Search NASA⌕ Search

SEARCH · Search NASA

Results for “surface traffic management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Autonomous System Subversion Tactics: Prototypes and Recommended Countermeasures

One of the fielding requirements for Advanced and Small Modular Reactors (AR/SMR) is the ability to support remote and autonomous operations. Autonomous Control Systems (ACS) are found on platforms such as Autonomous Space Vehicles, Cruise Missiles, and advanced driver-assistance systems. Each of these ACS implementations depends upon a set of decision support subsystems responsible for supporting Autonomous Mission Managers (names vary based upon field and author preferences). These Autonomous Mission Managers receive inputs from system sensors (e.g., LIDAR collection from an automobile travelling down a street; transients from a nuclear reactor), and perform a set of classifications (e.g., Red Traffic Light; Small Pedestrian at 10m; Load Rejection; Single Coolant Pump Trip), and then use these classifications in combination with recommendation algorithms to achieve platform goals (e.g., Stop the Vehicle at the Traffic Light, Avoid the Small Pedestrian; Trip the Reactor to prevent a Safety Event). The design, implementation, and fielding of an ACS capability will alter the cyber-attack surface such that existing risk management plans will need to be updated to include how to protect and defend against data-science and decision-support-system attack classes. These attack classes would include protection of the design and training environments where algorithm selection and testing and training data would be obvious attack vectors. These attack classes would also require an informed set of detection and response procedures to identify anomalous behaviors and document best practices for anomaly assessment and vulnerability mitigation and remediation. Last year we published a Cyber Threat Assessment Methodology for Autonomous and Remote Operations for AR/SMRs along with a companion publication on Cyber Attack and Defense Use Cases. The focus of the methodology was on describing and enumerating ACS processes, components, and functions such that security engineers could: evaluate subversion options against the target; identify threat actor attributes and capabilities derived from each subversion option; and identify security controls and response countermeasures. The Use Cases document offered detailed methodology examples including an assessment of a Military Base SMR, an Autonomous System Decision Loop, and implementation of AR/SMR Machine Learning algorithms. Our proposal at the end of last year was to focus on implementation of subversion prototypes related to the last Use Case area: AR/SMR Machine Learning (ML) Algorithms. We included six attack scenarios in our Use Cases paper: a Poisoning Attack against ML functions implemented using an FPGA; a Trojaning Attack against ML classifiers exploiting the excitability of Nuclear Engineers; a Backdooring Attack against ML Training environments to ensure persistence of an attack vector; a False Positive Evasion Attack against multi-factor Access Control Systems using clever inputs; an Inference Attack against ML models by an Insider with access to the Operational environment; and an Adversarial Reprogramming Attack against a Material Access Control Video Surveillance System. At the beginning of this year these six attack scenarios were provided to our research teams at Georgia Tech and Idaho State University and each team successfully implemented a subversion attack against a ML implementation to include transient misclassifications. While this is a notable outcome from this type of research, this paper offers the reader insight into not only how to structure and execute these types of attacks, but into the thought process behind how the researcher investigated the problem space, performed initial algorithm implementation, and the trial-and-error behind arriving at the successful subversion prototypes. We include in this paper a set of associated Scenarios on how these subversion prototypes could be implemented and an initial set of guidance for AR/SMR architects, Nuclear Regulators, and Cyber Defenders to implement awareness and defense capabilities into their current operational portfolios.

42 ENGINEERING↗

Transportation Energy Analytics Dashboard (TEAD)

The investment decisions within the nation’s transportation sector have traditionally been prioritized and measured against safety and travel efficiency goals. Increasingly, federal, state, and local policies are requiring consideration of energy use and emissions in the design of our transportation infrastructure. Yet the processes, analytics, and knowledge to include these new metrics into transportation decisions are lacking. Although targeted studies and before and after analysis are performed from time to time, no comprehensive real-time monitoring systems provide energy and emissions to the same level as congestion and safety. To address this gap, the Center for Advanced Transportation Technology (CATT Lab) and the Maryland Transportation Institute (MTI) at the University of Maryland (UMD), in partnership with the National Renewable Energy Laboratory (NREL), have developed a Transportation Energy Analytics Dashboard, or TEAD, to raise awareness of the energy and emission impacts to the same level of observability as that of safety and mobility concerns. The overall goal of this project was to develop and demonstrate an online tool to monitor transportation energy use and emissions in real-time and to archive this data for retrospective analysis. By combining surface transportation energy and emissions evaluation capability with more traditional safety, mobility and reliability system evaluation, our goal is for TEAD to create a dynamic new paradigm in transportation systems management and performance analyses, for both real-time traffic operations, and longer-term planning for project and program investment decision-making.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Recursive Multiscale Correlation-Averaging Algorithm for an Automated Distributed Road Condition Monitoring System

