Search NASA⌕ Search

SEARCH · Search NASA

Results for “waste free delivery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Remote Sampler Demonstration Isolok Configuration Test

The accuracy and precision of a new Isolok sampler configuration was evaluated using a recirculation flow loop. The evaluation was performed using two slurry simulants of Hanford high-level tank waste. Through testing, the capability of the Isolok sampler was evaluated. Sample concentrations were compared to reference samples that were simultaneously collected by a two-stage Vezin sampler. The capability of the Isolok sampler to collect samples that accurately reflect the contents in the test loop improved – biases between the Isolok and Vezin samples were greatly reduce for fast settling particles.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efficient Mesofluidic Separation of Large Particles in nuclear slurries - 20408

Efficient and effective particle separation is essential to cleanup of many nuclear wastes. For example, particle separation may be used to accelerate settle-decant bottlenecks that limit the throughput necessary to achieve the U.S. Department of Energy waste cleanup mission in a timely manner. Particle separation may be used to protect downstream processing equipment from pulses of solids that may be encountered near (within a few feet of) liquid-solid interfaces during waste transfer operations, thereby preventing work stoppages. Effective particle separation may permit efficient sludge washing. These are only a few of the ways in which particle separation is important. Yet, efficient and effective particle separation in nuclear processing environments remains challenging. For example, settle-decant operations permit larger and heavier particles to settle, leaving smaller, lighter particles suspended. However, settle-decant operations are slow, convection currents may resuspend solids, hindered settling of multicomponent slurries remains incompletely understood, and predictive models for settling in graduated cylinders fail to match limited observations of settling in large waste tanks. Additionally, pumping operations can cause turbulent resuspension of particles when the pump intake is close to the settled solids layer. Filtration techniques that use membranes or partially permeable barriers retain larger particles, permitting smaller particles to permeate. However, filters, including dead-end filtration, are prone to clogging and caking, operate at elevated pressures due to minimal void volume, and increase in pressure during operations, which require more control systems. Therefore, the need for high throughput particle separation techniques that operate with modest pressure drops persists. A novel mesofluidic separator presents the opportunity to effectively and efficiently accelerate the waste cleanup mission. The separator separates large particles from process streams across a broad range of particle sizes and has no moving parts or media to replace, regenerate, or clean. This separator design has an unusually large void volume, permitting operation at much higher flow rates (and lower pressures) than traditional filtration (e.g., dead-end filtration). Industrial-scale flow rates have been demonstrated. In performance testing, mesofluidic separators operate at might flow rates (>90 gpm (0.0006 m{sup 3}/s) in piping 3 inches (0.08 m) in diameter; Re>10{sup 5}), with modest pressure drop (∼25 psi (170 KPa) in testing). In complex, aggregating waste simulants, the separator loses <25% of flow projected over months without back pulsing or chemical cleaning. Mesofluidic separation presents infrastructure advantages, reduces risk, and provides mission impact. Infrastructure advantages include implementation within existing transfer systems, plug and play without facility modifications to safety systems, and operation at low pressures. The separator is flexible in location, may be positioned within or outside of waste tanks, and may replace or augment dead-end and cross-flow filters. Mesofluidic separation reduces risk by minimizing waste (no media to replace or regenerate and no cleaning chemicals to handle and dispose) and by minimizing filter change-out consistent with as low as reasonably achievable (ALARA) exposure to workers. The potential mission impact of these separators is substantial. The separator has potential to support, simplify, and accelerate in-farm transfers and waste feed delivery. Furthermore, the separator can free up settling and holding tanks in the Direct Feed Low-Activity Waste (DFLAW) mission by reducing or eliminating post-transfer settling and wait times with the potential to free up 1 Mgal (4000 m{sup 3}) of double-shell tank space. This paper quantitatively compares mesofluidic separation to dead-end filtration, discusses scale-up results, and considers the separator's potential to efficiently and effectively reduce the long-term environmental ability of particulate-rich nuclear wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An overview of the value of parabolic dish solar thermal systems in industrial cogeneration applications

