Search NASA⌕ Search

SEARCH · Search NASA

Results for “transmission expansion”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗

Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scalable Stochastic Transmission Expansion: A Use Case for ExaSGD

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and un- certain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty. This is an example of a possible use of the ExaSGD security constrained AC optimal power flow solver.

Exascale Computing Project↗

Scalable Transmission Expansion Under Uncertainty Using Three-Stage Stochastic Optimization

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and uncertain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty.

multi-stage stochastic optimization↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessing the Interactive Impacts of Energy Efficiency and Demand Response on Power System Costs and Emissions

Utilities are increasingly interested in integrating energy efficiency (EE) and demand response (DR) measures and technologies (as well as other distributed energy resources) as a strategic approach to improve their cost-effectiveness and performance. However, the specific EE and DR features that may be best integrated, the interplay between changing EE and DR resource potential, and resulting utility system impacts are not well understood. We quantify the impacts of EE and DR in isolation and in combination on bulk power system costs and emissions based on changes in generation expansion, transmission expansion, and dispatch patterns. The study methodology mimics utility resource planning and uses more novel techniques to select least-cost generation and transmission capacity from supply-and demand-side resources, as compared to more commonly used utility approaches that only consider supply-side resources. The results identify key EE and DR characteristics affecting each other’s power system value and the most valuable technologies and strategies that can be jointly deployed. We discuss implications for EE and DR cost-effectiveness frameworks, program design, and integrated resource planning.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Recent advances and challenges in optimization models for expansion planning of power systems and reliability optimization

Optimization models for expansion planning of power systems aim to determine capacities, investment timing, and location of power systems to satisfy the power demands while minimizing the total cost. The models have become complex in recent years to reflect both regulations on conventional energy sources and the increasing penetration of renewable energy sources (RES). This paper reviews the basic concepts and optimization models for expansion planning of power systems. We first explain the definition and features of generation expansion planning (GEP), transmission expansion planning (TEP), and generation and transmission expansion planning (GTEP). To address the computational challenges of large-scale expansion planning problems, we review several simplifications including temporal and spatial aggregation, and decomposition methods. This paper also addresses power system reliability defined as the probability of satisfying the load demand while withstanding failures of components. Finally, the goal of this paper is to provide a research overview, discuss trends in expansion planning of power systems, and suggest directions for future research.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Synergies and trade-offs between storage, transmission, and sector coupling in high renewable energy systems

Energy storage, transmission, and sector coupling are some prominent flexibility solutions to support variable renewable energy (VRE) integration. However, investment cost uncertainties and public acceptance could hamper the deployment of these flexibility solutions. This raises questions about the development and cost-effectiveness of future energy systems, especially on how the dependence on local and cross-border solutions of flexibility would evolve if the uptake of these solutions is restricted. In this context, this paper identifies the synergies among flexibility options under restrictions on transmission expansion or increased costs of energy storage. It contributes to determining whether investments in energy storage and/or transmission expansion offer the least-cost transition and investigates the impact of sector coupling on these solutions. A long-term energy system planning and optimisation model towards 2050 is developed using the open-source energy system optimisation tool Balmorel, and a case study of the countries surrounding the Baltic Sea and the North Sea is established. Five cases with restrictions imposed on transmission expansion and higher energy storage technology costs are analysed at different levels of sector coupling. The results highlight the importance of transmission expansion at all levels of sector coupling. As the level of sector coupling increases, uncertainties around the cost of energy storage drive the least-cost pathways. Optimal investment solutions are found to have a mix of transmission and energy storage in capacity expansion at all levels of sector coupling.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Joint Planning of Electricity Transmission and Hydrogen Transportation Networks

The abundance and uneven distribution of renewable energy might cause congestion and curtailment in electric power systems. Transmission expansions can potentially alleviate transmission congestion and reduce renewable energy curtailment. On the other hand, with the substantial cost reduction of electrolyzer technology and the continuing rise of hydrogen demand, converting surplus renewable energy to hydrogen provides synergistic benefits to power and hydrogen systems, but consequently requires joint planning of the two systems. To this end, we propose a joint planning approach for power transmission and hydrogen transportation networks to coordinately optimize the investment and operation of power and hydrogen infrastructure. In our proposed model, detailed truck routing, pipeline, and hydrogen storage are formulated to quantify the flexibility of hydrogen transportation system. A robust joint planning approach is also proposed to address various uncertainties from renewable energy, electric load, and hydrogen demand. Furthermore, our numerical simulations show that the proposed joint planning model can save the total system cost, reduce renewable energy curtailment, and increase the utilization level of transmission lines.

08 HYDROGEN↗

Opportunities for wave energy in bulk power system operations

Wave energy resources have high, yet largely untapped potential as candidate generation technology. In this paper, we perform a data-driven analysis to characterize the impact of wave energy integration on bulk-scale power systems and market operations. Through data-driven sensitivity studies centered on an optimization-based production cost modeling formulation, our work characterizes the inflection point beyond which wave integration starts impacting power system operations, considering present day transmission infrastructure. Furthermore, our analysis also considers the joint effects of wave energy integration and system-wide transmission expansion. Finally, potential resilience scenarios such as wildfire-driven transmission contingencies and heat wave events are investigated, whereby the contributions of grid-integrated wave energy in alleviating the effects of the resilience events are analyzed. As our demonstration test bed, we consider a reduced-order network topology for the U.S. Western Interconnection with wave energy generation integrated at carefully selected sites across the coastal areas of Washington, Oregon, and northern California. Our results indicate that over a representative year of operations, wave energy integration systematically reduces locational marginal prices (LMPs) of energy and price volatility, especially during periods of high wave resource availability (winter months for the U.S. west coast). Average, maximum, and minimum of hourly LMPs over a typical year of operation was reduced by 2.95, 51.28, and 1.13 $\$$/MWh respectively (over a baseline scenario with no wave energy integration), when the selected network model had a total of 5000 MW wave power installed capacity during the representative year of study. The effects of wave energy integration can remain localized with existing transmission infrastructure (identified to be most pronounced in the Pacific Northwest region in the example we studied). However, with concurrent transmission expansion, the impacts of wave energy integration are likely to have a higher geographical spread. Our results also indicate that wave energy may be able to assist power system operations during resilience events such as major transmission contingencies and heat wave events, although such benefits might be dependent on factors such as proximity of affected area to wave resources, availability of adequate resource potential and adequate transmission capacity.

16 TIDAL AND WAVE POWER↗