Search NASA⌕ Search

SEARCH · Search NASA

Results for “interrupt”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

Update on Construction Planning for the Bulgarian Low and Short-Lived Intermediate Level Radioactive Waste Repository - 16159

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for low and short-lived inter-mediate level radioactive waste, the National Disposal Facility (NDF), at the Radiana Site adjacent to the Kozloduy Nuclear Power Plant (KNPP). This paper presents an update on construction planning activities that were originally presented at the 2015 Waste Management Conference. The Site, a rectangular area approximately 1.2 km east-west by 0.4 north-south, is located on a slopping area between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. Construction of the NDF will be divided into three phases separated by approximately 20 years each. The first phase will see the construction of the primary support facilities, referred to as the Auxiliary Buildings and including the Waste Reception and Buffer Storage (WRBS) Building, and the first set of 22 reinforced concrete disposal cells and supporting infrastructure, including a network of subsurface observation galleries, the Infiltration Network Control (ICN) Galleries. Each disposal cell will be 20.15 m long by 17.05 m wide by 9.45 m in height. The disposal cells will be arranged in two parallel rows. Disposal activities will be conducted using overhead cranes installed inside of track mounted mobile roofs. Each row of disposal cells will be serviced by one mobile roof. The mobile roofs will be supported by massive concrete foundations. Construction at the site will present several logistical challenges that will need to be overcome to fully realize the NDF. First in order to begin construction of these facilities nearly 1 million m{sup 3} of soil will require excavation and handling. Consistent with requirements to minimize potential environmental impacts identified in the site Environmental Safety Assessment (EIA) excavated soil will, to the extent possible, remain onsite. Approximately three quarters of the soil can be accommodated within the site boundaries. Another challenge results from requirements imposed by the ground conditions. The sub-grade at the site, which consists primarily of loess, will require considerable improvement. To this end a 5 m thick loess-cement cushion will be constructed across much of the site. Specifically, the cushion will be required beneath the disposal cells and the WRBS Building. The cushion beneath the disposal cells also contains embedded structures, including the ICN Galleries as well as the massive concrete foundation beams required for the two mobile roofs. Construction of these structures will require planned interruptions in the construction of the loess-cement cushion. Specific cement types and strict quality requirements will be required for completion of the loess-cement cushion as well as for the completion of the ICN Galleries. The construction planning will need to account for the large volumes of soil to be excavated as well as ensuring sufficient material supplies in terms of both quality as well as quantity. Large quantities of materials including both dry cement for mixing with the loess, and wet concrete for pouring of the mobile roof foundations are ac-counted for by the plan. However, even after completion of these activities additional challenges are addressed by the plan related to the contemporaneous construction management of the auxiliary buildings and the disposal cells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Organization Change: Leadership Speaks the Future, Management Makes It Happen - 18462

Implementing an organization change is challenging, because many changes touch unexpected organizational units and processes, requiring unplanned inter-group communications and collaboration. Organization change communications can be designed to engage people, and to coordinate their actions for a successful change completion. Leadership communication focuses on presenting the idea for an organization change as a purposeful and worthwhile process that will deliver benefits to the organization and its customers and stakeholders. A series of discussions with personnel to clarify the change objectives, success metrics, and timelines serve to engage them in productive participation in the change process. Management communication ensures that the actions taken will be effective to accomplish the intended results and benefits of the change. The depth, detail, and orientation of the information delivered in these three types of communication is different, but the intention, in all cases, is to have people work together to successfully complete the goal(s) of the change. An example of these communications is included in this paper, focusing on the communications of a change leader. Change leadership communications are usually delivered by high-level people but can be delivered by individuals at any level. They speak a vision for a possibility, i.e., a new future, in a way that engages people in its value and desirability. The shift from change leadership communications to change management communications is best made as a collection of dialogues with groups of people who will be leading, managing, supporting and/or participating in various aspects of the change. These dialogues take several forms, including Q and A sessions, dialogues to clarify what 'success' will look like, and discussions that develop management tools and practices for the change. These 'engagement' discussions create a bridge from leadership vision to management implementation. Change managers often head up departments, teams, or smaller groups. Their communications are designed to have group members participate in refining the change goals into team goals, measures, and assignments; collaboration with key players; and tracking and updating elements of the change process as it progresses toward completion. This work is often more daunting than the leadership phase, due to forces of increasing detail, complexity, and disorganization over time, such as unexpected interruptions, changes in resources, and new requirements for coordination. (authors)