The essential elements of the cogeneration system configuration to be captured were the displacement of thermal energy by collection and use of the Brayton exhaust stream, and the sale back to the utility of any electricity production in excess of on-site requirements. In contrast to simply dumping these energy flows, their use or sale obviously serves, by itself, to increase gross value of the solar thermal energy system. Net allowable cost of the parabolic dish modules may or may not be increased, however. A consideration is that the waste heat capture and delivery subsystems are not free. This study does not address the incremental cost of adding waste heat capture, transport, and conversion (to steam, if necessary). It does compute a value for the thermal energy thereby displaced. This value can serve as a first-round input to any detailed economic evaluation of waste heat recovery.

Source record↗

Technology Integration to Gain Commercial Efficiency for the Urban Goods Delivery System, Meet Future Demand for City Passenger and Delivery Load/Unload Spaces, and Reduce Energy Consumption

This three-year project supported by the U.S. Department of Energy Vehicle Technologies Office has the potential to radically improve the urban freight system in ways that help both the public and private sectors. Working from 2018-2021, project researchers at the University of Washington’s Urban Freight Lab and collaborators at the Pacific Northwest National Laboratory have produced key data, tested technologies in complex urban settings, developed a prototype parking availability app, and helped close major knowledge gaps. All the fruits of this project can be harnessed to help cities better understand, support and actively manage truck load/unload operations and their urban freight transport infrastructure. Project learnings and tools can be used to help make goods delivery firms more efficient by reducing miles traveled and the time it takes to complete deliveries, benefitting businesses and residents who rely on the urban freight system for supplies of goods. And, ultimately, these project learnings and tools can be used to make cities more livable by minimizing wasted travel, which, in turn, contributes to reductions in fuel consumption and emissions. Cities today are challenged to effectively and efficiently manage their infrastructure to absorb the impacts of ever-increasing e-commerce-fueled delivery demand. All delivery trucks need to park somewhere to unload and load. Yet today’s delivery drivers have no visibility on available parking until they arrive at a site, which may be full. That means they can wind up cruising for parking, which wastes time and fuel and contributes to congestion. Once drivers do find parking, the faster they can unload at the spot, the faster they free up space for other drivers, helping others avoid circling for parking. This makes the parking space—and thus the greater load/unload network—more productive. To this end, the research team successfully met the project’s three goals, developing and piloting strategies and technologies to: 1. Reduce parking-seeking behavior in the study area by 20%; 2. Reduce parcel truck dwell time (the time a truck spends in a spot to load/unload) in the study area by 30%; 3. Increase curb space, alley space and private loading bay occupancy rates in the study area. The research team met these goals by creating and piloting on Seattle streets OpenPark, a first-of-its-kind real-time and forecasting curb parking app customized for commercial delivery drivers—giving drivers the “missing link” in their commonly used routing tools that tell them how best to get to delivery locations, but not what parking is available to use when they get there. Installing in-ground sensors on commercial vehicle load zones (CVLZs) and passenger load zones (PLZs) in the 10-block study area in Seattle’s downtown neighbourhood of Belltown let researchers glean real-time curb parking data. The research team also met project goals by piloting three parcel lockers in public and private spaces open to any delivery carrier, creating a consolidated delivery hub that lets drivers complete deliveries faster and spend less time parked. Researchers collected and analysed data to produce the first empirical, robust, statistically significant results as to the impact of the lockers, and app, on on-the-ground operations. In addition to collecting and analyzing sensor and other real-time and historical data, researchers rode along with delivery drivers to confirm real-world routing and parking behavior. Researchers also surveyed building managers on their private loading bay operations to understand how to boost usage.

