Search NASA⌕ Search

SEARCH · Search NASA

Results for “Options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Tritiated Water Disposition Strategies

Tritium, a radioactive isotope of hydrogen, is typically confined within one or more confinement barriers. Tritium readily reacts with oxygen to form tritiated water or can exchange with protium or deuterium atoms in water to create tritiated water which is around 10,000 times more toxic than elemental tritium. Primary tritium confinement systems can create small volumes of highly tritiated water. Secondary confinement systems, like inert gloveboxes, will produce larger volumes of lower concentration tritiated water. Much larger volumes of tritiated water of very low tritium content are produced by tritium permeation/diffusion. Tritium from inside primary and secondary confinement barriers will diffuse from these systems into cooling water systems. Closed loop, recirculating cooling water systems will slowly accumulate tritium and create concentrations which exceed drinking water (or permitted discharge) concentrations. The cooling water systems designed as series of interconnected cooling loops that can slowly transfer tritium from one cooling loop to another cooling loop through heat exchangers. These large volumes of tritiated water may be above federal discharge limits and also lack convenient disposition pathways. This document will discuss tritiated water management strategies from the perspective of large volume, low tritium concentrations that exceed drinking water or permitted discharge limits. Applicable US regulatory requirements for a Molybdenum-99 (Mo-99) production facility concerning tritiated water are also cited. Tritiated water disposition options, based on typical waste minimization strategies will guide dispositions options. A Case Study example is presented to illustrate the pros and cons of several disposition options. The report does not recommend any particular disposition pathway but discusses strategies to be explored by a producer to guide selection of processes which best fits the needs of a particular waste stream.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Validation of Reactive Flow Capabilities in PAGOSA

Several reactive flow modeling capabilities are studied and applied to physics problems of interest in the PAGOSA hydrocode with an emphasis on validation. The Davis equation of state and the Arrhenius shock temperature dependent WSD (AWSD) reactive flow model have been implemented by the author in PAGOSA over the last year. These high-explosive modeling options along with the previously existing HE-JWL equation of state and the SURF/SURFplus reactive flow models are discussed, exercised and compared. Validation of the models analyze numerical results against experimental data from cylinder tests, two-stage gas gun experiments and proton radiography (pRad) experiments. Applications of the modeling options are explored involving both HMX based PBX 9501 and TATB based PBX 9502. The effect of mesh size is considered for prediction of phenomena such as corner turning and dead zones, and the relative code performance of the modeling options is discussed.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Financing Federal Microgrids [Slides]

A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. When components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs, implementation by one of several privately financed federal procurement mechanisms is possible. However, it is typically difficult to achieve enough savings and avoided costs to cover the design, equipment, and installation of certain microgrid components that are required to integrate the system. This presentation explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

There's No Place Like Home: Residential Parking, Electrical Access, and Implications for the Future of Electric Vehicle Charging Infrastructure

In March 2021, the cumulative sale of plug-in electric vehicles (PEVs), including plug-in hybrid electric vehicles (PHEV) and battery electric vehicles (BEV), reached 1.8 million in the United States (Argonne National Laboratory 2021). However, PEV adoption is still in its infancy; its market share has just reached around 3% of new light-duty vehicle (LDV) sales by the end of 2020 (Alliance for Automotive Innovation 2021). Current trends suggest that PEV market share in the United States is increasing. The U.S. Energy Information Administration's (EIA's) 2020 Annual Energy Outlook forecasts PEV registrations to exceed 8 million vehicles by 2030 (AEO 2020). PEV adoption is expected to be led by states that are regulating the sale of zero emission vehicles (ZEVs) (California Air Resources Board). California continues to push for more aggressive ZEV regulations; the state recently issued an executive order aimed at 100% of LDV sales being ZEVs by 2035 (Office of Governor Newsom). At the federal level, the Biden administration has shown great ambition in encouraging broader electric vehicle (EV) adoption, including setting the goal of installing 500,000 new chargers nationwide (The White House 2021). Access to charging infrastructure is consistently cited as one of the primary barriers to the increased sale of PHEVs and BEVs (Carley et al. 2019). In the United States, PEV charging options are often described using a pyramid structure, with residential charging as the foundation, workplace charging in the middle, and public charging on top (Figure 1). The existing electricity system, which generates, transmits, and distributes electric fuel to residential households, has helped PEVs partially overcome the "chicken and egg" conundrum that has haunted other alternative fuels. Viable home access to electric charging is also an important equity issue, because non-residential PEV charging options (e.g., workplace or public charging stations) are generally more expensive. Households without residential charging access may experience higher total cost of PEV ownership if non-residential charging options are more costly.