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Optimization of Backfill Material Transport for the Future Belgian Geological Disposal Facility - 19071

In Belgium, long-lived, low- and intermediate level waste (B waste) will be conditioned in concrete monoliths B and high-level waste (C waste) in so-called Supercontainers (SC). It is planned to dispose of the waste packages in a Geological Disposal Facility (GDF). The B and C waste shall be disposed of each in one emplacement field at a depth between 200 m and 600 m below the surface. Two access galleries run through each field and connect the disposal galleries with a central shaft and support zone. After the emplacement of a specified number of waste packages, a stepwise backfilling of the voids is planned in order to stabilize the galleries, to limit the amount of voids, and to ensure a favourable chemical environment. Taking into account the objectives of backfilling and the specific material properties of the waste packages two mortars were developed to backfill the disposal galleries. In particular, for reasons of safety at work, the mortars should be hydraulically pumped through pipelines. Accordingly, in any case, it is necessary to operate storage facilities of the raw materials, a mix plant and a pump. The raw materials are foreseen to be supplied by trucks from external producers. Due to this fact, the better accessibility of the plants and with the aim of minimizing noise and dust emissions and the space for technical systems in the GDF, it is advisable to install the technical equipment above ground outside the GDF control area. However, the feasibility of this basic concept depends on the processing time of the backfill materials and the capacity of the transport system. Thus, although short transport times can theoretically be realized if pipelines with a small cross sections are chosen, in this case the required power of the pump increases significantly. If no suitable configuration can be found, the distance of the mixing and pumping system to the backfill segment has to be shortened. In this case a pneumatic conveyor system would have to be installed to transport the solids to a mix plant and pumping unit located in the underground galleries to be able to meet the desired backfill rates. In order to identify the optimum solution, the decision criteria and the advantages and disadvantages of existing and planned transport systems were evaluated. The investigations showed that it is technically feasible to pump the backfill material from above ground into the disposal galleries. As failures of the backfill system would result in interruptions of the general disposal operation, a redundant pump and pipeline system was developed. The two lines can be operated separately or simultaneously in order to realize high flow rates needed for the backfilling of segments far from the shaft. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

96 Park Way Vicinity Property Remediation Challenges at the FUSRAP Maywood Superfund Site, Maywood, New Jersey - 19216

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS), 'the Project,' was transferred to the US Army Corps of Engineers (USACE) in 1997. Shortly thereafter, USACE initiated FUSRAP remediation efforts on 24 commercial and residential properties and, in addition, the Project team evaluated properties previously addressed at the FMSS. One of those properties was located at 96 Park Way in Rochelle Park, New Jersey. The property history included removal of contaminated soil in 1985 by the US Department of Energy (US DOE). Soil sampling performed after removal of contaminated soil indicated the cleanup met applicable guidelines in place at the time. A Five-Year Review of the FMSS conducted by the US Environmental Protection Agency (USEPA) in 2009 found that 96 Park Way did not meet the current residential cleanup levels for the site and recommended additional study and remediation, if warranted. The current levels are established in the approved cleanup plan for the FMSS (known as the Record of Decision [ROD]) issued in 2003. Based on USEPA's recommendation, USACE carefully reviewed all available records for the property. The review considered the differences between the soil cleanup standards used in the 1980's and the 2003 ROD standards, which are slightly more restrictive for deeper soils. The USACE conducted detailed field studies at 96 Park Way in 2014-15 to address the USEPA findings. This work included gamma walkover surveys and soil sampling to depths of approximately 3.5 meters. The results identified three discrete areas at depth that did not meet the ROD residential soil cleanup standard: two areas bordering an adjacent highway (New Jersey Route 17) and one along railroad property adjacent to the site. To address these areas, soil removal actions were conducted in 2016-17. The principal challenge with construction, engineering, and community relations was the property housed two sensitive facilities: a long-term assisted care living facility and a short-term post-surgery rehabilitation center. The operations at these facilities could not be interrupted in any way during FUSRAP activities. The three FUSRAP-impacted areas were addressed and restored in coordination with the USEPA, property management, and local officials. Site restoration presented a particular challenge well after the remedial action was completed, as the property owner and the government disagreed on the level of restoration. Those negotiations are ongoing as of this writing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Career Development through Discreet Simulation Modeling - 19009