97 MATHEMATICS AND COMPUTING↗

3D printed droplet generation devices for serial femtosecond crystallography enabled by surface coating

The role of surface wetting properties and their impact on the performance of 3D printed microfluidic droplet generation devices for serial femtosecond crystallography (SFX) are reported herein. SFX is a novel crystallography method enabling structure determination of proteins at room temperature with atomic resolution using X-ray free-electron lasers (XFELs). In SFX, protein crystals in their mother liquor are delivered and intersected with a pulsed X-ray beam using a liquid jet injector. Owing to the pulsed nature of the X-ray beam, liquid jets tend to waste the vast majority of injected crystals, which this work aims to overcome with the delivery of aqueous protein crystal suspension droplets segmented by an oil phase. For this purpose, 3D printed droplet generators that can be easily customized for a variety of XFEL measurements have been developed. The surface properties, in particular the wetting properties of the resist materials compatible with the employed two-photon printing technology, have so far not been characterized extensively, but are crucial for stable droplet generation. This work investigates experimentally the effectiveness and the long-term stability of three different surface treatments on photoresist films and glass as models for our 3D printed droplet generator and the fused silica capillaries employed in the other fluidic components of an SFX experiment. Finally, the droplet generation performance of an assembly consisting of the 3D printed device and fused silica capillaries is examined. Stable and reproducible droplet generation was achieved with a fluorinated surface coating which also allowed for robust downstream droplet delivery. Experimental XFEL diffraction data of crystals formed from the large membrane protein complex photosystem I demonstrate the full compatibility of the new injection method with very fragile membrane protein crystals and show that successful droplet generation of crystal-laden aqueous droplets intersected by an oil phase correlates with increased crystal hit rates.

47 OTHER INSTRUMENTATION↗

Tests of a High Temperature Sample Conditioner for the Waste Treatment Plant LV-S2, LV-S3, HV-S3A and HV-S3B Exhaust Systems

Tests were performed to evaluate a sample conditioning unit for stack monitoring at Hanford Tank Waste Treatment and Immobilization Plant (WTP) exhaust stacks with elevated air temperatures. The LV-S2, LV-S3, HV-S3A and HV-S3B exhaust stacks are expected to have elevated air temperature and dew point. At these emission points, exhaust temperatures are too high to deliver the air sample directly to the required stack monitoring equipment. As a result, a sample conditioning system is considered to cool and dry the air prior to its delivery to the stack monitoring system. The method proposed for the sample conditioning is a dilution system that will introduce cooler, dry air to the air sample stream. This method of sample conditioning is meant to reduce the sample temperature while avoiding condensation of moisture in the sample stream. An additional constraint is that the ANSI/HPS N13.1-1999 standard states that at least 50% of the 10 μm aerodynamic diameter (AD) particles present in the stack free stream must be delivered to the sample collector. In other words, depositional loss of particles should be limited to 50% in the sampling, transport, and conditioning systems. Based on estimates of particle penetration through the LV-S3 sampling system, the diluter should perform with about 80% penetration or better to ensure that the total sampling system passes the 50% or greater penetration criterion.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tests of a High Temperature Sample Conditioner for the Waste Treatment Plant LV-S2, LV S3, HV S3A and HV-S3B Exhaust Systems

Tests were performed to evaluate a sample conditioning unit for stack monitoring at Hanford Tank Waste Treatment and Immobilization Plant (WTP) exhaust stacks with elevated air temperatures. The LV-S2, LV-S3, HV-S3A and HV-S3B exhaust stacks are expected to have elevated air temperature and dew point. At these emission points, exhaust temperatures are too high to deliver the air sample directly to the required stack monitoring equipment. As a result, a sample conditioning system is considered to cool and dry the air prior to its delivery to the stack monitoring system. The method proposed for the sample conditioning is a dilution system that will introduce cooler, dry air to the air sample stream. This method of sample conditioning is meant to reduce the sample temperature while avoiding condensation of moisture in the sample stream. An additional constraint is that the ANSI/HPS N13.1-1999 standard states that at least 50% of the 10 µm aerodynamic diameter (AD) particles present in the stack free stream must be delivered to the sample collector. In other words, depositional loss of particles should be limited to 50% in the sampling, transport, and conditioning systems. Based on estimates of particle penetration through the LV-S3 sampling system, the diluter should perform with about 80% penetration or better to ensure that the total sampling system passes the 50% or greater penetration criterion.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UP2 400 High Activity Oxide Legacy Waste Retrieval Project Scope and Progress-13048