A signal processing approach is proposed to jointly filter and fuse spatially indexed measurements captured from many vehicles. It is assumed that these measurements are influenced by both sensor noise and measurement indexing uncertainties. Measurements from low-cost vehicle-mounted sensors (e.g., accelerometers and Global Positioning System (GPS) receivers) are properly combined to produce higher quality road roughness data for cost-effective road surface condition monitoring. The proposed algorithms are recursively implemented and thus require only moderate computational power and memory space. These algorithms are important for future road management systems, which will use on-road vehicles as a distributed network of sensing probes gathering spatially indexed measurements for condition monitoring, in addition to other applications, such as environmental sensing and/or traffic monitoring. Our method and the related signal processing algorithms have been successfully tested using field data.

47 OTHER INSTRUMENTATION↗

Development of a Methodology to Assess the Impact of Non-Conventional Waste Streams Following a Radiological Incident - 18271

The Environmental Protection Agency's (EPA's) Waste Estimation Support Tool (WEST) is a Geographic Information System (GIS)-based decision support tool for estimating waste generated from remediation and cleanup activities following a radiological incident. WEST uses the Federal Emergency Management Agency's (FEMA's) Hazus-MH software's infrastructure information combined with image classification capabilities to estimate the quantity of waste and debris that may result from a radiological incident. WEST can be used to create customized decontamination strategies that allow end-users to evaluate different means of decontamination and how those strategies may impact the resulting waste stream in each geographical locality. This capability can potentially reduce the response/recovery time frame and cost. One of the key observations from past applications of WEST is that planning scenarios are site-specific, especially when dealing with chemical, biological, radiological, or nuclear (CBRN) waste management issues. Furthermore, site-specific issues are not limited to resource limitations or response bottlenecks but should also account for differences in an area's geography and urban footprint, a phenomenon observed during the Fukushima response. For instance, a recent WEST case study found that the amount of waste generated per unit of affected area, for a given decontamination approach, is largely a function of the building surface area in the affected area (relative to the ground surfaces). However, differences in the geometry and density of contaminated objects in the landscape may impact the amount and characteristics of the waste stream. Although buildings typically constitute a large portion of the surface area in urban environments, other objects such as vehicles and trees can be just as prominent. For example, seasonal changes in the amount of foliage present can alter the non-structural surface area calculated for an area like New York City by 20-30%. Very little is known about the impact that these non-conventional waste streams have on overall remediation strategies, or to what extent differences in characteristics of urban versus rural environments, traffic activities, or seasonal variations may have on these factors. This paper will present the proposed methodology to incorporate into WEST the impacts that niche, nonconventional waste streams might have from rural and urban environments following a nuclear power plant incident or detonation of a radiological dispersal device or improvised nuclear device. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Route Optimization for Energy Efficient Airport Shuttle Operations - A Case Study from Dallas Fort Worth International Airport

Air travel and requisite surface traffic supporting passenger arrival/departure constitutes a significant portion of travel and emissions in cities with large airports. An airport trip can segment into three parts namely: i) travel from a location in the city to the airport; ii) travel from a parking lot or rental car center to the terminal (i.e., within the airport premises), and iii) travel inside the terminal. Depending on the airport access mode all or a part of these legs comprise a traveler’s journey to the airport. The priority of airport ground transport management teams is to provide passengers with a seamless travel experience within the airport, so it is understandable that within airport shuttle routes might not be optimized for minimizing energy consumption. Solutions that meet the dual objective of reducing energy consumption from airport shuttle operations without compromising on passenger travel experience are key to improving system efficiency. There is currently a dearth of research and tools that can inform airports in making such decisions. Addressing this need, this research effort puts forth an optimization model that generates optimal shuttle routes for a given set of constraints, and a discrete-event simulator that evaluates the optimal solutions in a stochastic environment to understand the tradeoffs between passenger wait times, and within airport shuttle energy consumption. The proposed set of tools are tested in the context of optimizing airport shuttles routes within the Dallas Fort Worth International Airport (DFW). In addition to shuttle spatial positioning, and passenger demand information, high-fidelity vehicle data was collected using data loggers installed on DFW shuttles. Results show that 20% energy reduction in shuttle operations is possible with a modest two-minute increase in average passenger wait times. The tools developed in this research effort are designed to be generalizable and can help optimize shuttle operations planning at any major airport.

