Search NASASearch

SEARCH · Search NASA

Results for “NESDPS Office of Nuclear Energy Space and Defense Power Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,786 records · Page 10

STANDARD REFERENCE MATERIAL CHARPY TESTING FROM HIGH FLUENCE SURVEILLANCE CAPSULE

The Palisades Nuclear Generating Station included in its original surveillance program a surveillance capsule, designated A-60. The capsule was removed from its surveillance position in early 1995 and has been resident in the spent fuel pool since that time. It was harvested to perform characterization of surveillance specimens in this capsule in 2023. This capsule was irradiated to a fluence of 1.96x1020 n/cm2 (E> 1MeV) that is equivalent for more than 150 effective full power years for the current US reactor pressure vessel (RPV) fleet. This capsule contained several materials, including Charpy specimens of standard reference material (SRM) from Heavy-Section Steel Technology (HSST) A533-B Plate 01. To perform Charpy testing of this highly irradiated material, the new Charpy specimen transfer system was designed and implemented on Charpy impact testing machine in the hot cell to accommodate remote testing of these specimens. This new transfer system includes integrated environmental chamber to cool or heat Charpy specimens to the desired temperature. Testing of this highly irradiated material revealed very large shift of Charpy transition temperature, 188oC.

Sokolov, Mikhail [ORNL] (ORCID:0000000256373346)

Power and particle exhaust in the ST-E1 fusion power plant

Power exhaust challenges and potential solutions for a 5 m major radius, low-aspect ratio burning tokamak have been explored. 1D edge plasma models have been used to screen for access to detachment using short and long outer divertor legs in double and single null configurations, using Ar as the primary impurity and assuming tungsten plasma-facing components (PFCs). These show that detachment access can be accessed for all but the most conservative assumptions on scrape-off layer (SOL) width and power, but that trade-offs will be required between magnet engineering and the size of the acceptable window of as-yet uncertain plasma parameters. SOLPS-ITER was used to further model selected plasma scenarios, confirming that Ar seeding can be used to achieve dissipative divertor scenarios with peak deposited heat fluxes below 15 MWm -2 . Initial scoping of first wall loads and positioning of limiters has been carried out, showing the feasibility of protecting the breeding blanket wall during steady state without impeding tritium breeding. Initial PFC technology selection is also presented, identifying this as a critical area where further work is needed to find an attractive solution for helium-cooled PFCs that can handle high heat fluxes without excessive power requirements. Key questions and trade-offs for concept development have been identified, including: how to achieve high radiation for reduction of SOL power without core performance degradation; whether power exhaust can be well-controlled in a double null plasma; mechanical design and materials challenges of high-heat flux PFCs; and control of material erosion, redeposition and tritium retention.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Nanohybrid of Cu2O-Ti3C2Tx as a Silver-Free MXene Sorbent for Iodine Gas Capture from Nuclear Waste

The capture of volatile radioiodine from nuclear fuel reprocessing off-gas streams remains a critical challenge due to the high volatility, long half-life of 129I, and biological uptake of iodide from the environment. Although silver-based sorbents provide strong iodine chemisorption, their high cost and regulatory classification as mixed radioactive-hazardous waste motivate the development of alternative materials. Here, we report a silver-free Cu2O-Ti3C2Tx MXene hybrid for iodine gas capture at 150 °C. Structural and compositional analyses confirm the formation of Cu2O nanoparticles on Ti3C2Tx nanosheets and their subsequent conversion to thermodynamically stable CuI upon static iodine gas exposure, achieving an iodine mass loading of up to 1115 mg/g. These results demonstrate the potential of Cu2O-Ti3C2Tx MXene as a copper-based alternative to silver sorbents for elevated-temperature iodine gas capture.

iodine gas capture

Storing Affordability: Battery Storage as an Asset to Reduce Data Center Cost Shifts

