Search NASA⌕ Search

SEARCH · Search NASA

Results for “subcontracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Subcontracted activities related to TES for building heating and cooling

The subcontract program elements related to thermal energy storage for building heating and cooling systems are outlined. The following factors are included: subcontracts in the utility load management application area; life and stability testing of packaged low cost energy storage materials; and development of thermal energy storage systems for residential space cooling. Resistance storage heater component development, demonstration of storage heater systems for residential applications, and simulation and evaluation of latent heat thermal energy storage (heat pump systems) are also discussed. Application of thermal energy storage for solar application and twin cities district heating are covered including an application analysis and technology assessment of thermal energy storage.

Martin, J.↗

Keys to Subcontracting Space Hardware with JPL

The Jet Propulsion Laboratory’s (JPL), process of subcontracting space systems and hardware with suppliers varies somewhat from the industry-standard supply chain process. This paper is an overview of the contracting process with JPL, a division of the California Institute of Technology (Caltech), in Pasadena, CA. The goal of this paper is to present and clarify the JPL way of subcontracting in order to help both current and potential suppliers understand the JPL nuances and ease their process of contracting with JPL.

Pasko Heuchert, Susan↗

The NASA Plan: To award eight percent of prime and subcontracts to socially and economically disadvantaged businesses

It is NASA's intent to provide small disadvantaged businesses, including women-owned, historically black colleges and universities and minority education institutions the maximum practicable opportunity to receive a fair proportion of NASA prime and subcontracted awards. Annually, NASA will establish socioeconomic procurement goals including small disadvantaged business goals, with a target of reaching the eight percent level by the end of FY 1994. The NASA Associate Administrators, who are responsible for the programs at the various NASA Centers, will be held accountable for full implementation of the socioeconomic procurement plans. Various aspects of this plan, including its history, are discussed.

Source record↗

[Equipment Inventory Report of Inventions and Subcontracts]

This was a joint award to the PI, then of Texas A&M University, and Gerald Heymsfield of NASA GSFC, with co-I's Robbie Hood and Richard Blakeslee of NASA Marshall Space Flight Center (MSFC). Although the PI moved to the University of Utah during year-2 of this grant, it continued to be administered through Texas A&M for the convenience of the Ph.D. student Daniel Cecil until after he defended his dissertation in late 2000. Cecil has assembled a subset of this database for 261 Tropical Rainfall Measuring Mission (TRMM) passes over 45 hurricanes or tropical cyclones. It consists of TRMM Microwave Imager (TMI) ice scattering signatures and TRMM Precipitation Radar (PR) reflectivity profiles and Lightning Imaging Sensor (LIS) flash locations for the rain features associated with all tropical cyclones observed by TRMM from Dec. 1997 through Dec. 1998. Each rain feature has been subjectively cataloged as belonging to a hurricane eyewall, inner rainband, outer rainband, or the inner or outer regions of a developing or non-developing tropical cyclone. This database quantifies the relative abundance of lightning in outer rainbands compared to eyewalls and inner rainbands. The TRMM data set permits studies that can seek more specific physical relationships than Cecil and Zipser were able to find when they related some SSM/I measures of ice scattering to hurricane intensity change.

