Search NASA⌕ Search

Engineering topics

Chlachidze, G.

Publications and source records attributed to Chlachidze, G..

At least 19 records

First results of AUP Nb3Sn quadrupole horizontal tests

The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.

43 PARTICLE ACCELERATORS↗

AUP First Pre-Series Cryo-Assembly Design Production and Test Overview

New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ~5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. In conclusion, this paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.

43 PARTICLE ACCELERATORS↗

Quench Performance of the First Pre-series AUP Cryo-assembly

The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S. contributions to the HL-LHC. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 and Q3 inner triplet optical elements in front of the two interaction points. Each cryo-assembly consists of two 4.2 m long Nb 3 Sn quadrupole magnets with aperture 150 mm and operating gradient 132.6 T/m. The first pre-series cryo-assembly has been fabricated and successfully tested at the horizontal test facility at Fermi National Accelerator Laboratory. Here in this manuscript we report the quench test results of the LQXFA/B-01 cryo-assembly. The primary objective of the horizontal test is full cryo-assembly qualification and validation of the performance requirements.

43 PARTICLE ACCELERATORS↗

Fermilab's Horizontal Test Stand Upgrade Overview and Commissioning

Cryo-assemblies with the Nb 3 Sn MQXFA low-beta quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab's magnet test facility. A total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational for more than a decade. In order to restore the test stand functions and meet the design and test requirements for the HL-LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded horizontal test stand was completed during the first cryo-assembly test in 2023. These tests verified the major cryo-mechanical installations, as well as the basic test stand operations, including controlled cooldown and operation at 1.9 K, magnet protection and process controls. Here, in this paper, overview of the Fermilab's horizontal test facility upgrade and commissioning of these upgrades are presented.

43 PARTICLE ACCELERATORS↗

Magnetic Measurements and Alignment Results of LQXFA/B Cold Mass Assemblies at Fermilab

MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the U.S. Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and are being tested to assess alignment and magnetic performance at Fermilab's horizontal test stand facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis position, and for magnet variations in positioning and local field profile. Here this paper describes the results of the magnetic and alignment measurements which characterize the first LQXFA/B assembly.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Fermilab’s horizontal test stand upgrade overview and commissioning

Cryo-assemblies with the low-beta Nb3Sn quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab’s magnet test facility. Total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational more than a decade. In order to restore the test stand functions and meet the design and test requirements for the high luminosity LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded test stand was completed during the first cryo-assembly test in 2023. These tests verified all the cryo-mechanical installations, as well as the test stand operations, including controlled cooldown and operation at 1.9 K, the helium recovery capabilities, magnet protection and process controls.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

FNAL test facility

Report on the status of superconducting magnet test facility at Fermilab.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Analysis of the MQXFA Low Beta Quadrupoles for HL-LHC after 50% magnet assembly complete +

The US HL-LHC Accelerator Upgrade Project (AUP) is fabricating the MQXFA magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC (HL-LHC). This is the first production of Nb3Sn magnets for a particle accelerator, together with the MQXFB magnets for Q2a and Q2b. Here we show status and some results of MQXFA magnets fabrication and vertical test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

C1Po2D-04: Cryogenic Testing of the First HL-LHC Q1/Q3 Cryo-Assembly at

In early 2023, Fermilab is conducting horizontal cryogenic testing of the first Q1/Q3 Cryo-Assembly for the high-luminosity LHC upgrade (HL-LHC). The Cryo-Assembly was installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of this test include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench.

Rabehl, R.↗

Cryogenic testing of the first HL-LHC Q1/Q3 cryo-assembly at Fermilab

In early 2023, Fermilab is conducting horizontal cryogenic testing of the first Q1/Q3 cryo-assembly for the high-luminosity LHC upgrade (HL-LHC). The cryo-assembly was installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of this test include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from this first test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Challenges and Lessons Learned From Fabrication, Testing, and Analysis of Eight MQXFA Low Beta Quadrupole Magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low-beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some of the criteria and were disassembled. Furthermore, lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this article, we present a summary of 1) the fabrication and test data for all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Status and Challenges of the Interaction Region Magnets for HL-LHC

About one hundred magnets of six different types shall be installed in the High Luminosity LHC (HL-LHC) in the years 2026-2028 at CERN. The magnets design, construction and test are based on CERN collaborations with institutes and industrial partners in USA, Spain, Italy, Japan and China. Three types of correctors are based on Nb-Ti technology and feature conductor peak fields in the 2 to 4 T range: for all of them the prototype phase has been successfully completed. The production is well advanced for the superferric correctors, and is starting for the canted cosine theta correctors and for the nested correctors. The separation and recombination Nb-Ti dipoles D1 and D2, with a 4.5-6 T bore field range, are both in the prototype phase after the completion of the short model program. The most challenging magnet, the Nb 3 Sn quadrupole with conductor peak field above 11 T, is in the prototype phase at CERN and halfway through the production phase in the USA. In this paper we will give, for each type of magnet, an overview of the main achievements obtained so far and we will outline the technical points still needing validation from the prototype program.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Magnetic Measurements of $\mathrm{HL-LHC AUP}$ Cryo-Assemblies at Fermilab