The High Activity Oxide facility (HAO) reprocessed sheared and dissolved 4500 metric tons of light water reactor fuel the fuel of the emerging light water reactor spent fuel between 1976 and 1998. Over the period, approximately 2200 tons of process waste, composed primarily of sheared hulls, was produced and stored in a vast silo in the first place, and in canisters stored in pools in subsequent years. Upon shutdown of the facility, AREVA D and D Division in La Hague launched a thorough investigation and characterization of the silos and pools content, which then served as input data for the definition of a legacy waste retrieval and reconditioning program. Basic design was conducted between 2005 and 2007, and was followed by an optimization phase which lead to the definition of a final scenario and budget, 12% under the initial estimates. The scenario planned for the construction of a retrieval and reconditioning cell to be built on top of the storage silo. The retrieved waste would then be rinsed and sorted, so that hulls could subsequently be sent to La Hague high activity compacting facility, while resins and sludge would be cemented within the retrieval cell. Detailed design was conducted successfully from 2008 until 2011, while a thorough research and development program was conducted in order to qualify each stage of the retrieval and reconditioning process, and assist in the elaboration of the final waste package specification. This R and D program was defined and conducted as a response and mitigation of the major project risks identified during the basic design process. Procurement and site preparatory works were then launched in 2011. By the end of 2012, R and D is nearly completed, the retrieval and reconditioning process have been secured, the final waste package specification is being completed, the first equipment for the retrieval cell is being delivered on site, while preparation works are allowing to free up space above and around the silo, to allow for construction which is scheduled to being during the first semester of 2013. The elaboration of the final waste package is still undergoing and expected to be completed by then end of 2013, following some final elements of R and D required to demonstrate the full compatibility of the package with deep geological repository. The HAO legacy waste retrieval project is so far the largest such project entering operational phase on the site of La Hague. It is on schedule, under budget, and in conformity with the delivery requirements set by the French Safety Authority, as well as other stakeholders. This project paves the way for the successful completion of AREVA La Hague other legacy waste retrieval projects, which are currently being drafted or already in active R and D phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preventing Bio-Bloopers and XFEL Follies: Best Practices from your Friendly Instrument Staff

Serial Femtosecond Crystallography (SFX) at X-ray Free electron Lasers (XFELs) is a relatively new field promising to deliver unparalleled spatial and temporal resolution on biological systems and there dynamics. Over the past decade, though, there have been a handful of results that have truly delivered on these promises. Why? SFX has many paradigm shifting techniques not seen in typical structural biology arenas, such as creating a concentrated slurry of microcrystals rather than a handful of loopable prisms worthy of a catalog photo. Then taking that slurry and high speed jetting them towards the vacuum or helium interation region to destroy less than 1% of your sample and waste the other 99. The literature is full of techniques and methods promising to cure what ails your experiment, yet as an instrument scientist will tell you –and a first author might admit after a few drinks at the conference happy hour—is that there are a lot more failures than the success we published, results may vary. We will walk through a best practices on how to prepare your sample and chose a sample delivery technique that will amerliorate your studies rather than undermine your hardwork and hopefully lead to better experimental planning and execution, inching you closer to that scientific goal and that call from Stockholm. This will be written in a more editorialized fashion and is meant to give the reader an idea of what to try or how they should be thinking. Welcome to SFX, now what?