Zipser, Edward J.↗

Hardware Development Process for Human Research Facility Applications

The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

Bauer, Liz↗

Scientific Data Analysis and Software Support: Geodynamics

The support on this contract centers on development of data analysis strategies, geodynamic models, and software codes to study four-dimensional geodynamic and oceanographic processes, as well as studies and mission support for near-Earth and interplanetary satellite missions. SRE had a subcontract to maintain the optical laboratory for the LTP, where instruments such as MOLA and GLAS are developed. NVI performed work on a Raytheon laser altimetry task through a subcontract, providing data analysis and final data production for distribution to users. HBG had a subcontract for specialized digital topography analysis and map generation. Over the course of this contract, Raytheon ITSS staff have supported over 60 individual tasks. Some tasks have remained in place during this entire interval whereas others have been completed and were of shorter duration. Over the course of events, task numbers were changed to reflect changes in the character of the work or new funding sources. The description presented below will detail the technical accomplishments that have been achieved according to their science and technology areas. What will be shown is a brief overview of the progress that has been made in each of these investigative and software development areas. Raytheon ITSS staff members have received many awards for their work on this contract, including GSFC Group Achievement Awards for TOPEX Precision Orbit Determination and the Joint Gravity Model One Team. NASA JPL gave the TOPEX/POSEIDON team a medal commemorating the completion of the primary mission and a Certificate of Appreciation. Raytheon ITSS has also received a Certificate of Appreciation from GSFC for its extensive support of the Shuttle Laser Altimeter Experiment.

Klosko, Steven↗

Nuclear Lunar Logistics Study

This document has been prepared to incorporate all presentation aid material, together with some explanatory text, used during an oral briefing on the Nuclear Lunar Logistics System given at the George C. Marshall Space Flight Center, National Aeronautics and Space Administration, on 18 July 1963. The briefing and this document are intended to present the general status of the NERVA (Nuclear Engine for Rocket Vehicle Application) nuclear rocket development, the characteristics of certain operational NERVA-class engines, and appropriate technical and schedule information. Some of the information presented herein is preliminary in nature and will be subject to further verification, checking and analysis during the remainder of the study program. In addition, more detailed information will be prepared in many areas for inclusion in a final summary report. This work has been performed by REON, a division of Aerojet-General Corporation under Subcontract 74-10039 from the Lockheed Missiles and Space Company. The presentation and this document have been prepared in partial fulfillment of the provisions of the subcontract. From the inception of the NERVA program in July 1961, the stated emphasis has centered around the demonstration of the ability of a nuclear rocket to perform safely and reliably in the space environment, with the understanding that the assignment of a mission (or missions) would place undue emphasis on performance and operational flexibility. However, all were aware that the ultimate justification for the development program must lie in the application of the nuclear propulsion system to the national space objectives.

Source record↗

Management of optics

American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.

Kirchner, T. E.↗

The Grid Analysis and Display System (GrADS)

During the period 1 September 1993 - 31 August 1994, further development of the Grid Analysis and Display System (GrADS) was conducted at the Center for Ocean-Land-Atmosphere Studies (COLA) of the Institute of Global Environment and Society, Inc. (IGES) under subcontract 5555-31 from the University Space Research Association (USRA) administered by The Center of Excellence in Space Data and Information Sciences (CESDIS). This final report documents progress made under this subcontract and provides directions on how to access the software and documentation developed therein. A short description of GrADS is provided followed by summary of progress completed and a summary of the distribution of the software to date and the establishment of research collaborations.

Kinter, James L., III↗

Application of Russian Thermo-Electric Devices (TEDS) for the US Microgravity Program Protein Crystal Growth (PCG) Project

Changes in the former Soviet Union have opened the gate for the exchange of new technology. Interest in this work has been particularly related to Thermal Electric Cooling Devices (TED's) which have an application for the Thermal Enclosure System (TES) developed by NASA. Preliminary information received by NASA/MSFC indicates that Russian TED's have higher efficiency. Based on that assumption NASA/MSFC awarded a contract to the University of Alabama in Huntsville (UAH) in order to study the Russian TED's technology. In order to fulfill this a few steps should be made: (1) potential specifications and configurations should be defined for use of TED's in Protein Crystal Growing (PCG) thermal control hardware; and (2) work closely with the identified Russian source to define and identify potential Russian TED's to exceed the performance of available domestic TED's. Based on the data from Russia, it is possible to make plans for further steps such as buying and testing high performance TED's. To accomplish this goal two subcontracts have been released. One subcontract to Automated Sciences Group (ASG) located in Huntsville, AL and one to the International Center for Advanced Studies 'Cosmos' located in Moscow, Russia.

