Search NASA⌕ Search

SEARCH · Search NASA

Results for “data sheet”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

A preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: Characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory A description of the on-site infrastructure at the shutdown sites An evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State staff, State Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative have participated in nine of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 13 shutdown sites use designs from 4 different suppliers involving 11 different (horizontal and vertical) dry storage systems that would require the use of 9 different transportation cask designs to remove the SNF and GTCC waste from the shutdown sites. Although some changes to transportation certificates of compliance will be required, the SNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in dual purpose dry storage canisters that can be transported, including a small amount of high-burnup fuel. Most sites indicated that 2-3 years of advance time would be required for its preparations before shipments could begin. Some sites could be ready in less time. As additional sites such as Fort Calhoun, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cure Schedule for Stycast 2651/Catalyst 11.

The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, T g , exceeding cure temperature).

36 MATERIALS SCIENCE↗

Cure Schedule for Stycast 2651/Catalyst 9.

The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

36 MATERIALS SCIENCE↗

Document Release of CSAM 99-140 to DNFSB for Review, October 17, 2018

The data sheet on HFE-7200 from 3M is included in attachment 2. Unfortunately, at this time, the Criticality Safety Group cannot allow the replacement of TCE by HFE-7200 for the reasons discussed below. The moderating and reflecting properties of HFE-7200 were compared to trichloroethylene (TCE) and water. The results of several calculations are presented in attachment 1 and indicate that water is a far superior moderator than either HFE-7200 or TCE, but HFE-7200 results in significantly higher reactivity than TCE. The criticality safety evaluation for machining (CSM1020) credited the usage of TCE and this material was included in the Monte Carlo calculations to determine the reactivity of the upset conditions. Unfortunately, since the results of these calculations are relatively high, it cannot be determined without significant re-evaluation whether the replacement of conservatisms were employed in CSM1020 to simplify the calculations, it is likely that a re-evaluation considering less conservative models would allow the approval of HFE-7200. The Criticality Safety Group will include HFE-7200 when the evaluation for machining is upgraded to higher mass limits (with shape control).

61 RADIATION PROTECTION AND DOSIMETRY↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

A preliminary evaluation of removing spent nuclear fuel (SNF) from 14 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure at the shutdown sites, (3) an evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State representatives, State Regional Group representatives, Tribal representatives, and a Federal Railroad Administration representatives have participated in eleven of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 14 shutdown sites use designs from 4 different suppliers involving 11 different (horizontal and vertical) dry storage systems that would require the use of 9 different transportation cask designs to remove the SNF and GTCC waste from the shutdown sites. Although some changes to transportation certificates of compliance will be required, the SNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in dual purpose dry storage canisters that can be transported, including a small amount of high-burnup fuel. Most sites indicated that 2-3 years of advance time would be required for its preparations before shipments could begin. Some sites could be ready in less time. As additional sites such as Palisades, Pilgrim, Three Mile Island, Oyster Creek, Indian Point, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DAP: Cosmic Plastics D33/6120 vs. Sumitomo Bakelite 52-01

As soon as you lay eyes on the two data sheets for these materials, Cosmic D33/6120 and Sumitomo Bakelite 52-01, there are some pretty clear differences in mechanical, thermal, electrical, and physical properties. There are three distinct hypotheses relating to why the plastics are so distinctly different from one another: 1. unique composition; 2. different molding procedure; and 3. separate molding parameters A closer look into each of these hypotheses is necessary in explaining why the Sumitomo Bakelite and Cosmic DAPs are so different from one another.

36 MATERIALS SCIENCE↗

A Brief Review of Sylgard 184

This paper will explore applications and functionality of the Dow material Sylgard 184. Pure Sylgard 184 is a “Two-part, clear, 10:1, RT and heat cure, good strength, UL and Mil Spec” material that has good dielectric properties. According to the Technical Data Sheet, Sylgard 184 has a base viscosity of 511 cP, mixed viscosity of 3500 cP, and a work time of 1.5 hours. The cured mate rial has a Shore A hardness of 43, a tensile strength of 980 PSI, and a dielectric strength of 500 volts/mil.