47 OTHER INSTRUMENTATION↗

Accessing Wi-Fi Data for Occupancy Sensing

A key issue for saving energy in buildings is to assure that delivery of energy services matches building occupancy as closely as possible, to assure that energy is not wasted providing the services to empty rooms or buildings, and to assure that needed services are provided during all times when desired. Accomplishing this to date has been significantly hampered by a lack of inexpensive mechanisms to obtain and use building-wide and more granular data about occupancy. In recent years, the concept of inferential (or implicit) sensing has been proposed and explored to use data from IT systems that already exists in most buildings, to obtain data that are not perfect, but are nearly free to obtain. Past work by LBNL and others has primarily demonstrated the principle and potential for this, with a primary focus on data from Wi-Fi networks as the best near-term opportunity for inferential sensing from IT networks. This is due to its near-ubiquity, ease of explanation to many audiences, relative uniformness in deployment, low latency of detection, clear ways to mitigate privacy and security, and other benefits (Price et al., 2015). While the potential and value are clear, researchers or building managers who want to obtain the data lack a source of information to understand what data might exist, what devices may have it, and what mechanisms are available to obtain the data. The purpose of this report is to fill that gap. The report begins with a review of institutional issues in collecting such data, including very real concerns about privacy and IT security. It then describes the various system architectures used in Wi-Fi systems in commercial buildings today, and a variety of mechanisms that can be used to obtain information from them, including examples of how to use them, and sample output. Next is a summary of how to use such data for several different purposes, from retrospective analysis to dynamic building operation, and a conclusion. An appendix provides additional detail on specific mechanisms available from major equipment manufacturers. The mechanisms specified in this report can be used by building owners and operators to confirm proper operation and uncover any issues or unexpected conditions as a resource for building owners and researchers interesting in utilizing inferential sensing data.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cayuga County Regional Digester: Vision Becomes Reality. Final Report

With an average herd size of 113 mature cows, Cayuga County is home to 280 dairy farms and 31,500 dairy milking cows producing approximately 855 million gallons of milk per year. The Cayuga Dairy industry is a major contributor to the countys economy, employing nearly 1200 people, while generating $140,000,000 of revenue from sale of milk alone. At the same time, the Cayuga County dairy industry also produces 5.7 million gallons of manure daily: (a) Nearly 34% of this manure is produced on smaller farms. (b) Digesters are expensive pieces of equipment and require attention and care. ( c) The on-farm digester systems have fairly long payback (>10 years) even for larger CAFO farms (>1000 milking cows). In 2005, Cayuga County Soil and Water Conservation District (The District), a Public Agency under Cayuga County, decided to undertake a centralized community digester project. The primary goal of the project was to develop an economically sustainable model, under the auspices of The District to address manure management issues facing the smaller dairies, improve the water quality and improve the quality of life for Cayuga County residents. It is believed that the District has accomplished this goal by completing construction of Cayuga County Regional Digester on a parcel of land behind the Cayuga County Natural Resource Center located at 7413 County House Road in the Town of Sennett in Cayuga County, New York. The digester facility consists of the following major components. 1. Transfer Station: This an indoor truck bay, where 35,000 gallons of manure from three local farms, 8,500 gallons of liquid organic food-processor waste, and 1,200 gallons of brown grease are unloaded from tanker trucks and the digested slurry is loaded onto the tanker trucks for delivery back to the participating farms. 2. Anaerobic Digester: The project utilizes a hydraulic mix anaerobic digester, a unique design that has no internal moving parts for mixing. The digester, which operates at mesophilic temperatures, is designed to process the daily feedstock and produce 220,000 SCF2 of biogas per day. The digester also produces 44,000 gallons of digested slurry per day. 3. Biogas Conditioning System: The plant employs a biological biogas conditioning system to remove the H2S and moisture contents of the biogas and prepare it to be used by the plant generation system. 4. Combined Heat and Power System (CHP): This is a 633kW high efficiency biogas-fired GE-Jenbacher model JMS-312 GS-NL reciprocating engine cogeneration system. The heat recovery system incorporated into the package is designed to capture the waste heat from the engine exhaust, the jacket cooling water and the engine oil circuit. 5. Electrical Substation and Power Distribution Systems: An electrical distribution system has been constructed on-site that aggregates the electrical service of the different county buildings on the District campus into a county owned electric distribution system that is interconnected with the CHP and the local electric grid. The electrical system is designed, in accordance with the utility guidelines, to allow grid-parallel operation of CHP and provide for import and export of electric power. 6. Thermal Energy Distribution System: The heat recovery system has been integrated into a high temperature water distribution system that distributes the heat to the thermal circuits for the anaerobic digester facility. Additional piping has also been installed to transfer the remaining thermal energy to other county buildings on the campus. On a daily basis, the plant will co-process 35,000 gallons of manure from local dairy farms, 8,500 gallons of food-processor waste and 1,200 gallons of brown grease to produce 200,000 ft3/d of biogas and 44,000 gallons of pathogen-free nutrient-rich digested slurry for agricultural use by farms and in the local area.The biogas fueled CHP produces 5,157,000 kWh of electricity and 19,506 dekatherms of thermal energy per year. Electrical power generated by the cogeneration system powers all the buildings on the Cayuga County campus and any surplus power is exported to the grid under a power purchase agreement. Heat recovered from the cogeneration system will be used to maintain the temperature of the process equipment and the excess will be transported to the Cayuga County Public Safety Building to offset purchase of fossil fuel to fuel the boilers. The majority of plant operations are unmanned and automated. However, the plant will have a small staff of well-trained personnel to coordinate the feedstock deliveries and shipments, supervise the day-to-day operation, monitor the systems and perform maintenance, maintain a safe and reliable operation and to respond to emergencies.