33 ADVANCED PROPULSION SYSTEMS↗

Light-Level Geolocation of the LANL Population of Western Bluebirds

Options for tracking and reconstructing animal movement are increasingly accessible due to rapidly decreasing costs, smaller sizes, and a proliferation of analytical inference techniques (Rutz and Hays, 2009; Wikelski et al., 2007). A wide variety of options exists for determining movement patterns of animals—from high-resolution pinpoint ARGOS satellite tags to time-consuming and logistically challenging radio telemetry. One option, light-level geolocation, offers small, affordable devices with long battery lives known as global location sensors (GLS), making them ideal for gathering preliminary migratory data. Geolocation works by inferring patterns of animal movement from light-level transitions between day and night (Hill and Braun, 2001). The recent advances in tracking technologies allow biologists to zoom in on migratory behavior, delineating heretofore-unidentified intraspecific migratory behavior (Delmore et al., 2012). The ubiquity of migratory divides (populations within a species that exhibit different migratory patterns) remains largely unknown, but their existence can lead to favorable demographic metrics (e.g., genetic diversity) in conservation contexts (Møller et al., 2011) and necessitate the development of population-specific conservation plans (Delmore et al., 2012). Delimiting the populations within a species that migrate and the extent of their migrations relative to individuals that remain resident across a species’ range has important evolutionary, ecological, and conservation implications. Within this context, Los Alamos National Laboratory (LANL) biologists have leveraged the local Avian Nestbox Network (ANN; Fair and Myers, 2002) to evaluate the migratory behaviors of a common local bird species, the Western Bluebird (Sialia mexicana).

47 OTHER INSTRUMENTATION↗

Carbon Dioxide Utilization Life Cycle Analysis Guidance for the U.S. DOE Office of Fossil Energy and Carbon Management (Version 2.0)

Capturing carbon dioxide (CO 2 ) and placing it in permanent storage in geologic formations is an option for reducing CO 2 emissions, but it may not be a viable one for all CO 2 emitters. For some, the added cost of capture may be too high to implement, or the geology near the source may not be suitable for storage. In these circumstances, other options will be needed. Carbon use and reuse, or CO 2 utilization (CO2U), is an alternative approach that seeks beneficial uses for captured CO 2 , such as using it as a feedstock in the production of fuels, chemicals, and building materials. These uses would give CO 2 value that could be used by suppliers (emitters) to offset capture costs. One of the principal features and challenges associated with CO2U is that the products derived from CO 2 must have lower carbon footprints than their conventional counterparts. Previous assessments of CO2U alternatives have focused on the carbon content of utilization products as an indicator of CO 2 equivalent (CO 2 e) emissions reduction potential. However, embodied emissions are—at best—only weakly correlated with the amount of carbon contained in any physical product. Therefore, the most attractive CO2U options will both displace the carbon in an existing product and improve the overall carbon efficiency of the manufacturing process. Research to overcome barriers will include identifying existing co-feeds and available low-carbon energy sources to enable the conversion of CO 2 to value-added products under favorable processing conditions. New discoveries in the fields of nano- and bio-technology will be applied to efficiently utilize CO 2 in new applications. Development of advanced materials and processes, integrating CO 2 capture with utilization processes (e.g., algae), exploring a diverse slate of products from CO 2 to effectively offset capture costs and developing processes based on waste energy are means to overcome these barriers. The research will lead to the development of advanced catalysts, materials, and equipment that can be used to convert CO 2 into useful products. The result will be multiple flexible and adaptable technology platforms that can be used to produce suites of products spanning multiple utilization pathways.

