Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPITAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Energy Efficiency Program Financing

In this technical brief we characterize the programmatic energy efficiency financing market from a quantitative perspective. Financing in this report refers to provision of capital—which is paid back over time—to cover upfront costs of energy efficiency. It does not refer to rebates and other types of incentives. We gather and report data on the volume of capital for energy efficiency financing that originated from five programmatic sources: on-bill programs; other utility financing programs; property assessed clean energy (PACE) programs; state energy office (SEO) revolving loan funds (RLF); and energy savings performance contracting (ESPC) programs. We estimate the amount of investment moving through EE financing programs, the sources of capital they employ, and program availability and activity by geography and market sector (residential and non-residential). We also present information on trends in investment by program type, and on the presence or absence of certain program design features, such as credit enhancements and interest rate buydowns. The result is a much more comprehensive accounting of programmatic energy efficiency financing activity than exists elsewhere.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Direct Coal -to-Liquids (CTL) for Jet Fuel Using Biomass-Derived Solvents

Battelle has demonstrated a novel and potentially breakthrough technology for a direct coal-to-liquids (CTL) process for producing jet fuel using biomass-derived coal solvents (bio-solvents). The Battelle process offers a significant reduction in capital and operating costs and a substantial reduction in greenhouse gas (GHG) emissions, without requiring carbon capture and storage (CCS). The results of the project are the advancement of three steps of the hybrid coal/biomass-to-jet fuel process to the technology readiness level (TRL) of 5. The project objectives were achieved over two phases. In Phase 1, all three major process steps were explored and refined at bench-scale, including: (1) biomass conversion to high hydrogen-donor bio-solvent; (2) coal dissolution in biomass-derived bio-solvent, without requiring molecular H 2 , to produce a synthetic crude (syncrude); and (3) two-stage catalytic hydrotreating/hydrogenation of syncrude to jet fuel and other distillates. In Phase 2, all three subsystems of the CTL process were scaled up to a pre-pilot scale, and an economic analysis was carried out. A total of over 40 bio-solvents were identified and prepared. The most unique attribute of Battelle’s bio-solvents is their ability to provide much-needed hydrogen to liquefy coal and thus increase its hydrogen content so much that the resulting syncrude is liquid at room temperature. Based on the laboratory-scale testing with bituminous coals from Ohio and West Virginia, a total of 12 novel bio-solvent met the goal of greater than 80% coal solubility, with 8 bio-solvents being as good as or better than a well-known but expensive hydrogen-donor solvent, tetralin. The Battelle CTL process was then scaled up to 1 ton/day (1TPD) at a pre-pilot facility operated in Morgantown, WV. These tests were conducted, in part, to produce enough material for syncrude-upgrading testing. To convert the Battelle-CTL syncrude into a form suitable as a blending stock for jet turbine fuel, a two-step catalytic upgrading process was developed at laboratory scale and then demonstrated at pre-pilot scale facility in Pittsburg, PA. Several drums of distillate products were produced, which were then distilled into unblended (neat) synthetic jet fuel and diesel products for a detailed characterization. Based on a detailed characterization of the synthetic jet fuel, a 20% synthetic, 80% commercial jet fuel blend was prepared, which met all specifications. An analysis of the synthetic diesel product showed that it has the promise of being a drop-in fuel as super-low (less than 15 ppm)-sulfur diesel fuel. A detailed economic analysis showed that the Battelle liquefaction process is economical at between 1000 metric tons/day (MT/day) and 2000 MT/day. The unit capital cost for Battelle CTL process for making jet fuel is 50K USD/daily bbl compared to 151K USD/daily bbl for indirect CTL, based on 2011 dollars. The jet-fuel selling cost at the refinery, including a 12% capital cost factor (which included profit), for the Battelle CTL process is 61USD/bbl (1.45 USD/gallon). This is competitive with crude oil price of 48 USD/bbl. At the same time, the GHG emissions of 3.56 MT CO 2 /MT fuel were lower than the GHG emissions of 3.79 MT CO 2 /MTfuel for petroleum-based fuels and 7.77 MT CO 2 /MT fuel for indirect CTL. Thus, the use of bio-solvents completely eliminates the need for carbon capture in the case of Battelle CTL process. The superior economics and low GHG emissions for the Battelle CTL process has thus sparked worldwide interest and some potential commercialization opportunities are emerging.

01 COAL, LIGNITE, AND PEAT↗

Lignite-plus-Biomass to Synthetic Jet Fuel with CO2 Capture and Storage: Design, Cost, and Greenhouse Gas Emissions Analysis for a Near-Term First-of-a-Kind Demonstration Project and Prospective Future Commercial Plants