09 BIOMASS FUELS↗

In-Tank Processing Using Low Temperature Aluminum Dissolution: Year 1 Progress Report

The Hanford Site stores approximately 56 million gallons of radioactive legacy defense waste in underground tanks. This study investigates the feasibility of utilizing in-tank low-temperature aluminum dissolution to favorably alter the transport properties of aluminum-rich southeast quadrant waste sludges, thereby de-risking sludge delivery for Direct Feed of High-Level Waste. Specifically, this study aims to assess the rate and extent of gibbsite dissolution under various conditions, including different particle sizes (~10 to 90 µm), NaOH concentrations (1 to 6 M), and the presence of specific analytes such as NO 2 - , NO 3 - , and other aluminum-rich waste background analytes, using simulated waste solids and liquids. Experimental tests were designed to highlight the impact of aluminum leaching on simulated waste transport properties, quantified by the just-suspended mixing speed (NJS), and were conducted under well-mixed, turbulent conditions, ensuring full suspension of gibbsite particles using an overhead mixer. The results suggest that the presence of NO 2 - and NO 3 - , in conjunction with leaching at relatively low free hydroxide contents, improved transport requirements (i.e., lowered NJS) for pure gibbsite slurries. These findings will inform the design of potential in-tank processing systems, optimizing aluminum dissolution for improved waste management in the Hanford Tank Farms.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pooling the resources of the CMS Tier-1 sites

The CMS experiment at the LHC relies on 7 Tier-1 centres of the WLCG to perform the majority of its bulk processing activity, and to archive its data. During the first run of the LHC, these two functions were tightly coupled as each Tier-1 was constrained to process only the data archived on its hierarchical storage. This lack of flexibility in the assignment of processing workflows occasionally resulted in uneven resource utilisation and in an increased latency in the delivery of the results to the physics community.The long shutdown of the LHC in 2013-2014 was an opportunity to revisit this mode of operations, disentangling the processing and archive functionalities of the Tier-1 centres. The storage services at the Tier-1s were redeployed breaking the traditional hierarchical model: each site now provides a large disk storage to host input and output data for processing, and an independent tape storage used exclusively for archiving. Movement of data between the tape and disk endpoints is not automated, but triggered externally through the WLCG transfer management systems.With this new setup, CMS operations actively controls at any time which data is available on disk for processing and which data should be sent to archive. Thanks to the high-bandwidth connectivity guaranteed by the LHCOPN, input data can be freely transferred between disk endpoints as needed to take advantage of free CPU, turning the Tier-1s into a large pool of shared resources. The output data can be validated before archiving them permanently, and temporary data formats can be produced without wasting valuable tape resources. Lastly, the data hosted on disk at Tier-1s can now be made available also for user analysis since there is no risk any longer of triggering chaotic staging from tape.In this contribution, we describe the technical solutions adopted for the new disk and tape endpoints at the sites, and we report on the commissioning and scale testing of the service. We detail the procedures implemented by CMS computing operations to actively manage data on disk at Tier-1 sites, and we give examples of the benefits brought to CMS workflows by the additional flexibility of the new system.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