54 ENVIRONMENTAL SCIENCES↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis

This report presents an analytical methodology to identify alternative options to manage interconnection costs and streamline interconnection timelines for distribution system-connected photovoltaic (PV) systems not co-located with load. Specifically, the report details the methodology and results of an analysis that: 1. Identifies potential grid violations that would be induced by a PV system requesting interconnection to a distribution circuit; 2. Identifies multiple technically viable options for mitigating the potential violations, including infrastructure upgrades, downsizing the PV system size, curtailment of PV, and addition of battery energy storage; 3. Defines the required technical operating parameters of the system in order to mitigate all potential violations (the "Operating Envelope"); 4. Compares the economics of each option, from the PV developer's perspective. The analysis supports the ongoing evolution of interconnection standards for combined PV and energy storage systems by providing a methodology to define allowable maximum export limits during each hour. The methodology presented could be used by utilities as part of the interconnection study process, to inform negotiations with DER developers and the drafting of mutually acceptable interconnection agreements. The resulting technical operating parameters could be included as part of the interconnection service agreement (ISA) between the system owner and the utility company. The companion report to this analysis, Gill et al. (2022), details the envisioned framework for the implementation of the technical operating parameters.

14 SOLAR ENERGY↗

Physics Opportunities for the Fermilab Booster Replacement

This white paper presents opportunities afforded by the Fermilab Booster Replacement and its various options. Its goal is to inform the design process of the Booster Replacement about the accelerator needs of the various options, allowing the design to be versatile and enable, or leave the door open to, as many options as possible. The physics themes covered by the paper include searches for dark sectors and new opportunities with muons.

43 PARTICLE ACCELERATORS↗

(U) Marker Lagrangian Simulations using Geometry from CAD Assembly Files [Slides]

The Eulerian code PAGOSA now contains an option for the forward time integration of any user selected material in the Lagrangian frame of reference. This option is accomplished using a Multifield version of Brackbill’s FLIP plus Sulsky’s MPM. FLIP+MPM is a Marker Lagrangian scheme that is not to be confused with well known Grid Lagrangian schemes. This Marker Lagrangian method allows materials to undergo completely arbitrary deformation, up to and including fracture and separation. Using this option makes PAGOSA into a mixed frame simulation tool such that fluids can be integrated in the Eulerian frame and solids integrated in the Lagrangian frame. Boundaries between the fields are said to be ’immersed’ in the computational domain, and their nature is formulated using Multifield Theory. Each Marker in a field of FLIP+MPM material tracks the thermodynamic state of a small (but finite) piece of mass. Initiation of the Markers using the geometry and material information from CAD Assembly files is the subject of the talk. The ease and speed with which the dynamics of the assembly can be studied is demonstrated.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Verification of the DIF3D Software to Support Fast Reactor Analysis