air travel↗

Heavy metal imprints in Antarctic snow from research and tourism

Antarctica, long regarded as one of the last pristine environments on Earth, is increasingly affected by human activity. As tourism surges and scientific operations expand, air pollution from local emissions is raising new environmental concerns. Here, in this study, we analyze surface snow samples collected along a ~2,000 km transect, from the South Shetland Islands (62°S) to the Ellsworth Mountains (79°S), to map the geochemical fingerprints of aerosol deposition. We identify distinct spatial patterns shaped by crustal, marine, biogenic, and anthropogenic sources. Notably, we detect heavy metal imprints in the snow chemistry of the northern Antarctic Peninsula, where major research stations are concentrated and marine tourism traffic is most intense. Our findings shed light on the extent of the impacts from energy-intensive local activities in Antarctica, underscoring the need for enhanced environmental monitoring and sustainable management strategies in this fragile region.

Cordero, Raúl R. [Univ. of Groningen, Leeuwarden (↗

American Recovery & Reinvestment Act: Fuel Cell Hybrid Power Packs and Hydrogen Refueling for Lift Trucks

HEB Grocery Company, Inc. (H-E-B) is a privately-held supermarket chain with 310 stores throughout Texas and northern Mexico. H-E-B converted 14 of its lift reach trucks to fuel cell power using Nuvera Fuel Cells’ PowerEdge™ units to verify the value proposition and environmental benefits associated with the technology. Issues associated with the increasing power requirements of the distribution center operation, along with high ambient temperature in the summer and other operating conditions (such as air quality and floor surface condition), surfaced opportunities for improving Nuvera’s PowerEdge fuel cell system design in high-throughput forklift environments. The project included on-site generation of hydrogen from a steam methane reformer, called PowerTap™ manufactured by Nuvera. The hydrogen was generated, compressed and stored in equipment located outside H-E-B’s facility, and provided to the forklifts by hydrogen dispensers located in high forklift traffic areas. The PowerEdge fuel cell units logged over 25,300 operating hours over the course of the two-year project period. The PowerTap hydrogen generator produced more than 11,100 kg of hydrogen over the same period. Hydrogen availability at the pump was 99.9%. H-E-B management has determined that fuel cell forklifts help alleviate several issues in its distribution centers, including truck operator downtime associated with battery changing, truck and battery maintenance costs, and reduction of grid electricity usage. Data collected from this initial installation demonstrated a 10% productivity improvement, which enabled H-E-B to make economic decisions on expanding the fleet of PowerEdge and PowerTap units in the fleet, which it plans to undertake upon successful demonstration of the new PowerEdge reach truck product. H-E-B has also expressed interest in other uses of hydrogen produced on site in the future, such as for APUs used in tractor trailers and refrigerated transport trucks in its fleet.

08 HYDROGEN↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Templates for Risk Informed Assurance with Curvature Embeddings (TRACE)

We investigate recovery of geometric structure from networks embedded in manifolds with spatially varying curvature, extending the constant-curvature framework of Lubold et al. (2023). Our work supports cascade risk assessment in critical infrastructure through the Templates for Risk-informed Assurance with Curvature Embeddings (TRACE) framework. Simulations on a bi-modal Gaussian surface show that constant-curvature methods yield weighted averages shaped by clique patterns, while hierarchical clustering identifies distinct regimes. Localized estimation, however, reveals boundary contamination in transitional regions. To address heterogeneity, we develop distance metrics for graphs with edge and node features, proving their metric validity, and validate them via deterministic graph generation from canonical tilings. We further propose a diffusion-based anomaly detection approach that treats networks as glued manifolds, using curvature discontinuities to detect structural anomalies. Employing the carré-du-champ operator and scalar curvature, we achieve robust anomaly discrimination, demonstrated on the Singapore Water Treatment (SWaT) dataset with joint network-traffic and sensor features. Integration with TRACE reveals how curvature shapes cascade dynamics: positive curvature impedes, while negative curvature accelerates propagation. This geometric perspective provides interpretable risk metrics and visualization tools for critical infrastructure managers. While full validation remains ongoing, our contributions establish a rigorous foundation for geometric analysis of network resilience and cascade vulnerability.