This report examines how battery energy storage systems (BESS) can help utilities accommodate large load growth while protecting affordability for existing ratepayers. Rapid growth in electricity demand from artificial intelligence (AI) data centers is straining the U.S. grid. Furthermore, many new data centers are entering rural markets, which could offer economic benefits but may also pose implementation challenges for smaller utilities. At the same time, retail electricity prices are increasing faster than inflation, elevating customer affordability as a key challenge. While data centers have not been the primary driver of increases in residential prices to date, they have pushed wholesale energy and capacity prices higher in several markets. Fundamental utility cost-allocation principles show that data center growth can be rate-positive for existing customers only if new peak demand grows faster than the costs a utility must incur to serve it. Several factors, including a utility’s degree of wholesale market exposure, forecast uncertainty and stranded-asset risk, and tariff design can determine the outcome of load growth on retail rates. Energy storage can make several affordability contributions in the face of this landscape of uncertainty and market volatility, including deferral of higher-cost grid investments through improved utilization of existing assets and flexibility of new large loads, insulation from volatile wholesale prices through peak shaving, and reliability support to address grid risks stemming from the behavior of AI data center loads. Different potential BESS deployment pathways—utility-scale front-of-the-meter systems, aggregated small-scale storage installations, and data center-sited behind-the-meter storage—are compared against each other and against conventional capacity alternatives. This framework is intended as a conceptual resource to utilities, particularly smaller public utilities with rural service territories, who may be considering the role that energy storage can play in insulating existing ratepayers from data center cost shifts.

25 ENERGY STORAGE

A Technical Evaluation of Self-Protection Dose Rates in U.S. Domestic Nuclear Security Policy

U.S. nuclear security policy uses radiation self-protection as a basis for reducing material attractiveness, but existing dose-rate criteria may not reflect the time scales of theft or sabotage. This report evaluates whether the commonly cited 1 Gy/h at 1 m criterion can plausibly cause adversary task failure during short-duration malicious acts.

Fritchie, Jacob Wesley [Sandia National Laboratori

Utility Experience with Inverter Based Resource Impacts on Transmission Protection

High penetration of inverter-based resources (IBR) can adversely affect the transmission protection schemes in the area. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems because the existing system has been designed based on the fault current response of conventional rotating-machine-based generators. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This report identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. It includes a broad review of all challenges that system protection has experienced so far with high penetration of IBRs. Key issues have been identified based on a survey of different utility protection engineers. Finally, fault event recordings are shown to demonstrate some actual cases of mis-operations of relays near IBRs.

24 POWER TRANSMISSION AND DISTRIBUTION

Divergent trait controls on soluble sugars and starch underlie global strategies of tree carbohydrate storage

Nonstructural carbohydrate (NSC) stores buffer tree metabolism, osmotic regulation, and defense, thereby mediating tolerance and survival under climate extremes. Yet, the functional and evolutionary determinants of interspecific variation in NSC remain elusive, limiting understanding and prediction of forest carbon allocation and mortality under global change. Here, we present a cross-species synthesis of NSC concentrations across multiple organs for 281 woody species from 102 mixed forest communities worldwide, where we quantified species-specific deviations from community means to disentangle intrinsic trait effects from environmental and methodological variation. We found phylogenetic signals in NSC deviations, with coniferous gymnosperms and evergreen species consistently maintaining lower stem soluble sugars and starch concentrations than co-occurring angiosperms and deciduous species, respectively. A global pattern emerged where greater stomatal sensitivity to leaf water potential was associated with declines in the relative concentrations of both sugars and starch. In contrast, xylem hydraulic safety traits showed weak and organ-dependent relationships with NSC concentrations. Sugars increased with photosynthetic capacity and declined with wood density, whereas starch showed the reverse pattern, which aligned with the distinct functional-metabolic roles of sugars and starch. By integrating trait-based ecology with a community-centered framework, our study provides global evidence that stomatal regulation, photosynthetic capacity, specific leaf area, and wood density jointly govern interspecific NSC variation, through contrasting effects on sugars and starch. These are among the most broadly measured traits globally, thus the emergent carbohydrate–trait relationships can have broad applications toward understanding and predicting forest growth and survival under climate change.

tropic system

Single-Nucleon Transfer on Unstable 59 Cu Probes the NiCu Cycle in Astrophysical X-Ray Bursts

