Search NASA⌕ Search

SEARCH · Search NASA

Results for “FUNCTION TEST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Comparison of Cognitive Performance Tests for Promethazine Pharmacodynamics in Human Subjects

The objective of this study is to compare cognitive function tests, Automated Neurological Assessment Metrics (ANAM) based Readiness Evaluation System (ARES(Registered TradeMark)) on a Palm Pilot and Windows based Spaceflight Cognitive Assessment Tool (WinSCAT(Registered TradeMark)) on a personal computer (PC) to assess performance effects of promethazine (PMZ) after administration to human subjects. In a randomized placebo-controlled cross-over design, subjects received 12.5, 25, and 50 mg intramuscular (IM) PMZ or a placebo and completed 14 sessions with WinSCAT(Registered TradeMark) (v. 1.26) and ARES(Registered TradeMark) (v. 1.27) consecutively for 72 h post dose. Maximum plasma concentrations (4.25, 6.25 and 13.33 ng/ml) were linear with dose and were achieved by 0.75, 8, and 24 h after dosing for the three doses, respectively. No significant differences in cognitive function after PMZ dosing were detected using WinSCAT(Registered TradeMark), however, tests from ARES(Registered TradeMark) demonstrated concentration dependent decrements in reaction time associated with PMZ dose.

Vaksman, Z.↗

Integrated Advanced Microwave Sounding Unit-A(AMSU-A). Performance Verification Report, METSAT Phase Locked Oscillator Assembly, P/N 1348360-1, S/N's F07 and F08

Two Flight Model AMSU-A Phase Locked Oscillators (PIN 1348360-1, S/N F07 and F08) have been tested per AES Test Procedure AE-26758 Rev. B, which include full functional testing, vibration testing, thermal testing, and AM/FM Noise testing. Both assemblies satisfactorily passed all performance requirements of the AE-26633 Product Specification. During the thermal cycling of both units, spurs developed 1 MHz from the carrier when the units were cold, and TARs were written to document the anomaly. The symptoms observed in both cases were consistent with inadequate tuning. The units were successfully re-tuned. In the case of F08, re-tuning required a design change which allowed a greater range of possible values for tuning resisters. Both units completed thermal cycling without further delay. The results of the required tests are presented in the following section as test data. As indicated on the test data sheets, all measured data passed all requirements.

Pines, D.↗

Evaluation plan for space station network interface units

Outlined here is a procedure for evaluating network interface units (NIUs) produced for the Space Station program. The procedures should be equally applicable to the data management system (DMS) testbed NIUs produced by Honeywell and IBM. The evaluation procedures are divided into four areas. Performance measurement tools are hardware and software that must be developed in order to evaluate NIU performance. Performance tests are a series of tests, each of which documents some specific characteristic of NIU and/or network performance. In general, these performance tests quantify the speed, capacity, latency, and reliability of message transmission under a wide variety of conditions. Functionality tests are a series of tests and code inspections that demonstrate the functionality of the particular subset of ISO protocols which have been implemented in a given NIU. Conformance tests are a series of tests which would expose whether or not selected features within the ISO protocols are present and interoperable.

Weaver, Alfred C.↗

Green Run Modal Test of the NASA Space Launch System Core Stage

The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot-tall rocket assembly—consisting primarily of two cryogenic propellant tanks, an engine section, and four RS-25 rocket engines—that will send crew and large payloads to the moon and beyond for NASA’s Artemis program. Prior to SLS assembly, the Core Stage completed a series of structural and functional tests in the B-2 Test Stand at Stennis Space Center, designated Green Run. The goal of Green Run was to verify analytical models, confirm proper subsystem operation, and test-fire all four RS-25 engines of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test, performed by the Marshal Space Flight Center modal test team. A free-boundary test condition of the Core Stage was simulated as close as possible by suspending the massive launch vehicle from the B-2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound instrumented hammer for impact testing. Modal response was measured with 550 accelerometer channels distributed on both the Core Stage and the B-2 Test Stand derrick crane. Following one very long day of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 5 Hz to 15 Hz, and mode shapes, frequencies, and damping values were successfully estimated. The case-study presented in this paper will discuss Green Run, the SLS Core Stage, the modal test setup and execution, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.

