Search NASA⌕ Search

SEARCH · Search NASA

Results for “statistical resilience metric analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Powered By ERAD [Slides]

Energy Resilience Analysis for Distribution Power System (ERAD) is a free, open-source Python toolkit for estimating the energy and service impacts of hazards like earthquakes and flooding. It uses a graph-based approach to capture high resolution connectivity among the grid, critical services, and customers and rapidly compute household level metrics and aggregated statistics across large distribution systems. It uses asset fragility curves that relate hazard severity to survival probability for power system equipment including cables, transformers, substations, etc. The tool is designed to be modular and extensible, allowing it to interface with third-party hazard simulators and integrate into broader resilience analysis workflows. ERAD enables researchers, students, communities, distribution utilities, and other stakeholders to understand hazard impacts and evaluate the effectiveness of different programs to improve energy resilience. The webinar was hosted by NLR researcher Aadil Latif.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Decoding Resilience by Modeling Outage and Restoration Processes in Distribution Grids: A Pittsburgh Case Study

Climate-induced extreme weather events, such as floods and heatwaves, pose significant challenges to the resilience of urban power distribution grids. This paper examines the outage and restoration dynamics of Pittsburgh's power grid during the flood event in April 2024 and three heatwaves in June, July, and August 2024. We introduce a comprehensive modeling framework that integrates outage and restoration processes, enabling the quantification of resilience metrics, including total customer-hours of power outage, maximum residual values, and restoration durations across various ZIP codes. Our analysis highlights spatial disparities in outage impacts and restoration efficiencies, with ZIP Code 15222 experiencing the highest cumulative disruptions, while ZIP Code 15217 shows lower susceptibility. By linking statistical trends with weather events, this study underscores the critical need for targeted infrastructure upgrades and advanced restoration strategies. Furthermore, the proposed framework offers valuable insights for planning and managing resilient power systems in the face of increasing climate stress.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Resolution South American Wind Resource Data Downscaled with Generative Machine Learning Conditioned on Near-Surface Observations

High-resolution historical wind data was developed for the entirety of South America using the innovative Super-Resolution for Renewable Resource Data (sup3r) machine learning framework. The publicly available Sup3rWind South America dataset represents a significant advancement in wind resource data generation, leveraging generative machine learning conditioned on near-surface observations from the Meteorological Assimilation Data Ingest System (MADIS) to efficiently and accurately downscale coarse reanalysis data from the European Centre for Medium-Range Weather Forecasts (ERA5). This approach produces fine-scale, spatially and temporally coherent wind and meteorological fields hundreds of times more computationally efficient than traditional numerical weather modeling methods, enabling access to high-fidelity wind information across both continental and offshore regions. Sup3rWind South America builds on the earlier Sup3rWind Ukraine dataset through improvements in model architecture and outputs conditioned on near-surface observation inputs. As with the Ukraine data release, this dataset includes wind speed, wind direction, temperature, relative humidity, and pressure at a horizontal resolution of ~2 km, representing a 15x spatial enhancement relative to the 31 km ERA5 grid. Wind speed and direction are provided at 5-minute resolution, a 12x temporal refinement compared to the hourly ERA5 data, while temperature, relative humidity, and pressure remain at hourly resolution. The data covers all years from 2005 to 2024. Before downscaling, ERA5 inputs were bias-corrected using long-term monthly means and a limited number of quality-controlled observations to align large-scale statistics with regional conditions. The resulting dataset is the first publicly available high-resolution timeseries wind record that provides full spatial coverage of South America. Model validation demonstrates strong agreement with observations across several statistical metrics, consistent with other state-of-the-art high-resolution wind resource datasets. The potential applications of Sup3rWind South America span renewable energy resource assessment, energy system modeling, and grid resilience analysis. The 20-year record and high spatial and temporal resolution support accurate estimation of long-term energy yield and the economic feasibility of potential wind development sites. Continuous coverage across both continental and offshore regions enables comprehensive site prospecting within exclusive economic zones. The 2 km, 5-minute resolution data provide the spatial and temporal variability required for power system simulation, operational planning, and regional risk assessments.

17 WIND ENERGY↗

Extracting Resilience Metrics From Distribution Utility Data Using Outage and Restore Process Statistics

Resilience curves track the accumulation and restoration of outages during an event on an electric distribution grid. We show that a resilience curve generated from utility data can always be decomposed into an outage process and a restore process and that these processes generally overlap in time. We use many events in real utility data to characterize the statistics of these processes, and derive formulas based on these statistics for resilience metrics such as restore duration, customer hours not served, and outage and restore rates. The formulas express the mean value of these metrics as a function of the number of outages in the event. We also give a formula for the variability of restore duration, which allows us to predict a maximum restore duration with 95% confidence. Overall, we give a simple and general way to decompose resilience curves into outage and restore processes and then show how to use these processes to extract resilience metrics from standard distribution system data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Computational analysis of deployable wind turbine systems in defense operational energy applications.