97 MATHEMATICS AND COMPUTING↗

The Design and Evaluation of Zero Trust Architecture for Electric Vehicle Charging Infrastructure: EVs @ Scale Series on EV Charging Station Cybersecurity

Implementing a zero trust architecture can significantly bolster the security of electric vehicle (EV) charging infrastructure. EV charging infrastructure includes numerous networked interfaces, each of which can present potential vulnerabilities. When these vulnerabilities are exploited, they can compromise the entire system, leading to severe operational and security risks. Zero trust is a security model that operates on the principle of "never trust, always verify," which helps manage the attack surface and limit the scope of any potential compromises. Fundamentally, this model ensures that no entity, whether inside or outside the network, is trusted by default. The design principles of zero trust include continuous verification, strict deny-by-default access controls, and micro-segmentation. Continuous verification ensures that every request is thoroughly checked, regardless of its origin. Strict access controls enforce the principle of least privilege, allowing users and devices only the minimum necessary access to perform their functions. Micro-segmentation involves dividing the network into smaller, isolated segments to prevent lateral movement in case of a breach. In the context of EV charging infrastructure, zero trust can be implemented through various strategies. For example, multi-factor authentication (MFA) can be required for engineers to access the management interfaces and control systems of charging stations. Real-time monitoring and analysis of network traffic can help detect and respond to anomalies. Systems that do not need to communicate with each other can be micro-segmented to enhance security. All communications should adhere to predefined policies to be permitted. Additionally, encrypting communications can protect sensitive information exchanged between chargers and management systems. This paper presents a zero trust architecture specifically designed for EV charging infrastructure. Implementing zero trust not only mitigates risks but also builds a resilient infrastructure capable of withstanding and quickly recovering from cyber threats. The architecture addresses six defined security objectives. A comprehensive test plan is developed to assess the architecture against these objectives, and the results of the evaluation are reported. This approach is essential for maintaining the reliability and integrity of EV charging services in an increasingly interconnected and vulnerable digital landscape. This is the first in a planned series of papers exploring the implementation of zero trust in EV charging infrastructure. Each paper will delve into different aspects and applications of zero trust, highlighting how various work processes and requirements can lead to distinct architectural designs. These architectures will be tailored to address specific security challenges and operational needs within the EV charging ecosystem, ensuring a robust and adaptable security framework.

33 ADVANCED PROPULSION SYSTEMS↗

Andra's strategy and approach for operational safety of French underground facility Cigeo - 15127