Recent models of the rapid proton (𝑟⁢𝑝) capture process indicate that a competition between the 59 Cu⁢(𝑝,𝛾) ⁢60 Zn and 59 Cu⁢(𝑝,𝛼) ⁢56 Ni reactions may result in the formation of a nickel-copper (NiCu) cycle that traps the flux of material between 56 Ni and 60 Zn . Here, in this work, we report the identification of 15 proton-unbound levels in 60 Zn , populated via 59 Cu⁢(𝑑,𝑛) transfer, which govern the rate of the 59 Cu⁢(𝑝,𝛾)⁢ 60 Zn reaction in XRBs. Precise excitation energies for levels in 60 Zn were obtained from observed 𝛾 decays, and spectroscopic factors were determined from angle-integrated cross sections. Incorporating these results into stellar-model calculations, we find that with experimentally constrained uncertainties a NiCu cycle in XRBs is indeed possible, though we limit its branching strength to less than 38%. While modest, such a branching has significant impact on the light curve, motivating further studies of the relevant rates. Our calculations also indicate that a significant NiCu cycle leads to an increase in the amount of odd-𝐴 nuclei in the burst ashes, which may affect Urca cooling processes in neutron star crusts.

direct reactions

Effect of magnetic fields on Urca rates in neutron star mergers

Isospin-equilibrating weak processes, called “Urca” processes, are of fundamental importance in astrophysical environments like (proto-)neutron stars, neutron star mergers, and supernovae. In these environments, matter can reach high temperatures of tens of MeVs and be subject to large magnetic fields. We thus investigate Urca rates at different temperatures and field strengths by performing the full temperature and magnetic-fielddependent rate integrals for different equations of state. We find that the magnetic fields play an important role at temperatures of a few MeV, especially close to or below the direct Urca threshold, which is softened by the magnetic field. At higher temperatures, the effect of the magnetic fields can be overshadowed by the thermal effects. Finally, we observe that the magnetic field influences the neutron decay rates more strongly than the electron-capture rates, leading to a shift in the flavor equilibrium.

electroweak interactions in nuclear physics

Time-dependent scenario modeling for the ST-E1 fusion power plant

ST-E1 is a low aspect ratio fusion power plant being designed by Tokamak Energy targeting 1.5 GW of fusion power. Characterization of the ST-E1 flat-top scenario is described elsewhere McNamara et al (2026 Nucl. Fusion 66 086008); here we focus on addressing the question of how to ramp-up the ST-E1 plasma from an initial state following breakdown and flux-surface formation to the target flat-top state. Being low-aspect ratio, the available solenoid flux of ST-E1 is limited. Therefore, particular consideration is placed on developing ramp-up scenarios that predominantly use inductive flux provided by external vertical field coils. Through time-dependent modeling with METIS, we show that this is possible when the ramp-up is performed at relatively high plasma density: although auxiliary current drive efficiency is reduced, this is significantly outweighed by (1) higher electron-ion collisional equilibration, (2) higher fusion power once ions become sufficiently hot, (3) higher poloidal beta for increased vertical-field flux, and (4) potentially favorable exhaust compatibilities. Ultimately, we show the target ST-E1 flat-top performance can be reached after a ramp-up period lasting 150 s using less than 40 Vs of solenoid flux (with vertical field providing ∼ 90 Vs of flux). The sensitivity to model assumptions are presented, with the general observation that deleterious effects can be mitigated through minor alterations of the auxiliary power temporal waveform and/or total auxiliary power level. The impact of a solenoid and the auxiliary power mix (electron cyclotron heating only versus electron and ion cyclotron heating) on the ST-E1 ramp-up success are also discussed in appendices. On this latter topic, we show that the effect of direct-ion heating during ramp-up is obscured by the uncertainty in the pedestal dynamics, identifying a clear line of future work required to make a definite decision on the ST-E1 auxiliary power mix.

current ramp-up

Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.

24/7

Exceedance Probabilities and Recurrence Intervals for Extended Power Outages in the United States

This report provides estimates of recurrence intervals and conditional exceedance probabilities for major power outages by U.S. region between 2015 and 2021. Additionally, we provide estimates for grid management, particularly outages caused by California’s public safety power shutoffs (PSPS), and for natural outages caused by major hurricanes. Outage recurrence intervals are the average number of years between outage events, and conditional exceedance probabilities are the likelihoods that a customer who experiences a major power outage will experience an outage exceeding a given duration. Major outage events are those that affect 10,000 or more customers, as defined by the U.S. Department of Energy’s (DOE’s) Electric Emergency Incident and Disturbance Report, called OE-417 (DOE 2020). These results can be applied to determine the likelihood of experiencing long-duration outages, which can be integrated into cost-benefit analyses of resilience solutions and broader energy resilience studies.

Ericson, Sean [National Renewable Energy Laborator