Aksamentov, Valery↗

Small Explorer (SMEX) POsitron Electron Magnet Spectrometer (POEMS)

This report covers the activities of Louisiana State University (LSU) under subcontract 26053-EX between LSU and the Bartol Research Institute (Bartol), which began January 1, 1994. The purpose of this subcontract was for LSU to participate in and support Bartol in the work to define the SMEX (Small Explorer)/POEMS (Positron Electron Magnet Spectrometer) spaceflight mission under NASA Contract NAS5-38098 between NASA and Bartol. The conclusions of this study were that for a 1998 launch into a 600km altitude, 98 degrees, approximately sun synchronous orbit, (a) the total radiation dose would be typically a few k-rad per year, certainly less than 20 k-rad per year for the anticipated shielding and potential solar flare environment, (b) detector counting rates would be dominated by the South Atlantic Anomaly (SAA) and the horns of the Van Allen belts, (c) the galactic electron and positron 'signal' can be extracted from the albedo background and the trapped populations by detailed evaluation of the geomagnetic transmission function (cut-off) for each event, (d) POEMS could make significant contributions to magnetospheric science if sufficient downlink capacity were provided and, (e) a fully functioning, cost efficient, data processing and analysis facility design was developed for the mission. Overall, POEMS was found to be a relatively simple experiment to manifest, operate and analyze and had potential for fundamental new discoveries in cosmic, heliospheric, solar and magnetospheric science.

LHeureux, Jacques↗

A Search for Solar Sources of High-Speed Solar Wind Streams

This report covers technical progress during the third and fourth years of Subcontract No. 5710000474, 'A Search for Solar Sources of High-speed Solar Wind Streams,' between Science Applications International Corporation (SAIC) and the Massachusetts Institute of Technology (MIT), covering the period November 2000 to December 2002. This is a subcontract originating from NASA SR&T Contract NAG5-7967 with MIT. In the following sections we summarize our progress during this reporting period.

Mikic, Zoran↗

Rocket-UV Spectrometer

This is a report of the second three months (March-May 1961) of a program to design and fabricate an ultraviolet spectrometer and fine guidance control for use in an Aerobee-Hi rocket. The work is being done under Subcontract No. 1 under Contract NASr-3 between Princeton University and the National Aeronautical and Space Administration. The design goals for this instrument are described in the report for the first three month period (Perkin-Elmer Engineering Report No. 5906). The accomplishments of the second three month period include the solution of certain design problems, the establishment of an effective liaison system with personnel at Goddard Space Flight Center, and the completion of certain design and fabrication tasks.

ULTRAVIOLET SPECTROMETER↗

Ultra high vacuum adhesion testing of NERVA engine materials

The primary objective of this research program was to determine the effects of surface cleaning and deliberate gaseous contamination on the adhesion behavior of selected candidate materials for use in the NERVA nuclear rocket engine program. Using a torsion balance technique, the relationship between the normal compressive load applied to crossed rod samples and the resultant contact resistance was used to ascertain the extent of adhesion under each set of experimental conditions. In addition to an evaluation of the static adhesion behavior of selected materials combinations, the experimental apparatus was modified to permit a similar investigation relating to the effects of specific tangential displacements of the sample wires, i.e., their sliding friction behavior. During the course of this subcontract, the materials combinations 440 C vs. 440 C. pyrographite vs ZTA graphite, Nbc (graphite) vs. Nbc (graphite), and Electrolize Inconel 718 vs. Au electroplated 302 S/S were evaluated.

Source record↗

Apollo lunar orbital sciences program alpha and X-ray spectrometers

The development of the alpha and X-ray spectrometers which were used on the Apollo 15 and 16 flights is discussed. Specific subjects presented are: (1) lunar program management, (2) scientific and technical approach, (3) major test programs, (4) reliability, quality assurance, and safety, and (5) subcontract management.

Source record↗