The cleanup mission of the Department of Energy (DOE) Office of River Protection (ORP) at the Hanford Site is to immobilize 212,000 m3 (56 million gallons) of nuclear waste, currently stored in 177 underground tanks, at the Waste Treatment and Immobilization Plant (WTP) and associated supplemental treatment facilities. Waste transfers to and from the WTP utilize the intricate Hanford Waste Feed Delivery (WFD) system, a network composed of: double-shell tanks (DSTs), single shell tanks (SSTs), the effluent treatment facility (ETF), a large number of pumps, valves, and leak detectors, and thousands of feet of underground transfer lines. This equipment must be prepared to safely and reliably transfer waste to the WTP. This study used discrete event simulation modeling to explore the behavior of the waste transfer system to identify areas of improvement. Two models and their subsequent results are presented: the Effluent Treatment Facility and the next-to-be-retrieved single-shell tanks (A/AX Farms). This study focused on identifying throughput bottlenecks, operational constraints, choke-point analysis, and redundancy in equipment, process design, and operational strategy. Analysis performed on the ETF OR Model indicated that the existing facility operation strategy will not result in a sufficient throughput to prevent WTP melter idling. Furthermore, in the absence of equipment failures, the facility was still shown to be unable to reach the required throughput to prevent melter idling. It is concluded that ETF system maintenance events are currently the main bottlenecks in the ETF facility. Analysis performed on the SST (A/AX) OR model indicate that the main drivers of the retrieval schedule are the hard retrieval start dates for each SST tank. In addition, it was concluded that operating the ventilation trains in parallel results in 15 times less retrieval interruptions and shortens the retrieval durations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Component Testing Supporting SHINE Medical Technologies

SHINE is going to be implementing a tritium gas processing system to support their Mo-99 work. They have requested that the Hydrogen Process Group of SRNL does some required testing on the system components before startup. The lab plans on conducting both seismic and valve testing. Test Plan: - Testing 10 1C valves 750,000 cycles or until failure; - Testing intervals will be every couple thousand; - 1C valves will have metal stem tips instead of Polymer due to being in a tritium prone area; - Hope that the valves will still have enough force to create a sufficient seal with metal stem tips; - Goal is for a more cost and space efficient alternative to the 5C valves. Status: - Received half the parts, waiting on the other half due to long procurement times; - Waiting on the LabVIEW program which will perform the testing. Path Forward: - R and DE to change out the stem tips (July 2018); - Assemble Manifold (July 2018); - Perform Testing (August 2018); - Report (September 2018). Since SRNL does not own a shaker table, the test will be conducted at a facility like the NTS Facility in Huntsville, Alabama. Test Plans: - Leak Testing; - Use LabVIEW to monitor for leaks before, during and after seismic testing with an Electronic Pressure Transducer; - If leak is detected, sniff for location using Helium Leak Detector; - Connector Testing; - Use LabVIEW to test for electrical continuity before, during and after seismic testing; - If a connectors continuity is interrupted, further testing will be performed; - Each Pin in faulty connector will be testing to determine specific location of disruption. Path Forward: - Pick a Qualified Vender for testing (July 2018); - Procure the connector plugs (July 2018); - Send components and test plan to facility for testing (August 2018); - Perform Testing (August-September 2018); - Report Results (September 2018)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and Preparation of SiC-ZrC Composite Coating Layers by FB-CVD Used in TRISO Coated Fuel Particles - 18417