Ongoing design activities at Argonne National Laboratory are requiring a thorough verification of the Argonne Reactor Computation codes be performed. DIF3D is central to this system. The driver for this effort requires the 3D Cartesian, triangular-Z, and hexagonal-Z core geometry options of DIF3D be verified. Previous work identified the DIF3D features required to be verified to support current design activities, features of which are generally applicable to hexagonal-Z fast reactor designs. The scope of this verification effort includes verifying DIF3D’s ability to correctly translate the user’s model in to DIF3D’s preferred format, verifying that options planned for use have the desired effect, and verifying the correctness of the eigenvalue, fixed-source, forward, and adjoint solvers in DIF3D-FD and DIF3D-VARIANT. This manuscript provides the verification tasks and their results with respect to the features needed for current design activities. Since analytic solutions of the neutron diffusion and transport equations are either limited in scope or not possible, multiple tiers of problems unique to each solver and geometry type were implemented. Each of these tiers tests features independent and complementary arguments for why the separate testing of functionalities is acceptable. Finally, this separate testing was also supplemented with a high-level integral check of each the diffusion and transport capabilities and applicable geometries. To accommodate cases which an analytic solution is not feasible, MCNP6.2 was relied upon to provide a higher-order reference solution. This therefore required that the capabilities within MCNP6.2 which were relied upon for this work are also verified in this work. No MCNP discrepancies were noted in this effort. Note that the MCNP6.2 verification included in this work does not stand as a full verification of MCNP6.2, but merely verifies the features used in verifying DIF3D. The verification effort identified no issues that are debilitating or otherwise impactful to design usage of DIF3D, and thus DIF3D version 11.0, release 3012 is considered verified. As some additional changes have been made to the ARC software since this point all versions between release 3012 and 3266 can be considered verified as version 3253 was used for all updates in this revision. The types of issues that were identified were predominantly in the areas of: unclear documentation, software bugs which were inconsequential to final results, editing options which were ignored in favor of printing more information than requested, bugs in the outputs of intermediate results, or secondary output binary file information which was not present. While not a bug, this verification report also identified that the algorithm used to evaluate the peak fast flux in a nodal transport solution can be quite unreliable due to the methodology used and the location of the peak within the mesh. The authors of the report therefore recommend the usage of the EvaluateFlux software (distributed with ARC) as a more robust alternative noting that DIF3D will properly notify the user when the peaking values it is providing are potentially incorrect.

97 MATHEMATICS AND COMPUTING↗

Support Vector Machines for Estimating Decision Boundaries with Numerical Simulations

Many engineering design problems can be formulated as decisions between two possible options. This is the case, for example, when a quantity of interest must be maintained below or above some threshold. The threshold thereby determines which input parameters lead to which option, and creates a boundary between the two options known as the decision boundary. This report details a machine learning approach for estimating decision boundaries, based on support vector machines (SVMs), that is amenable to large scale computational simulations. Because it is computationally expensive to evaluate each training sample, the approach iteratively estimates the decision boundary in a manner that requires relatively few training samples to glean useful estimates. The approach is then demonstrated on three example problems from structural mechanics and heat transport.

25 ENERGY STORAGE↗

Assessment of Offshore Wind Leasing Areas in California [Slides]

This presentation summarizes an analysis of options for dividing Morro Bay and Humboldt Wind Energy Areas (WEAs) into offshore wind lease areas. The delineation process considered input from wind energy developers, physical characteristics of the sites, and potential effects of turbine layout and mooring technology selection on the energy generation capacity of each location. Two delineation options were assessed for the Humboldt WEA and four options for the Morro Bay WEA. The lease areas within each WEA were designed to have equal value and support approximately 1 gigawatt of generation capacity.

17 WIND ENERGY↗

Verification Problems for Smooth Step Amplitude Load Curves in DYNA3D/Paradyn

This report documents the addition of three new verification tests in the LOADCURVE directory of the DYNA3D/Paradyn Software Quality Assurance test suite. Each test consists of a single element, where the velocities of each node are specified by either the newly added smooth step tabular load curve or another load curve option. The first test assesses the initialization and interpolation of the newly inputted load curve option through tabulated abscissa-ordinate pairs of data. The second test uses the same set of abscissa-ordinate data points and applies offset and scaling parameters available within the load curve definition. The third test defines the smooth step load curve in an original input deck, and assesses its correct redefinition using a restart file. The simulation velocities are compared to their true values at discrete points in time, and each test is verified up to numerical precision. These results confirm that the smooth step load curve option is functioning correctly and as intended.