We report on a 30-month design study for a first-of-a-kind (FOAK) demonstration plant that would be built at a site near Meridian, Mississippi, to coprocess lignite coal and woody biomass into jet fuel. The design uses an oxygen-blown TRIG™ gasifier developed by KBR and Southern Company. Fischer-Tropsch conversion of the syngas produces synthetic paraffinic kerosene (SPK) as the primary product, plus naphtha. Other co-products include electricity sold to the grid and CO 2 sold for use in enhanced oil recovery (EOR). Previous studies have identified coprocessing of various coals and biomass with CO 2 capture as promising options for cost-competitive production of low net lifecycle greenhouse gas (GHG) emissions synthetic fuels. The effort reported here goes beyond earlier studies in the level of detail in process design and cost estimation with the aim of improving the understanding of the economic prospects for lignite and woody biomass coprocessing systems. Key objectives in the design of the FOAK lignite/biomass-to-jet (LBJ) plant were to achieve net lifecycle GHG emissions for the SPK that are less than for conventional petroleum-derived jet fuel and to make process design and equipment selections such that the plant could be built and operated in the near term, e.g., before 2025. The process design was developed by researchers at Princeton University and the University of Queensland and validated by engineers at the WorleyParsons Group (WP). Commercial vendors provided design and cost estimates for several major plant components. Bare-erected capital costs and operating and maintenance costs were estimated by WP. The primary objective in building and operating the FOAK plant would be to demonstrate the technical viability of the LBJ concept as an essential first step toward launching commercial-scale plants in the longer term. With this in mind, the project team developed a set of principles to help guide the process design: the total plant cost should be less than 2 billion USD (to limit investment risk); the level of input biomass should be both proportionally significant to reflect biomass/lignite co-gasification and sufficient to achieve GHG emissions goals; process design decisions and vendor/equipment selections should prioritize the likelihood of technical success over minimizing the cost of jet fuel production. The resulting FOAK plant design capacity is 1,551 metric t/d (45.5% moisture) lignite and 556 t/d (43.3% moisture) biomass, for a total input of 295 MW HHV , of which 25% is biomass. The design output is 1,252 actual barrels per day of liquids, of which 80% is SPK (62.3 MW LHV ) and 20% is naphtha (13.9 MW LHV ). It exports 15 MW e of electricity after satisfying a 38 MW e onsite auxiliary load. Additional products are 1,326 t/d of pressurized pipeline-quality CO 2 and 49 t/day of sulfuric acid (93 wt% H 2 SO 4 ). With thinnings from sustainably-managed southern pine plantations as the biomass, and with captured CO 2 stored underground via EOR, the net lifecycle emissions for the SPK product are estimated to be about one-quarter of those for petroleum-derived jet fuel. The bare-erected cost (BEC) estimated by WP for this plant is 588 million USD (2015). The authors’ best estimate of total plant cost (TPC) is 1,230 million USD, arrived at by assuming engineering, procurement and construction management services (20% of BEC), process 5 contingencies (35% of BEC), and project contingencies (35% of the sum of all other costs, i.e., 35% of 1.55xBEC). Not surprisingly, an annual discounted cash flow (DCF) analysis determined that it would be impossible to generate a positive net present value (NPV) over a wide range in key input assumptions. An SPK production cost subsidy of nearly 400/bbl USD over a 20-year plant life would be required to achieve zero NPV under a baseline set of assumptions (including 3% real weighted average cost of capital and a levelized crude oil price of 80/bbl USD). Alternatively, a capital grant in excess of the TPC value would also achieve zero NPV. The poor financial results reflect the small scale of the plant, the design principle to prioritize technical success, the levels of contingencies appropriate for the relatively early stage of project development, and the first-of-a-kind nature of the plant. Technology innovations, learning via construction and operating experience, alternative plant configurations, and larger scale should improve economics of future plants. To help understand these prospects, a preliminary analysis of N th -of-a-kind (NOAK) plants was developed, but with the limitation that plants would use only equipment components that for the most part are already commercial today: consideration of advanced, not-yet-commercial technologies and of R&D-driven improvements in existing technologies were beyond the scope of this analysis. The analysis found that a variety of NOAK plant designs that coprocess lignite and woody biomass to make jet fuel are unlikely to be economically competitive without subsidy even in the presence of a high future carbon tax or equivalent greenhouse gas mitigation policy. This conclusion applies to process configurations and input biomass/lignite ratios that result in net GHG emissions as high as those for petroleum-derived jet fuel and as low as zero. In contrast, encouraging results were found for plants processing only biomass. The economics of these “BECCS” plants (biomass energy with CCS) improve dramatically with the strength of carbon mitigation policies because of their strongly negative net GHG emissions. These findings do not imply that coal/biomass coprocessing strategies for making synfuels with CCS are not economically promising – only that, in the case of lignite, much more than a 25% biomass coprocessing rate would be needed. However, our analysis shows that all such systems are unlikely to be economic in the absence of a strong carbon mitigation policy. Future R&D driven technological innovations could modify this conclusion. Among other R&D priorities, an emphasis on better understanding and reducing plant auxiliary loads is warranted.

09 BIOMASS FUELS↗

Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

Currently, geothermal project developers customize the size of the power plant to fit the resource being developed. The turbine is designed and sized to optimize efficiency and resource utilization for electricity production; most often, other power plant components are then chosen to complement the turbine design. These custom turbine designs demand one-off manufacturing processes, which result in higher manufacturing setup costs, longer lead-times, and higher capital costs overall in comparison to larger-volume line manufacturing processes. In contrast, turbines produced in standard increments, manufactured in larger volumes, could result in lower costs per turbine. In this study, we developed a manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. Then we used discounted cash flow (DCF) analysis to calculate the minimum sustainable price (MSP). We analyzed three different cases 1) 1 MWe geothermal ORC turboexpander 2) 5 MWe ORC turboexpander and 3) 20 MWe geothermal steam turbine, and calculated the cost of manufacturing the major components, such as the impellers/blades, shaft/rotor, nozzles, inlet guide lanes, disks, and casings. The results showed that MSP could highly vary between 893 /kW and 30 /kW based on turbine size, standardization and volume of manufacturing. The analysis also showed that the economy of scale applies both to the size of the turbine and the number manufactured in a single run. As an example, the unit price of a 5 MW standard design turbine could be 150 /W cheaper than the custom design. Sensitivity analysis indicated that these savings come largely from reduced labor costs for design and engineering and manufacturing setup. In addition to manufacturing cost savings, there is a delivery time saving up to 10 months, which could have a positive effect to construction financing operation time. Another advantage of these standard turbines is their adaptability to different geothermal systems by operating at off-design conditions. We also modeled off-design turbine efficiencies within the commercially-favorable operating range of a standard ORC compared to custom-designed ORC equipment. Than we used these performance calculations and power output capacities in a discounted cash flow (DCF) analysis of plant operations and financing, thereby creating representative techno economic models of a total geothermal power plant. I this scope we used NREL's System Advisor model (SAM) and performed DCF analysis of standard and custom design turbines using results from IPSEpro over range of temperatures of interest. In this scope 63 different off-design cases were analyzed. This helped us to answer the question; 'Can today's capital cost savings compensate the future revenue losses due to lower electricity generation?' The results showed that, the net capital cost savings for the modeled 5 MW case study may reach up to plus 1,298,672. Also, the difference between NPV of standard design and custom design turbine could reach up to 733,940. To sum up, when all the things mentioned above are taken into consideration, it can be said that, the standard turbines are competitive over a wide range of temperatures and flow rates and the give positive NPV differences for certain cases near their design point.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Report on the Economic Optimization of a Demonstration Case for a Static N-R HES Configuration using RAVEN