According to the French Act on radioactive waste of 28 June 2006, Andra shall design a reversible repository. In response to this demand, Andra is developing the industrial project namely 'Cigeo', a reversible geological disposal facility for HLW and ILW located in Meuse/Haute-Marne. The previous safety cases of 2005, 2009 and 2012 give a sound basis to assess Cigeo's safety both for the operational and post-closure periods. Regarding operational safety, in this new stage of the project, the challenging issues for the preparation of the safety case are the following: - To adapt the various regulatory frameworks (nuclear and non-nuclear) to the underground facility - To design the underground facility and handling equipment's to reduce at first risks in the underground facility as such radioactive particles release, gas explosion, fire and co-activity and limit their consequence. - To establish waste acceptance criteria to be fulfilled by waste producers in line with operational safety and design options. The objective of the paper is to present the experience of Andra in operation safety of the underground facility of Cigeo. Operational safety for Cigeo is assessed as much as possible according to the existing French regulations and guidance for nuclear facilities. Indeed, compared to existing nuclear facilities, a geological repository is a specific case due to the existence of underground facilities with particularities such as: - ventilation management in a large scale underground facility, - fire risk management. As an input for the industrial design of Cigeo for operation, Andra defined a fire guidance and a specific reference safety guidance, based on the adaptation of the French nuclear regulatory texts for and when feasible to mines and tunnels regulatory texts and on its own experience gained through safety operational reports since 2005 and their reviews by the Safety Authority. - underground co-activity of nuclear operation with construction works. According to the common 'defense-in depth' principle for nuclear facilities, these guidelines for the industrial design of Cigeo for operation consider the successive levels of defense of: - Preventing the risk and its spreading by design and construction; - Detecting incidents and early fighting by design and operation dispositions (detection and control systems, survey procedure); - Controlling incidents and limiting of their consequences by safeguarding systems, specific procedures. At that stage, design options for Cigeo constitute an adequate response to the operational safety functions and requirements: - Two levels of containment are set up: the first one is ensured by the waste package, the second one is ensured from the surface facility to the disposal vaults by the transfer cask during the transfer of waste packages in the disposal vaults by the disposal vault itself and a nuclear ventilation with HEPA filter; - Favorable options for fire risk prevention and mitigation: transport system minimizing heat load (cable car for the transfer from the surface, electric transfer engines), twin access tunnels to ease fire-fighting and evacuation...; - Permanent complete physical separation of nuclear zone and construction zone (including ventilation systems). In practice, operation safety assessment of Cigeo, designed following the aforesaid reference safety guidelines, follows a common risk analysis (internal aggressions such as auxiliary losses, chemical and toxic risks, fall or collision, fire, human factors and external aggressions such as earthquake, air traffic, flooding) with the following steps: - Identification of the major risks and the design basis scenarios that have to be considered for dimensioning of the installations and the safety devices; - On the basis of these different situations, those who will have to be quantified are identified; one or more representative and envelop situations are chosen in order to evaluate robustness of the installation. Quantitative evaluation of these situations permits to: - identify the consequences on man, environment and installation, and in particular to gain confidence in the maintaining of the safety functions; - identify or define the technic and/or organisational dispositions classified as 'important elements for protection' (IEP); - Situations beyond dimensioning permit to verify the robustness of the installation. They permit, on one hand to identify possible complementary material or organisational dispositions; on the other hand, to define the 'hard core' i.e. structures, systems and components that permit to maintain the confinement function of radioactive substance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utica Shale Energy and Environment Laboratory Final Scientific/Technical Report

The Ohio State University (OSU) was awarded a contract on October 1, 2014, from the Department of Energy National Energy Technology Laboratory (DOE-NETL) to develop the Utica Shale Energy and Environment Laboratory (USEEL) in the Utica-Point Pleasant shale play of the Appalachian Basin. It was designed to be an environmental and technology development lab that would enable the academic, industry, government, and non-governmental organization (NGO) research communities to better understand unconventional oil and gas (UOG) engineering practices and technology to increase production and safety, and decrease environmental effects. Political and economic consequences necessitated changes in project site location and design, from the Ohio State Eastern Agricultural Research Station (EARS) and the Muskingum Watershed Conservancy District (MWCD) in east-central Ohio to a site located at an Energy Corporation of America (ECA) Marcellus drill pad in Greene County, Pennsylvania. Although the overall project progressed little beyond planning and administration before termination on September 18, 2017, significant research and MS or PhD investigations were completed or continue today. An experimental study design for site specific and regional baseline assessments was developed utilizing ecoregions, United States Geological Survey (USGS) Hydraulic Unit Code watersheds, and GIS technology and databases. This can be utilized to build a defensible and scalable management and research framework for UOG investigations that can be extrapolated for predictive and comparative analyses. The most commonly mentioned perceived risks of shale energy development identified in a socioeconomic analysis included impacts to the environment and water resources, traffic and road deterioration, and crime. Economic benefits, such as the windfall wealth to residents, job opportunities, and the demand for hotels and restaurants emerged, as the main positive impact to the community. Preliminary results of an analysis of the location and mechanisms for extremely high pore pressures of the deep Utica-Point Pleasant formations of southwestern Pennsylvania and their possible relationship to high initial production rates indicate that the overpressure is caused by a combination disequilibrium compaction and fluid expansion. Drilling fluids research designed a proof-of-concept device to evaluate desalination and solvent separation in hydraulic fracturing flowback water that could facilitate water recycling and potentially mitigate deep-well injection. A groundwater study was devised to characterize the subsurface aquifers in terms of the geological framework and groundwater chemistry, including the chemistry of dissolved gases and salts. Brines and gases associated with hydrocarbon migration in groundwater (including noble gases and hydrocarbons) were to be specifically fingerprinted for use as tracers of fluid migration. Trace element analysis of fish otoliths, using laser ablation inductively coupled plasma mass spectrometry (LA-ICP-MS), is being utilized to assess surface water quality. This methodology will be used to reconstruct the exposure histories of fish from watersheds and discriminate between the signatures associated with hydraulic fracturing and coal mining activities.