Tri-structural-isotropic (TRISO) particle has been successful in high temperature gas cooled reactor (HTGR), but an improved design is required for future development. In this paper, two alternative designs of TRISO particle are proposed by introducing ZrC to the coating layers. One design is to add an individual ZrC layer between the inner PyC layer and the SiC layer. Another design is to construct a periodic coating layer with the repeated sequence of SiC/SiC-ZrC by doping pulsed ZrCl{sub 4} at proper time intervals during the SiC preparation process. The designed coating layers were successfully prepared on the ZrO{sub 2}/buffer/IPyC particles by the fluidized bed chemical vapor deposition (FB-CVD) method. Microstructures and characterizations of the composite coating layers were given based on XRD, SEM, EDX and Raman scattering analysis. By controlling the pulse parameter, the grain size of SiC is significantly decreased which means doping ZrCl{sub 4} can interrupt normal growth of SiC crystals. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗

Real-time Anomaly Detection at the L1 Trigger of CMS Experiment

We present the preparation, deployment, and testing of an autoencoder trained for unbiased detection of new physics signatures in the CMS experiment Global Trigger (GT) test crate FPGAs during LHC Run 3. The GT makes the final decision whether to readout or discard the data from each LHC collision, which occur at a rate of 40 MHz, within a 50 ns latency. The Neural Network makes a prediction for each event within these constraints, which can be used to select anomalous events for further analysis. The GT test crate is a copy of the main GT system, receiving the same input data, but whose output is not used to trigger the readout of CMS, providing a platform for thorough testing of new trigger algorithms on live data, but without interrupting data taking. We describe the methodology to achieve ultra low latency anomaly detection, and present the integration of the DNN into the GT test crate, as well as the monitoring, testing, and validation of the algorithm during proton collisions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Serial communication tapping and transmission to routable networks

Apparatuses and methods for tapping serial communications and transforming the serial data into a format appropriate for routable networks are significant for purposes of security and troubleshooting, especially in critical infrastructure networks. Communication taps should be completely passive such that any failure would not interrupt the serial communications. Furthermore, automatic determination of unspecified serial protocol frames allow general implementation across various networks, or across devices within a single network, without the need to customize for each implementation.

Edgar, Thomas W.↗

A Generic FSC Wind Park EMT Model with IEEE Std 2800-Compliant Fault Ride-Through Capability

The modern power grid is seeing more and more electricity come from renewable sources like wind farms, which use sophisticated power electronics instead of traditional spinning generators. To keep everything running smoothly and meet industry standards such as IEEE 2800, these systems need smart control strategies. In our work, we built a flexible computer model of a full-scale wind farm converter that can handle grid disturbances without shutting down. When a fault or storm hits, the model’s built-in logic automatically adjusts the currents it sends to the grid and protects its internal energy storage, ensuring the wind farm stays connected and doesn’t damage its own equipment. Once the disturbance clears, the model restores normal operation seamlessly, so there’s no long interruption in power delivery. At the same time, it carefully regulates the voltage where the wind farm ties into the larger grid, helping to maintain safe voltage levels across the network. Our simulations show that this control setup not only meets all the requirements of IEEE Standard 2800 but also allows the wind farm to recover quickly and predictably, keeping the lights on no matter what happens on the grid.