The synthetic time history generation algorithm in RAVEN has been extensively tested and used to perform qualitative assessments of the statistical characteristics of the net demand vs. demand for different values of the penetration of wind generation. Reported results highlight the need to consider the impact of variable renewable on the electricity net demand profile, due to the increase in its volatility with increased wind penetration. This analysis provides a strong foundation for the modeling and simulation needs expressed under the "Nuclear-Renewable Hybrid Energy Systems" (NRHES) project. Following this confirmative analysis the entire stochastic optimization framework has been tested in a demo case. The case chosen is an optimization driven by profitability for a system composed by a nuclear plant and a hydrogen production industrial process. This type of economical analysis is aimed to assess the capability of a hybrid system to penetrate the current energy market. In this sense it differs from the approach suggested under NRHES, where a cost minimization approach is suggested. This analysis is instead aimed to show the flexibility of the developed framework, e.g. for the evaluation of retrofitting projects of already existing plants. The system considered is subject to variable prices of electricity, which are simulated using the algorithm for the production of synthetic time histories. The physical system is considered without inertia so that it can be replaced by dispatching rules based on the highest marginal profit. Two optimization problems have been considered, for the first the size of the nuclear power plant is fixed and the optimization variable is the capacity of the hydrogen production plant. For the second, both plant sizes are optimization parameters while the overall capital expenditure is caped. The economical figures of merits considered are the Internal Rate of Return (IRR) and/or Profitability Index (PI) for the first one (since no cap is placed on the investment size) and Net Present Value (NPV) and/or IRR for the second one where the capital expenditure is constrained. Economic input data concerning capital costs, size-scaling factors, and operational costs for both plants have been collected from literature in order to achieve a simulation as realistic as possible. More work will be needed to obtain even more realistic numbers, possibly from industrial partners, and considering market elasticity for the hydrogen market. In order to perform the optimization of the cases described above, the economical external RAVEN module (CashFlow) for financial analysis has been improved in flexibility and generality. Some improvements have also been made to the optimization algorithm for a more efficient treatment of the boundary constrains. In conclusion three major results have been obtained: a) collection of the economical parameters characterizing the nuclear power plants and hydrogen production plants, b) extension of the financial analysis module (CashFlow) to drive the calculation of all needed cash flow streams and c) the testing of the full framework in a nearly final configuration.

97 MATHEMATICS AND COMPUTING↗

Pilot Scale Operation and Testing of Syngas Chemical Looping For Hydrogen Production

The Syngas Chemical looping (SCL) process provides efficient and economic means to utilize the abundant fossil reserve of coal. The main problem associated with coal utilization is the CO 2 emissions resulting from its combustion. Even though CO 2 regulation or carbon tax is currently not in place, its enforcement is expected in the near future. Such a greenhouse gas emission control, if adopted in current power plant systems, will drive the efficiency down and increase the cost of electricity, due to the energy and capital-intensive nature of current CO 2 separation techniques. This highlights the need to develop technologies that present a solution to the rising cost of electricity in the future. The integrated gasification combined cycle (IGCC) presents an improvement to the above predicament, but it is capital intensive due to the extensive unit operations involved. The efficiency for a CO 2 capture incorporated IGCC system is around ~32%, resulting in approximately 45% increase in cost of electricity. This is definitely a better path to traverse than the conventional pulverized coal (PC) power plants as it has improved economics and efficiencies accompanied by product flexibility. The SCL process advances the benefits even further when integrated with the IGCC process. The SCL process removes the expensive WGS system and CO 2 separation columns, thereby saving on capital and operational expenses. This integration results in a 12 – 21% increase in efficiency accompanied by a reduction in cost of electricity by 15 – 28%, over conventional IGCC systems. Therefore, SCL process provides the best route to harness the energy from coal. The overall project objective was to construct and operate a syngas chemical looping pilot scale test unit at the NCCC. The project scope of work was divided into 3 phases. In Phase I, cold flow model studies using a 1:1 scale acrylic test unit constructed at Particulate Solids Research, Inc. (PSRI) was successfully completed confirming robust solid flow control is achievable in the non-mechanical system design. In Phase II, the high pressure, high temperature, chemical looping reactor was successfully designed with all necessary equipment and safety instrumentation/controls specified to allow for fabrication, site construction, and assembly to commence in Phase III. In Phase III, the SCL pilot plant was successfully assembled and all necessary functional checks and pre-startup safety reviews completed. During unit commission over the course of 200 hours of testing, operational issues were observed with premix burner used for system startup. With the grants awarded by the National Energy Laboratory (NETL) and the Ohio Development Services Agency (ODSA) under awards DE-FE0023915 and D-14-18, the SCL pilot unit underwent three auxiliary equipment modifications to resolve all of the startup operational issues encountered. The unit was successfully demonstrated with 300+hr continuous operation. Key results obtained include high syngas conversion of 97.95% with 16.03% oxygen carrier conversion in the moving bed reducer and >99% purity H 2 produced from the moving bed oxidizer.