03 NATURAL GAS↗

Zero Discharge Water Management for Horizontal Shale Gas Well Development

Hydraulic fracturing technology (fracking), coupled with horizontal drilling, has facilitated exploitation of huge natural gas (gas) reserves in the Devonian-age Marcellus Shale Formation (Marcellus) of the Appalachian Basin. The most-efficient technique for stimulating Marcellus gas production involves hydraulic fracturing (injection of a water-based fluid and sand mixture) along a horizontal well bore to create a series of hydraulic fractures in the Marcellus. The hydraulic fractures free the shale-trapped gas, allowing it to flow to the well bore where it is conveyed to pipelines for transport and distribution. The hydraulic fracturing process has two significant effects on the local environment. First, water withdrawals from local sources compete with the water requirements of ecosystems, domestic and recreational users, and/or agricultural and industrial uses. Second, when the injection phase is over, 10 to 30% of the injected water returns to the surface. This water consists of flowback, which occurs between the completion of fracturing and gas production, and produced water, which occurs during gas production. Collectively referred to as returned frac water (RFW), it is highly saline with varying amounts of organic contamination. It can be disposed of, either by injection into an approved underground injection well, or treated to remove contaminants so that the water meets the requirements of either surface release or recycle use. Depending on the characteristics of the RFW and the availability of satisfactory disposal alternatives, disposal can impose serious costs to the operator. In any case, large quantities of water must be transported to and from well locations, contributing to wear and tear on local roadways that were not designed to handle the heavy loads and increased traffic. The search for a way to mitigate the situation and improve the overall efficiency of shale gas production suggested a treatment method that would allow RFW to be used as make-up water for successive fracs. RFW, however, contains dissolved salts, suspended sediment and oils that may interfere with fracking fluids and/or clog fractures. This would lead to impaired well productivity. The major technical constraints to recycling RFW involves: identification of its composition, determination of industry standards for make-up water, and development of techniques to treat RFW to acceptable levels. If large scale RFW recycling becomes feasible, the industry will realize lower transportation and disposal costs, environmental conflicts, and risks of interruption in well development schedules.

03 NATURAL GAS↗

Pavement condition and climatic data in southeast Texas: A dataset for evaluating flood impacts on pavement performance

Effective pavement maintenance is essential for economic stability, optimal network performance, and roadway safety. Achieving this requires thorough evaluation of pavement conditions, including structural integrity, surface roughness, and distress characteristics. Pavement performance indicators play a critical role in influencing vehicle safety and ride quality. Recent advances have emphasized the use of data-driven modeling to anticipate pavement behavior, with the goal of optimizing resource allocation and refining Maintenance and Rehabilitation (M&R) strategies through accurate condition assessment. A foundational requirement for these modeling efforts is the availability of standardized, high-quality datasets that can support robust and reproducible infrastructure analysis. This data article presents a comprehensive dataset assembled to facilitate pavement performance prediction, with a geographic focus on Southeast Texas, particularly the flood-vulnerable area of Beaumont. The dataset encompasses pavement and traffic attributes, meteorological records, flood simulation outputs, ground deformation measurements, and topographic indices, enabling detailed examination of both load-associated and non-load-associated degradation mechanisms. Data preprocessing was performed using ArcGIS Pro, Microsoft Excel, and Python to ensure consistency and usability in data-driven modeling applications, including machine learning workflows. Key contributions of this dataset include its utility in analyzing the climatic and environmental factors affecting pavement conditions, identifying critical predictive features, and enabling in-depth correlation analysis across diverse variables. By filling existing gaps in input variable selection resources, this dataset supports the development of predictive tools for estimating future maintenance demand and enhancing the resilience of pavement networks in flood-impacted areas. The resource highlights the importance of standardized datasets for advancing pavement management practices and provides a robust foundation for ongoing infrastructure performance modeling.