97 MATHEMATICS AND COMPUTING↗

Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process

Due to the urgency around climate change and associated goals for clean energy transition, and Battelle Energy Alliance's (BEA) and Idaho National Laboratory's (INL) role as the nation's nuclear energy laboratory, numerous stakeholders have asked for BEA’s thoughts and recommendations to reduce the time and costs associated with licensing new reactors at the U.S. Nuclear Regulatory Commission (NRC). As an M&O contractor for an FFRDC, BEA is a long-term partner with the Government in seeking to achieve clean energy goals, yet has a level of independence needed to appropriately evaluate this topic. The views herein are informed by extensive BEA experience supporting nuclear energy endeavors including ongoing discussions with current and former regulators, applicants, and licensees. With this background in mind, the United States benefits from having an agency such as the NRC, which is viewed internationally as the leader in nuclear safety licensing and regulation. Nonetheless, while acknowledging the important nuclear safety role satisfied by the NRC, it is apparent that one of the most significant time and resource intensive activities for new reactor developers is the NRC licensing process. The time and cost to obtain NRC licenses add significant financial stress for new reactor projects and may result in abandonment of projects or failure to even begin new projects. The challenge is particularly acute for advanced reactors which may raise unique or new regulatory questions and may be smaller in size, resulting in a much higher proportional impact from regulatory and cost challenges. This situation presents a particularly troublesome risk for the nation given the urgency in which utilities are working to transition to clean, non-carbon-emitting energy sources like nuclear energy. Reforms to the NRC licensing process have the potential to greatly increase certainty and support the successful progress of new reactors. The NRC can retain its world-class nuclear safety reputation while becoming a world leader for regulatory efficiency and a critical enabler to the clean energy transition. This report describes potential NRC reforms, focusing on those with a statutory connection. Recognizing the potential tradeoffs with any proposed changes, the report attempts to highlight those considerations in the analysis of the reforms. The recommendations are presented as a set of options for consideration. Unless noted, they are independent options, offering stakeholders the option to select a subset for further consideration. Although difficult to calculate precise time improvements for some of the changes, the reforms have the potential for substantial improvements, perhaps even by a factor of two.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

Verification of the DIF3D Software to Support Fast Reactor Analysis (Rev. 3)

Ongoing design activities at Argonne National Laboratory are requiring a thorough verification of the Argonne Reactor Computation codes be performed. DIF3D is central to this system. The driver for this effort requires the 3D Cartesian, triangular-Z, and hexagonal-Z core geometry options of DIF3D be verified. Previous work identified the DIF3D features required to be verified to support current design activities, features of which are generally applicable to hexagonal-Z fast reactor designs. The scope of this verification effort includes verifying DIF3D’s ability to correctly translate the user’s model in to DIF3D’s preferred format, verifying that options planned for use have the desired effect, and verifying the correctness of the eigenvalue, fixed-source, forward, and adjoint solvers in DIF3D-FD and DIF3D-VARIANT. This manuscript provides the verification tasks and their results with respect to the features needed for current design activities. Since analytic solutions of the neutron diffusion and transport equations are either limited in scope or not possible, multiple tiers of problems unique to each solver and geometry type were implemented. Each of these tiers tests features independent and complementary arguments for why the separate testing of functionalities is acceptable. Finally, this separate testing was also supplemented with a high-level integral check of each the diffusion and transport capabilities and applicable geometries. To accommodate cases which an analytic solution is not feasible, MCNP6.2 was relied upon to provide a higher-order reference solution. This therefore required that the capabilities within MCNP6.2 which were relied upon for this work are also verified in this work. No MCNP discrepancies were noted in this effort. Note that the MCNP6.2 verification included in this work does not stand as a full verification of MCNP6.2, but merely verifies the features used in verifying DIF3D. The verification effort identified no issues that are debilitating or otherwise impactful to design usage of DIF3D, and thus DIF3D version 11.0, release 3012 is considered verified. As some additional changes have been made to the ARC software since this point all versions between release 3012 and 3266 can be considered verified as version 3253 was used for all updates in this revision. The types of issues that were identified were predominantly in the areas of: unclear documentation, software bugs which were inconsequential to final results, editing options which were ignored in favor of printing more information than requested, bugs in the outputs of intermediate results, or secondary output binary file information which was not present. While not a bug, this verification report also identified that the algorithm used to evaluate the peak fast flux in a nodal transport solution can be quite unreliable due to the methodology used and the location of the peak within the mesh. The authors of the report therefore recommend the usage of the EvaluateFlux software (distributed with ARC) as a more robust alternative noting that DIF3D will properly notify the user when the peaking values it is providing are potentially incorrect.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Direct Air Capture of CO 2 and Delivery to Photobioreactors for Algal Biofuel Production (Final Report)

