Search NASASearch

NASA NTRS · 20150023597

Interim Land Use Control Implementation Plan

Abstract

This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Applegate, Joseph L.. 2014-11-30. Interim Land Use Control Implementation Plan. https://ntrs.nasa.gov/citations/20150023597

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports