Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation and Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

A K-band radiometer for the microwave weather project

The design of a K-band radiometer for use in the microwave weather project is discussed. The major components of the system, such as feedhorn, waveguide switch, and receiver assembly are described. The system will be installed at DSS 13 at Goldstone, California, when completed.

Wallace, K.↗

An Investigation of Assembly and Performance of a Resistoflex Dynatube 1/4 Inch Fitting

Installation of titanium (6Al-4V) threaded fittings on 1/4 in. tubing is sensitive to workmanship and to the state of repair of the installation tooling. Tooling with very slight out-of-specification imperfections produces less than optimum swaged fittings. A significant quantity of samples were fabricated and X-rays were used to determine the depth of swage. Joint performance was assessed through static and dynamic testing.

Ehl, J. H.↗

A very large space telescope for optical/UV astronomy

A concept is presented for a Ritchey-Chretien optical-UV telescope to be deployed in orbit using a preassembled segmented primary mirror of 8 meter aperture, carried into orbit inside the modified interstage of the Space Shuttle External Tank. Shuttle revisits allow major assembly tasks to proceed such as the installation of the light shield, fine alignment of the system and attachment of scientific instrument modules to the instrument adapter. Prime technology requirements for the VLST are assessed in this paper.

Nein, M. E.↗

DOE/NASA SIMS Prototype Solar System, no. 4. Part 1: Market analysis. Part 2: Modular manufacturing cost estimate

The findings of the IIT Research Institute (IITRI) market study of the SIMS Prototype System 4, a hot water (DHW) system are documented. The feasibility of prepackaging currently available solar heating components into modular subsystems for site assembly is addressed. A documented design and installation procedure and a performance test report were prepared. The potential markets and applications for this particular system in the nonfederal market are profiled by assessing the needs and requirements of potential users and specifiers, by characterizing the nature of the market and the competitive environment, by identifying the barriers to commercial acceptance, and by estimating the size of the potential market.

Source record↗

Internally Wrenching Nut

Less space needed for installation and removal. Nut for use with short bolts torqued with allen wrench. In contrast with standard hexagonal nuts, new nut requires no external wrench clearance on installation surface. Nut has many uses in assemblies where space is limited, especially in automotive and aircraft industries.

Cortes, R. G.↗

STS-108 Post Flight Presentation

The crewmembers of STS-108, Commander Dominic Gorie, Pilot Mark Kelly, and Mission Specialists Linda Godwin and Daniel Tani, narrate this video as footage from the mission is shown. The crew is seen flying into Kennedy Space Center, suiting up, boarding the Endeavour Orbiter, and during launch. Various mission highlights are seen, including the rendezvous with the International Space Station (ISS) and docking of Endeavour, the unloading of the Multipurpose Logistics Module (MPLM), and the spacewalk to install thermal blankets over the Beta Gimbal Assemblies (BGAs) at the bases of the Space Station's solar panels. A glimpse is given into the difficulties of working in a microgravity environment as the crewmembers attempt to eat food before it floats away from them and drink water from a bag. The exchange of the Expedition 4 (Yuri I. Onufrienko, Carl E. Walz, and Daniel W. Bursch) for the Expedition 3 crew (Frank L. Culbertson, Mikhail Turin, and Vladimir N. Dezhurov) is also seen. The Endeavour undocks from the ISS, which is seen over the Caribbean Sea. Endeavour passes over Cuba, and footage of the Swiss Alps is shown. The video ends with the landing of the spacecraft.

