Search NASA⌕ Search

Engineering topics

Lawrie, Sean

Publications and source records attributed to Lawrie, Sean.

Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration

Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration The DI BCA document also identifies specific, digitally enabled WRO categories for further study. These were selected as most relevant by Reference Plant personnel from a larger list of WRO areas identified across the nuclear industry as captured INL/RPT-21-64134, “Process for Significant Nuclear Work Function Innovation Based on Integrated Operations Concepts.” This ION WRO demonstration report was developed to provide illustrative, specific, and actionable direction for intertwined PTPG changes associated with digital modernization efforts. The coordinated changes in these areas are intended to maximize safe plant operational and economic performance. This includes enabling WROs associated with detailed configuration, implementation, and use of digital systems and how they are supported over their lifecycle. Illustrating this direction through a minimum set of advanced technology examples establishes a model PTPG framework that can be leveraged across the spectrum of nuclear plant digital modernization efforts going forward. This document addresses many related concepts. To promote an integrated understanding of the topics that make up this work, this document contains an extensive set of internal hyperlinks. This set includes hyperlinks to page numbers in the table of contents, section numbers, items in lists, figures, tables, and references to other documents within the report. When hovering the cursor above hyperlinked text in Adobe, the cursor will change from “ ” to “ .” When the “ ” appears, a left mouse click will take the reader to the referenced location in the document. To return to the original location in the document, the reader need only press and hold the “alt” button on the keyboard and then simultaneously press the “<” directional key on the keyboard.

42 ENGINEERING↗

ION Work Reduction Opportunity Realization Demonstration

The purpose of this research was to realize one of the advanced training work reduction opportunities first presented in the Idaho National Laboratory (INL) report, “Process for Significant Nuclear Work Function Innovation Based on Integrated Operations Concepts” (INL/EXT-21-64134) [1], with a nuclear power plant (NPP) research partner. Researchers modernized two trainings: (1) an accredited instructor-led training (ILT) overview course on Westinghouse DS 480-volt (V) circuit breakers to a multimedia-focused computer-based-training (CBT) learning module, and (2) an on-demand chaptered video on how to properly rack and un-rack a Westinghouse DS 480-V circuit breaker. These modernized work products were developed and implemented in a manner consistent with the industry guidelines found in Institution of Nuclear Power Operations (INPO) Teaching and Learning 23-001 [2]. Researchers calculated that the modernized accredited training course reduced the time necessary to prepare and deliver the training material by a factor of 8:1. The amount of time learners spend in class could be reduced by this same factor. In other words, if a course took 8 hours to deliver a class, the new CBT instruction would take just over 1 hour. The researchers noted that the requirement for any practicum training by the learners with the instructor(s) would remain in place. But through interviews with new and experienced learners, the researchers discovered that the confidence of these learners in performing the racking and un-racking of the circuit breaker improved as a result of using the new modernized CBT process. Additionally, the learners who tested the modernized work products enjoyed the modernized CBT and the learning video significantly more than current in-class learning methods. These are encouraging results for the nuclear industry, as this modernization of training can be applied to other classes and is scalable across the industry. In line with the Integrated Operations for Nuclear (ION) model, positive workload analysis supports the investment of resources in modernizing NPP training processes and infrastructure. Implementation of the advanced training technologies in this report is likely to result in substantive long-term workload benefits to instructors and learners and result in hard-dollar savings on contractor spends. Additionally, investment in these modernized training processes will result in improved learner proficiency. The results of this research can be applied to additional operator, technical, and general training topics to provide additional workload and learning benefits in addition to what was explored.

42 ENGINEERING↗

Complete Evaluation of ION Cost Reduction Opportunities for LWRS Pathways

The Light Water Reactor Sustainability (LWRS) Program, sponsored by the U.S. Department of Energy (DOE), plays a pivotal role in enhancing the sustainability, safety, and economic viability of the nation's fleet of nuclear power plants. This program collaborates extensively with industry, vendors, suppliers, regulatory agencies, and research and development organizations within the nuclear energy sector. The overarching goals of the LWRS program are twofold: to provide innovative science and technology-based solutions to the nuclear industry, surpassing current performance models, and to manage the aging of systems, structures, and components (SSCs) to extend the operational lifetimes of nuclear power plants safely, efficiently, and economically. The program focuses on five research and development pathways: Plant Modernization: This pathway seeks to enhance the economic viability of nuclear power plants in evolving energy markets through innovation, efficiency improvements, and digital transformation. The integration of digital technologies into plant operations is a central theme, aiming to create a seamless digital environment that improves plant economics and safety. Flexible Plant Operation and Generation: Research efforts in this pathway explore opportunities for light-water reactors (LWRs) to directly supply energy to industrial processes, diversifying revenue generation approaches and improving economic sustainability.