01 COAL, LIGNITE, AND PEAT↗

Enabling Staged Pressurized Oxy-Combustion: Improving Flexibility and Performance at Reduced Cost

Introduction: The staged pressurized oxy-combustion (SPOC) process, developed by Washington University in St. Louis (WUSTL), is an oxy-combustion carbon capture technology that employs a steam power cycle to generate electricity. As with atmospheric-pressure oxy-combustion processes, carbon dioxide (CO 2 ) capture rates of 90% or higher can be achieved. The staged-combustion approach of the SPOC process, when operated at elevated gas pressure, allows for near elimination of flue gas recycle (FGR) and leads to significant improvements in efficiency and reduced costs. The primary goal of this project was to investigate the potential for SPOC for flexible operation beyond the capabilities of conventional coal-fired power plants, particularly those employing carbon capture and storage (CCS). Oxy-combustion differs from conventional coal combustion in that the combustion of coal is carried out using oxygen as opposed to air. The resultant flue gas is a mixture of primarily CO 2 and water, greatly simplifying CO 2 capture. As SPOC does the oxy-combustion process under pressure, it is higher efficiency and lower cost than atmospheric oxy-combustion. The project was led by the Electric Power Research Institute, Inc., with the assistance of WUSTL, Doosan Babcock (DBL – boiler plant original equipment manufacturer), and Air Liquide (AL – air separation experts). The specific objectives of the project were to: (1) Evaluate the SPOC concept and develop a risk-based approach to the heating surface layout ensuring that performance (gas and steam side), manufacturing, transportation, and plant erection considerations were fully accounted for in the system design. (2) Improve the technology to ensure its performance and cost potential are substantially better than today’s baseline pulverized coal power plant with post-combustion capture (PCC) or atmospheric oxy-combustion, and show progress toward performance commensurate with projected commercial operation, including 90% or more CO 2 capture. (3) Address critical technology gaps and improving overall system performance for the technology. (4) Perform combustion tests at scale under commensurate pressure to the commercial operating system validate combustor and advance the SPOC combustion modeling tools that will facilitate full-scale design. Combustion Testing: Testing was initially carried out at atmospheric pressure with methane to ensure that all systems were correctly operating. Following this, the testing then proceeded to moderate pressure operation at 4 bara, where different stoichiometric conditions were used across an extended heat input range, showing that a stable flame could be maintained. Testing then proceeded at 10 and 15 bara where it was shown that the ignition system needed to be replaced at these operating conditions. When testing recommenced, a similar stable flame shape was achieved, without any methane support, and the full 100 kWth coal oxy-combustion was demonstrated. Heat flux measurements showed 400 kW/m 2 (0.126 MMBtu/hr-ft 2 ) from the flame, within the 450 kW/m 2 (0.142 MMBtu/hr-ft 2 ) preferred limit defined by DBL for the full-scale design case. Carbon monoxide and carbon-in-ash measurements showed that complete combustion was possible with ultra-low excess oxygen at 1 vol % in the product flue gas. This allowed the full-scale models to be calculated based on this level of excess oxygen, improving the performance of the system as lower feed oxygen is produced in the air separation unit (ASU), saving auxiliary power. Full-Scale Design: The full-scale design is sized to deliver 550 MWe net electrical power output to allow direct comparison with the National Energy Technology Laboratory (NETL) baseline cases using the same Montana Powder River Basin (PRB) fuel. The cases used for direct comparison are: Case S12A (supercritical [SC] coal without CO 2 capture), Case S12B (SC coal with PCC at 90% CO 2 capture, and Case S12F (atmospheric oxy-combustion SC coal with 90% CO 2 capture). The SPOC stages were configured to be identical arrangements, allowing for a more straightforward design, construction, and control strategy. Each stage consists of two PVs, the first being the combustor PV module and the second being the convective PV module. The combustor module is the tallest vessel, with local coal feeding equipment and the burner FGR and oxygen plenums at the top and ash management at the bottom. The combustor module is effectively an open cross section with membrane tubes around the circumference – this unobstructed slender profile ensures that the relatively slower burnout mechanism needed for the low-speed turbulent mixing burner can proceed unimpeded and that molten ash will not attach to any surfaces at an angle to the predominant flue gas flow. The steam turbine used in the SPOC design is essentially the same unit utilized in the atmospheric oxy-combustion case except the degree of heat recovery possible allows the low-pressure (LP) feedwater heater train to be eliminated. This is a result of being able to capture the latent heat of evaporation of the moisture produced in the combustion (normally lost to the stack). The SPOC system outperforms the NETL atmospheric oxy-combustion baseline case by 3.3% points and the PCC case by 7.5% points. This performance increase is mainly a result of the improved heat recovery possible from the product flue gas and from the reduced auxiliary power consumption from the ASU and the CO 2 compression and purification unit over the atmospheric equivalent. The combined improvement in boiler efficiency and reduction in the steam turbine heat rate resulted in a net improvement in the overall plant efficiency by 0.61%, to 35.6% on a HHV basis. This relatively small improvement in plant efficiency between sub-bituminous and bituminous coals shows the value of useful moisture latent heat recovery offered by the SPOC system when using low rank fuels. Flexibility and Turndown: The SPOC system has inherent high turndown capabilities because of a demonstrated high range of combustion stability and the ability to bypass stages, thereby reducing steam generation rates proportionally without altering firing rates in operating stages. ASU units do not generally offer significant turndown opportunities as they are limited by the performance of the compression plant. The baseline SPOC design has a 2-train ASU configuration, needed to be able to meet the 10,500 tonnes per day duty, that can deliver efficient turndown points between 85–100% load with both trains operating, and at 45–50% load with a single train operating. Outside these operating points, the flexibility and efficiency are limited and may be uncompetitive at loads below 45% as the ASU systems are unable to turndown beyond 85% for the base case and 70% for the flexible case. The ASU cold box for the flexible case was designed to operate at loads between 40-100%, below this operating range the purity of the produced oxygen cannot be guaranteed, resulting in additional load for the CPU equipment. The additional power consumption of these cases yields an uneconomic operating condition with poor efficiency when operating at low loads such as 25% and 12%. To address this flexibility constraint, AL evaluated how the ASU configuration could be altered to deliver efficient oxygen supply over the load range. This involved integrating the compressor duties across both ASU trains into a shared duty arrangement with multiple compressors, strategically sized to deliver the duty required across all load ranges between 40–100% by enabling different combinations of the main air compressors and the booster air compressors. The oxygen purity cannot be guaranteed below 40% load for each train – the power consumption at 25% and 12% loads were estimated based on the multi-compressor configuration at maximum turndown as these load cases were not considered in the flexible ASU design. With a different cold box configuration, i.e. number of trains, the entire load range could be delivered within oxygen purity specifications. Although there is a small efficiency reduction at full load, there are significant improvements in overall plant performance during low-load operation. The exact ASU configuration needed will therefore be dependent on the expected operating profile of the unit. Economic Analysis: Cost estimates for the baseline and the flexible cases were developed using NETL baseline case data for common BOP items and an Association for the Advancement of Cost Engineering International Class 5 (conceptual/screening study) assessment of key components unique to the SPOC system. The capital, operating, and maintenance costs were assessed along with the first-year power cost, levelized cost of electricity, and CO 2 captured and avoided cost for the SPOC cases were compared against the relevant NETL baseline cases in January 2019 dollars. Both SPOC cases achieve a lower cost that the alternative NETL baseline cases (with the flexible SPOC case being slightly higher than the baseline SPOC case due to the compounded impact of higher capital costs and lower efficiency at full load). The SPOC cases deliver a lower cost of CO 2 avoided than the NETL baseline cases due to greater efficiency in generating low-carbon power. However, the cost of CO 2 captured is higher because the higher efficiency of the SPOC process generates less CO 2 , hence less needs to be captured, resulting in a high capital cost being shared over a reduced CO 2 quantity. The flexible ASU adds 1.6% overall to the plant cost in comparison to the baseline case, but the efficiency improvements at loads below 50% are significant. Subsequently, depending on the plant load-profile expectation, the flexible ASU would be beneficial if the plant spends a significant portion of its operating life below 50% load. This kind of operating profile is likely to be required for all fossil plants when more renewable electricity generators are installed on the local grid, particularly solar power that can be predicted ahead of time, allowing for appropriate pricing signals to be incorporated into the diurnal cycle. R&D Recommendations: SPOC, while a promising technology, is a relatively recent concept and, as such, operability issues of combustor design and steam-side integration for such systems at a scale relevant to commercial deployment have not been evaluated. WUSTL has conducted extensive small pilot-scale (100 kWth) research to understand and advance pressurized oxy-combustion processes, including investigation of combustion and flame characteristics, radiative heat flux, burner operability, turn down, char burnout, ash characteristics, water-wash column operation, etc. for pressurized oxy-combustion systems. Nonetheless, at this stage in the development of the SPOC process, what is needed is a large-scale pilot plant that can serve to study pressurized oxy-combustion systems and components at a scale commensurate with the maturity of the technology. A scale of 10 MWth, which includes steam-side integration and two stages would yield essential information with respect to heat transfer characteristics both in the radiative and convective sections of the pressure vessels, and the ability to operate the fuel staging process. In addition, while modeling results indicate that combustion and flame characteristics improve with scale, direct studies of the combustor at this scale will ensure that the models can be relied upon for scale up to commercial scale. Furthermore, a detailed analysis must be performed to understand the scaling aspects of key components and systems.