Space Launch System↗

Defining the Physiological Factors that Contribute to Postflight Changes in Functional Performance

Astronauts experience alterations in multiple physiological systems due to exposure to the microgravity conditions of space flight. These physiological changes include sensorimotor disturbances, cardiovascular deconditioning and loss of muscle mass and strength. These changes might affect the ability of crewmembers to perform critical mission tasks immediately after landing on lunar and Martian surfaces. To date, changes in functional performance have not been systematically studied or correlated with physiological changes. To understand how changes in physiological function impact functional performance an interdisciplinary pre/postflight testing regimen (Functional Task Test, FTT) has been developed that systematically evaluates both astronaut postflight functional performance and related physiological changes. The overall objective of the FTT is to identify the key underlying physiological factors that contribute to performance of functional tests that are representative of critical mission tasks. This study will identify which physiological systems contribute the most to impaired performance on each functional test. This will allow us to identify the physiological systems that play the largest role in decrement in functional performance. Using this information we can then design and implement countermeasures that specifically target the physiological systems most responsible for the altered functional performance associated with space flight. The functional test battery was designed to address high priority tasks identified by the Constellation program as critical for mission success. The set of functional tests making up the FTT include the: 1) Seat Egress and Walk Test, 2) Ladder Climb Test, 3) Recovery from Fall/Stand Test, 4) Rock Translation Test, 5) Jump Down Test, 6) Torque Generation Test, and 7) Construction Activity Board Test. Corresponding physiological measures include assessments of postural and gait control, dynamic visual acuity, fine motor control, plasma volume, orthostatic intolerance, upper and lower body muscle strength, power, fatigue, control and neuromuscular drive. Crewmembers perform both functional and physiological tests before and after short (Shuttle) and long-duration (ISS) space flight. Data are collected on R+0 (Shuttle only), R+1, R+6 and R+30.

Bloomberg, J. J.↗

Environmental Test Screening Procedure

This procedure describes the methods to be used for environmental stress screening (ESS) of the Lightning Mapper Sensor (LMS) lens assembly. Unless otherwise specified, the procedures shall be completed in the order listed, prior to performance of the Acceptance Test Procedure (ATP). The first unit, S/N 001, will be subjected to the Qualification Vibration Levels, while the remainder will be tested at the Operational Level. Prior to ESS, all units will undergo Pre-ESS Functional Testing that includes measuring the on-axis and plus or minus 0.95 full field Modulation Transfer Function and Back Focal Length. Next, all units will undergo ESS testing, and then Acceptance testing per PR 460.

Zeidler, Janet↗

LDBT instead of DBTL: combining machine learning and rapid cell-free testing

Synthetic biology is defined by Design-Build-Test-Learn cycles. Machine learning has yielded significant improvements in protein design; thus, we propose that “Learning” can precede “Design” to optimize engineering workflows. Additionally, shifting to cell-free platforms will further accelerate “Build” and “Test” capabilities by allowing the rapid expression of proteins and functional testing without the need for cellular transformation or isolation.

59 BASIC BIOLOGICAL SCIENCES↗

Analysis of large system black box verification test data

Issues regarding black box, large systems verification are explored. It begins by collecting data from several testing teams. An integrated database containing test, fault, repair, and source file information is generated. Intuitive effectiveness measures are generated using conventional black box testing results analysis methods. Conventional analysts methods indicate that the testing was effective in the sense that as more tests were run, more faults were found. Average behavior and individual data points are analyzed. The data is categorized and average behavior shows a very wide variation in number of tests run and in pass rates (pass rates ranged from 71 percent to 98 percent). The 'white box' data contained in the integrated database is studied in detail. Conservative measures of effectiveness are discussed. Testing efficiency (ratio of repairs to number of tests) is measured at 3 percent, fault record effectiveness (ratio of repairs to fault records) is measured at 55 percent, and test script redundancy (ratio of number of failed tests to minimum number of tests needed to find the faults) ranges from 4.2 to 15.8. Error prone source files and subsystems are identified. A correlational mapping of test functional area to product subsystem is completed. A new adaptive testing process based on real-time generation of the integrated database is proposed.

