Results for “stochastic planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Proactive Operations and Investment Planning via Stochastic Optimization to Enhance Power Systems’ Extreme Weather Resilience

We present scalable stochastic optimization approaches for improving power systems’ resilience to extreme weather events. We consider both proactive redispatch and transmission line hardening as alternatives for mitigating expected load shed due to extreme weather, resulting in large-scale stochastic linear programs (LPs) and mixed-integer linear programs (MILPs). We solve these stochastic optimization problems with progressive hedging (PH), a parallel, scenario-based decomposition algorithm. Our computational experiments indicate that our proposed method for enhancing power system resilience can provide high-quality solutions efficiently. With up to 128 scenarios on a 2,000-bus network, the operations (redispatch) and investment (hardening) resilience problems can be solved in approximately 6 min and 2 h of wall-clock time, respectively. Additionally, we solve the investment problems with up to 512 scenarios, demonstrating that the approach scales very well with the number of scenarios. Moreover, the method produces high quality solutions that result in statistically significant reductions in expected load shed. Our proposed approach can be augmented to incorporate a variety of other operational and investment resilience strategies, or a combination of such strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Period Active Distribution Network Planning Using Multi-Stage Stochastic Programming and Nested Decomposition by SDDIP

This paper presents a multi-period active distribution network planning (ADNP) with distributed generation (DG). The objective of the proposed ADNP is to minimize the total planning cost, subject to both investment and operation constraints. The paper proposes a multi-stage stochastic optimization model to address DG uncertainties over several periods, in which the decisions are made sequentially by only using the present-stage information. A nested decomposition method is proposed which applies the stochastic dual dynamic integer programming (SDDIP) method to address computational intractabilities of the proposed ADNP approach. The presented numerical results and discussions on a 33-bus distribution system and a large-scale 906-bus system verify the effectiveness of the proposed ADNP method and its solution method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Airport Infrastructure Planning Using Multi-Stage Stochastic Programming

The Athena project, funded by the Department of Energy, has worked to identify the critical infrastructure at Dallas Fort Worth (DFW) Airport which influences mobility between the airport and the surrounding city of Dallas. Using scalable methods that can leverage HPC resources we have developed a multi-stage stochastic infrastructure expansion model for determining parking and curb modifications to the DFW Airport over a 20-year horizon. Additionally, we have explored the impacts of congestion pricing in conjunction with infrastructure modifications. Our multi-stage stochastic model is implemented using the mpi-sppy software and solved in parallel using progressive hedging on the National Renewable Energy Laboratory's HPC system Eagle. In this talk we present results from solving this model at scale.

airport planning↗

A Stochastic Charging Station Deployment Model for Electrified Taxi Fleets in Coupled Urban Transportation and Power Distribution Networks

Metropolitansworldwide are increasingly adopting electric taxis (ET) to address concerns about transportation-related emissions. However, the widespread deployment of electric taxis presents challenges in terms of increased electricity demand and changing demand profiles. This transition impacts both the urban transportation network (TN) and the electricity power distribution network (PDN), highlighting the interdependence between these two systems. Here, in this paper, we propose a two-stage stochastic programming planning model that aims to optimize both the TN and PDN, enabling efficient deployment of charging stations and grid upgrades. Our model seeks to strike a balance between meeting ET drivers' charging preferences, minimizing the costs associated with infrastructure deployment and grid expansion, and harmonizing the coordination between the TN and PDN. Additionally, we explore the potential benefits of utilizing an autonomous ET fleet to enhance overall system performance.

33 ADVANCED PROPULSION SYSTEMS↗

Bi-Level Adaptive Storage Expansion Strategy for Microgrids Using Deep Reinforcement Learning