20 FOSSIL-FUELED POWER PLANTS↗

Evaluation of Hydrogen Production Feasibility for a Light Water Reactor in the Midwest

Increased electricity production from renewable energy resources coupled with low natural gas prices has caused existing light-water reactor (LWRs) to experience ever diminishing returns from the electricity market. Via partnership among Idaho National Laboratory (INL), The National Renewable Energy Laboratory (NREL), Argonne National Laboratory (ANL), Exelon, and Fuel Cell Energy a techno-economic analysis on the viability of retrofitting existing pressurized water reactors (PWRs) to produce hydrogen (H2) via high temperature steam electrolysis (HTSE) has been conducted. Such integration would allow nuclear facilities to expand into additional markets that may be more profitable in the long-term. To accommodate such an integration, a detailed analysis of HTSE process operation, requirements, and flexibility was conducted. Technical analysis includes proposed nuclear system control scheme modifications to allow dynamic operation of the HTSE via both thermal and electrical connection to the nuclear plant. High fidelity Modelica simulations showcase the viability of such control schemes. However, due to limited knowledge of solid oxide fuel cell (SOFC) stack degradation due to thermal gradients; thermal cycling of the HTSE was not included. Therefore, the control schemes proposed are only utilized to re-distribute steam at startup and only the portion of electricity utilized in the electrolyzers is cycled. From the detailed analysis of the nuclear integration and the HTSE process design, a comprehensive cost estimation was conducted in the APEA and H2A models to elucidate capital and operational costs associated with the production, compression, and distribution of hydrogen from a nuclear facility. Alongside this costing analysis, market analyses were conducted by NREL and ANL on the electric and hydrogen markets respectively in the PJM interconnect. Utilizing the electricity data market projections in the PJM interconnect from NREL and hydrogen demand/pricing projections from ANL a five variable sweep over component capacities, discount rates, and hydrogen pricing was completed using the stochastic framework RAVEN (Risk Analysis Virtual ENVironment) through its resource dispatch plugin HERON (Heuristic Energy Resource Optimization Network). Each combination of variables was evaluated stochastically four times over a seventeen year timespan from 2026-2042 (inclusive) to determine the most economically advantageous solution. Following the five variable sweep an optimization was conducted about the best sweep point to determine optimal component sizing and setpoints. Results suggest positive gain is achievable at all projected hydrogen market pricing levels and at all discount rates. However, exact component sizing and net returns vary based on these values and if incorrect sizing is selected; major net losses can occur. The optimal result occurred with set points as follows: high hydrogen prices, the largest possible HTSE unit in the sweep set at 7.47 kg/sec [645.4 tpd], a contractual hydrogen market agreement 7.29 kg/sec [629.8 tpd], and a hydrogen storage size 115,188 kg. The analysis suggested that with a discount rate of 8%, a ΔNPV = 1.2 billion over the seventeen year span can be achieved. The results illuminate that by operating in multiple markets the nuclear facility is capable of avoiding sale of electricity during times of low electricity market pricing, while maintaining the ability to capitalize on the high electricity market pricing. It should be noted that the analysis conducted in this report is a differential cash flow analysis and as such does not present profit levels. Instead it highlights the net benefit between building and competing in the hydrogen market utilizing nuclear facilities and conducting business as usual in the electricity markets. Additionally, results presented in this report exhibit conservatism due to four key assumptions: Given the limited knowledge on SOFC stack degradation due to thermal gradients the high temperature steam electrolysis plant is not allowed to thermally cycle. This limitation decreases electricity generation capacity in the nuclear plant, reducing capacity payments and the maximum output to the electrical grid. This analysis considers building a separate hydrogen pipeline for use in the nuclear facility. Research is currently being conducted to determine if existing natural gas pipelines can accommodate direct hydrogen injection. If hydrogen can be integrated into existing natural gas pipelines then a capital savings of ~$19,000,000 per kg/sec [1 kg/sec = 86.4 tpd] of installed HTSE capacity could be realized. Fast transients in the electric grid are typically served by flywheels and electric batteries. With electrolysis only operation the nuclear plant can flex its electricity just as quickly. However, for this analysis, the ancillary services market has been neglected. Should the nuclear plant have the ability to operate in the ancillary services market during periods when it is producing hydrogen, an additional substantial income stream that would increase overall system profitability could be considered. Subsidies for non-emitting generation technologies are not introduced in the cash flow analysis, but instead are completed assuming zero subsidies. Profitability is based solely on electricity pricing. Electric pricing is assumed to never go negative. Instead, it is assumed overall system curtailment by the Independent System Operator (ISO) will occur in such a manner that pricing remains at or above zero. This assumption inflates the “business as usual” scenario, thus decreasing the ΔNPV calculated. If negative pricing scenarios continue to occur as they do today, one would expect a further increase in ΔNPV. Overall, results advocate that, through market diversification, nuclear power plants have the potential to substantially increase current profit margins, increase market penetration, and ultimately solidify their place as a mainstay in energy production.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Optimizing an Integrated Renewable-Electrolysis System

