Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Energy Resources, Interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Improving estimates of transmission capital costs for utility-scale wind and solar projects to inform renewable energy policy

Estimating the overall costs of transmission needed to integrate variable renewable energy (VRE) onto the grid is challenging. An improved understanding of these transmission costs would support electricity system planning as VRE penetrations increase. This paper brackets VRE transmission capital costs using multiple approaches based on interconnection studies, actual transmission projects, capacity-expansion simulation models, and aggregated U.S. VRE-related transmission expenditures. Each approach possesses advantages and drawbacks, and combining the approaches lends confidence to the results. The resulting range of average levelized VRE transmission costs is 1– 10 dollars/MWh, which is generally lower than earlier estimates in the literature. These transmission capital costs can increase the direct plant-level levelized cost of VRE by 3%–33%, based on levelized costs of energy of 29– 56 dollars/MWh for utility-scale wind and 36–46 dollars/MWh for utility-scale solar. As VRE deployment continues to expand, policy makers can use this information to (1) assess the benefits of transmission avoidance and deferral when comparing distributed energy resources versus utility-scale projects, (2) evaluate the potential costs of large-scale public transmission investments, and (3) better analyze system-level costs of utility-scale VRE technologies. Future research can expand on the framework presented here by providing a review of operation and maintenance costs for transmission systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SIDSIM (Sub-Interval Distribution-function in Simulation) [SWR-17-22]

Time-series simulation is a technique used to estimate the energy delivery of a power generation system with output that changes under changing conditions. Such variable resources include photovoltaic energy systems that experience different levels of sunlight or wind farms with changing wind patterns. As distributed generation from these variable resources continues to flourish, having improved software tools to accurately measure, model, and estimate phenomena of interest to grid integration, in addition to energy output, will be crucial for safeguarding smooth integration and operation of these energy systems. Currently, time-series simulations assume conditions and power output are constant over the duration of a time-step (steady-state assumption). NREL researchers improve the accuracy with a new simulation software called SIDSIM (Sub-Interval Distribution Simulation) that replaces this steady value (solar or wind resource) with a distribution function that has a maximum value, a minimum value, and a shape to the curve within each time-step. The distribution function used for modeling varying values in the SIDSIM software is a novel equation and presents advantageous new benefits over the conventional methods. The first advantage comes in the ability to determine maximum instantaneous power within a time-step. This enables better protection of a system from overcurrent issues and it also allows for better forecasting and reservation of transmission capacity; such capabilities are essential for energy system integration. Second, a distribution function helps to determine the amount of energy loss due to “clipping” in cases where the photovoltaic direct current (DC) system capacity exceeds the inverter capacity, the AC interconnect capacity, or any other limiting component or threshold value. It improves estimates of battery throughput by allowing both charge and discharge of a battery within the duration of a time-step. Third, it provides a more refined estimate of utility-bill impacts by considering the delivered power may be higher than the site load or lower than the regular average power estimates that are made using a quasi-steady-state assumption. SEE ALSO OSTI ID 1,361,018

Walker, Andy↗

Exploring the Grid Value Potential of Offshore Wind Energy in Oregon

The grid value of Oregon's offshore wind resource is considered through the lenses of (i) resource complementarity with the hydroelectric system and other Variable Renewable Energy resources, (ii) load complementarity with the four balancing authorities with territory in Oregon, and (iii) spatial value to regional and coastal grids as represented through a Production Cost Model of the WECC system. Capacity implications of the interactions between offshore wind and the historical east-to-west power flows of the region are reviewed. The existing system is shown to accommodate 2GW of offshore wind interconnections without curtailment.

