Methods for Assessing Opportunities for Ring Dam Pumped Storage Hydropower

There is growing interest in new pumped storage hydropower (PSH) deployment to provide a range of grid flexibility, reliability, and resiliency services under an evolving and uncertain future power sector. The National Laboratory of the Rockies develops open PSH resource assessment and cost modeling tools to help evaluate PSH deployment opportunities, and this report describes expansions to those tools to consider an additional PSH system configuration - ring-dam reservoirs built on flat topographical features that are constructed from roller-compacted concrete material. This reservoir type is common among current PSH proposals and requires new methods to identify sites with this reservoir geometry throughout the United States and characterize the associated dam cost. Cost characterization for ring dam reservoirs required collecting historical dam cost data for earthen, rockfill, and roller-compacted concrete dams and regressing equations that relate costs between alternative materials. The ring dam site identification algorithm follows a 5-step procedure to identify circular geometry reservoirs. Once ring dam reservoirs are identified, they are then paired with potential dry-gully reservoirs, and the full set of potential paired reservoirs is cost-optimized to produce a least-cost set of potential PSH sites with no overlapping reservoirs. The resulting analysis found 1,663 ring-dam to dry-gully systems in the contiguous United States that are lower cost than any overlapping dry-gully to dry-gully systems, 29 in Alaska, and none in Hawaii or Puerto Rico. These systems constitute 1.5 TW of capacity in the contiguous United States and nearly 29 GW in Alaska, demonstrating that under suitable topography and head, ring-dam systems can provide cost-effective PSH opportunities. The greatest density of these opportunities are found in the intermountain west where there are mesas and flat land at bases of mountain ranges, but continued work could incorporate additional site characteristics or consider more complex reservoir shapes to find additional PSH deployment opportunities.

13 HYDRO ENERGY↗

Industrial Conduit Hydropower Opportunities in the United States: Scoping Assessment

Industrial conduit hydropower involves generating electricity from flowing water in existing industrial water supply, process flow, or wastewater discharges. The broader range of conduit hydropower involves powering existing water infrastructure in municipal, industrial, or agricultural systems. Whereas municipal and agricultural water systems have been retrofitted somewhat broadly in the United States, there are very few examples of industrial conduit hydropower. As stated in Kao et al. (2022), “conduit hydropower opportunities associated with industrial conduits are the least understood […] industrial developments are likely to be particularly efficient and cost-effective since they are typically eligible for on-site net-metering.” Therefore, additional insight into industrial opportunities is needed.

13 HYDRO ENERGY↗

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY↗

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY↗

Using Artificial Intelligence to Improve Reliability and Operational Efficiency of Small-Scale Hydroelectric Distributed Generation

Reliability and resilience are critical concerns for distributed generation (DG) at the rural electric level. The integration of renewable energy sources, such as small-scale hydroelectric distributed generators (hydro DGs), introduces operational challenges, particularly regarding aging infrastructure and grid stability. Artificial Intelligence (AI)-driven Machine Learning (ML) models and applications of Large Language Models (LLMs) offer promising solutions for optimizing DG operations and enhancing resilience. This paper explores AI-based models for improving efficiency, fault resolution, and outage mitigation in small-scale hydro DGs. Furthermore, it highlights the development of a centralized, AI-powered information portal for rural electric cooperatives and municipalities. The research evaluates hydro DG plant models and discusses the applicability of AI-powered question-answering tools for real-time operations, focusing on statistical data, load flow, voltage regulation, and generation power. The findings demonstrate AI’s potential to transform DG management to ensure greater stability and resilience in rural electric grids.

Bhattacharyya, Arjun [ORNL] (ORCID:000900060976046↗

Small Hydropower Interconnections: Small Hydropower in the United States

Small hydropower projects, which we define as generators below 20 MW in capacity have been the predominant source of hydropower growth over the past decade and create the most cost-effective and environmentally permissible avenues for new hydropower installation in the United States (DOE 2016; Johnson et al. 2018). Small hydropower developers across the United States have found that interconnecting these projects with the grid can be challenging due to unexpected costs and schedule overruns. Understanding the interconnection challenges and improving the process may allow more small hydropower projects to be successful. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. To begin to analyze the existing interconnection processes and challenges facing small hydropower, the state of small hydropower development in the U.S. must first be described to understand the characteristics of the industry. The first in a series, this paper presents the state of small hydropower projects in the U.S. to describe their type, location, and size based on data extracted from the HydroSource database (ORNL 2020). The following papers in the series will detail the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”), and present best practices in interconnection processes (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Impedance-Based Prediction of SSR-Generated Harmonics in Doubly-Fed Induction Generators

Doubly-fed induction generators (DFIGs) are prone to subsynchronous resonance (SSR) with series-compensated transmission lines and experiencing SSR-generated harmonics of wide-ranging magnitudes. This paper presents a large-signal impedance-based approach for the prediction of the magnitude of SSR-generated harmonics in DFIGs. Note that the large-signal impedance of a network shows variation in its impedance response with the magnitude of perturbation at its terminals. It is discovered in this paper that the impedance of a series-compen- sated transmission line starts changing with the magnitude of SSR because of the metal-oxide varistor-based protection of series capacitors in the line. The changing line impedance halts the growth of the SSR beyond a certain point, where the DFIG forms a limit-cycle mode and emits harmonics at the SSR frequency. The discovered role of the protection of series capacitors in SSR not only enables the prediction of SSR-generated harmonics but also can be used for the timely detection of an SSR event to avoid system disruption and sudden loss of bulk generation. The large- signal impedance-based prediction of SSR-generated harmonics in DFIG-based wind and hydro generators is demonstrated using numerical simulations of a 2.5-MVA, 690-V DFIG supplying to a series-compensated transmission line.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Small Hydropower Interconnections: Best Practices

Small hydropower projects have been the predominant source of capacity growth of U.S. hydropower for more than a decade, and they present the most cost-effective and environmentally permissible avenues for hydropower growth (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier due to cost surprises and schedule overruns. As a culmination to research into the status and requirements of small hydropower interconnection across the United States, this paper presents the best practices for setting interconnection standards that can improve the process for small hydropower developers. As part of the analysis, the interconnection costs are compared between small hydropower, solar, and wind. The analysis of the small hydropower interconnection landscape across the United States was carried out by Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) with support from the U.S. Department of Energy Water Power Technologies Office. The research team was guided by a Technical Advisory Group (TAG) and gleaned data from publicly available sources, such as the HydroSource database (ORNL 2020) and interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs). The results of this work are shared in a series of papers detailing the state of small hydropower in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”), the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), and an analysis of the interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”). In this, the final paper in the series, best practices for interconnection processes (“Small Hydropower Interconnections: Best Practices”) are identified from the solar energy and distributed wind energy industries that are transferrable to small hydropower development. This information will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