Hydrogen is a versatile energy carrier that is used in a wide variety of chemical and industrial processes. Producing hydrogen using electrolysis can enable integration of multiple sectors including electricity, heating, and industrial sectors; however, the cost of producing hydrogen from electrolysis remains a challenge for encouraging greater adoption. With growing amounts of renewable generation on the California grid, there is downward pressure on wholesale electricity prices, particularly during the afternoon from photovoltaics (PV). These lower, or even potentially negative prices, challenge the business cases for new and existing PV plants. In addition, as the grid transitions to less flexible generation, there is greater need for system flexibility. To help improve the economics for both solar PV and hydrogen production using electrolyzers, we explore the benefit of combining PV and electrolysis systems. The optimal breakeven hydrogen production cost for six unique market participation configurations is calculated at six candidate locations where PV is already installed. The six market configurations include islanded, separated, retail, net energy metering (NEM), hybrid retail/wholesale and wholesale. Using the Revenue Operation and Device Optimization Model (RODeO) model, the optimal breakeven hydrogen price over the lifetime of the equipment is calculated. The cost includes production, storage, and compression in preparation for gaseous delivery trucks. Revenue streams include the sale of hydrogen, low carbon fuel standard (LCFS) credits, renewable electricity sold to the grid, and Renewable Energy Credits (REC). The costs included are the electricity costs, capital and fixed operation and maintenance cost (FOM) for the electrolyzer, PV, and storage and compression systems as well as taxes and financing costs. In addition, cost reductions are achieved through retail and wholesale rate optimization, by which electricity is purchased at the lowest price and sold, if possible, at the highest price. For all locations, the breakeven hydrogen production cost results show that, in the order of decreasing cost, the system configurations are islanded (highest), separated, NEM, retail, hybrid retail/wholesale, and wholesale (lowest). The resulting system design balances between the capital and maintenance cost components, the operation costs (i.e., electricity costs) and the additional market revenues. The integration of solar PV and electrolysis is shown to provide a mutually beneficial relationship. For PV, integration with electrolysis offers the potential to hedge against wholesale market price volatility, and integration with electrolysis may offer the potential to defer or avoid transmission investment to deliver power to the point-of-use and instead use it on-site. When compared with SMR without considering any renewable hydrogen premiums, this study finds that PV + Electrolysis systems with current costs are likely not competitive; however, with cost reductions for electrolysis equipment consistent with DOE projections, it was found that systems with wholesale market access would be competitive, largely on account of both low capital costs and low-cost electricity. The electrolysis units can provide greater flexibility than is required based on retail rate optimization, so there is an opportunity for a utility or CAISO to increase system flexibility with PV + Electrolysis systems in return for commensurate compensation. In this way, there are potentially several solutions that fall between the hybrid configuration and the wholesale configuration that could provide sufficient compensation for a PV + Electrolysis unit to compete with SMR while also providing greater flexibility to the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ION Engineering Commercial Carbon Capture Design & Costing (C3DC) (Final Report)

ION Engineering LLC (ION) has coupled its proven, solvent-based CO 2 capture technology with an exceptionally qualified design and engineering team to complete a pre FEED for a 300-megawatt equivalent commercial-scale CO 2 capture plant for Gerald Gentleman Station’s (GGS) Generation Unit 2 (GGS2). The remarkable team was comprised of ION, Nebraska Public Power District (NPPD), Sargent & Lundy (S&L) with continued support from Koch Modular Process Systems (KMPS), and Siemens. The overall objective of the project was to provide the engineering design and cost estimate at an American Association of Cost Engineers (AACE) Class 3 estimate, resulting in accuracy ranges of -20 to +30% for the capital cost estimate. The project team was successful in completing this objective and was able to overcome the challenges that were presented during the process. A conservative interest rate of 7.0% with a financing term of 20 years was used based on interest rates utilized by S&L for this level of study. The resulting annualization factor is multiplied by the total EPC cost to calculate an annualized capital expenditure. It is estimated that the carbon capture facility treating a 300 MWe slipstream will capture 1.9 million tonnes per year of CO 2 at a capacity factor of 85%. The resulting cost of capture for the CO 2 island was determined to be $\$$36.55/tonne. Utilizing an interest rate of 4.5%, supported by historical rates for previous large capital projects in the power industry, reduces the cost of capture to $32.52/tonne. These cost of capture numbers continue to further ION’s case for commercial deployment of ION’s solvent technology.