Source record↗

Limbed Excursion Mechanical Utility Rover: LEMUR II

The assembly inspection, and maintenance requirements of permanent installations in space demand robotic agents that provide a high level of operational flexibility relative to the mass and volume of the robotic system.

robot limb manipulation robot vision↗

Development of dispensing hardware for safe fueling of heavy duty vehicles

The development of safe dispensing equipment for the fueling of heavy duty (HD) vehicles is critical to the expansion of this newly and quickly expanding market. This paper discusses the development of a HD dispenser and nozzles assembly (nozzle, hose, breakaway) for these new, larger vehicles where flow rates are more than double compared to light duty (LD) vehicles. This equipment must operate at nominal pressures of 700 bar, -40o C gas temperature, and average flow rate of 5-10 kg/min at a high throughput commercial hydrogen fueling station without leaking hydrogen. The project surveyed HD vehicle manufacturers, station developers, and component suppliers to determine the basic specifications of the dispensing equipment and nozzle assembly. The team also examined existing codes and standards to determine necessary changes to accommodate HD components. From this information, the team developed a set of specifications which will be used to design the dispensing equipment. In order to meet these goals, the team performed computational fluid dynamic, pressure modelling, and temperature analysis in order to determine the necessary parameters to meet existing safety standards modified for HD fueling. The team also considered user, operational, and maintenance requirements, such as freeze lock which has been an issue which prevents the removal of the nozzle from LD vehicles. The team also performed a failure mode and effects analysis (FMEA) to identify the possible failures in the design. The dispenser and nozzle assembly will be tested separately, and then installed on an innovative, HD fueling station which will use a HD vehicle simulator to test the entire system.

08 HYDROGEN↗

Installation Quality Framework: Investment Return Approach for Energy Savings on Building Product Installation

A case study was conducted on 44 residential homes using both traditional house wrap and ZIP System systems to measure the overall airtightness and compare estimated energy usages. The labor, material, and overhead and profit (O&P) costs were analyzed and used to determine the optimal choice for long-term benefits in terms of cost and performance. The impact of insulation installation is considered a key factor in improving the strategy of reducing energy consumption. Improved installation practices can affect the airtightness of common wall assemblies to reduce the building energy performance gaps and provide insight on how to allocate resources better. A framework was developed to analyze operational costs and building energy performance to address how installation quality is a factor in the return of investment in building construction for heating and cooling systems within the thermal envelope. With this methodology, aggressive energy performance goals will be met while balancing the tradeoff between installation techniques and building systems efficiency based on the introduced probabilistic investment return (PIR) metric.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LWS design replacement study: Optimum design and tradeoff analysis

A design for two long-wavelength (LW) focal-plane and cooler assemblies, including associated preamplifiers and post-amplifiers is presented. The focal-planes and associated electronic assemblies are intended as direct replacement hardware to be installed into the existing 24-channel multispectral scanner used with the NASA Earth Observations Aircraft Program. An organization skilled in the art of LWIR systems can fabricate and deliver the two long-wavelength focal-plane assemblies described in this report when provided with the data and drawings developed during the performance of this contract. The concepts developed during the study including the alternative approaches and selection of components are discussed. Modifications to the preliminary design as reported in a preliminary design review meeting have also been included.

Source record↗

Hydrogen Production Cost from Proton-Conducting Solid Oxide Electrolysis

Rigorous stakeholder-vetted techno-economic analysis (TEA) was conducted to estimate the cost of hydrogen (H 2 ) production using Proton-Conducting Solid Oxide (PSO) electrolysis. The analysis evaluates Current (2025) and Future (2035) technology cases at centralized plant scales of 50 and 500 metric tonnes per day (MTD), assuming electricity, water, and air as the only system inputs. Untaxed, unsubsidized levelized cost of hydrogen (LCOH) is projected to range from 2020 $\$$1.81 to $\$$2.47/kg H 2 at an electricity price of $\$$0.03/kWh and 97% capacity factor under Nth-of-a-kind (NOAK) deployment assumptions. Total installed capital cost was developed using bottom-up Design for Manufacture and Assembly (DFMA) stack cost modeling and detailed balance-of-plant estimates, including mechanical and electrical subsystems, installation, site preparation, engineering, and contingency. Stack performance assumptions include thermoneutral operation, degradation over time, and periodic replacement. LCOH was calculated using the Hydrogen Analysis (H2A) discounted cash flow model in constant 2020 dollars. Results indicate PSO electrolysis has potential for competitive hydrogen production costs under low-cost electricity and mature manufacturing conditions.