42 ENGINEERING↗

Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration Strategy

EXECUTIVE SUMMARY The Light Water Reactor Sustainability Program Plant Modernization Pathway has been working with industry for a number of years to leverage digital technology to extend the life and improve the performance of the existing fleet through modernized technologies and improved processes for plant operation and power generation. This includes development of modernization solutions to improve reliability and economic performance while addressing US nuclear industry’s aging and obsolescence challenges. The objective of these efforts is to deliver a sustainable business model that enables US nuclear industry to remain competitive. Digital Infrastructure (DI) research has established a technical foundation for these efforts. This effort began with technical analysis and support for a safety-related instrumentation and control (I&C) pilot upgrade being performed at Constellation Energy Generation’s Limerick Nuclear Plant. The following publicly available reports were produced as part of this effort. • INL/EXT-20-61079, Vendor-Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade [1] • INL/EXT-20-59371, Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations [2] • INL/EXT-20-59809, “Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation Report and Lessons Learned [3] • INL/RPT-23-72105, Safety-Related Instrumentation and Control Upgrade: Conceptual – Detailed Design Phase Report and Lessons Learned [4]

99 GENERAL AND MISCELLANEOUS↗

Initial Scoping Efforts for a Plant-Wide Digital Infrastructure Modernization Business Case Study

This research report describes the preparatory efforts to perform a BCA on an expanded set of digital upgrades envisioned for implementation at the Luminant?s Comanche Peak nuclear plant. It captures efforts to scope the digital upgrade effort to enable performance of the BCA. The final BCA will be the subject of a subsequent report. LWRS pilot research in this area is intended to enable this effort and to provide a roadmap to others to follow. INL appreciates the Luminant?s participation in this research.

99 GENERAL AND MISCELLANEOUS↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations

The commercial nuclear sector faces unprecedented financial challenges driven by low natural gas prices and subsidized renewables in a marketplace that does not reward carbon-free baseload capacity. These circumstances, along with increasingly antiquated labor-centric operating models and analog technology, have forced the premature closure of multiple nuclear facilities and placed a much larger population of nuclear power stations at risk. Nuclear plant economic survival in current and forecasted market conditions requires an efficient and technology-centric operating model that harvests the native efficiencies of advanced technology. This is analogous to transformations in nearly every other industry. In light of previous industry experience in modernizing safety Instrumentation and Controls (I&C) systems, nuclear utilities are reluctant to pursue these upgrades due to uncertainty in licensing and cost.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations

This LWRS research seeks to assist in breaking the impasse which has precluded digital safety system upgrades by generating and demonstrating a process and related business case tool to enable a Business Case Analysis (BCA). The purpose of a BCA is to show such upgrades can be economically justified. This BCA methodology first systematically establishes a forecast of expected lifecycle costs for I&C identified for upgrade by: • Definitively bounding the scope of current I&C systems envisioned for upgrade. • Collecting historical labor and material usage data that bound cost contributors related to the systems to be upgraded. • Synthesizing and analyzing the data to establish lifecycle cost forecasts for the current systems. In collaboration with engineers familiar with the attributes of the digital equipment to be used in the upgrade and how it is envisioned to be applied, cost savings categories and expected savings in those categories are then identified and applied using the analysis tools developed for this purpose. The result is an estimate NPV of savings enabled by the upgrade. This includes both direct cost savings (e.g., surveillance labor costs) as well as cost avoidance items (e.g., inventory carrying costs). Finally, when utility-provided digital upgrade costs estimates are included, the resultant BCA provides an NPV for the upgrade project. Development of a useful BCA methodology requires a real-world basis. With the cooperation of Exelon Generation (“Owner”), an Exelon-owned 2-Unit BWR Station (“Station”) was used as the foundation for this research. Exelon is pursuing a digital upgrade of current, first-echelon, safety-related I&C systems at these units, including the following: • Reactor Protection System (RPS) • Nuclear Steam Supply Shutoff System (N4S) • Emergency Core Cooling Systems (ECCS) • Anticipated Transient Without Scram (ATWS) Mitigation System

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis and Planning Framework for Nuclear Plant Transformation