'Green-in-Three' IT Solutions Protecting Workers and the Environment - 12526

The U.S. Department of Energy (DOE), Environmental Management (EM), DOE Richland Operations Office (RL), Mission Support Alliance (MSA), and Lockheed Martin Services, Inc. (LMSI), Information Technology partnered in an effort to reduce environmental impacts, energy use, and operating costs and improve worker safety through consolidation, centralization, and standardization of Information Technology (IT) assets on the Hanford Site. Green-in-Three is an IT Value strategy, which is moving Hanford from an inefficient, antiquated 20. Century IT architecture to a smart, green, flexible 21. Century IT architecture that delivers information anywhere at any time to Hanford Mission partners. The 'Green-in-three' efforts to date have had a significant impact on meeting and exceeding the overall IT Value Strategy to decrease IT maintenance and delivery costs and move Hanford into a smart, green, and flexible 21. Century IT architecture. Some of the results and impacts are as follows: - Thirteen data centers were reduced to two, freeing up approximately 279 m{sup 2} (3000 ft{sup 2})) of space; - Reduced data center energy use 50%, from 120,000 to 60,000 kW; - Excessed 9 metric tons (10 tons) of server equipment; - Removed and properly disposed of 2871 kg (6,300 lb) lead acid batteries; - Projects saved over $1 M in fiber and copper cable installation through 2011; - Developed or improved partnerships with local, state, and federal agencies, Tribes, and Site contractors; - Increased wireless coverage for improved access to remote areas. Moving forward to 2012, the impact of these accomplishments will be realized in the years to come. IT services will be delivered in days instead of months. Field personnel will have access to information at the point of performance, reducing travel time. Remote monitoring, telemetry, and/or video can be conducted using the wireless network; reducing travel time for field inspections. Emergency personnel have access to critical information at the incident site, saving valuable time. Full deployment of the VoIP technologies will reduce power use by 1,000,000 kWh/yr for telecommunications equipment, driving home the IT Value Strategy of Green-in-Three. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Solutions for Interim Used Fuel Management: From Pool Unloading to Safe Delivery to Recycling or Repository Facilities - 17235

Safe management of used nuclear fuel (UNF) is key to the survival of the nuclear industry. That is why it is more important than ever to have a consent-based, practical, credible, and sustainable roadmap for managing the back-end of the nuclear cycle. Worldwide UNF Light Water Reactors (LWR) inventories are currently around 200,000 tons and are estimated to grow to more than 350,000 tons by 2030, and operating nuclear reactors in the U.S. continue to discharge UNF every 18 to 24 months. International experience has demonstrated that the development of a permanent geological repository can be a multi-decade process, especially in the face of public acceptance challenges. Meanwhile, the solution for permanent disposal of UNF in the U.S. is moving at a glacial pace. As a result, industrial stakeholders have been forced to find practical interim UNF storage solutions in order to continue safely operating their reactors. Among those interim solutions are the cask- or canister-based dry storage systems that have dramatically increased in the last 10 years as they provide flexibility for expansion with a low up-front investment. With interim dry storage in place for more than 30 years, our industry is entering a new phase as we are forced to prepare for a few more decades before geological repositories begin operating. Consequently, interim dry storage has to be extended for 80 years or more. Thus, new considerations have to be taken into account to ensure the safety of this stored used fuel: - Interim storage systems are aging; - High burn-up fuel behavior overtime is uncertain; - Used fuel is losing its self-protection; - The number of shutdown sites without a fuel transfer facility, such as a pool, is increasing; - Some owners of Independent Spent Fuel Storage installation (ISFSI) at shutdown sites are not nuclear operators anymore. With increasing uncertainties, AREVA TN -- based on its long expertise with used fuel transportation and interim storage systems -- is adapting its portfolio to develop integrated and flexible solutions that will remove the burden of interim used fuel management from nuclear operators. AREVA TN is developing comprehensive solutions to reduce risks including the continued supply of proven safe high-performance dry storage systems; on-site services to safely transfer used fuel from pool to pad; the optimization of fuel heat load in the storage pool and pad; innovative aging management services including inspection, monitoring and repair; a realistic solution for consolidated interim storage with a priority to remove Used Nuclear Fuel stored in dry storage systems from shutdown sites; world-class transport and logistics services to safely move the used fuel from nuclear reactor sites to consolidated storage and repository or recycling as applicable, and turnkey management of shutdown ISFSIs. Due to the lack of an available path for transporting used fuel away from reactors, nuclear operators are faced with many challenges and growing uncertainties. Our presentation will describe the practical solutions developed and being developed in order to manage used fuel on behalf of nuclear operators and allows them to continue focusing on the important job of producing carbon-free clean energy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modification of the Decontamination Facility at the Kruemmel NPP - 13451