36 MATERIALS SCIENCE↗

Hybrid Solar System (Final Scientific/Technical Report)

GTI Energy (GTI) teamed with the University of California at Merced (UCM) to scaleup the hybrid solar system (HSS) technology for demonstrating its performance at the US Gypsum (USG) plant in Plaster City, California. The technology integrates two-stage concentrating solar collector with matching particle thermal transport and storage (TSS) system to deliver cost-effective, and on-demand distributed high temperature industrial process heat up to 600°C with solar thermal, in this case to a gypsum kettle, to reduce its fuel use and carbon footprint. Current solar technologies, which reach these temperatures, are not distributable (towers) or cost-effective (dish). The research team developed a conceptual system design for host site retrofit, including preliminary heat balance, process flow diagram, particle to process heat exchanger and equipment placements at the site. Subsequently, parallel efforts were carried out at UCM to design, build and test a 12 m long commercial scale prototype concentrating thermal-only collector system and at GTI to design, build and test a matching 650°C capable particle TTS system. The nominal 50 kWth collector consists of a parabolic trough and three 4 m long two-stage receivers in series. Prior to on-sun testing, a 4 m long receiver was fabricated and successfully tested at 650 °C in a laboratory setting for 100 hrs of continuous operation showing less than 15% radiation loss. A 7 m wide x 17 m long parabolic trough was then installed at UCM for on-sun testing of the 12 m long receiver, and concurrently several 4 m long receivers were built. The optics of the parabolic trough were calibrated, and on-sun test were carried out on 12 m long receivers. During tests, the intense solar radiation (53x) caused the absorber tubes in the receivers to bend, reducing the overall optical efficiency. To address the bending issue, a self-consistent algorithm that includes ray tracing, thermal and deformation models was developed to perform thermal stress analysis on absorbers for parabolic solar collectors. Results obtained with this algorithm showed a dramatic rise in deformation as absorber tube length increases. A combined efficiency parameter that includes the occluded area for the mounts was developed to obtain an optimized tube length obtained. Based on the results, a length of 2.7 m for the absorber + 0.2 m for the coupler was chosen to minimize any bending and optimize optical efficiency while maintaining ease of mounting. The associated particle TTS system was designed, built and successfully tested at GTI. It includes storage, receiving and lock hoppers and piping that simulates the transfer of captured solar energy to an actual industrial furnace. Tests over 77 charge-discharge cycles demonstrated <2% particle degradation, with no problematic particle accumulations and no flow interruptions. The piping pressure drop was about 5 psi. The team also worked with Stanley Consultants (Stanley) to prepare conceptual and preliminary engineering packages to facilitate follow-on development and commercialization efforts. These include process and instrumentation diagram’s (P&ID’s), general arrangements, electrical one-line, project definitions document, equipment data sheets, schedule, and construction cost estimate for 2 MWth system. Updated HSS technology commercialization and customer engagement plans and detailed costs and evaluated market trade-offs and manufacturing.

03 NATURAL GAS↗

Equipment Qualification Report Environmental Qualification of GNB Absolyte Valve Regulated Lead Acid (VRLA) 1600 Ah100G33 Battery Rack Assembly (24590-QL-POA-EDB0-00001-11-00002_00A)

Greenberry Environmental Qualification Report 550001.001-35.0.5 provides basis for assignment of qualified life for: GNB Absolyte Valve Regulated Lead Acid (VRLA) 1600 Ah 100G33 Battery Rack Assembly in accordance with the requirements specified 24590-WTP-3PS-G000-T0015 (Rev 2) and Environmental Qualification Plan 550001.001-35.0.1 (Rev. 3). The equipment qualification basis represents the most conservative capability of the equipment. The analysis performed for the qualification is not less conservative than the bounding environmental conditions detailed in contract documents issued to Greenberry in contract 24509-QL-POA-EDB0-00001 Rev.0. The qualified life of 10 years has been established based upon an end-condition objective of the equipment condition indicators that correlate to the ability of equipment to perform its safety function. The VRLA Battery Cell Assembly was aged by 10 years (minimum) in accordance with conditions specified by Bechtel Equipment Qualification Datasheet 24590-LAW-EUQ-UPE 00003 Rev. 3 and the process conditions specified by the Instrument Data Sheet 24590-LAW EUD-UPE-00009 Rev. 2. Greenberry Industrial has contracted with GNB Industrial Battery Co located at 4115 S Zero St, Fort Smith, AR 72908 to perform age conditioning, monitoring, and capacity testing in accordance with Environmental Qualification Plan 550001.001-35.0.1 Rev. 1. The required process at the stated conditions set by the parameters established by the plan were completed satisfactorily. The details of the of the test process observed by Greenberry is detailed in the attached Seismic Test Log 550001.001-7.0.3, including examples of the objective evidence collected during the qualification process.

54 ENVIRONMENTAL SCIENCES↗

H3D Characterization Memo

The H3D was characterized using GADRAS 19.3.5 using data sent by the IAEA. Everything related to the measurement setup was provided by the IAEA. The sources measured were detailed and the distance from the detector was also provided. The data sheets of the sources were used to determine the source activity at the time of calibration, as needed for characterization.