Clapp, Kenneth C.↗

Breadboard Facility

In the sixties, Chrysler was NASA's prime contractor for the Saturn I and IB test launch vehicles. The company installed and operated at Huntsville what was known as the Saturn I/IB Development Breadboard Facility. "Breadboard," means an array of electrical and electronic equipment for performing a variety of development and test functions. This work gave Chrysler a broad capability in computerized testing to assure quality control in development of solid-state electronic systems. Today that division is manufacturing many products not destined for NASA, most of them being associated with the company's automotive line. A major project is production and quality-control testing of the "lean-burn" engine, one that has a built-in Computer to control emission timing, and allow the engine to run on a leaner mixture of fuel and air. Other environment-related products include vehicle emission analyzers. The newest of the line is an accurate, portable solid state instrument for testing auto exhaust gases. The exhaust analyzers, now being produced for company dealers and for service

Source record↗

A Boundary Scan Test Vehicle for Direct Chip Attach Testing

To facilitate the new faster, better and cheaper spacecraft designs, smaller more mass efficient avionics and instruments are using higher density electronic packaging technologies such as direct chip attach (DCA). For space flight applications, these technologies need to have demonstrated reliability and reasonably well defined fabrication and assembly processes before they will be accepted as baseline designs in new missions. As electronics shrink in size, not only can repair be more difficult, but 49 probing" circuitry can be very risky and it becomes increasingly more difficult to identify the specific source of a problem. To test and monitor these new technologies, the Direct Chip Attach Task, under NASA's Electronic Parts and Packaging Program (NEPP), chose the test methodology of boundary scan testing. The boundary scan methodology was developed for interconnect integrity and functional testing at hard to access electrical nodes. With boundary scan testing, active devices are used and failures can be identified to the specific device and lead. This technology permits the incorporation of "built in test" into almost any circuit and thus gives detailed test access to the highly integrated electronic assemblies. This presentation will describe boundary scan, discuss the development of the boundary scan test vehicle for DCA and current plans for testing of direct chip attach configurations.

Parsons, Heather A.↗

Creating the Required Deep Space Environments for Testing the James Webb Space Telescope (JWST) at NASA Johnson Space Center's Chamber A

NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2021. NASA was directly responsible for the integration and test (I&T) program that culminated in an end-to-end cryo vacuum optical test of the flight telescope and instrument module in Chamber A at NASA Johnson Space Center. Historic Chamber A is the largest thermal vacuum chamber at Johnson Space Center and one of the largest space simulation chambers in the world. Chamber A has undergone a major modernization effort to support the deep cryogenic, vacuum and cleanliness requirements for testing the JWST. This paper will discuss the thermal vacuum test of the Optical Telescope Element (OTE) plus Integrated Science Instrument Module (ISIM) (OTIS) as well as the extensive series of tests that were performed to incrementally validate the operations and performance of the Chamber and Ground Support Equipment (GSE). Each test required a unique thermal vacuum profile for cool down and warm up, steady state operations, GSE testing and contamination control. Select results will be presented on Facility Functional Testing, Chamber Bake-out, GSE Cryo-Proof Testing, Chamber Commissioning, the Optical Ground Support Equipment (OGSE) Test series and the final thermal vacuum test of the OTIS with respect to facility operations to meet JWST program test requirements.

Francis, Andrew↗

Estimation of Optimum Stimulus Amplitude for Balance Training using Electrical Stimulation of the Vestibular System

Sensorimotor changes such as posture and gait instabilities can affect the functional performance of astronauts after gravitational transitions. Sensorimotor Adaptability (SA) training can help alleviate decrements on exposure to novel sensorimotor environments based on the concept of 'learning to learn' by exposure to varying sensory challenges during posture and locomotion tasks (Bloomberg 2015). Supra-threshold Stochastic Vestibular Stimulation (SVS) can be used to provide one of many challenges by disrupting vestibular inputs. In this scenario, the central nervous system can be trained to utilize veridical information from other sensory inputs, such as vision and somatosensory inputs, for posture and locomotion control. The minimum amplitude of SVS to simulate the effect of deterioration in vestibular inputs for preflight training or for evaluating vestibular contribution in functional tests in general, however, has not yet been identified. Few studies (MacDougall 2006; Dilda 2014) have used arbitrary but fixed maximum current amplitudes from 3 to 5 mA in the medio-lateral (ML) direction to disrupt balance function in healthy adults. Giving this high level of current amplitude to all the individuals has a risk of invoking side effects such as nausea and discomfort. The goal of this study was to determine the minimum SVS level that yields an equivalently degraded balance performance. Thirteen subjects stood on a compliant foam surface with their eyes closed and were instructed to maintain a stable upright stance. Measures of stability of the head, trunk, and whole body were quantified in the ML direction. Duration of time they could stand on the foam surface was also measured. The minimum SVS dosage was defined to be that level which significantly degraded balance performance such that any further increase in stimulation level did not lead to further balance degradation. The minimum SVS level was determined by performing linear fits on the performance variable at different stimulation levels. Results from the balance task suggest that there are inter-individual differences and the minimum SVS amplitude was found to be in the range of 1 mA to 2.5 mA across subjects. SVS resulted in an average decrement of balance task performance in the range of 62%-73% across different measured variables at the minimum SVS amplitude in comparison to the control trial (no stimulus). Training using supra-threshold SVS stimulation is one of the sensory challenges used for preflight SA training designed to improve adaptability to novel gravitational environments. Inter-individual differences in response to SVS can help customize the SA training paradigms using minimal dosage required. Another application of using SVS is to simulate acute deterioration of vestibular sensory inputs in the evaluation of tests for assessing vestibular function.