The U.S. military has been exploring pathways to reduce the logistical burden of fuel on virtually all their missions globally. Energy harvesting of local resources such as wind and solar can help increase the resilience and operational effectiveness of military units, especially at the most forward operating bases where the fuel logistics are most challenging. This report considers the potential benefits of wind energy provided by deployable wind turbines as measured by a reduction in fuel consumption and supply convoys to a hypothetical network of Army Infantry Brigade Combat Team bases. Two modeling and simulation tools are used to represent the bases and their operations and quantify the impacts of system design variables that include wind turbine technologies, battery storage, number of turbines, and wind resource quality. The System of Systems Analysis Toolkit Joint Operational Energy Model serves as a baseline scenario for comparison. The Hybrid Optimization of Multiple Energy Resources simulation tool is used to optimize a single base within the larger Joint Operational Energy Model. The results of both tools show that wind turbines can provide significant benefits to contingency bases in terms of reduced fuel use and number of convoy trips to resupply the base. The match between the turbine design and wind resource, which is statistically low across most of the global land area, is a critical design consideration. The addition of battery storage can enhance the benefits of wind turbines, especially in systems with more wind turbines and higher wind resources. Wind turbines may also provide additional benefits to other metrics such as resilience that may be important but not fully considered in the current analysis. ACKNOWLEDGEMENTS The authors would like to thank the following individuals for their helpful support, feedback and review to improve this report: U.S. Department of Energy Wind Energy Technologies Office, Patrick Gilman and Bret Barker; Idaho National Laboratory, Jake Gentle and Bradley Whipple; The National Renewable Energy Laboratory, Robert Preus and Tony Jimenez; Sandia National Laboratories, Alan Nanco, Dennis Anderson, and Hai Le. In addition, numerous discussions with military and industry stakeholders over the year were invaluable in focusing the efforts represented in this report.

17 WIND ENERGY↗

Modeling the Functional Forms of Grid Disturbances

This report introduces a functional form that may be used to quantitatively predict the impacts of new grid tools and changing system qualities on the likelihoods, durations, and depths of various grid disturbances. Each disturbance scenario is modeled to have three component stages—avoidance, reactance and recovery, which together parametrically estimate one disturbance’s impacts. The modeled scenario is then placed and replicated within an analysis period to represent the likelihood or frequency of the scenario and its consequent impacts. Whereas analysts have struggled to define and apply metrics for grid resilience, the functional form introduced by this report shares units of measurement with accepted grid-status measures (e.g., numbers of customers currently experiencing a service outage). Furthermore, the integrated and averaged functional form over an analysis period provides a meaningful normalized performance metric (e.g., customer outage minutes per year) that is ultimately independent of the duration of the period of. The approach may be applied similarly regardless of the severity or frequency of the disturbances that are being analyzed. Because metrics can be chosen to be identical in both the hypothetical future and the actual historical past, the historical past eventually becomes the test of the future predictions, at least in a statistical sense. The authors originally developed this approach to facilitate analysis of the effects of transactive energy (TE) systems effects on electric power grid resilience. TE systems invite energy suppliers and consumers to actively collaborate toward the discovery of, and their responses to, the locational value of energy. The findings from this process are often embodied as energy prices, the dynamics of which indicate the locational value of energy and can further represent important grid service needs. While some academic papers claim to quantify the value of a specific TE system design toward grid resilience, the answer, in general, has been elusive. Not only do multiple and conflicting definitions of resilience and reliability exist, but countless TE systems are being invented. We conclude the following: (1) The ideal analysis should harmonize rather than differentiate resilience and reliability. Therefore, this report uses the more general term disturbance whenever the overloaded terms resilience and reliability can be avoided. (2) The effectiveness of TE systems must be mapped to underlying qualities of a TE system, thereby avoiding presumptions that every TE design offers similar advantages. The authors seek to evaluate the parametric effects of TE system qualities (e.g., spatial granularity, granularity of time steps, length of future prediction horizon) on avoiding, reacting to, and recovering from grid disturbances. Furthermore, any advantages (or disadvantages) must be fairly compared with the many alternative tools, systems, and strategies that might offer comparable benefits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Power Outage Data Informed Resilience Assessment Framework