Commercial nuclear power in the United States has been an unqualified success by any measure, providing low cost, carbon-free, and safe baseload electricity for decades. The industry today is at the peak of its historical performance in terms of generation output, reliable operations, and demonstrated nuclear safety. However, it is no longer among the lowest-cost electric generation sources with the emergence of subsidized renewables and shale gas generation. The business model that has served the operating nuclear fleet so well over its life is now a drag on cost performance due to its reliance on a large highly skilled labor force. In contrast, digital technology and innovation are enabling dramatic efficiencies in energy production, resulting in fierce competition for a commodity such as electricity. The nuclear power industry has responded to this challenge with many initiatives to improve efficiency and modernize plant equipment, especially where reliability and obsolescence issues are pressing. However, it would be a missed opportunity to merely modernize the plant components and the work processes of an outdated business model that was formulated to manage the technology of the 1960s. Rather, the greater opportunity is to transform that business model to one that fully exploits the capabilities of modern digital technology, resulting in substantially lower production costs and sustainable market viability. One successful example of such transformation is the concept of Integrated Operations, which was introduced into the North Sea oil and gas industry a couple of decades ago when the profitability of operating these fields was severely threatened by low world petroleum prices and the high overhead of operating the offshore oil and gas platforms. This effort resulted in significant changes to how these oil fields were operated and allowed the industry to continue profitable operation of these platforms. This example has some remarkable parallels to the U.S. commercial nuclear industry as described in the next section. This report provides an analysis and planning framework for such a nuclear plant operating model transformation based on the transferable learnings from the North Sea transformation. This framework is termed Integrated Operations for Nuclear or ION. This report describes the key principles and methods of Integrated Operations and how they are being applied in a collaboration between the DOE Light Water Reactor Sustainability Program and Xcel Energy in an initiative to transform its operating model for performance improvement and long-term sustainability. It describes a method to bring the operating costs of a nuclear fleet in line with market-based pricing, transforming work functions to reduce cost with technology innovations. This initiative will continue over the next several years in the detailed development of transformative concepts for nuclear plants, which will be published as follow-up to this initial report on Integrated Operations for Nuclear.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A business case for nuclear plant control room modernization - 352

This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM) in existing nuclear power plants (NPPs). The business case is based on advanced digital instrumentation and control (I and C), human-system interface (HSI), and work process technologies that allow NPP operators to conduct control room operations with improved human factors and efficiency, and therefore operate with fewer operational events. Labor savings can be harvested in terms of reduced overtime and redistribution of work. Significant savings are also demonstrated as reduced time to bring the plant back on line after completion of outages. The benefits are quantified to a rough order of magnitude, providing directional guidance to NPPs that are interested in developing similar business cases. The technologies employed in CRM include large overview displays, task-based operator displays, computer-based procedures, advanced alarm systems, computerized operator support systems, and wireless networks, among others. The CRM business case is founded on the following categories of cost savings: - Integrated Computer-Based Procedures for Operators; - Reduction in Corrective Action Program Work Due to Operator Error; - Reduction in Outage Critical Path Time; - Operation of Local Control Panels; - Reduction in Control Room Support; - Reduction in Plant Events Resulting in Generation Loss; - Paperless Control Room Processes. In addition to cost savings, these technologies also offer improvements to indirect ways that have impact on key performance indicators of the plant. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Business Case for Nuclear Plant Control Room Modernization

This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM). The analysis presented in two forms; 1) a standalone technology upgrade, and 2) a technology upgrade that is built upon and incremental to a prior business case created for Mobile Work Packages (MWP). The business case contends that advanced communication and networking and analytical technologies will allow NPP to conduct control room operations with improved focus by reducing human factors and redundant manpower, and therefore operate with fewer errors. While some labor savings can be harvested in terms of overtime, the majority of savings are demonstrated as reduced time to take the plant off line and bring back on line in support of outages. The benefits are quantified to a rough order of magnitude that provides directional guidance to NPPs that are interested in developing a similar business case. This business case focuses on modernization of the operator control room and does not consider a complete overhaul and modernization of a plants instrument and control systems. While operators may be considering such an investment at their plants, the sizable capital investment required is not likely supported by a cost/benefit analysis alone. More likely, it is driven by obsolescence and reliability issues, and requires consideration of mechanical condition of plant systems, capital depreciation, financing, relicensing and overall viability of the plant asset over a 20-year horizon in a competitive market. Prior studies [REF] have indicated that such a modernization of plant I&C systems, alone or as part of a larger modernization effort, can yield very significant reductions in O&M costs. However, the depth of research and analysis required to develop a meaningful business case for a plant modernization effort is well beyond the scope of this study. While CRM as considered in this study can be easily integrated as part of grander plant modernization effort, it can also be considered as a stand-alone project, implemented as a supervisorial layer over and above existing systems. CRM is enabled by a suite of technologies, which are described in further detail in the body of this report. They include: • Modernized control room with interactive displays • High-bandwidth wireless networks • Mobile devices • Component identification technology • Mobile wireless video cameras • Smart or task based operator displays • Computer-Based Procedures (CBP)/Automated Mobile Work Packages (MWP) • Intelligent plant configuration • Advanced data analytics An analysis was conducted to determine how these technologies might impact outage operations at an NPP. The analysis concluded that outage management capabilities would be improved with application of these technologies, and result in annual benefits for the plant. These improved capabilities were identified and described in further detail in this report. • Reduction in need redundant manpower (verification, etc) • Improved critical path shutdown and restart duration during outages • Reduction in human factors and errors • Remote watches • Paperless outage coordination • Bulk work optimization