20 FOSSIL-FUELED POWER PLANTS↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

Europe's Evolving Deterrence Discourse

Over the last decade, a deteriorating security environment has brought into sharp focus the atrophy of strategic thought that occurred after the Cold War. At a time of intensifying major power rivalry, renewed urgency about the effectiveness of deterrence and the reliability of strategic stability, and mounting threats by nuclear armed and -arming “rogue states,” the need for new intellectual capital has become more pressing. But the U.S. analytical community shed a great deal of capability and capacity in the 1990s and after the 9/11 attacks was long focused on other problems. In recent years, the United States has slowly begun to rebuild institutional capacity and to reinvest in the development of the necessary human capital and analytical tools. One symptom of past atrophy was the near-complete collapse of transatlantic dialogue on these matters. One indicator of the nascent renewal is the reemergence of transatlantic collaboration, especially among early career professionals. In recent years it has also become clear that European institutions too are beginning to rebuild capacity and reinvest in human capital. This small volume is the result of a collective effort by four institutions to take stock of the state of strategic thought in Europe as it relates to deterrence and to advance transatlantic dialogue on deterrence. As a co-organizer of this process, CGSR is pleased to produce this edited collection of papers on behalf of the group. I am especially grateful to Amelia Morgan and Anna Péczeli for their role as coeditors. Please note that the views expressed here are the personal views of the authors and should not be attributed to the Laboratory, its sponsors, or any of the institutions with which the authors are or have been affiliated. Please also note that the Laboratory assumes no responsibility for the validity of the information used by the authors, who have drawn on information in common usage in Europe to inform their thinking.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

A Technical and Economic Assessment of LWR Flexible Operation for Generation and Demand Balancing to Optimize Plant Revenue

With increased penetration of subsidized variable renewable energy (VRE) resources and competition from low natural gas prices, existing light water reactor (LWR) nuclear power plants (NPPs) are struggling to remain economically competitive. This work examines the potential economic competitiveness of various thermal energy storage (TES) technologies when coupled directly or indirectly with a NPP. To highlight their relative economic competitiveness, we contrast several energy storage solutions in stochastic dispatch optimization. We leverage data from recent work analyzing a range of TES technologies with varying capital costs, performance, and technology readiness level (TRL) to establish our case. We explore inserting these technologies into an electricity market with existing nuclear generation and large projected variable renewable energy (VRE) penetration. Although these technologies' projected capital costs may make them unlikely candidates in their current state, this analysis demonstrates a high-fidelity techno-economic analysis of energy storage. Furthermore, as the projected cost of energy storage technologies evolves, this analysis sets a precedent for similar future investigations. One region with projected trends that may be unfavorable for existing nuclear capacity is the New York Independent System Operator (NYISO) market. New York state’s baseload generation has been historically provided by fossil-fired and nuclear assets. However, amid economic pressures from subsidized VREs and low natural gas prices, the state has recently deactivated Indian Point nuclear power plant units 2 and 3. Furthermore, the state plans to meet its zero-emission generation target by 2040 by replacing fossil-fired capacity with significant investments in VRE resources like wind and solar photovoltaic (PV) and battery storage. Increased intermittent resource penetration lowers the baseload power requirement, adding further economic pressure to the state’s three remaining NPPs still in operation. With three NPPs still in operation in New York, this work analyzes potential economic benefits to NPPs on the New York grid when directly or indirectly coupled with various TES technologies. This work requires two modeling steps to analyze the potential economic benefits of various system configurations of the TES directly or indirectly coupled with nuclear. First, this analysis leverages capacity expansion modeling by experts at the Electric Power Research Institute (EPRI). Using their deterministic capacity expansion model, U.S. Regional Economy, Greenhouse Gas, and Energy (US-REGEN), EPRI analysts evaluated the capacity and generation evolution of the New York state energy market under four projection scenarios. These four projection scenarios were developed to represent the potential evolution of the capacity and generation in NYISO from 2015 to 2050 under various economic, technology, and policy constraints. The results from these capacity expansion models are then used as boundary conditions in the second modeling step. The second modeling step uses the Holistic Energy Resource Optimization Network (HERON) for a set of stochastic techno-economic analyses (STEAs) to investigate the potential increase in the economic viability of various configurations of the TES. With no current capacity expansion capabilities, HERON takes the data generated from US-REGEN for 2050 to generate synthetic load, solar, and wind data. Then HERON economically optimizes the capacity and dispatch of the various TES configurations. The potential economic benefit is the differential net present value (NPV) of the TES configurations from the no-TES baseline. As a stochastic techno-economic analysis package, HERON introduces uncertainty into the economic metrics, while US-REGEN trades resolution for reduced computational complexity. Using HERON also allows the modeling of direct thermal coupling, a feature not common in capacity and dispatch models. As expected, with high capital costs, the costs of introducing energy storage for all the technologies considered outweighed the potential economic benefit of this strategy for flexible plant operation. The benefit of this analysis is primarily in demonstrating a workflow that examines innovative solutions to increase NPP revenue via TES coupling. HERON’s stochastic capacity and dispatch optimization process used in this work has proven an effective tool in observing and evaluating the impact of introducing storage technologies in a grid energy system.

25 ENERGY STORAGE↗

Request for Information on Establishing a New Manufacturing Institute (DE-FOA-0002564)

Deep decarbonization of major industries such as metals manufacturing requires extensive process integration and controls to manage feedstocks, side reactions, heat, water, and waste streams. The scale of the energy and capital investment requires that process integration be validated to a high level of confidence with no bias. Industries such as steel production have very thin profit margins. Therefore, lack of confidence in process integration, product quality, and economics is a major deterrence to changes in manufacturing capital investment. Public sector investment in reconfigurable pilot testbeds and a first-of-a-kind plant would be necessary to de-risk technical and financial barriers prior to industry-wide buildout. DOE should consider a National Lab-led hub for the testbeds. Lab testbeds could be utilized in campaigns and allow multiple industrial partners to evaluate and validate technologies prior to making major capital investments.