LQXFA/B production series cryogenic assemblies are being built for the LHC upgrade by the HL-LHC Accelerator Upgrade Project (AUP). These contain a pair of MQXFA quadrupole magnets combined as a cold mass within a vacuum vessel, and are to be installed in the IR regions of the LHC. The LQXFA/B are being tested at 1.9 K to assess alignment and magnetic performance at Fermilab's horizontal test facility. The ~10 m long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis location, and for variations in axis position and local field profiles. A multi-probe, PCB-based rotating coil and a Single Stretched Wire system are employed for these measurements. To accurately determine rotating coil location and angles within the cold mass, a laser tracker is utilized to record multiple targets at one end of the probe. Here this paper describes the measurements, probes/equipment, and techniques used to perform the necessary characterization of the cold mass.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

High-precision measurement of the W boson mass with the CDF II detector

The mass of the W boson, a mediator of the weak force between elementary particles, is tightly constrained by the symmetries of the standard model of particle physics. The Higgs boson was the last missing component of the model. After observation of the Higgs boson, a measurement of the W boson mass provides a stringent test of the model. We measure the W boson mass, M W , using data corresponding to 8.8 inverse femtobarns of integrated luminosity collected in proton-antiproton collisions at a 1.96 tera–electron volt center-of-mass energy with the CDF II detector at the Fermilab Tevatron collider. A sample of approximately 4 million W boson candidates is used to obtain M W = 80,433.5 ± 6.4 stat ± 6.9 syst = 80,433.5 ± 9.4 MeV/c 2 , the precision of which exceeds that of all previous measurements combined (stat, statistical uncertainty; syst, systematic uncertainty; MeV, mega–electron volts; c, speed of light in a vacuum). This measurement is in significant tension with the standard model expectation.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Designing a Magnetic Measurement Data Acquisition and Control System With Reuse in Mind: A Rotating Coil System Example

Accelerator magnet test facilities frequently need to measure different magnets on differently equipped test stands and with different instrumentation. Designing a modular and highly reusable system that combines flexibility built-in at the architectural level as well as on the component level addresses this need. Specification of the backbone of the system, with the interfaces and dataflow for software components and core hardware modules, serves as a basis for building such a system. The design process and implementation of an extensible magnetic measurement data acquisition and control system are described, including techniques for maximizing the reuse of software. The discussion is supported by showing the application of this methodology to constructing two dissimilar systems for rotating coil measurements, both based on the same architecture and sharing core hardware modules and many software components. The first system is for production testing 10 m long cryo-assemblies containing two MQXFA quadrupole magnets for the high-luminosity upgrade of the Large Hadron Collider and the second for testing IQC conventional quadrupole magnets in support of the accelerator system at Fermilab.

43 PARTICLE ACCELERATORS↗

A Quench Detection and Monitoring System for Superconducting Magnets at Fermilab

A quench detection system was developed for protecting and monitoring the superconducting solenoids for the Muon-to-Electron Conversion Experiment (Mu2e) at Fermilab. The quench system was designed for a high level of dependability and long-term continuous operation. It is based on three tiers: Tier-I, FPGA-based Digital Quench Detection (DQD); Tier-II, Analog Quench Detection (AQD); and Tier-3, the quench controls and data management system. The Tier-I and Tier-II are completely independent and fully redundant systems. The Tier-3 system is based on National Instruments (NI) C-RIO and provides the user interface for quench controls and data management. It is independent from Tiers I & II. The DQD provides both quench detection and quench characterization (monitoring) capability. Both DQD and AQD have built-in high voltage isolation and user programmable gains and attenuations. The DQD and AQD also includes user configured current dependent thresholding and validation times. A 1 st article of the three-tier system was fully implemented on the new Fermilab magnet test stand for the HL-LHC Accelerator Up-grade Project (AUP). It successfully provided quench protection and monitoring (QPM) for a cold superconducting bus test in November 2020. The Mu2e quench detection design has since been implemented for production testing of the AUP magnets. A detailed description of the system along with results from the AUP superconducting bus test will be presented.

monitoring↗

Magnetic Measurements of HL-LHC AUP Cryo-Assemblies at Fermilab

LQXFA/B production series cryogenic assemblies are being built for the LHC upgrade by the HL-LHC Accelerator Upgrade Project (AUP). These contain a pair of MQXFA quadrupole magnets combined as a cold mass within a vacuum vessel, and are to be installed in the IR regions of the LHC. The LQXFA/B are being tested at 1.9 K to assess alignment and magnetic performance at Fermilab's horizontal test facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis location, and for variations in axis position and local field profile. A multi-probe, PCB-based rotating coil and Single Stretched Wire system are employed for these measurements. To accurately determine rotating coil location and angles within the cold mass, a laser tracker is utilized to record multiple targets at one end of the probe. This paper describes the measurements, probes/equipment, and techniques used to perform the necessary characterization of the cold mass.

43 PARTICLE ACCELERATORS↗