Search NASA⌕ Search

SEARCH · Search NASA

Results for “upgrading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Are Deep Energy Retrofits in Commercial Buildings Including Window Upgrades?

U.S. Commercial buildings account for about 20% of total U.S. energy consumption. Because the thermal performance of windows significantly affects building energy efficiency and HVAC system performance, best practice guidance often includes window and envelope improvements in conjunction with HVAC upgrades to optimize energy use and improve occupant comfort. It is an open question, however, regarding how often these best practices are implemented in the field. This paper aims to address that gap by conducting a literature review and a series of interviews with commercial building auditing and management professionals to explore the factors that drive window retrofits in commercial buildings. The paper explores a range of case studies from deep energy retrofits across the globe, comparing projects with and without window retrofits. The primary goals of this review are to: (1) provide data from real-world case studies illustrating the role of windows in deep energy renovations and HVAC upgrades, (2) conduct retrofit cost analyses for windows and high-performance HVAC systems and (3) offer insights into how window upgrade decisions are made and when they are implemented as part of deep energy retrofits. Most of the retrofit studies focused exclusively on high performance HVAC upgrades without considering how window upgrades might further enhance the overall energy efficiency of commercial buildings. Interviews with building industry experts shed light on the key factors influencing deep energy retrofit decisions and what factors tip the scales in favor of including window measures with more comprehensive retrofit projects.

Cort, Katherine↗

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

Test Results of the LQXFA/B02 and LQXFA/B03 Cryo-Assemblies for the High Luminosity LHC Upgrade

Here, the US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within this program. After the successful test of the first pre-series cryo-assembly in 2023, two more cryo-assemblies were tested at Fermilab's horizontal test facility. Production overview and the test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies are summarized in this paper. After the first test, to increase the capability of the horizontal test facility, various improvements have been made. These improvements are also described in this paper.

Chlachidze, Guram [Fermi National Accelerator Labo↗

APS upgrade: Commissioning the world’s first light source based on swap-out injection

The Advanced Photon Source (APS) has recently completed a major upgrade, replacing its 25-year-old storage ring with a cutting-edge hybrid seven-bend achromat lattice enhanced by six additional reverse bends. The new design achieves a natural emittance of 42 pm-rad, enabling the production of X-rays up to 500 times brighter than those generated by the original APS. A key innovation of the upgrade is the implementation of a swap-out injection scheme, which replaces entire depleted bunches instead of performing traditional top-up injection. This approach enables on-axis injection to accommodate for the reduced dynamic aperture resulting from strong focusing. This paper outlines the commissioning process, shares initial operating experience with swap-out injection, and presents performance data for new systems such as the bunch-lengthening cavity.

Sajaev, Vadim [Argonne, PHY]↗

Development of combined function dipole-quadrupole PMQs magnets for NSLS-II upgrade

This paper focuses on the R&D performed for the development of permanent magnets-based dipoles-quadrupoles combined function magnets (PMQs) for the future NSLSII upgrade “complex bend” lattice (CB). This new lattice uses PMQs that provide both bending (dipole) and strong focusing (quadrupole) magnetic field on the electron beam. The permanent magnet (PM) technology is suitable for the high magnetic field strengths (0.5 T, 130 T/m) required for such combine function magnets. PM technology leads to a compact magnet design that is essential in realizing the complex bend lattice concept, as well as a passive magnet solution which does not require electrical power supply reducing power consumption by ~ 80% (from 1.7 MW to 0.3 MW for NSLS-II). Two PMQs magnets designs are under consideration: A hybrid design that use both PM and soft iron poles, and Halbach type that is a pure PM design. Both PMQs designs present challenges in achieving the specified magnetic field quality due to their higher sensitivity to errors (mechanical tolerances and PM properties). This paper presents cost-effective designs and prototypes results for hybrid and Halbach PMQs, addressing various technical challenges while meeting the field requirements of the complex bend lattice for the NSLS-II upgrade.

N'gotta, Patrick [Brookhaven]↗

Design progress for the 22 GeV CEBAF energy upgrade

In this work we examine the progress made in the design of the proposed FFA upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF). This proposed upgrade will double the number of passes through the two linacs by replacing the two highest energy arcs with new Fixed Field Alternating Gradient (FFA) arcs, roughly doubling the energy. These FFA arcs will use permanent magnets in a Halbach configuration to shape their fields. The design involves new optics for the linacs and remaining electromagnetic arcs, as well as new electromagnetic separators. These feed into the permanent magnet FFA arcs. We also report on ongoing studies of the dynamics of the beams, and an experiment to measure the effects of radiation on the permanent magnets.