17 WIND ENERGY↗

Capacity Expansion Modeling for Storage Technologies

The Resource Planning Model (RPM) is a capacity expansion model designed for regional power systems and high levels of renewable generation. Recent extensions capture value-stacking for storage technologies, including batteries and concentrating solar power with storage. After estimating per-unit capacity value and curtailment reduction potential, RPM co-optimizes investment decisions and reduced-form dispatch, accounting for planning reserves; energy value, including arbitrage and curtailment reduction; and three types of operating reserves. Multiple technology cost scenarios are analyzed to determine level of deployment in the Western Interconnection under various conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of μCHP in Light Commercial Hot Water Applications

Internal combustion engine driven combined heat and power (CHP) systems produce power while the waste heat is recovered and used for another purpose. For µCHP systems (less than 50kWe output) overall efficiencies can reach over 90% for products currently on the market throughout the world. On a fuel basis this offers an advantage over using grid-based power and another fuel for heat. Additionally, the cost of natural gas on an energy unit basis is significantly less expensive than electric power. This difference can lead to substantial savings for the end user of a CHP system. In some parts of the world, particularly Germany and Japan, µCHP has become a common part of the heat and distributed generation equipment mix. Market analysis conducted in 2012 showed that in North America there is potential of a 5,300 units per year market for µCHP, resulting in an annual energy savings of approximately 13.5 TBtu and more than $84 million in annual customer savings. However, µCHP still has not seen much market penetration in North America. This study helps to identify some of the reasons why, address roadblocks that still need to be overcome and provide experience to established best practices. Nine commercial sites were initially identified (fitness club, surgical center, senior community, resort and spa, commercial laundry, two multi-family housing, restaurant and manufacturing facility). Systems from two different manufacturers were installed at five sites total, but due to unforeseen circumstances, only three of those sites were finally commissioned: test data were collected by Oak Ridge National Laboratory. While not all systems were installed as intended, the project resulted in the following key findings: Micro combined heat and power is an unfamiliar technology for building owners and plumbing and electrical contractors that serve the buildings most suited for µCHP. Manufacturers will need to be aggressive in providing training and providing broad support to successfully bring the technology to market.; The proper integration of µCHP into other building systems is the most critical part of a successful installation. Manufacturers will need to be able to provide the expertise to train, advise and support the mechanical contractors during the design and installation of the heat integration system.; Regulations governing µCHP varies across the country. There are a few UL standards (UL 2200 and UL 1741) that apply nationally. Emissions are governed by EPA except in California where the California Air Resources Board (CARB) has established their own standard. Requirements that dictate installation and interconnection are dependent on local building codes and local utility processes and requirements. Some out of date building codes do not offer clear guidance for these requirements, leading to confusion. This makes developing training and determining broadly applicable best practices difficult.; Installation costs of µCHP are a key factor in making an installation successful. It is critical that these costs and all national, state and local regulations be understood and accounted for by all parties involved in the installation before a project is undertaken.; A robust customer service organization is important to meet the needs of the customers. These systems require annual maintenance and service and local capability is needed to keep costs inline.

03 NATURAL GAS↗

A Review of Distributed Wind Interconnection Technology and Standards

The objectives of this report are to discuss the uniqueness of power converters in distributed wind (DW), identify challenges in complying with existing standards, prioritize technological innovations to facilitate interconnection of DW energy systems, and, where necessary, propose potential clarifications or revisions to standards. This report evaluates IEEE 1547-2018, IEEE 1547.1-2020, and UL 1741 SB standards and their implications for DW. A standards review and interviews of DW industry stakeholders were conducted to identify challenges in the application of current standards to DW. The study concludes with a combination of recommendations of pathways towards facilitating DW product commercialization and DW interconnection, which draws on participation from multiple stakeholders in the space. These solutions can continue to be explored to improve DW standards compliance, improve the applicability of the standards to DW, reduce certification testing barriers, and ensure the safe and reliable operation of DW energy resources and electric power systems.

17 WIND ENERGY↗

Multi-Megawatt-Scale Power-Hardware-in-the-Loop Interface for Testing Ancillary Grid Services by Converter-Coupled Generation: Preprint

Power-hardware-in-the-loop (PHIL) is a simulation tool that can support electrical systems engineers in the development and experimental validation of novel, advanced control schemes that ensure the robustness and resiliency of electrical grids that have high penetrations of low-inertia variable renewable resources. With PHIL, the impact of the device under test on a generation or distribution system can be analyzed using a real-time simulator (RTS). PHIL allows for the interconnection of the RTS with a 7 megavolt ampere (MVA) power amplifier to test multi-megawatt renewable assets available at the National Wind Technology Center (NWTC). This paper addresses issues related to the development of a PHIL interface that allows testing hardware devices at actual scale. In particular, the novel PHIL interface algorithm and high-speed digital interface, which minimize the critical loop delay, are discussed.

