Search NASA⌕ Search

DOE OSTI · 1373649

Integral Experiment Request 209 CED-3a Summary Report.

Abstract

Under IER-209, critical experiments like those done under IER-208 will be performed. The difference between the two sets of experiments is that, while the IER-208 experiments were done in the 0.800 cm pitch 7uPCX hardware, the IER-209 experiments will be done in the 0.855 cm pitch 7uPCX hardware.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Harms, Gary A., Zerkle, Michael L., Miller, Thomas M., Heinrichs, David P.. 2017-07-01. Integral Experiment Request 209 CED-3a Summary Report.. https://doi.org/10.2172/1373649

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS↗