Accelerator Physics↗

The Upgrade of the SNS Extraction Kicker Power Supplies for the Proton Power Upgrade

The Proton Power Upgrade (PPU) project at the Spallation Neutron Source (SNS) aims to enhance the linear accelerator's power output from 1.4 to 2.8 megawatts. A critical focus lies on upgrading the Extraction Kicker Power Supplies to handle the amplified beam power. The existing capacitor charging power supplies lacked the capability to charge the Blumlein-type Pulse Forming Network (PFN) to the required 40 kV at a repetition rate of 60 Hz. To address this limitation, an initial solution involving the use of a resonant charging circuit was proposed. However, a challenge arose with a self-firing issue in the thyristor switch, which proved unsolvable within the given timeframe. Facing a critical decision point in the project, an alternative approach was explored: integrating a supplementary power supply to enhance the overall power capacity. This solution was tested and ultimately chosen as the path forward. To accommodate the additional power supply, the power distribution system had to undergo upgrades. Throughout this endeavor, a comprehensive examination of the system took place, with meticulous identification of key components. This paper delves into the technical challenges encountered during the process and the corresponding solutions that were implemented.

Tan, Yugang [ORNL] (ORCID:0000000155968252)↗

Beam Performance of the Positron Transport Line for CEBAF Positron Upgrade

The Low Energy Recirculator Facility (LERF) at Jefferson Lab, formerly operated for the Free-Electron Laser program, has been proposed as the injector complex for the planned 12 GeV CEBAF positron upgrade (Ce+BAF), with an additional pathway to support a potential 22 GeV CEBAF electron upgrade. In this configuration, LERF would generate and pre-accelerate positrons to 123 MeV, matching the present injection energy into the North Linac. Due to the relatively large emittance expected from the positron source, a comprehensive acceptance study has been performed from LERF through the CEBAF recirculating linacs and beam transport lines to the experimental halls. The objective is to establish the positron phase-space acceptance and provide design feedback to the positron production and capture systems. Furthermore, given CEBAF’s capability to deliver highly polarized beams, spin-tracking simulations have been carried out including magnet imperfections, alignment errors, and synchrotron-radiation–induced energy spread. Particular attention is given to the evolution of the spin tune and the corresponding depolarization mechanisms along the beam delivery path, especially for providing longitudinal polarization at the experimental halls. These results inform injector design choices and assess the overall feasibility of delivering high-polarization positron beams in CEBAF.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Separation, Recovery and Upgrading of 2,3-Butanediol from Fermentation Broth

2,3-Butanediol (BDO) is a bio-derived building block available from biomass through biochemical methods in high titers (>120 g L-1) making it an attractive target for production and further upgrading to chemical products and fuels such as sustainable aviation fuel. A key challenge to enable the adoption of BDO as a precursor is the effective separation and isolation of this molecule from the fermentation broth. 2,3-Butanediol has a boiling point higher than that of water (177 degrees C), and as a consequence, separation via distillation methods is an energy-intensive and therefore costly approach. We have improved the BDO separation through conversion to a 1,3-dioxolane directly in fermentation broth via reaction with bio-derived aldehydes catalyzed by a solid acid catalyst. The resulting dioxolane phase separates from the fermentation broth, allowing for easy decantation and isolation in >90% isolated yield. Isolated dioxolane can be used directly as a compression iginition fuel, trans-acetalized to recover high-purity BDO or used directly in a catalytic process as a BDO synthon to produce methyl ethyl ketone with aldehyde recovery in near quantitative yield.

aviation fuel↗

Evaluation of HPK n + - p planar pixel sensors for the CMS Phase-2 upgrade

To cope with the challenging environment of the planned high luminosity upgrade of the Large Hadron Collider (HL-LHC), scheduled to start operation in 2029, CMS will replace its entire tracking system. The requirements for the tracker are largely determined by the long operation time of 10 years with an instantaneous peak luminosity of up to 7.5 × 10 34 cm –2 s –1 in the ultimate performance scenario. Depending on the radial distance from the interaction point, the silicon sensors will receive a particle fluence corresponding to a non-ionizing energy loss of up to $\Phi_{\text {eq}}$ = 3.5 × 10 16 cm –2 . Here this paper focuses on planar pixel sensor design and qualification up to a fluence of $\Phi_{\text {eq}}$ = 1.4 × 10 16 cm –2 . For the development of appropriate planar pixel sensors an R&D program was initiated, which includes $n^+ -p$ sensors on 150 mm (6”) wafers with an active thickness of 150 μm with pixel sizes of 100 × 25 μm 2 and 50 × 50 μm 2 manufactured by Hamamatsu. Single chip modules with ROC4Sens and RD53A readout chips were made. Irradiation with protons and neutrons, as well was an extensive test beam campaign at DESY were carried out. This paper presents the investigation of various assemblies mainly with ROC4Sens readout chips. It demonstrates that multiple designs fulfill the requirements in terms of breakdown voltage, leakage current and efficiency. The single point resolution for 50 × 50 μm 2 pixels is measured as 4.0 μm for non-irradiated samples, and 6.3 μm after irradiation to $\Phi_{\text {eq}}$ = 7.2 × 10 15 cm –2 .