17 WIND ENERGY↗

Properly Understanding the Impacts of Distributed Resources on Distribution Systems

The subject paper discusses important impacts of distributed resources on distribution networks and feeders. These include capacity, line losses, voltage regulation, and central system support (such as volt/var via central generators and substation) as the number, placement and penetration levels of distributed resources are varied. Typically, the impacts of distributed resources on the distribution system are studied by using steady-state rather than dynamic analysis tools. However, the response time and transient impacts of both system equipment (such as substation/feeder capacitors) and distributed resources needs to be taken into account and only dynamic analysis will provide the full impact results. ORNL is wrapping up a study of distributed resources interconnected to a large distribution system considering the above variables. A report of the study and its results will be condensed into a paper for this panel session. The impact of distributed resources will vary as the penetration level reaches the capacity of the distribution feeder/system. The question is how high of a penetration of distributed resource can be accommodated on the distribution feeder/system without any major changes to system operation, design and protection. The impacts most surely will vary depending upon load composition, distribution and level. Also, it is expected that various placement of distributed resources will impact the distribution system differently.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Metrics required for Power System Resilient Operations and Protection

Today’s complex grid involves many interdependent systems. Various layers of hierarchical control and communication systems are coordinated, both spatially and temporally to achieve gird reliability. As new communication network based control system technologies are being deployed, the interconnected nature of these systems is becoming more complex. Deployment of smart grid concepts promises effective integration of renewable resources, especially if combined with energy storage. However, without a philosophical focus on resilience, a smart grid will potentially lead to higher magnitude and/or duration of disruptive events. The effectiveness of a resilient infrastructure depends upon its ability to anticipate, absorb, adapt to, and/or rapidly recover from a potentially catastrophic event. Future system operations can be enhanced with a resilient philosophy through architecting the complexity with state awareness metrics that recognize changing system conditions and provide for an agile and adaptive response. The starting point for metrics lies in first understanding the attributes of performance that will be qualified. In this paper, we will overview those attributes and describe how they will be characterized by designing a distributed agent that can be applied to the power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Waiting in Queue: A Historical Evaluation of Interconnection Policy

Both states and Independent System Operators (ISO)/Regional Transmission Organizations (RTO) have struggled with long wait times in interconnection queues. As a result, numerous reforms have been proposed to expedite the connection of new resources to the grid. This paper conducts a quantitative analysis of two of these policies: one providing detail hosting capacity information in Massachusetts, the other experimenting with cost allocation in New York. We find that both policies led to a statistically significant decrease in the times projects spend pending in interconnection queues, with New York seeing a small drop in days pending, and Massachusetts seeing a much larger one. We also include an analysis of how energy storage is impacts queue time in these states. These results can help inform regulators who are weighing reforms to interconnection policies, with the goal of reducing wait times.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Regional Inertia Estimation Using Actual Event Measurements: Florida Case

As inverter-based resources’ integration in power grids increases, their uneven distribution across the electrical network leads to the formation of local regions that are weakly coupled to the larger interconnection. This signifies the necessity of regional frequency dynamics investigation and analyzing various inertia metrics. This paper presents a practical methodology for estimating regional rate-of-change of frequency (RoCoF) using actual event recordings, which is then used to evaluate regional inertia. Florida (FL) is selected as the region of interest due to its distinct regional frequency dynamics and the rising levels of solar generation. We identify and analyze confirmed events from 2017 to 2024 that occurred in FL. The results indicate that FL contributes about 14% to the total inertia of the US Eastern Interconnection, which approximately matches its share of generation capacity. Results also highlight seasonal fluctuations in energy generation, which play a significant role in influencing inertia and thus the RoCoF levels. This emphasizes the importance of estimating regional inertia to enhance grid operations for a future that focuses on distributed generation.