08 HYDROGEN↗

STS-109 Mission Highlights Resource Tape: Flight Days 4 & 5 - Part 2 of 4

This video, Part 2 of 4, shows the activities of the STS-109 crew (Scott Altman, Commander; Duane Carey, Pilot; John Grunsfeld, Payload Commander; Nancy Currie, James Newman, Richard Linnehan, Michael Massimino, Mission Specialists) during flight days 4 and 5. The activities from other flights days can be seen on 'STS-109 Mission Highlights Resource Tape' Part 1 of 4 (internal ID 2002139471), 'STS-109 Mission Highlights Resource Tape' Part 3 of 4 (internal ID 2002139476), and 'STS-109 Mission Highlights Resource Tape' Part 4 of 4 (internal ID 2002137577). The primary activities during these days were EVAs (extravehicular activities) to replace two solar arrays on the HST (Hubble Space Telescope). Footage from flight day 4 records an EVA by Grunsfeld and Linnehan, including their exit from Columbia's payload bay airlock, their stowing of the old HST starboard rigid array on the rigid array carrier in Columbia's payload bay, their attachment of the new array on HST, the installation of a new starboard diode box, and the unfolding of the new array. The pistol grip space tool used to fasten the old array in its new location is shown in use. The video also includes several shots of the HST with Earth in the background. On flight day 5 Newman and Massimino conduct an EVA to change the port side array and diode box on HST. This EVA is very similar to the one on flight day 4, and is covered similarly in the video. A hand operated ratchet is shown in use. In addition to a repeat of the previous tasks, the astronauts change HST's reaction wheel assembly, and because they are ahead of schedule, install installation and lubricate an instrument door on the telescope. The Earth views include a view of Egypt and Israel, with the Nile River, Red Sea, and Mediterranean Sea.

Source record↗

AUP First Pre-Series Cryo-Assembly Design Production and Test Overview

New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ~5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. In conclusion, this paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.

43 PARTICLE ACCELERATORS↗

Hand tool permits shrink sizing of assembled tubing

Portable tool sizes tubing ends without disassembling the tubing installation. The shrink sizing tool is clamped to the tubing and operated by a ratchet wrench. A gear train forces the tubing end against an appropriate die or mandrel to effect the sizing.

Millett, A.↗

NASA Facts: AERoBOND Project

Sustainability of the commercial air travel industry requires new aircraft with ultra-efficient structures and designs, which will depend largely on lightweight polymer composites and new assembly methods. Manufacturers of commercial transport aircraft are compelled to install thousands of redundant fasteners into bonded joints to prevent failures due to unpredictable weak bonds. The Adhesive-Free Bonding of Complex Composites (AERoBOND) process enables re-flow of matrix resin during assembly to eliminate the material discontinuity at the interface, thereby eliminating the dependence of mechanical performance on interfacial adhesion.

Frank Louis Palmieri↗

Programmed Supramolecular Assemblies Using Orthogonal Pairs of Heterodimeric Coiled Coil Peptides

Despite recent progress, it remains challenging to program biomacromolecules to assemble into discrete nanostructures with pre-determined sizes and topologies. We report here a novel strategy to address this challenge. By using two orthogonal pairs of heterodimeric coiled coils as the building blocks, we constructed six discrete supramolecular assemblies, each composed of a prescribed number of coiled coil components. Within these assemblies, different coiled coils were connected via end-to-side covalent linkages strategically pre-installed between the non-complementary pairs. The overall topological features of two highly complex assemblies, a “barbell” and a “quadrilateral” form, were characterized experimentally and were in good agreement to the designs. This work expands the design paradigms for peptide-based discrete supramolecular assemblies and will provide a route for de novo fabrication of functional protein materials.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