Search NASASearch

SEARCH · Search NASA

Results for “work planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Morpheus Test Area SWMU #119 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Work Plan

This Work Plan documents the proposed field sampling activities for a per- and polyfluoroalkyl substances (PFAS) Site Assessment at the Morpheus Test Area (MTA) at Kennedy Space Center (KSC). The Work Plan provides a background of the historical activities that occurred at the MTA, and the limited environmental investigations performed at the MTA. The proposed Site Assessment activities at MTA includes the collection of soil samples from seven locations, the installation of a staff gauge in site surface water, the installation of four monitoring wells, perform direct push groundwater sampling at ten locations, and collect one surface water sample. Sampling details, depths, and locations are presented in the Work Plan. The Work Plan was presented to the KSC Remediation Team in the form of an Advance Data Package in February 2023. Following STRIVES approval, the SLF FRB PFAS Site Assessment Work Plan will be formally submitted to the Florida Department of Environmental Protection.

Howard Franklin Fowler

Contractor Support Building #7 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Work Plan

This Work Plan documents the proposed field sampling activities for a per- and polyfluoroalkyl substances (PFAS) Site Assessment at the Contractor Support Building (CSB) #7 at Kennedy Space Center (KSC). The Work Plan provides a background of the historical activities that occurred at CSB #7, and the limited environmental investigations performed at CSB #7. The proposed Site Assessment activities at CSB #7 include the advancement of a soil lithologic boring to 60 feet below ground surface, the installation of a staff gauge in site surface water, perform direct push groundwater sampling at eight locations, and collect four surface water samples. Sampling details, depths, and locations are presented in the Work Plan. The Work Plan was presented to the KSC Remediation Team in the form of an Advance Data Package in February 2023. Following STRIVES approval, the CSB #7 PFAS Site Assessment Work Plan will be formally submitted to the Florida Department of Environmental Protection.

Howard Franklin Fowler

Former SLF Fire and Rescue Building SWMU #120 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Work Plan

This Work Plan documents the proposed field sampling activities for a per- and polyfluoroalkyl substances (PFAS) Site Assessment at the Former Space Shuttle Landing Facility (SLF) Fire and Rescue Building (FRB) at Kennedy Space Center (KSC). The Work Plan provides a background of the historical activities that occurred at the SLF FRB, and the limited environmental investigations performed at the SLF FRB. The proposed Site Assessment activities at SLF FRB includes the collection of soil samples from eight locations, the advancement of a soil lithologic boring to 60 feet below ground surface, the installation of a staff gauge in site surface water, the installation of four monitoring wells, perform direct push groundwater sampling at seven locations, and collect one surface water sample. Sampling details, depths, and locations are presented in the Work Plan. The Work Plan was presented to the KSC Remediation Team in the form of an Advance Data Package in February 2023. Following STRIVES approval, the SLF FRB PFAS Site Assessment Work Plan will be formally submitted to the Florida Department of Environmental Protection.

Howard Franklin Fowler

Converter/Compressor Building Solid Waste Management Unit (SWMU) #89 Monitoring Well 21 Area Interim Measure Work Plan

This Work Plan details the approach and design for the Interim Measure (IM) to remediate groundwater within the MW21 Area where VOC concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The IM includes in-situ bioremediation via injection of emulsified vegetable oil (EVO) and emulsified zero-valent iron (EZVI). The in-situ bioremediation technology consists of injecting an electron donor substrate into the subsurface to promote microbial breakdown of VOCs. The EVO injections for this IM are designed based on the use of Provectus ERD-CH4, which is a vegetable oil/carbon substrate mixture. The EZVI injections for this IM are designed based on the use of Provectus EZVI-CH4. The IM treatment layout consists of nine injection locations of EVO at approximately 10-foot radius of influence (ROI) and three injections locations of EZVI at approximately 6-foot ROI. The injection method will be direct push using a DPT rig. The overall injection depths range from 7 to 17 ft bls. The 7 ft bls top depth is designed to be 2 ft below the water table to prevent substrates from reaching the top of the water table. Injections are planned to be implemented using 2 ft intervals and will take place using a bottom-up approach to 2 ft below the water table. This work plan further describes the IM design, injection calculations, performance monitoring plan, and provides an injection layout. Revision 1 of this Work Plan includes quarterly performance sampling during Year 1 in accordance with F.A.C. 62-780. These changes are reflected in Section 7 and Table 2 of the Work Plan.