Goel, R.↗

Ocean Color Instrument Integration and Testing

This paper describes the plans, flows, key facilities, components and equipment necessary to fully integrate, functionally test, qualify and calibrate the Ocean Color Instrument (OCI) on the Plankton, Aerosols, Clouds, and oceans Ecosystem (PACE) observatory. PACE is currently in the design phase of mission development. It is scheduled to launch in 2022, extending and improving NASA's twenty-year record of satellite observations of global ocean biology, aerosols and clouds. PACE will advance the assessment of ocean health by measuring the distribution of phytoplankton, which are small plants and algae that sustain the marine food web. It will also continue systematic records of key atmospheric variables associated with air quality and the Earth's climate. PACE's primary sensor, the OCI, is a highly advanced optical spectrometer that will be used to measure properties of light over portions of the electromagnetic spectrum. It will enable continuous measurement of light at finer wavelength resolution than previous NASA satellite sensors, extending key system ocean color data records for climate studies. The color of the ocean is determined by the interaction of sunlight with substances or particles present in seawater such as chlorophyll. By monitoring global phytoplankton distribution and abundance with unprecedented detail, the OCI will contribute to a better understanding of the complex systems that drive ocean ecology and it's impacts on global fisheries. This paper will focus on the Integration and Test (I&T) activities for OCI while it is at the NASA Goddard Space Flight Center. The OCI integration consists of assembly and alignment of the rotating telescope, electronics box integration, fixed deck assembly integration, thermal systems integration and the final assembly and testing. This I&T phase will be followed by the OCI calibration and characterization, environmental tests which include electromagnetic interference (EMI)/electromagnetic compatibility (EMC), vibration with sine sweep, acoustics, shock, thermal balance, thermal vacuum, mass properties and center of gravity. This paper will briefly discuss OCI shipment and delivery to the spacecraft vendor for observatory level I&T as well as some launch preparation activities.

Petro, Susanna↗

Plankton, Aerosol, Cloud, Ocean Ecosystem (PACE) Mission Integration and Testing

This paper describes the plans, flows, key facilities, components and equipment necessary to fully integrate, functionally test and qualify the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Observatory. PACE is currently in the design phase of mission implementation. It is scheduled to launch in 2022, extending and improving NASA's twenty-year record of satellite observations of global ocean biology, aerosols and clouds. PACE will advance the assessment of ocean health by measuring the distribution of phytoplankton, which are small plants and algae that sustain the marine food web. It will also continue systematic records of key atmospheric variables associated with air quality and the Earth's climate. The PACE observatory is comprised of the spacecraft and three instruments, an Ocean Color Instrument (OCI) and two polarimeters, the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone). The spacecraft and the OCI, which is the primary instrument, are developed and integrated at the NASA Goddard Space Flight Center (GSFC). The OCI is a hyper-spectral scanning (HSS) radiometer designed to measure spectral radiances from the ultraviolet to shortwave infrared (SWIR) to enable advanced ocean color and heritage cloud and aerosol particle science. The HARP2 and SPEXone are secondary instruments on the PACE observatory, acquired outside of GSFC. The Hyper-Angular Rainbow Polarimeter instrument (HARP2) is a wide swath imaging polarimeter that is capable of characterizing atmospheric aerosols for purposes of sensor atmospheric correction as well as atmospheric science. The SPEXone provides atmospheric aerosol and cloud data at high temporal and spatial resolution. This paper will focus on the Integration and Test (I&T) activities for the PACE mission at NASA GSFC. This I&T phase consists of mechanical, electrical and thermal integration and test of all the spacecraft subsystems and the integration of the instruments with the spacecraft. The PACE observatory environmental tests include electromagnetic interference (EMI)/electromagnetic compatibility (EMC), vibration, acoustics, shock, thermal balance, thermal vacuum, mass properties and center of gravity. This paper will also discuss the observatory shipment to the launch site as well as the launch site processing.