Battery energy storage (BES) is a versatile resource for the secure and economic operation of microgrids (MGs). Prevailing stochastic optimization-based approaches for BES expansion planning for MGs are computationally complicated. This work proposes a data-driven bi-level multi-period BES expansion planning framework to determine the siting, sizing, and timing of BES installations. The proposed planning framework unifies deep reinforcement learning (DRL) and linear programming, thereby decoupling the determinations for the integer and continuous decision variables in two time scales, respectively. In the upper level, a rainbow DRL agent with quantile regression is trained to provide dynamic planning policies to accommodate stochastic renewable energy resources (RESs), load, and battery price changes efficiently. Further, the lower level computes the optimal operation of MGs with frequency constraints to hedge the islanding contingency. The two levels communicate with one another by exchanging storage configuration and operating expenses in order to accomplish the shared goal of minimizing investment and operation costs. Comparative case studies on an MG are carried out to demonstrate the superiority of the proposed DRL-based solution to the mixed-integer linear programming counterpart on efficiency, scalability, and adaptability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Numerically Testing Conceptual Models of the Utah FORGE Reservoir Using July 2023 Circulation Test Data

Over the past several years, many new data sets have become available regarding the characterization of the Utah FORGE reservoir. These include, but are not limited to, the stimulation of Well 16A, the drilling and completion of Well 16B, and interwell circulation confirmatory testing. As part of the characterization efforts, conceptual models of the reservoir are re-examined as new data become available. As part of the planning for FORGE activities, numerical models are often used to predict the reservoir response to the planned testing. Stochastic methods are often employed to bound uncertainty and allow for evaluation of comprehensive ranges of key reservoir parameters. For the most recent interwell circulation confirmatory testing (July 2023), a priori numerical model predictions did bound the observed behavior (Xinj et al., 2023), but key deviations from expected behavior prompted the FORGE team to reevaluate our conceptual model of the reservoir. In early October 2023, key members of the development, testing, and monitoring teams met for 2 days to review newly collected data and discuss ‘interesting’ or ‘key’ observations. From these discussions, 15 Key Observations were documented, with several significant ones being that the discrete fracture network developed from the 16A stimulation data may not be appropriate and that the early time pressure data obtained during the summer 2023 reservoir testing were best described using radial solutions. In July 2023, two campaigns of interwell confirmatory testing were conducted, the first set of tests occurred on July 4-5 and the second set on July 18-19. The second set of circulation tests conducted at the Utah FORGE site between the injection well 16A(78)-32 and production well 16B(78)-32 on July 18 and 19, 2023 are used to calibrate material properties in a thermal-hydraulic-mechanical (THM) simulation of the discrete fracture network connecting the wells. The spatially and temporally varying reservoir properties are calibrated to match the time dependent pressure and production profiles from the circulation tests. In future work, this calibrated model will be coupled to the native state THM model of the FORGE reservoir to predict surface deformation and strains resulting from pumping schedules.

58 GEOSCIENCES↗

Numerically Testing Conceptual Models of the Utah FORGE Reservoir Using July 2024 Circulation Test Data

Over the past several years, many new data sets have become available regarding the characterization of the Utah FORGE reservoir. These include, but are not limited to, the stimulation of Well 16A, the drilling and completion of Well 16B, and interwell circulation confirmatory testing. As part of the characterization efforts, conceptual models of the reservoir are re-examined as new data become available. As part of the planning for FORGE activities, numerical models are often used to predict the reservoir response to the planned testing. Stochastic methods are often employed to bound uncertainty and allow for evaluation of comprehensive ranges of key reservoir parameters. For the most recent interwell circulation confirmatory testing (July 2023), a priori numerical model predictions did bound the observed behavior (Xinj et al., 2023), but key deviations from expected behavior prompted the FORGE team to reevaluate our conceptual model of the reservoir. In early October 2023, key members of the development, testing, and monitoring teams met for 2 days to review newly collected data and discuss ‘interesting’ or ‘key’ observations. From these discussions, 15 Key Observations were documented, with several significant ones being that the discrete fracture network developed from the 16A stimulation data may not be appropriate and that the early time pressure data obtained during the summer 2023 reservoir testing were best described using radial solutions. In July 2023, two campaigns of interwell confirmatory testing were conducted, the first set of tests occurred on July 4-5 and the second set on July 18-19. The second set of circulation tests conducted at the Utah FORGE site between the injection well 16A(78)-32 and production well 16B(78)-32 on July 18 and 19, 2023 are used to calibrate material properties in a thermal-hydraulic-mechanical (THM) simulation of the discrete fracture network connecting the wells. The spatially and temporally varying reservoir properties are calibrated to match the time dependent pressure and production profiles from the circulation tests. In future work, this calibrated model will be coupled to the native state THM model of the FORGE reservoir to predict surface deformation and strains resulting from pumping schedules.