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Business Case for Advanced Outage Management

The Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program develops and validates technologies that will make the U.S. operating nuclear fleet more efficient and competitive. The program has developed a standard methodology for determining the impact of new technologies in order to assist nuclear power plant (NPP) operators in building sound business cases. This paper presents a generic business case for implementation of technology that supports Advanced Outage Management (AOM). The analysis presented demonstrates that advanced communication and networking and analytical technologies will allow NPP to conduct outages with fewer people in management roles and the remaining people can be more effective and more productive. The benefits are quantified with a rough order of magnitude that provides directional guidance to NPPs that are interested in developing a similar business case. Advanced Outage Management is enabled by a suite of technologies, which are described in further detail in the body of this report. They include: • Mobile Work Packages (MWP) • Computer Based Procedures (CBP) • Personal Digital Assistants (PDA) also referred to as smart devices • Barcode readers • High bandwidth wireless networks • Collaboration software (i.e., OneNote) • Advanced digital displays • Advanced data analytics All the hardware necessary to implement AOM as envisioned in this report is readily available today. Configuration to perform within the plant systems and regulatory boundaries would need to be developed by the NPP. 1. The resulting business case demonstrates benefits in two major categories: 2. Reduction in resources required to manage the outage, a. Increased productivity in outage work that reduces the likelihood of schedule overruns: b. reduce likelihood of bulk work resulting in outage delays c. improved management of critical path single issues, d. improved management of emergent work (improve time to collect data and prepare response) It is important to note that in order to realize these benefits at the scale described in this report requires the plant to rethink how technologies can disrupt current processes; how data might be captured, processed, analyzed and presented with little or no human intervention. In many cases, technology be fully utilized in a way that not only aides productivity, but is utilized towards “work destruction” – elimination of work that is currently performed through a human interface.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pilot Project Technology Business Case: Mobile Work Packages

Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are “harvestable,” meaning they result in an actual reduction in headcount and/or cost. The report describes the specific activities conducted with a partner utility to examine the various work activities associated with mobile work packages to determine what time savings and error rate reductions are available. The report summarizes these findings in the form of a business case for the technology.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Light Water Reactor Sustainability Program: Digital Technology Business Case Methodology Guide

The Department of Energy’s (DOE’s) Light Water Reactor Sustainability Program aims to develop and deploy technologies that will make the existing U.S. nuclear fleet more efficient and competitive. The program has developed a standard methodology for determining the impact of new technologies in order to assist nuclear power plant (NPP) operators in building sound business cases. The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies Pathway is part of the DOE’s Light Water Reactor Sustainability (LWRS) Program. It conducts targeted research and development (R&D) to address aging and reliability concerns with the legacy instrumentation and control and related information systems of the U.S. operating light water reactor (LWR) fleet. This work involves two major goals: (1) to ensure that legacy analog II&C systems are not life-limiting issues for the LWR fleet and (2) to implement digital II&C technology in a manner that enables broad innovation and business improvement in the NPP operating model. Resolving long-term operational concerns with the II&C systems contributes to the long-term sustainability of the LWR fleet, which is vital to the nation’s energy and environmental security. The II&C Pathway is conducting a series of pilot projects that enable the development and deployment of new II&C technologies in existing nuclear plants. Through the LWRS program, individual utilities and plants are able to participate in these projects or otherwise leverage the results of projects conducted at demonstration plants. Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) addresses the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the "benefits" side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