42 ENGINEERING↗

Polar Ocean Observations: A Critical Gap in the Observing System and Its Effect on Environmental Predictions From Hours to a Season

There is a growing need for operational oceanographic predictions in both the Arctic and Antarctic polar regions. In the former, this is driven by a declining ice cover accompanied by an increase in maritime traffic and exploitation of marine resources. Oceanographic predictions in the Antarctic are also important, both to support Antarctic operations and also to help elucidate processes governing sea ice and ice shelf stability. However, a significant gap exists in the ocean observing system in polar regions, compared to most areas of the global ocean, hindering the reliability of ocean and sea ice forecasts. This gap can also be seen from the spread in ocean and sea ice reanalyses for polar regions which provide an estimate of their uncertainty. The reduced reliability of polar predictions may affect the quality of various applications including search and rescue, coupling with numerical weather and seasonal predictions, historical reconstructions (reanalysis), aquaculture and environmental management including environmental emergency response. Here, we outline the status of existing near-real time ocean observational efforts in polar regions, discuss gaps, and explore perspectives for the future. Specific recommendations include a renewed call for open access to data, especially real-time data, as a critical capability for improved sea ice and weather forecasting and other environmental prediction needs. Dedicated efforts are also needed to make use of additional observations made as part of the Year of Polar Prediction (YOPP; 2017– 2019) to inform optimal observing system design. To provide a polar extension to the Argo network, it is recommended that a network of ice-borne sea ice and upper-ocean observing buoys be deployed and supported operationally in ice-covered areas together with autonomous profiling floats and gliders (potentially with ice detection capability) in seasonally ice covered seas. Finally, additional efforts to better measure and parameterize surface exchanges in polar regions are much needed to improve coupled environmental prediction.

54 ENVIRONMENTAL SCIENCES↗

Comparing Ecological Risk between D and D Facilities and Operating Facilities at the Hanford Site - 19531

Many countries are faced with a large remediation task resulting from World War II, the Cold War, and subsequent industrial development. In the U.S. the Department of Energy (DOE) faces the largest hazardous waste remediation tasks, with a commitment to protect human health and the environment during and following remediation. DoE's biggest challenge is remediation of the many remaining cleanup areas at the Hanford Site, Washington. Some Hanford sites have extensive ecological resources and ecosystems that require protection or restoration. We briefly 1) describe a rapid evaluation method for ecological resources on units slated for cleanup that allows comparison among the different areas at the Hanford Site, 2) examine some D4 (deactivation, decommissioning, decontamination and demolition) facilities and Operating facilities that require remediation, 3) describe potential ecological harm to resources on these sites, and 4) compare how risks from potential harm vary at the Hanford Site. The ecological evaluation includes three phases: 1) general steps (identify resource categories, identify cleanup areas), 2) ecological descriptions (describe resources on the site to be cleaned up), and 3) ecological ratings (rate the value of the resources on a scale that can be applied across remediation sites). After completion of these steps for the sites requiring cleanup, a comparison of potential risks can be made among types of facilities (e.g. D4 facilities, legacy waste sites, operating facilities). D4 facilities are those slated for deactivation, decommissioning, decontamination and demolition, while operating facilities at Hanford include waste treatment plants, sludge basins, waste trenches, Central Waste Complex, storage facilities, and disposal facilities, among others required to support the D4 and other remediation activities, before they too are remediated. Currently the potential harm to ecological (and eco-cultural) resources on the Hanford Site for remediation at D4 facilities is very low, but increases to very high (for reactors) during remediation when there is physical disruption, increased traffic and personnel, and possible increased contamination. Following remediation, the potential harm to ecological resources is low, and the value may increase due to restoration of native vegetation on sites that were largely industrial prior to remediation. In contrast, the potential harm to ecological resources at Operating Facilities was higher currently than for D4 facilities, but was low to medium following cleanup. The higher harm (risk) at D4 facilities partly derives from the location of the reactors near the Columbia River, a resource extremely important to Tribal Nations and to other peoples in the Northwestern United States, as well as for the iconic and threatened salmon populations. Methods described in this paper provide Congress, DOE managers, regulators, Tribes, and the general public with assurance that ecological and eco-cultural resources and the environment are being protected during and following remediation. The analysis of specific sites provides managers, regulators and the public with information to make cost-effective decisions about remediation that continues to enhance ecological value while protecting human health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