Progress Towards the Development of a Modular Reprogrammable Information Barrier for Arms Control Applications
A presentation on MRPIB for the 2024 INMM meeting.
Engineering topics
Publications and source records attributed to Helguero, Rachel Rae.
A presentation on MRPIB for the 2024 INMM meeting.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Manuscript for INMM conference.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The international safeguards regime desires methods to efficiently verify that facilities are only performing declared activities. Electropotential verification (EPV) is a newly proposed technique that was tested for its feasibility to perform facility design information verification (DIV) and verification of spent nuclear fuel while in a cooling pool. EPV works by passing a constant, low voltage current through a conductive system (facility infrastructure of nuclear fuel assembly) and measuring the resulting voltage at various places throughout the infrastructure in order to establish a baseline. Changes made to the system affect these voltage readings, which will deviate from the baseline and indicate that a change to the system was made. For facility DIV, it appears feasible that changes in configuration of the system’s grounding can be detected in real-time, and the location of the change can be inferred from the measured intensity of the change in voltage. Determination of whether or not spent fuel was present in a fuel rod, as well as the presence/absence of a fuel rod from an assembly using EPV, proved unsuccessful with the sensitivity of instrumentation used in this study.
The international safeguards regime desires methods to efficiently verify that facilities are only performing declared activities. Electropotential verification (EPV) is a newly proposed technique that was tested for its feasibility to perform facility design information verification (DIV). EPV works by passing a constant, low voltage current through a conductive system (facility infrastructure of nuclear fuel assembly) and measuring the resulting voltage at various places throughout the infrastructure in order to establish a baseline. Changes made to the system affect these voltage readings, which will deviate from the baseline and indicate that a change to the system was made. For large scale infrastructure such as a nuclear facility DIV, it appears feasible that changes in configuration of the system’s grounding can be detected in real-time, and the location of the change can be inferred from the measured intensity of the change in voltage.
Abstract not provided.
Abstract not provided.