17 WIND ENERGY↗

Power Quality and Load Capacity Evaluations of an Electric Vehicle for Multi-Robot System Applications

This paper evaluates the capability of a fully electric pickup truck, using the Ford F-150 Lightning as an example, to provide power to the circuit of a multi-robot system. The case study was conducted on a simulated INL Autonomous Pit Exploration System (APES) designed for the inspection of nuclear waste tank pits. Through a series of controlled tests, the vehicle’s power delivery consistency, load-handling capability, and battery performance were assessed under various conditions. First of all, the load test demonstrated that the vehicle provided stable power with low distortion and no unexpected interruptions. Second, during the operational limit test, the 240V system sustained loads up to 7.4 kW before tripping, providing insights into its operational limits. Last but not least, during a simulated full-scale APES operation, the vehicle’s battery depleted by only 6% over an hour, indicating sufficient capacity for extended use while retaining reserve power for transportation needs. This study highlights the potential of electric vehicles as reliable power sources for field operations, contributing to the advancement of sustainable technologies by reducing reliance on traditional fossil fuel generators and promoting the integration of clean energy solutions in remote and challenging environments.

Electric vehicle↗

IEEE SusTech 2025 Presentation

This paper evaluates the capability of a fully electric pickup truck, using the Ford F-150 Lightning as an example, to provide power to the circuit of a multi-robot system. The case study was conducted on a simulated INL Autonomous Pit Exploration System (APES) designed for the inspection of nuclear waste tank pits. Through a series of controlled tests, the vehicle’s power delivery consistency, load-handling capability, and battery performance were assessed under various conditions. First of all, the load test demonstrated that the vehicle provided stable power with low distortion and no unexpected interruptions. Second, during the operational limit test, the 240V system sustained loads up to 7.4 kW before tripping, providing insights into its operational limits. Last but not least, during a simulated full-scale APES operation, the vehicle’s battery depleted by only 6\% over an hour, indicating sufficient capacity for extended use while retaining reserve power for transportation needs. This study highlights the potential of electric vehicles as reliable power sources for field operations, contributing to the advancement of sustainable technologies by reducing reliance on traditional fossil fuel generators and promoting the integration of clean energy solutions in remote and challenging environments.

42 - ENGINEERING↗

Automating Testing of DUNE Electronics via a Finite State Machine

The Deep Underground Neutrino Experiment (DUNE) is a flagship international collaboration designed to study neutrinos—tiny, nearly massless particles that may hold answers to fundamental questions about the Universe. Fermilab’s Robotic Test Stand (RTS) plays a critical role in ensuring the quality of approximately 50,000 Application-Specific Integrated Circuit (ASIC) chips that will be used in DUNE’s massive liquid argon detectors. These electronics will be inside the cryostat; therefore, they will need to have a high yield of working chips and low noise. To improve the automation and reliability of the RTS, this project focused on designing and implementing a Python-based finite state machine (FSM) to manage chip handling workflows. The FSM was developed as a modular software framework to coordinate robotic arm movements, manage chip tray positions, and monitor system states during testing. Key features include robust error handling routines, a pause/resume system for safe mid-cycle interruptions, and a simulation mode for iterative testing without hardware dependencies. The system was designed to prepare for seamless integration with RTS hardware components such as the robotic arm and vision system. This integration will streamline collaboration and enable efficient deployment of updates across the six institutions performing testing. The outcomes of this internship contribute to Fermilab’s mission to advance high-energy physics and support the DOE’s national goals by directly improving the testing of equipment to be used in DUNE. The project also provided valuable experience in software design and contributing to the success of DUNE.

