DC-DC Boost Converter Prototype for Battery Energy Storage Integration in the Medium Voltage Grid
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
UL Solutions produced this report as a summary of a test series executed at Sandia National Laboratories that they funded. This report was approved for release by UL Solutions in October 2025 and released in 2026 on their website at https://www.ul.com/insights/methods-and-recommendations-large-scale-deflagration-testing-battery-energy-storage-system.
Abstract not provided.
A combined day-ahead (look-ahead) and real-time optimization approach is proposed to schedule BESS real and reactive power dispatch. The look ahead scheduling agent maximizes profit and essentially performs the function of energy arbitrage by looking at forecasted prices, network constraints and BESS operating conditions to generate real power dispatch schedule. While this schedule is followed, the real time optimization agent computes an optimum reactive power set-point (for a particular objective function) using optimal power flow framework. The concepts are implemented by co-simulating legacy tools and demonstrated on a large real world distribution system. In addition to the profits from energy arbitrage, optimum reactive power set point computation results in achieving desirable network attributes like flat voltage profiles and minimizing voltage deviations from desired value.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Recent commitments by the Biden administration have established targets to achieve a net-zero energy system by 2050. Meeting these targets will spur a rapid transition to clean energy technologies and a commensurate need to develop and deploy energy storage technologies at scale. Pumped Storage Hydro (PSH) is expected to be part of this solution because its ability to provide grid flexibility and stability and enable the dispatching of disparate variable renewable energy technologies. Despite PSH being a mature technology with a history of deployment dating back several decades, there is very little information on the greenhouse gas (GHG) implications of PSH as compared to other storage technologies. The objective of this project is to perform a full lifecycle assessment (LCA) of new PSH projects in the U.S. This LCA includes all project phases (resource extraction, construction, operation, maintenance, end-of-life). The functional unit for this study is 1 kWh electricity delivered by system to grid substation connection point and the estimated lifetime for our base case is 80 years. Data used in this study are based on over 30 potential PSH projects that are in preliminary planning phases and are represent a wide range of potential closed-loop PSH systems in terms of location, technology, and capacity. The project approach, data sources, and modeling assumptions have been informed by a technical review committee of stakeholders that include experts from academia, national and international government, industry, and utilities. The GHGs and energy return on investment (EROI) from PSH will be compared to other storage technologies (e.g., stationary battery storage). Results from this project will improve the PSH community's understanding of the environmental impacts and sustainability of new PSH projects and how PSH compares to other storage technologies. The approach used in this project relies on open-source programming. The analysis framework (source code and data) and will be made publicly available at the end of the project. In addition to reporting results for the base case, we will perform rigorous sensitivity analysis to identify the major drivers, understand impacts of different configurations, and future energy markets. Results from this project will be published in a suitable journal.
Abstract not provided.
While the field of wave energy has been the subject of numerical simulation, scale model testing, and precommercial project testing for decades, wave energy technologies remain in the early stages of development and must continuing proving themselves as a promising modern renewable energy field. One of the difficulties that wave energy systems have been struggling to overcome is the design of highly efficient energy conversion systems that can convert the mechanical power, derived from the oscillation of wave activated bodies, into another useful product. Often the power take-off (PTO) is defined as the single unit responsible for converting mechanical power into another usable form such as electricity, pressurized fluid, compressed air, and others. The PTO, and the entire power conversion chain (PCC), is of great importance as it affects not only how efficient wave power is converted into electricity, but also contributes to the mass, size, structural dynamics, and levelized cost of energy (LCOE) of the wave energy converter (WEC). Unlike wind and solar, there is no industrial standard device, or devices, for wave energy conversion and this diversity is transferred to the PTO system. The majority of current WEC PTO systems incorporate a mechanical or hydraulic drive train, power generator, and an electrical control system. The challenge of WEC PTO designs is designing a mechanical-to-electrical component that can efficiently convert irregular, bi-directional, low frequency and low alternating velocity wave motions. While gross average power levels can be predicted in advance, the variable wave elevation input has to be converted into smooth electrical output and hence usually necessitates some type of energy storage system, such as battery storage, accumulator super capacitors, etc., or other means of compensation such as an array of devices. One of the primary challenges for wave energy converter systems is the fluctuating nature of wave resources, which require WEC components to be designed to handle loads (i.e. torques, forces, and powers) that are many times greater than the average load. This approach requires a much greater PTO capacity than the average power output and indicates a higher cost. In addition, supporting mechanical coupling and or gearing can be added to the PCC to help alleviate the difficulties with transmission and control of fluctuating large loads with low frequencies (indicative of wave forcing) into smaller loads at higher frequencies (optimum for conventional electrical machine design) can quickly increase the complexity of the PCC which could result in a greater number of failure modes and increased maintenance costs. All of the previous points demonstrate how the PTO influences WEC dynamics, reliability, performance and cost which are critical design factors. This paper further explores these topics by providing a review of the state-of-the-art PTO systems currently under development, how these novel PTO systems are tested and derisked prior to precommercial deployment, and the evaluation metrics historically used to differentiate between PTO designs and how they can be improved to support control co-design focused development of wave energy systems.
Abstract not provided.
Explore the source record for details and available documents.
In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.
In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.
This study provides a comparative analysis of grid-connected PV-integrated battery storage at individual and community scales. The paper addresses the challenge of managing energy demand-generation mismatch by using a battery energy storage optimization algorithm, which minimizes operational costs while accounting for battery degradation. Also, this work introduces a broader evaluation basis that includes seasonal variability, grid exchange smoothness, and scalability across different battery capacities. Results show that community-scale storage more effectively dampens grid exchange power fluctuations and reduces system costs, particularly with moderate price differences between electricity buying and selling prices and low battery capacities. The paper also analyzes the impacts of static control versus cost-optimized battery system management. Here, it is shown that the gap in system costs between the cost-optimized and static control scenarios widens as the price difference increases.