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Upgrading Fermilab’s accelerator control system with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Roehrig, Christian [Fermilab]↗

Status of 22 GeV CEBAF Upgrade Using FFA Arcs

Jefferson Lab is exploring an upgrade to extend CEBAF’s energy to ~22 GeV within the existing tunnel by incorporating Fixed-Field Alternating-Gradient (FFA) arcs. In this scheme, the two lowest-energy electromagnetic arcs are removed, the remaining arcs are reassigned to lower energies, and a new pair of high-energy FFA arcs enables six additional recirculations using the existing SRF linacs. The non-scaling FFA lattice employs Halbach-derived permanent magnets with provisions for dipole, quadrupole, and higher-order components, offering large momentum acceptance and reduced operating cost. Implementing this concept requires updated linac optics, modifications to the remaining arcs, and a redesigned electromagnetic switchyard. Ongoing beam-dynamics studies address synchrotron-radiation–induced energy loss and emittance growth, along with strategies for their mitigation.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Ethanol Upgrading to n -Butanol Using Transition-Metal-Incorporated Poly(triazine)imide Frameworks

The upgrading of ethanol to n-butanol was performed using a molecular catalyst integrated into a carbon nitride support, one of the first examples of a supported molecular catalyst performing the Guerbet process. Initial studies using crystalline poly(triazine)imide (PTI) with lithium or transition-metal cations imbedded in the support together with a base as the catalyst system did not produce any significant amounts of n-butanol. However, when using the catalyst material formed by treatment of PTI-LiCl with [(Cp*)IrCl 2 ] 2 (Cp* = pentamethylcyclopentadienyl) along with sodium hydroxide, a 59% selectivity for butanol (13% yield) was obtained at 145 °C. This PTI-(Cp*)Ir material exhibited distinct UV–vis absorption features and powder X-ray diffractions which differ from those of the parent PTI-LiCl and [(Cp*)IrCl 2 ] 2 . Here, the PTI-(Cp*)Ir material was found to have a metal loading of 27% iridium per empirical unit of the framework. Along with the formation of n-butanol from the Guerbet reaction, the presence of higher chain alcohols was also observed.

Guerbet↗

End-Use Savings Shapes Upgrade Package Documentation: Wall and Roof Insulation and New Windows

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock and ComStock models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on an upgrade package of three end-use savings shapes upgrades - Window Replacement, Exterior Wall Insulation, and Roof Insulation, which we will refer to collectively as the "High Efficiency Envelope" package. More details on the individual upgrades can be found on the ComStock Measures Documentation page. An upgrade package applies two or more EUSS upgrades to a single building model simulation. Since ComStock is a bottom-up physics-based model, an upgrade package will go beyond aggregating or summing the individual upgrade results and produce novel results by simulating interactions between the upgrades. For example, pairing an envelope upgrade with an electrification upgrade would likely result in higher savings results than the sum of these upgrades individually, and the size of the heating, ventilating, and air conditioning (HVAC) equipment may be reduced if the envelope upgrade reduces the loads significantly.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

End-Use Savings Shapes Upgrade Package Documentation: LED Lighting, HP-RTU and ASHP-Boiler

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock and ComStock models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on an upgrade package of three end-use savings shapes upgrades - Light Emitting Diode (LED) Lighting, Heat Pump Rooftop Unit (RTU) (HP-RTU), and Air-Source Heat Pump (ASHP) Boiler, which we will refer to collectively as the "Interior Lighting and Heat Pump" package. More details on the individual upgrades can be found on the ComStock Measures Documentation page. An upgrade package applies two or more EUSS upgrades to a single building model simulation. Since ComStock is a bottom-up physics-based model, an upgrade package will go beyond aggregating or summing the individual upgrade results and produce novel results by simulating interactions between the upgrades. For example, pairing an envelope upgrade with an electrification upgrade would likely result in higher savings results than the sum of these upgrades individually, and the size of the heating, ventilating, and air conditioning (HVAC) equipment may be reduced if the envelope upgrade reduces the loads significantly.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