In February 2009, Siempelkamp Nukleartechnik GmbH was awarded the contract for the design, manufacture, delivery and construction of a new Decontamination Facility in the controlled area for Kruemmel NPP. The new decontamination equipment has been installed according to the state of art of Kruemmel NPP. The existing space required the following modification, retrofitting and reconstruction works: - Demounting of the existing installation: to create space for the new facility it was necessary to dismantle the old facility. The concrete walls and ceilings were cut into sizes of no more than 400 kg for ease of handling. This enabled decontamination so largest possible amount could be released for recycling. All steel parts were cut into sizes fitting for iron-barred boxes, respecting the requirement to render the parts decontaminable and releasable. - Reconstructing a decontamination facility: Reconstruction of a decontamination box with separate air lock as access area for the decontamination of components and assemblies was conducted using pressurized air with abrasives (glass beads or steel shots). The walls were equipped with sound protection, the inner walls were welded gap-free to prevent the emergence of interstices and were equipped with changeable wear and tear curtains. Abrasive processing unit positioned underneath the dry blasting box adjacent to the two discharge hoppers. A switch has been installed for the separation of the glass beads and the steel shot. The glass beads are directed into a 200 l drum for the disposal. The steel shot was cleaned using a separator. The cleaned steel shot was routed via transportation devices to the storage container, making it available for further blasting operations. A decontamination box with separate air lock as access area for the decontamination of components and assemblies using high pressure water technology was provided by new construction. Water pressures between 160 bar and 800 bar can be selected. The inner walls are welded gap-free and all rough edges are rounded off. All wetted parts are steel grade 1.4301 or higher. In an extension to the high pressure water decontamination box, 2 ultrasonic ponds and one washing station for small components as provide by new construction. A long pond with 3.25 m length for the decontamination of large components (e.g. turbine blades, pump rotors, driving rods) was installed. For the handling heavy components, a 2 t crane was installed. New construction of a mechanical effluent treatment facility including oil separator was connected to the existing effluent storage tank provided by the customer. One exhaust air filtration system is provided for each decontamination box, with the following requirements. The exhaust air is sent back to the room (recirculated air system). Dry blasting box including raw separator with dust collection in 200 l drum, filter for suspended particles; High pressure water decontamination box and wet area with water separator, pre-separator, filter for suspended particles. Installation of a steel platform at building height +12.85 above the decontamination boxes + 8.50 m for the erection of the high pressure water facilities, the recirculating air filter system, the air compressor and the respiratory air supply unit. The aforementioned components are placed on the steel platform and have been encased in a sound-lowering and accessible manner. New construction of the entire E and C technology for the TU system including modification of the supply lines from the switch gear. All devices are to be operated automatically. Dry blasting box, high pressure water decontamination box and wet area are designed to guarantee a unitary 'exterior view' of the decontamination facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