Mark J Jonnet

Un-numbered Operational Areas, PRL 229, Railroad Tie Disposal Area Pond Confirmatory Sampling Work Plan

This Confirmatory Sampling Work Plan presents the approach to be used to determine if the pond in the Un-numbered Operational Areas (Potential Release Location 229) has contamination associated with the adjacent railroad tie disposal area. The Work Plan describes sampling and analytical requirements and the approach that will be used for the screening level ecological assessment.

railroad tie

The Technical Work Plan Tracking Tool

The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

Chullen, Cinda

Former Central Heat Plant, SWMU 045 Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements for the air sparging (AS) Interim Measure (IM) design provided in the IM Work Plan (IMWP) within the High Concentration Plume (HCP) at the Former Central Heat Plan (CHP) located at Kennedy Space Center (KSC), Florida. The IMWP presented an approach to implement an AS IM to reduce chlorinated volatile organic compound concentrations to concentrations that facilitate a transition to long-term monitoring. CHP has been designated Solid Waste Management Unit 045 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

Christopher J Pike

Converter Compressor Building, SWMU 089 Monitoring Well 21 Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011/80KSC019F0070, for the implementation of a bioremediation Interim Measure (IM) at the Converter Compressor Building (CCB) site located at Kennedy Space Center (KSC), Florida. The location of CCB within KSC is shown on Figure A-1. CCB has been designated as Solid Waste Management Unit (SWMU) 089 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. The overall Corrective Action Objective (CAO) for CCB is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), and vinyl chloride (VC) to less than State of Florida Groundwater Cleanup Target Levels (GCTLs). The objective for the IM associated with this IM is to reduce groundwater concentrations for the contaminants of concern (COCs) to less than their Natural Default Attenuation Concentrations (NADCs) within the Monitoring Well 21 Area (herein referred to as MW21 Area) via bioremediation injections to support transition to long term monitoring (LTM). This IWP describes the activities that will be performed for the treatment of the MW21 Area. The Revision 1 CCB MW21 Area Interim Measure Work Plan (IMWP; NASA, 2024), which was approved by the Florida Department of Environmental Protection (FDEP) on December 26, 2024, was used as the design basis for this IWP.

Mark Jonnet

South Repeater Building (Swmu 121) Pilot Study Work Plan, Kennedy Space Center, Florida

This document is a Pilot Study Work Plan for a groundwater remediation system at the South Repeater Building (N6-1118) located at the John F. Kennedy Space Center (KSC), Florida. Aqueous fire-fighting foam was applied near the building in the late 1990s during a wildfire. Per- and polyfluoroalkyl substances (PFAS) are components of the foam. Sampling completed at and near the South Repeater Building identified PFAS in groundwater, surface water and soil. KSC is planning to design and install a groundwater remediation system to address the potential for off-Center migration of PFAS compounds in groundwater. This Pilot Study Work Plan outlines subsurface hydrogeologic data that will be collected to use in the construction of a groundwater flow model that will guide the design of a full-scale remediation system. This document was prepared by AECOM Technical Services, Inc., for NASA under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0010, Task Order 80KSC019F0096.

PFAS

KSC Child Development Center (Potential Release Location 149) Confirmatory Sampling Report and Interim Measures Work Plan

This Confirmatory Sampling (CS) Report and Interim Measures (IM) Work Plan was prepared for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida, by HydroGeoLogic, Inc. (HGL) under Contract Number 80KSC019D0012, Task Order 80KSC019F0118. This document presents the results of the CS activities performed in March 2022, and May 202, at the KSC Child Development Center (KCDC), Potential Release Location (PRL) 149, KSC, Florida. This report additionally presents the results of an assessment conducted in July 2023 to determine whether construction activities in 2023 to replace certain playground equipment and the rubberized play surface allowed soil contaminated by arsenic (As) to migrate from beneath the play surface.

arsenic

Components Cleaning Facility, SWMU 030 Eastern High-Concentration Plume Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements and coordination specifics to implement an air sparging (AS) Interim Measure (IM) to remediate groundwater at the Components Cleaning Facility (CCF), Eastern High Concentration Plume (HCP) Area located at Kennedy Space Center (KSC), Florida. The objective of the CCF East IM is to remediate groundwater where trichloroethene, cis-1,2-dichloroethene, and vinyl chloride concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Criteria (NADC) (identified as the HCP) via AS and to transition to monitored natural attenuation. CCF has been designated Solid Waste Management Unit 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