Dulal, Saurav [University of Tennessee, Knoxville ↗

Beyond Renewable Portfolio Standards: An Assessment of Regional Supply and Demand Conditions Affecting the Future of Renewable Energy in the West; Report and Executive Summary

This study assesses the outlook for utility-scale renewable energy development in the West once states have met their renewable portfolio standard (RPS) requirements. In the West, the last state RPS culminates in 2025, so the analysis uses 2025 as a transition point on the timeline of RE development. Most western states appear to be on track to meet their final requirements, relying primarily on renewable resources located relatively close to the customers being served. What happens next depends on several factors including trends in the supply and price of natural gas, greenhouse gas and other environmental regulations, consumer preferences, technological breakthroughs, and future public policies and regulations. Changes in any one of these factors could make future renewable energy options more or less attractive.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Southern California Edison High Penetration Photovoltaic Project - Year 1

This report discusses research efforts from the first year of a project analyzing the impacts of high penetration levels of photovoltaic (PV) resources interconnected onto Southern California Edison's (SCE's) distribution system. SCE will be interconnecting a total of 500 MW of commercial scale PV within their service territory by 2015. This Year 1 report describes the need for investigatinghigh-penetration PV scenarios on the SCE distribution system; discusses the necessary PV system modeling and distribution system simulation advances; describes the available distribution circuit data for the two distribution circuits identified in the study; and discusses the additional inverter functionality that could be implemented in order to specifically mitigate some of the undesirabledistribution system impacts caused by high-penetration PV installations.

14 SOLAR ENERGY↗

Impedance-Based Stability Analysis in Grid Interconnection Impact Study Owing to the Increased Adoption of Converter-Interfaced Generators

This study investigates the emerging harmonic stability concerns to be addressed by grid planners in generation interconnection studies, owing to the increased adoption of renewable energy resources connected to the grid via power electronic converters. The wideband and high-frequency electromagnetic transient (EMT) characteristics of these converter-interfaced generators (CIGs) and their interaction with the grid impedance are not accurately captured in the typical dynamic studies conducted by grid planners. This paper thus identifies the desired components to be studied and subsequently develops a practical process for integrating a new CIG into a grid with the existing CIGs. The steps of this process are as follows: the impedance equation of a CIG using its control dynamics and an interface filter to the grid, for example, an LCL filter (inductor-capacitor-inductor type), is developed; an equivalent impedance model including the existing CIGs nearby and the grid observed from the point of common coupling are derived; the system stability for credible operating scenarios is assessed. Detailed EMT simulations validate the accuracy of the impedance models and stability assessment for various connection scenarios. Here, by complementing the conventional EMT simulation studies, the proposed analytical approach enables grid planners to identify critical design parameters for seamlessly integrating a new CIG and ensuring the reliability of the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chapter Ten - Power, Buildings, and Other Critical Networks: Integrated Multisystem Operation

The electrifying transportation sector, the increasing grid interactivity of the built environment, the rapidly expanding number of devices within the Internet-of-Things, and the overall trend toward highly connected systems and interdependent networks is revolutionizing the operation of the electric power grid. While these changes are presenting grid operators with new challenges to ensure an efficient, reliable, and sustainable operation of the grid, they also enable a new suite of resources that can be utilized for assisting the grid in times of need. In this chapter, we explore how these recent changes and trends are affecting modern power systems and discuss the benefits and challenges of an increasingly electrified and interconnected world. We will observe how various critical infrastructure, that is, buildings, water and gas, transportation, and telecommunication networks are highly dependent on power network operations but, with improved coordination and control, can also provide valuable assets to the grid in times of need.

