Application of Flex-QA Arrays in HTS Magnet Testing

Flexible PCB quench antennas have been very useful in providing high-quality high-resolution data in low temperature superconducting magnet tests. Similar multi-sensor arrays have been employed recently to cover a high temperature superconductor magnet tested at FNAL. In the present work, data taking conditions and magnet features to support the analysis framework are discussed. Then observations made during complete magnet powering cycles are described and analysis of quench antenna data are presented. Based on results, improvements to instrumentation and data taking are debated. Views on the future of flexible quench antenna sensors for HTS magnet diagnostics and operational support are shared.

Stoynev, S.↗

First results of AUP Nb3Sn quadrupole horizontal tests

The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.

43 PARTICLE ACCELERATORS↗

AUP First Pre-Series Cryo-Assembly Design Production and Test Overview

New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ~5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. In conclusion, this paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.

43 PARTICLE ACCELERATORS↗

Quench Performance of the First Pre-series AUP Cryo-assembly

The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S. contributions to the HL-LHC. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 and Q3 inner triplet optical elements in front of the two interaction points. Each cryo-assembly consists of two 4.2 m long Nb 3 Sn quadrupole magnets with aperture 150 mm and operating gradient 132.6 T/m. The first pre-series cryo-assembly has been fabricated and successfully tested at the horizontal test facility at Fermi National Accelerator Laboratory. Here in this manuscript we report the quench test results of the LQXFA/B-01 cryo-assembly. The primary objective of the horizontal test is full cryo-assembly qualification and validation of the performance requirements.

43 PARTICLE ACCELERATORS↗

Fermilab's Horizontal Test Stand Upgrade Overview and Commissioning

Cryo-assemblies with the Nb 3 Sn MQXFA low-beta quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab's magnet test facility. A total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational for more than a decade. In order to restore the test stand functions and meet the design and test requirements for the HL-LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded horizontal test stand was completed during the first cryo-assembly test in 2023. These tests verified the major cryo-mechanical installations, as well as the basic test stand operations, including controlled cooldown and operation at 1.9 K, magnet protection and process controls. Here, in this paper, overview of the Fermilab's horizontal test facility upgrade and commissioning of these upgrades are presented.

43 PARTICLE ACCELERATORS↗

Magnetic Measurements and Alignment Results of LQXFA/B Cold Mass Assemblies at Fermilab

MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the U.S. Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and are being tested to assess alignment and magnetic performance at Fermilab's horizontal test stand facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis position, and for magnet variations in positioning and local field profile. Here this paper describes the results of the magnetic and alignment measurements which characterize the first LQXFA/B assembly.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Fermilab’s horizontal test stand upgrade overview and commissioning

Cryo-assemblies with the low-beta Nb3Sn quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab’s magnet test facility. Total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational more than a decade. In order to restore the test stand functions and meet the design and test requirements for the high luminosity LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded test stand was completed during the first cryo-assembly test in 2023. These tests verified all the cryo-mechanical installations, as well as the test stand operations, including controlled cooldown and operation at 1.9 K, the helium recovery capabilities, magnet protection and process controls.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

FNAL test facility

Report on the status of superconducting magnet test facility at Fermilab.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Analysis of the MQXFA Low Beta Quadrupoles for HL-LHC after 50% magnet assembly complete +

The US HL-LHC Accelerator Upgrade Project (AUP) is fabricating the MQXFA magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC (HL-LHC). This is the first production of Nb3Sn magnets for a particle accelerator, together with the MQXFB magnets for Q2a and Q2b. Here we show status and some results of MQXFA magnets fabrication and vertical test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Effect of CLIQ on training of HL-LHC quadrupole magnets

The high-luminosity LHC upgrade requires stronger than LHC low-beta magnets to reach the luminosity goals of the project. The project is well advanced and HL-LHC quadrupole magnets are currently being commissioned in US Labs (MQXFA magnets) and CERN (MQXFB magnets). Those are the first Nb3Sn magnets to be used in any large particle accelerator. At development stages, many Nb3Sn accelerator sub-scale models showed relatively slow training and MQXFA magnets were projected to have low tens of quenches before reaching operational field. Recently it was shown that dedicated capacitor-based devices can affect Nb3Sn magnet training, and it was suggested that CLIQ, a capacitor-based device intended for quench protection, can do too. The present paper investigates effects on training induced by CLIQ, using the base fact that only half the coils in a quadrupole experience upward current modulation because of the capacitor discharge. The study encompasses all MQXFA production magnets trained at BNL to date. No other high-statistics data from identical magnets (series) with CLIQ protection exists so far. Implications and opportunities stemming from data analysis are discussed and conclusions drawn.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Challenges and Lessons Learned From Fabrication, Testing, and Analysis of Eight MQXFA Low Beta Quadrupole Magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low-beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some of the criteria and were disassembled. Furthermore, lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this article, we present a summary of 1) the fabrication and test data for all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Commissioning, Performance, and Effect of the Quench Current-Boosting Device on a Dedicated Superconducting Magnet

Superconducting magnet training is one of the accelerator related issues attracting attention due to significant operational costs and time budget associated to it. It is especially worrisome that magnets based on the “next-generation” Nb 3 Sn technology are affected by long training. While various efforts are underway to better understand and resolve the problem a parallel path could also be investigated, a path bypassing the issue. Following the concept of fast induced over-current during magnet powering, FNAL has developed an upgradable capacitor-based device to discharge through a superconducting magnet at quench detection or operator chosen time. The 0.4 F/1 kV device has been tested on a 1-m-long dipole-coil in a “mirror” magnet configuration and conclusive results on magnet training elimination have been observed. Here in this paper we discuss the main characteristics of the device, compare simulated response and actual performance, elaborate on test drivers and outcomes. Next steps and perspectives for future use are debated.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status and Challenges of the Interaction Region Magnets for HL-LHC

About one hundred magnets of six different types shall be installed in the High Luminosity LHC (HL-LHC) in the years 2026-2028 at CERN. The magnets design, construction and test are based on CERN collaborations with institutes and industrial partners in USA, Spain, Italy, Japan and China. Three types of correctors are based on Nb-Ti technology and feature conductor peak fields in the 2 to 4 T range: for all of them the prototype phase has been successfully completed. The production is well advanced for the superferric correctors, and is starting for the canted cosine theta correctors and for the nested correctors. The separation and recombination Nb-Ti dipoles D1 and D2, with a 4.5-6 T bore field range, are both in the prototype phase after the completion of the short model program. The most challenging magnet, the Nb 3 Sn quadrupole with conductor peak field above 11 T, is in the prototype phase at CERN and halfway through the production phase in the USA. In this paper we will give, for each type of magnet, an overview of the main achievements obtained so far and we will outline the technical points still needing validation from the prototype program.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