08 HYDROGEN↗

Low-Cost Preform and Molding Processes

The entry cost for prototyping a composite component for manufacture using automated, high rate processes is prohibitively expensive in many cases, especially for small business, where tooling costs may be several $100k. Discussions with industry also indicate that many small companies, tier 1 and 2 suppliers, have an interest to mold composite parts but do not want to deal with the capital cost, material handling issues, and labor associated with dry fiber preforming operations. While the molders may locate near the end user for logistics reasons, it may be more cost effective for the performer to remain regional and invest in capital equipment to support preform automation, thus keeping costs to a minimum. This project was designed to explore and demonstrate several options to meet these industry needs. Dry fiber preforming approaches were evaluated which allow for low pressure resin infusion, single sided tooling options such a vacuum assisted resin transfer molding (VARTM) or low pressure resin transfer molding (RTM-light). Unlike sheet molding compound, SMC compression molding where typical molding pressures of 1000 psi are required to push material into the desired location; positioning of a dry fiber preform into the desired location on the tool allows for low molding pressures of 10-50 psi. Lower molding pressures allow for use of low cost, additive fabrication of polymeric tooling. Polymeric tooling is suitable for rapid part prototyping and limited production. Dry fiber preforming approaches evaluated included use of commercial chopped strand mat, robotic chopper gun deposition, and continuous fiber preform augmentation using tailored fiber placement (TFP). Use of chopped strand mat does not require a robotic deposition method, however a cutting table is generally required and there is typically 20-30% scrap generation. While various fiber areal weights are available, the preform is not readily optimized for minimal fiber use or weight savings. In contrast, a robotic chopper gun approach allows for localized deposition where fiber is required to meet structural requirements. The robotic method is highly automated and minimizes fiber scrap, however the capital cost of the equipment and engineering labor for programming can result in higher preform cost compared to chopped strand mat in certain cases depending on preform complexity. Dry fiber preforming using the robotic chopper gun method allows for creation of three dimensional forms. This approach may be ideal for molding in-house, or if the preforms stack together densely to allow for efficient shipping. Applications evaluated for this program considered trade-off between fabrication of a fully 3D preform versus production of a flat preform which is designed to readily drape into the final desired shape. Such a preform design greatly simplifies robotic programming and requires no specialized tooling. The flat preforms are easily stacked and shipped to the final molding location. Flat preforms are much easier to augment with TFP continuous fiber to provide local reinforcement. The demonstration and evaluation of these preforming and tooling methods were completed on three component applications. The first application was a battery box cover for an electric vehicle which was highly three dimensional. The second demonstrator article was comprised of complex contours and was used to demonstrate the use of TFP and RTM-light molding process. The third demonstration article was the roof of an operator’s cab for large construction equipment. The roof is relatively flat however it is comprised of complex changes in thickness which clearly demonstrate the advantage of robotic chopper gun approach as compared to using numerous preform layers of chopped strand mat. The cost trades for the various preforming methods are summarized to help guide the reader as to preforming method considerations. Finally, these demonstrations all used glass fiber roving. A fourth, exploratory task was added to evaluate the ability to make preforms using Zoltek’s carbon fiber split tow roving. We were able to adapt the chopper gun to make flat preforms for laminate testing, but further development effort would be required to make suitable preforms.

36 MATERIALS SCIENCE↗

Earned Value Management Systems for Operations Activities

An earned value management system (EVMS), which monitors contractor performance, is a requirement for program and project management for all major acquisitions by the United States Federal Government with development effort: (i.e., an asset requiring management attention because of its importance to an agency’s mission; high development, operating, or maintenance costs; high risk and/or high return). As an area less explored in earned value management (EVM) practices, this paper will survey the application of an EVMS for operations activities defined as: (1) Non-capital asset activities that are projects (or project - like) with definable start and end dates, with discrete scopes of work, and measurable accomplishments; as well as (2) Routine or recurring facility or environmental operations. This paper will examine the use of an EVMS to evaluate performance of operations and maintenance activities required once construction of a capital asset is complete and being used as intended. Such activities include upgrades and maintenance in order for capital assets to meet their mission function over a life-cycle (through repair, replacement, etc.). This paper will provide background on this topic from the perspective of the Department of Energy (DOE) Environmental Management (EM) Program. In addition, it will provide material from a panel discussion provided by a group of experts from the October 2019 Office of Environmental Management Project Management Workshop, as well as material from subsequent research on this topic.

97 MATHEMATICS AND COMPUTING↗

Hydrogen for Maritime Applications

The maritime industry is investigating a number of fuel options for reducing emissions, including liquefied natural gas (LNG), biofuels, and electrical drive systems powered by batteries and/or hydrogen-fueled fuel cells. Hydrogen-fueled ships offer the potential to significantly reduce, if not eliminate, regulated and unregulated pollutants in maritime applications. Argonne National Laboratory conducted preliminary comparisons of the total cost of ownership (TCO) of several classes of ships to determine how fuel cell technology compares to the current diesel technology, what advancements are needed for hydrogen fuel cell technology to be competitive in the future, and what applications may be appropriate for introducing fuel cells into the maritime industry. These studies included feeder container ships, harbor tugboats, river pushboats, and auto/passenger ferries. For this study, TCO was defined to include the cost of fuel, propulsion system, and fuel storage system, the levelized cost of propulsion/auxiliary engines, and the cost of annual maintenance and consumables. It did not include the cost of the vessel frame or other components, aside from the propulsion system, that the fuel cell and diesel ships have in common. A 10% internal rate of return (IRR) was applied to the initial capital investment and an installation cost factor of 20% was applied to the capital cost. The capital cost of each component (e.g., engine, fuel tank, motor, etc.) was amortized over a period of 20 years, except for the fuel cell system, which was amortized over 6 or 10 years depending on ship class. The initial comparisons for container ships indicate that fuel costs are by far the dominant contributor to the TCO. With the current low cost of low-sulfur marine gasoil (LSMGO) and relatively high cost of hydrogen, it is difficult for hydrogen to compete with LSMGO in container ship applications. The large energy demand for container ships also favors the use of the higher volumetric energy density LSMGO fuel, especially for longer voyages. The space required to store enough hydrogen for the same journey is larger than that needed to store diesel fuels and can reduce the available cargo carrying and revenue generating space available on the ship.

08 HYDROGEN↗