Catastrophic impacts to power systems due to disruptive events have increased significantly during the last decade. These events highlight the need to develop approaches to assess the resilience of power systems against extreme events. However, the availability of data that capture power system performance during and after disruptive events is scarce. This paper proposes an assessment framework to evaluate the performance aspects of the grid system during extreme outage events using the Environment for Analysis of Geo-Located Energy Information (EAGLE-I) data. EAGLE-I includes information related to the number of impacted customers, duration, and location of power outages in the United States. Statistical analyses were conducted to extract resilient-based outage data and derive probability distribution functions of their impact and recovery characteristics. A list of extreme events is identified based on few predetermined threshold values. Metrics from other power outage assessments were used to measure the characteristics of each event, including impact rate and duration, recovery rate and duration, and impact level. A probability distribution function is obtained for each metric. The obtained results provide a representation of national grid performance during extreme events, which can be applied as a framework to evaluate various resilience enhancement techniques.

EAGLE-I↗

Software Development for Data Visualization and Analysis of PN-Diodes & MOSFET Devices

The U.S. Department of Energy has a broad mission to ensure the nation’s security by addressing ongoing environmental challenges, developing novel energy production technologies, and mitigating nuclear security concerns. These efforts benefit from developing more effective semiconductor materials and devices. The research discussed in this report aims to further the development of these new electronics by improving implementations of vertical device structures, which offer theoretically better performance compared to lateral structures. Specifically, it reviews the background and development of a new and easy-to-use program for data processing and analysis from experiments run on vertical gallium nitride power devices. Current vertical structures fall short in critical performance metrics, such as On-Resistance and Breakdown Voltage, due to poor management of the device’s electric field. Junction termination extensions, or JTEs, are a field management technique that increases a device’s resilience to expected failure modes by controlling its surface electric fields. Each JTE design requires significant experimental validation, consisting of hundreds of tested devices, each outputting an enormous set of data points. The new software includes multiple methods of filtering large sets of device testing data to identify and remove flawed devices, automate device analyses, and provide statistical breakdowns for four metrics used to define the effectiveness of the JTE and the current carrying capacity of the device. These results can then be related back to fabrication techniques and device design, and in the future, be combined with processing simulations to further improve our understanding of the JTE mechanisms.

97 MATHEMATICS AND COMPUTING↗

Trade can buffer climate-induced risks and volatilities in crop supply

Climate change is intensifying the frequency and severity of extreme events, posing challenges to food security. Corn, a staple crop for billions, is particularly vulnerable to heat stress, a primary driver of yield variability. While many studies have examined climate impact on average corn yields, little attention has been given to the climate impact on production volatility. This study investigates the future volatility and risks associated with global corn supply under climate change, evaluating the potential benefits of two key adaptation strategies: irrigation and market integration. A statistical model is employed to estimate corn yield response to heat stress and utilize NEX-GDDP-CMIP6 climate data to project future production volatility and risks of substantial yield losses. Three metrics are introduced to quantify these risks: Sigma (σ), the standard deviation of year-on-year yield change, which reflects overall yield volatility; Rho (ρ), the risk of substantial loss, defined as the probability of yield falling below a critical threshold; and Beta (β), a relative risk coefficient that captures the volatility of a region's corn production compared to the globally integrated market. The analysis reveals a concerning trend of increasing year-on-year yield volatility (σ) across most regions and climate models. This volatility increase is significant for key corn-producing regions like Brazil and the United States. While irrigated corn production exhibits a smaller rise in volatility, suggesting irrigation as a potential buffer against climate change impacts, it is not a sustainable option as it can cause groundwater depletion. On the other hand, global market integration reduces overall volatility and market risks significantly with less sustainability concerns. Furthermore, these findings highlight the importance of a multidimensional approach to adaptation in the food sector. While irrigation can benefit individual farmers, promoting global market integration offers a broader solution for fostering resilience and sustainability across the entire food system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Topological Machine Learning Methods for Power System Responses to Contingencies: Preprint

While deep learning tools, coupled with the emerging machinery of topological data analysis, are proven to deliver various performance gains in a broad range of applications, from image classification to biosurveillance to blockchain fraud detection, their utility in areas of high societal importance such as power system modeling and, particularly, resilience quantification in the energy sector yet remain untapped. To provide fast acting synthetic regulation and contingency reserve services to the grid while having minimal disruptions on customer quality of service, we propose a new topologybased system that depends on neural network architecture for impact metrics classification and prediction in power systems. This novel topology-based system allows one to evaluate the impact of three power system contingency types, namely, in conjunction with transmission lines, transformers, and transmission lines combined with transformers. We show that the proposed new neural network architecture equipped with local topological measures facilitates both more accurate classification of unserved load as well as the amount of unserved load. In addition, we are able to learn complex relationships between electrical properties and local topological measurements on the simulated response to contingencies for NREL-SIIP power system.

graph theory↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