Petro, Susanna↗

L’Ralph Integration and Testing

This paper describes the plans, flows, key facilities, components and equipment necessary to fully integrate, functionally test, qualify and calibrate the L’Ralph instrument on the Lucy observatory. Lucy is currently in the final design and fabrication phase (phase C) of mission development. It is scheduled to launch out of Cape Canaveral, Florida, in October 2021. Lucy will be the first space mission to study the Trojan asteroids associated with Jupiter, that are thought to be remnants of the primordial material that formed the outer planets. Lucy will fly by and carry out remote sensing on six different Trojan asteroids. The mission takes its name from the fossilized human ancestor (called “Lucy” by her discoverers) whose skeleton provided unique insight into humanity's evolution. Likewise, the Lucy mission will revolutionize our knowledge of planetary origins and the formation of the solar system. L’Ralph is one of the instruments on Lucy and it is provided by the NASA Goddard Space Flight Center (GSFC). L’Ralph is a combined multi-band visible imager (the Multi-spectral Visible Imaging Camera, MVIC, 0.4-0.85 microns) and wedge-filter infrared spectrometer (Linear Etalon Imaging Spectral Array, LEISA, 1-3.6 microns). LEISA will allow the team to look for the absorption lines that serve as the fingerprints for different silicates, ices and organics that likely will be on the surface of the Trojan asteroids. MVIC will take color images of the Trojan asteroid targets, and help determine how active they are. This paper will focus on the Integration and Test (I&T) activities for L’Ralph while it is at the NASA GSFC. L’Ralph has two assemblies, the telescope detector assembly (TDA) and main electronics box (MEB). The TDA is a single telescope feeding two focal planes, MVIC and LEISA. L’Ralph integration consists of assembly and alignment of the telescope, electronics box integration, thermal systems integration and the final assembly and testing. This I&T phase will be followed by the L’Ralph calibration and characterization, environmental tests which include electromagnetic interference (EMI)/electromagnetic compatibility (EMC), vibration with sine sweep, acoustics, shock, thermal balance, thermal vacuum, mass properties and center of gravity determination. This paper will briefly discuss L’Ralph shipment and delivery to the spacecraft vendor for observatory level I&T as well as some launch preparation activities.

Spaceflight Instruments↗

SEE and TID of emerging non-volatile memories

We report on the SEE and TID tests of higher density flash memories. Stand-by currents and full functional tests were used to characterize the response of radiation effects.

single-event upset non-volatile memories↗

Flight Readiness of Mochii ISS-NL Portable Spectroscopic Electron Microscope

Electron microscopes (EM’s), are workhorse tools serving diverse fields such as materials science, biological science, and engineering. Scanning EM’s (SEM’s) in particular enable high magnification study and pinpoint chemical analyses of structures down to the nanoscale by providing a powerful blend of strong optical scattering, high native resolution, large depth of focus, and energy-dispersive X-ray spectroscopy (EDS). Mochii is the world’s smallest production electron microscope, scheduled to travel to the International Space Station (ISS) this spring where it will serve as an ISS National Laboratory (ISSNL) microgravity facility on successful demonstration. We previously reported on progress preparing Mochii for space flight, in particular flight integration verifications and science application testing. These included standard integration testing such as electromagnetic interference and flight vibration, and extend to unique functional testing such as magnetic susceptibility and extreme analog environment testing under the sea. Presently, Mochii payload flight hardware has completed testing and was handed over to NASA’s ISS payload processing facility in Houston. It will make its way to the the east coast for launch currently scheduled on Space-X CRS-20 for Mission increment 62 in March 2020.

Own, C. S.↗