A mobile DAC system was designed and constructed to pair with photobioreactors growing algae for biofuel production. The DAC system was designed as a versatile research system, rather than a compact production unit. The system was constructed and mounted on a mobile skid to facilitate transportation to the algae production site. Within the DAC system, CO 2 was captured using amine-loaded monoliths that allow for high CO 2 uptake with low pressure drop. The CO 2 is collected using a Global Thermostat patented temperature/vacuum swing adsorption (TVSA) process. Amine sorbents and process conditions were optimized to produce 10 to >20 g CO 2 .h-1. The stability of the amine sorbents was also studied, with sorbent modifications made to improve stability to degradation by oxidation. An Algenol-developed Spirulina strain (Arthrospira platensis AB2293) was selected as the production cyanobacterial strain. AB2293 cultured was inoculum for outdoor production following PBR installation by Algenol. The PBR system was composed of three independent PBRs, with each PBR composed of four hanging bags internally recirculated by a liquid turnover pump. The PBRs were operated outdoors in Atlanta, GA, and integrated with the DAC system. Algae were grown with similar productivity using DAC-CO 2 as algae grown using pure CO 2 obtained commercially (Airgas). Throughout the experimental duration, no discoloration was observed, and cellular morphology was consistent between the two experimental treatments. An LCA including lifecycle greenhouse gas emissions, full life cycle inventory of the Algenol system and the DAC system and integrated DAC+PBR system was developed. Lifecycle greenhouse gas emissions were calculated for capture of carbon dioxide using input from Global Thermostat and the National Renewable Energy Laboratory. Three scenarios for energy provision were evaluated: a natural gas combined heat and power system sized to meet the electricity requirement, a natural gas combined heat and power system sized to meet the process heat requirements, and a system without on-site power that procures the electricity from the grid. In all three cases, as expected, the major contributor to the emissions is the energy consumption associated with the desorption step of the DAC process. The LCA quantified the reduced potential energy and greenhouse gas emissions of heat and mass integration of DAC and Algenol compared to unintegrated DAC and Algenol systems. A life cycle assessment of the role of sorbent productivity and lifetime was also developed. The development of more robust, oxidation resistant DAC sorbents may enable small reductions in energy requirements and in lifecycle greenhouse gas emissions and other environmental impacts. NREL performed techno-economic analysis (TEA) to identify the integration scenario most likely to achieve a 15% cost reduction target versus the baseline. Heat and mass integration of DAC and the PBR is critical to minimizing the MFSP. The baseline case utilizes no heat and mass integration, and the DAC system provides 100% of the CO 2 required by the photobioreactors (20 tonnes/hr), operating for 12 hours/day capturing 40 tonnes CO 2 /operating hour. The minimum fuel selling price (MFSP) of ethanol calculated from the baseline case was $10.68/gal ethanol. This corresponds with a targeted MFSP of $9.07/gal ethanol (or 15% reduction). This target was achieved by integration Option 2a with the greatest cost reduction of 17.8% (or $8.78/gal) and integration Option 2b with a cost reduction of 16.4% (or $8.93/gal). Reductions in MFSP are attributed to two primary process considerations: (a) CO 2 storage at night reduces the capital expenses associated with DAC (i.e., increasing on-stream time); and (b) distributed DAC scenarios (DAC-PBR integration Options 2a and 2b) make use of boiler and DAC CHP flue gas CO 2 (free). Direct air capture on-stream time was one of the largest contributors to MFSP reduction.