electricity markets↗

Fish Friendly Water Rules' Impact On the Power Grid with High VRE Levels

Columbia River basin multipurpose reservoirs are operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. When conventional thermal power plants are retired, hydropower flexibility balances the wind and solar variability of the power grid and provides grid services to maximize the high renewable power absorption. On the other hand, over-reliance on hydropower could harm the river basin fish habitat. For example, water release pulses during peak electricity demand hours and shorter-term water release variation could harm the fish population. Power grid planners, environmentalists, Columbia Basin tribes, hydro regulators, and water resource planners work together to understand the impacts of Columbia River basin operation in a fish-friendly way in the current power grid and power grid with higher renewable power share. We examine different levels of renewable share in the Western Interconnection to understand the multiple weather years and future climate projection and operating scenario impact on the power grid and water system. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

environmental↗

Experimental Evaluation of PV Inverter Anti-Islanding with Grid Support Functions in Multi-Inverter Island Scenarios

As PV and other DER systems are connected to the grid at increased penetration levels, island detection may become more challenging for two reasons: 1.) In islands containing many DERs, active inverter-based anti-islanding methods may have more difficulty detecting islands because each individual inverter's efforts to detect the island may be interfered with by the other inverters in the island. 2.) The increasing numbers of DERs are leading to new requirements that DERs ride through grid disturbances and even actively try to regulate grid voltage and frequency back towards nominal operating conditions. These new grid support requirements may directly or indirectly interfere with anti-islanding controls. This report describes a series of tests designed to examine the impacts of both grid support functions and multi-inverter islands on anti-islanding effectiveness. Crucially, the multi-inverter anti-islanding tests described in this report examine scenarios with multiple inverters connected to multiple different points on the grid. While this so-called 'solar subdivision' scenario has been examined to some extent through simulation, this is the first known work to test it using hardware inverters. This was accomplished through the use of power hardware-in-the-loop (PHIL) simulation, which allows the hardware inverters to be connected to a real-time transient simulation of an electric power system that can be easily reconfigured to test various distribution circuit scenarios. The anti-islanding test design was a modified version of the unintentional islanding test in IEEE Standard 1547.1, which creates a balanced, resonant island with the intent of creating a highly challenging condition for island detection. Three common, commercially available single-phase PV inverters from three different manufacturers were tested. The first part of this work examined each inverter individually using a series of pure hardware resistive-inductive-capacitive (RLC) resonant load based anti-islanding tests to determine the worst-case configuration of grid support functions for each inverter. A grid support function is a function an inverter performs to help stabilize the grid or drive the grid back towards its nominal operating point. The four grid support functions examined here were voltage ride-through, frequency ride-through, Volt-VAr control, and frequency-Watt control. The worst-case grid support configuration was defined as the configuration that led to the maximum island duration (or run-on time, ROT) out of 50 tests of each inverter. For each of the three inverters, it was observed that maximum ROT increased when voltage and frequency ride-through were activated. No conclusive evidence was found that Volt-VAr control or frequency-Watt control increased maximum ROT. Over all single-inverter test cases, the maximum ROT was 711 ms, well below the two-second limit currently imposed by IEEE Standard 1547-2003. A subsequent series of 244 experiments tested all three inverters simultaneously in the same island. These tests again used a procedure based on the IEEE 1547.1 unintentional islanding test to create a difficult-to-detect island condition. For these tests, which used the two worst-case grid support function configurations from the single-inverter tests, the inverters were connected to a variety of island circuit topologies designed to represent the variety of multiple-inverter islands that may occur on real distribution circuits. The interconnecting circuits and the resonant island load itself were represented in the real-time PHIL model. PHIL techniques similar to those employed here have been previously used and validated for anti-islanding tests, and the PHIL resonant load model used in this test was successfully validated by comparing single-inverter PHIL tests to conventional tests using an RLC load bank.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid-Forming Inverters: Project Demonstrations and Pilots

Power system operators around the world are pushing the limits of integrating inverter-based resources (IBRs) to very high levels, approaching 100% instantaneous penetration under certain operating conditions. This often applies to smaller power systems with very little or no ac interconnections to other neighboring regions or sometimes to fringes of large balancing areas, such as Denmark or Portugal, within the mainland European power system. These jurisdictions have identified the potential of grid-forming (GFM) technology as a key enabler to support the energy transition with very few or no synchronous generators online. Until recently, practical applications of GFM inverters were limited to microgrids and isolated grids and in smaller grid applications on the order of a few tens of megawatts (MW).

Australia↗