Kang, Caleb [Fermilab]↗

Cost of convenience in long-dwell public electric vehicle charging

This paper presents a comprehensive methodology for quantifying trade offs between the cost of charging at public Level-2 charging stations and the inconvenience of using those stations. The paper also includes a methodology for generating synthetic travel itineraries of tens of thousands of drivers and for sizing and placing charging infrastructure to support those itineraries. Inconvenience is quantified by a weighted sum of the time a driver spends traveling between their intended destination and the charging station; weights are derived from the activity interrupted by the driver’s need to move their car. We demonstrate a trade off between cost of charging and inconvenience by varying how far away from their destination drivers are willing to charge. Our results demonstrate the importance of access to stations and suggest that other methods for increasing access, such as increasing the spatial density of stations, could significantly impact charging cost and inconvenience. Moreover, average energy cost may be reduced by introducing managed charging, which also affects inconvenience. The framework presented here can be used to evaluate the overlapping effects of both access and charge management. Furthermore, the framework can be easily extended to include additional factors such as capital costs, enabling thorough evaluation and planning of regional Level-2 charging networks.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Creating a Training Dataset for Semantic Segmentation of Canal Networks for Irrigation Modernization

Canal infrastructure has provided critical irrigation water to the western United States for over a century. To continue providing vital water resources to the semi-arid West, irrigation systems must undergo maintenance and modernization. Many canal companies are resource-constrained, and because funding opportunities often require detailed knowledge of existing infrastructure, they can struggle to secure financial capital. We address this problem by creating training data for a semantic segmentation deep learning model to map canal networks throughout the western United States. To create a diverse and robust training dataset, we labelled 1-m NAIP imagery with the locations of no canals, wet canals, and dry/vegetated canals. Since creating these datasets is time consuming, we first developed a preprocessing methodology to identify canals within our four study areas. We used NAIP imagery and provided canal centerline data to buffer, standardize, and cluster the imagery, automating the labeling process as much as possible. However, this still required manual cleaning and manual classification of canal type. Challenges arose when canals were interrupted (e.g., road culverts or piped sections) or when nearby features shared similar characteristics (e.g., irrigated fields, trees, and shadows). Combining automated preprocessing with manual refinement produced four detailed canal masks to be used in the semantic segmentation model developed by Richard Tapia.

13 - HYDRO ENERGY↗

Integrating AI Data Centers with the Power Grid

The rapid expansion of artificial intelligence (AI) has triggered an unprecedented surge in electricity demand, with US data center energy use projected to double or triple 2023 levels by 2028. This exponential growth places strain on grid infrastructure, which can hinder timely construction of desired computing capacity. To bridge this supply-demand gap, utilities and AI developers are increasingly turning to demand flexibility, a strategy that incentivizes shifting or reducing power use during peak periods of grid stress. Data centers are uniquely equipped for flexible operations due to their digital workloads, built-in redundancy, and onsite energy assets. This article outlines four primary mechanisms to enable data center flexibility: computational load flexibility (shifting tasks temporally or geographically), flexible use of core facility infrastructure adjustments, energy storage utilization, and onsite electricity generation. To encourage adoption, utilities are deploying new tariff designs, including voluntary interruptible service riders, mandated flexibility requirements, and streamlined interconnection processes for flexible loads. For the highly capitalized and rapidly growing AI industry, the primary motivators for embracing these strategies are expediting facility interconnection, satisfying emerging regulatory mandates, and mitigating community resistance. While demand flexibility cannot substitute the long-term need for new bulk power generation, it serves as an essential, immediate solution for enabling near-term deployment. By transforming data centers from grid stressors into stabilizing assets, flexible operations can ensure reliable grid integration, ease market pressures, and support a resilient power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SEARCH FOR A RELIABLE STORAGE ARCHITECTURE FOR RHIC.

Software used to operate the Relativistic Heavy Ion Collider (RHIC) resides on one operational RAID storage system. This storage system is also used to store data that reflects the status and recent history of accelerator operations. Failure of this system interrupts the operation of the accelerator as backup systems are brought online. In order to increase the reliability of this critical control system component, the storage system architecture has been upgraded to use Storage Area Network (SAN) technology and to introduce redundant components and redundant storage paths. This paper describes the evolution of the storage system, the contributions to reliability that each additional feature has provided, further improvements that are being considered, and real-life experience with the current system.

43 PARTICLE ACCELERATORS↗

Refine your search to explore more results.