09 BIOMASS FUELS↗

Multi-Unit Dwelling Plug-in EV Charging Innovation Pilots (Final Report)

Nearly one-third of residences in the U.S. are multi-unit dwellings (MUDs), e.g., apartments and condominiums, and MUDs with five or more units account for approximately 45% of rental households. While 80% of EV charging takes place at home, less than 5% of home charging takes place at MUDs. With public electric vehicle (EV) charging still underdeveloped, lack of access to reliable home charging is a major barrier to EV adoption for MUD residents. Challenges to siting electric vehicle supply equipment (EVSE) at MUDs include the high upfront cost of EVSE installation, physical and/or electrical infrastructure constraints, a lack of clear incentives for property managers to invest in installing EV charging for tenants, and a limited number of EV charging service providers that offer solutions adapted to the unique needs of MUDs. Through award DE-EE0008473 from the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE), Center for Sustainable Energy (CSE), Energetics, and Forth, along with a diverse team of partners, led a three-year project to address barriers to EV charging at MUDs by developing an online toolkit geared toward residents, homeowner associations (HOAs), and property managers. The project, referred to as Vehicle Charging Innovations – Multi-Unit Dwellings (VCI-MUD project), engaged stakeholders across the country to identify real and perceived barriers to EV charging at MUDs and explored innovative technologies that attempt to alleviate the identified barriers. Over the course of three and a half years, the project conducted 60 interviews with industry stakeholders, compiled findings in an easy-to-use toolkit, and disseminated the toolkit across national, regional, state, and local channels. Key findings and outcomes of the VCI-MUD project include: Identifying six primary barriers to the installation of EV charging at MUDs; Developing five fact sheets and eight case studies highlighting innovative charging solutions to address barriers, including real-world operational and financial data; Developing a user-friendly, online empowerment toolkit with five important points for “making your pitch” to support EV charging to assist residents, property managers, building managers, and HOAs explore options for MUD charging. The VCI-MUD online toolkit was designed with replicability in mind. It includes general tools and guides to evaluate EV charging demand, gauge readiness for EV charging installation, and develop actionable plans. The fact sheets and case studies highlight the diversity of emerging MUD EV charging solutions, featuring different geographic and structural installation scenarios and providing interested parties with a menu of options, rather than prescribing a one-size-fits-all solution. The following resources are included in the toolkit to provide MUD stakeholders with all the information needed to navigate EV charging installation at their MUD location: Empowerment Toolkit – Easy-to-read FAQ overview, stakeholder roles and responsibilities, and additional resources for MUD EV charging installations; Charging Basics – Glossary of terms and descriptions of charging features, installation and operating expenses; EV Charging Survey Templates – Resident-to-Resident, Property Manager-to-Resident and HOA-to-Resident template letters with pre-populated template questions; Technology Selection Tool – Charging barrier fact sheets and case study examples; Installation Checklist – Submittal document requirements for EVSE installations; MUD Building Self-Evaluation Survey – Self-guided evaluation of potential barriers to EV charging installation at MUD locations; Curbside Resources – Case studies and fact sheets for curbside charging options; Find a Certified Electrician – Approved list of certified EV charging installers; “Right-to-Charge” State Legal References – Legal requirements for charging equipment at MUD locations. The online toolkit was promoted extensively in the final six months of the project and will continue to be disseminated by the Clean Cities Coalitions and other partners after the end of the VCI-MUD project to encourage, support, and demonstrate viable solutions for vehicle charging infrastructure in MUDs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