James Lloyd

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson

Base Support Building Solid Waste Management Unit (SWMU) 014 PlumeStop Injection Pilot Study Work Plan

This document is a Pilot Study Work Plan (PSWP) for a PlumeStop® permeable reactive barrier (PRB) at the Base Support Building (BSB; the Site) located at the John F. Kennedy Space Center (KSC), Florida. The Site has been designated as Solid Waste Management Unit (SWMU) 014 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This document was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0010, Task Order 80KSC021F0096. This PSWP details the permeable reactive barrier (PRB) being installed at the BSB to decrease concentrations of per- and polyfluoroalkyl substances (PFAS) in downgradient groundwater using PlumeStop®. PlumeStop® is a colloidal activated carbon that PFAS compounds readily adsorb to. This PSWP outlines the design criteria, injection plan, and performance monitoring schedule for the proposed PlumeStop® PRB study that will guide the possible selection for use and future design of future full-scale PlumeStop® PRBs at KSC.

PFAS

Mobile Launch Platform Vehicle Assembly Building Area (SWMU 056) Hot Spot 3 Bioremediation Interim Measures Work Plan, Kennedy Space Center, Florida

This Interim Measures Work Plan (IMWP) presents an approach and design for the remediation of chlorinated volatile organic compound (CVOC) groundwater impacts using bioremediation (biostimulation and bioaugmentation) in Hot Spot 3, which is defined by the area where CVOC (trichloroethene [TCE], cis-1,2-dichloroethene [cDCE], and vinyl chloride [VC]) concentrations are greater than 10 times their respective Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentration (NADC) [10xNADC] near the western Mobile Launch Platform (MLP) structure. The IM treatment area is the Hot Spot 3 area, which is approximately 0.07 acres and extends from approximately 6 to 22 and 41 to 55 feet below land surface (ft BLS). Within Hot Spot 3, a source zone (SZ; area with TCE concentrations greater than 1% solubility [11,000 micrograms per liter (micrograms/L)]) was delineated and is approximately 0.02 acres and extends from approximately 6 to 16 and 41 to 50 ft BLS.

MLPV

In Situ Chemical Reduction Interim Measures Work Plan Hot Spot 3 Mobile Launcher Platform Rehabilitation Sites / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This document presents the design details of an In Situ Chemical Reduction (ISCR) Interim Measures Work Plan for Hot Spot 3 within Mobile Launcher Platform Rehabilitation Sites/Vehicle Assembly Building Area, Solid Waste Management Unit (SWMU) 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The interim measures (IM) treatment zone encompasses an area identified as the High Concentration Plume (HCP), which is defined as the area with chlorinated volatile organic compound (CVOC) groundwater concentrations greater than their respective Natural Attenuation Default Concentration (NADC). The objective of the IM is to remove CVOC mass within the treatment area to levels that facilitate a transition to natural attenuation monitoring. The IM design consists of the selected ISCR amendment, Provect-IR, which is a mixture of solid reagents in a single product that promotes enhanced reductive dechlorination and ISCR. ProvectIR includes natural antimethanogenic compounds; multiple hydrophilic, nutrient-rich organic carbon sources; zero valent iron; chemical oxygen scavengers; and vitamin and mineral sources. The proposed treatment area for this IM encompasses less than 1 acre and includes three vertical treatment intervals to reach the NADC plumes that vary per CVOC and depth: 4 to 10 feet below land surface (bls), 10 to 18 feet bls, and 42 to 52 feet bls. The amendment will be distributed through 16 injection points (IP01 through IP16) using dosing rates ranging from 0.4% to 0.6% of soil mass within the treatment interval and a 15% or 20% slurry strength. Dosage rates and slurry strength are based on groundwater geochemistry, soil characteristics, and contaminant concentrations. To aid in the evaluation of the ISCR IM performance, six performance monitoring wells will be installed following injections and sampled semiannually. CVOC parameters will be sampled until concentrations reduce to below their NADC. Underground Injection Control parameters will be sampled until concentrations decrease to background levels or to levels that meet respective groundwater standards. Sampling frequency will be evaluated annually and modified as needed. The path forward for the ISCR IM implementation includes preparing the IM Implementation Work Plan, ISCR injections, monitoring well installation, performance monitoring, and reporting.

Randall K. Sillan

KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

Remediation

Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

IMWP