15 GEOTHERMAL ENERGY↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A scalable planning framework of energy storage systems under frequency dynamics constraints

As the penetration of renewables increases in power systems, the declining system inertia can cause frequency stability issues. Battery energy storage systems (BESSs) respond fast and therefore can relieve the low inertia difficulty but need to be appropriately sized considering the associated cost. This paper presents a novel stochastic optimization model for economically planning BESS capacity while considering the spatial–temporal correlation of wind generation and generator outages under frequency stability constraints, which include the rate-of-change of frequency (RoCoF), frequency nadir (FN), and quasi-steady-state (QSS) frequency. A set of new FN constraints that can be easily linearized is developed. To account for renewable uncertainties, a realistic uncertainty modeling approach, Random Field, is adopted to generate wind generation scenarios by considering both spatial and temporal evolutions of wind speed profiles. The ESS sizing is formulated as a mixed-integer linear programming problem and solved by using a scalable decomposition-and-coordination approach, Surrogate Absolute Value Lagrangian Relaxation (SAVLR). To further improve the scalability and reduce computational burdens, a rolling-horizon-based update is developed and incorporated into SAVLR for providing a practical solution to the long-term planning of very large-scale power systems. Finally, a modified IEEE 118-bus system and the Polish system are used to validate the effectiveness and scalability of the model and solution methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Two-stage Stochastic Generalized Disjunctive Programming (GDP) Model for Proactive Planning and Reactive Operations of Resilient Power Systems under Disruptions

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

Optimal mitigation and control over power system dynamics for stochastic grid resilience

Optimal mitigation planning for highly disruptive contingencies to a transmission-level power system requires optimization with dynamic power system constraints, due to the key role of dynamics in system stability to major perturbations. We formulate a generalized disjunctive program to determine optimal grid component hardening choices for protecting against major failures, with differential algebraic constraints representing system dynamics (specifically, differential equations representing generator and load behavior and algebraic equations representing instantaneous power balance over the transmission system). We optionally allow stochastic optimal pre-positioning across all considered failure scenarios, and optimal emergency control within each scenario. This novel formulation allows, for the first time, analyzing the resilience interdependencies of mitigation planning, preventive control, and emergency control. Using all three strategies in concert is particularly effective at maintaining robust power system operation under severe contingencies, as we demonstrate on the western system coordinating council 9-bus test system using synthetic multi-device outage scenarios.

30 DIRECT ENERGY CONVERSION↗

Stochastic Model Predictive Control With Gaussian Wind Direction Preview for Wake Steering

This article addresses the problem of wake steering control for wind farms that explicitly consider the tradeoff between farm-level power generation and yaw duty cycle under variable and uncertain wind conditions. A novel stochastic model predictive control (MPC) algorithm is presented, which utilizes a stochastic model of the freestream wind field components in a receding horizon framework to compute optimal yaw set points that maximize the expected value of the farm power while constraining the yaw actuation. Different configurations of the algorithm are evaluated using a steady-state wind farm simulator. The proposed stochastic MPC algorithm can plan control actions over a future prediction horizon based on probabilistic estimates of the incoming wind magnitude and direction.

17 WIND ENERGY↗

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic Models, Indices & Optimization Algorithms for Pricing & Hedging Reliability Risks in Modern Power Grids: Data Plan - Princeton

We collected and cleaned the synthetic grid data produced by NREL for the Texas and New York synthetic grids. We developed a high dimensional joint stochastic model for load at the zone level, and solar and wind power productions at the asset level, capturing the spatial and temporal dependencies between all the variables, and demonstrated how such a model could be fitted to historical data. We designed and implemented a simulation engine which can produce Monte Carlo scenarios for the hourly day-ahead values of load, and solar and wind power productions at the spatial and temporal resolutions of the historical data used to fit the model. Finally we developed an open-source Python package which can, from an input grid model, efficiently use forecasts and large numbers of Monte Carlo scenarios to provide unit commitment and economic dispatch for each of these scenarios. The high dimensional stochastic model and the subsequent Monte Carlo simulation engine were implemented in the package PGscen and the corresponding UC and ED optimization programs in the package Vatic.

14 SOLAR ENERGY↗