97 MATHEMATICS AND COMPUTING↗

Chemical Process Safety at TRISO-Based, Metal-Based, and Salt-Based Fuel Fabrication Facilities: Technical Assessment and Guidance Assessment

As part of efforts to prepare for potential and ongoing safety reviews for licensing of advanced non-light-water reactor fuel cycles, the U.S. Nuclear Regulatory Commission (NRC) tasked Pacific Northwest National Laboratory to prepare an assessment on the state of knowledge of potential chemical processes at fuel cycle facilities supporting the front end of these fuel cycles, and to assess the associated regulatory guidance. This report provides a technical assessment of chemical process safety considerations to support NRC licensing reviews of fabrication processes for tri-structural isotropic (TRISO) based, metallic-based, and salt-based fuels. The assessments involved collecting publicly available information on the fuel fabrication processes to (i) identify the operational process steps, characteristics and chemicals involved, (ii) identify the physical safety considerations and health safety considerations during licensing reviews of the various process steps, and (iii) collect information to support assessments of severity of accidents and potential mitigative measures to be implemented. The assessment provides a foundational basis on chemical process safety considerations for advanced fuel fabrication activities, although it is recognized that licensing reviews may necessitate design-specific considerations. The specific conditions under which chemical hazards emerge will require process-specific considerations, highlighting the importance of process-informed interpretation. The assessment also determined that exposure guidelines and limits to assess the consequences of acute exposures are limited for some chemicals, although alternative limits and supplementary information from databases or safety data sheets provide sufficient information to evaluate consequences of acute exposures. In addition, it was identified that metallic and salt fuel fabrication processes may involve beryllium, which is an exposure hazard. The regulatory framework for the licensing of advanced fuel cycle facilities, per 10 CFR Part 70 Domestic Licensing of Special Nuclear Material, is deemed robust and flexible to address the chemical safety considerations in this report. A review was conducted on various regulatory guidance and technical basis documents. This included reviewing NUREG-1520, Revision 2, Standard Review Plan for Fuel Cycle Facilities License Applications – Final Report and the process descriptions in Appendix A of NUREG/CR-6410, Nuclear Fuel Cycle Facility Accident Analysis Handbook, to address advanced fuel types. As new fuels will involve process-specific chemical uses, process-specific considerations are provided in this report. Additionally, it is noted that the U.S. Department of Energy protective action criteria database includes Temporary Emergency Exposure Limits (TEELs) for process-specific chemicals. This report provides technical information to support chemical safety assessments of new advanced fuel cycle facilities and identifies technical and safety information to support licensing reviews. No regulatory barriers were identified for the licensing of advanced fuel cycle facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DALG: A program for test pattern generation in combinational logical circuits

A user's manual for a computer program DALG which generates test patterns for detecting faults in combinational logic circuits containing up to 200 logical gates is presented. The gates may be of logical types AND, OR, NAND, NOR, NOT, or Exclusive OR is presented. The faults may be any one gate or input struck at a fixed value (0 or 1). In addition to test pattern generation DALG will also determine whether or not the given test pattern will detect given faults in a circuit. Sample problems are given along with input data sheets and printed output to illustrate the capabilities of the program.

Source record↗

NASA directory of observation station locations, volume 1

Geodetic information is presented for NASA tracking stations and observation stations in the NASA geodetic satellites program. A geodetic data sheet is provided for each station, giving the position of the station and describing briefly how it was established. Geodetic positions and geocentric coordinates of these stations are tabulated on local or major geodetic datums, and on selected world geodetic systems when available information permits.

Source record↗

NASA directory of observation station locations, volume 2

The directory documents geodetic information for NASA tracking stations and observation stations in the NASA Geodetic Satellites Program, including stations participating in the National Geodetic Satellite Program. Station positions of these facilities are given on local or preferred major datums, and on the Modified Mercury Datum 1968. A geodetic data sheet is provided for each station, giving the position of the station and describing briefly how it was established. Geodetic positions and geocentric coordinates of these stations are tabulated on local or major geodetic datums, and on selected world geodetic systems when available information permits.

Source record↗

Production development of organic nonflammable spacecraft potting, encapsulating and conformal coating compounds. Volume 3: Appendices

Appendices are presented which include: statement of work; material vendor contacts; formulation/processing data sheet; upward propagation test; flammability test conditions/results sheet; odor test; vacuum stability requirements; flammability test facility; determination of offgassing products and carbon monoxide test; and pneumatic and mechanical impact test guidelines.

Lieberman, S. L.↗