Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planning Scheduling Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Flexible Control Center Architecture for Support of Diverse Spaceflight Missions

The Ames Multi-Mission Operations Center (MMOC) enables and supports flight and science operations for Ames' spaceflight missions. The MMOC is composed of the facilities, networks, information technology equipment, software, and system administration services needed by flight projects to effectively and efficiently perform all mission functions, including planning, scheduling, command, telemetry processing, and science analysis. The MMOC's ready-to-use services reduce start-up time, shorten procurement and provisioning and allow mission planning efforts to focus more on science and less on infrastructure. The architecture of the MMOC was designed from the start for flexibility, so that it can readily support multiple missions of greatly varying size and complexity while simultaneously keeping costs low.

Differding, Joan C.↗

Atmosphere, Magnetosphere and Plasmas in Space (AMPS). Spacelab payload definition study. Volume 7, book 2: AMPS phase C/D analysis and planning document

The results are presented of the AMPS Phase C/D (Design, Development, and Operations) program analysis and planning effort. Cost and schedule estimates are included. Although the AMPS program has been specifically addressed, these task descriptions are basically adaptable to a broader-based program incorporating additional or different Spacelab/orbiter payloads.

Source record↗

Supporting research and technology for automotive Stirling engine development

The technology advancement topics described are a part of the supporting research and technology (SRT) program conducted to support the major Stirling engine development program. This support focuses on developing alternatives or backups to the engine development in critical areas. These areas are materials, seals control, combustors and system analysis. Specific objectives and planned milestone schedules for future activities as now envisioned are described. These planned SRT activities are related to the timeline of the engine development program that they must support.

Tomazic, W. A.↗

Supporting Increased Autonomy for a Mars Rover

This paper presents an architecture and a set of technology for performing autonomous science and commanding for a planetary rover. The MER rovers have outperformed all expectations by lasting over 1100 sols (or Martian days), which is an order of magnitude longer than their original mission goal. The longevity of these vehicles will have significant effects on future mission goals, such as objectives for the Mars Science Laboratory rover mission (scheduled to fly in 2009) and the Astrobiology Field Lab rover mission (scheduled to potentially fly in 2016). Common objectives for future rover missions to Mars include the handling of opportunistic science, long-range or multi-sol driving, and onboard fault diagnosis and recovery. To handle these goals, a number of new technologies have been developed and integrated as part of the CLARAty architecture. CLARAty is a unified and reusable robotic architecture that was designed to simplify the integration, testing and maturation of robotic technologies for future missions. This paper focuses on technology comprising the CLARAty Decision Layer, which was designed to support and validate high-level autonomy technologies, such as automated planning and scheduling and onboard data analysis.

autonomous science↗

GradientGraph

Under this SBIR Phase II, Reservoir Labs has developed G2 Analytics, a new technology that allows network operators to analyze bottleneck and flow performance with high precision. G2 delivers a new analytical approach and framework to resolve a variety of key problems found in modern communication networks, including: traffic engineering, routing, flow scheduling, network design, capacity planning, resiliency analysis, network slicing, or service level agreement (SLA) management, among others. G2 leverages the bottleneck structure of congestion-controlled communication networks, a recent mathematical discovery by the Reservoir team [RL19b, RL20a, RL20b, RL21a]. Bottleneck structures reveal how perturbations on flows and links propagate through the network, providing an analytical framework to measure (qualitatively and quantitatively) the ripple effects induced as they traverse the network. Leveraging the mathematics of bottleneck structures, Reservoir Labs is developing the G2 technology to provide network operators with a framework to design, optimize and troubleshoot network performance. This delivery includes the G2 software stack.

Yellamraju, Sruthi↗

Heavy-duty diesel engine NO{sub x} reduction with nitrogen-enriched combustion air. Final CRADA report.

The concept of engine emissions control by modifying intake combustion gas composition from that of ambient air using gas separation membranes has been developed during several programs undertaken at Argonne. These have led to the current program which is targeted at heavy-duty diesel truck engines. The specific objective is reduction of NO{sub x} emissions by the target engine to meet anticipated 2007 standards while extracting a maximum of 5 percent power loss and allowing implementation within commercial constraints of size, weight, and cost. This report includes a brief review of related past programs, describes work completed to date during the current program, and presents interim conclusions. Following a work schedule adjustment in August 2002 to accommodate problems in module procurement and data analysis, activities are now on schedule and planned work is expected to be completed in September, 2004. Currently, we believe that the stated program requirements for the target engine can be met, based upon extrapolation of the work completed. Planned project work is designed to experimentally confirm these projections and result in a specification for a module package that will meet program objectives.

33 ADVANCED PROPULSION SYSTEMS↗

Development of the ITACA Network Loading Analysis Tool's Scheduling Techniques

NASA's SCENIC project aims to simplify and reduce the cost of space mission planning by creating analysis capabilities which are integrated with relevant analysis parameters specific to SCaN assets and SCaN supported user missions. The Integrated Tradespace Analysis of Communications Architectures (ITACA) will provide an all-in-one package for various analysis capabilities that normally require add-ons or multiple tools to complete. The ITACA tool will be responsible for assessing the given network architecture and generating a schedule for the missions as well as the assets. ITACA will allow users to evaluate the quality of service of a given network and determine whether or not the network will satisfy the mission's requirements. ITACA is currently under development, and during the spring of 2018 major development in the tools scheduling techniques were completed. A total of seven different techniques were completed.

space communications↗

Space Station Furnace Facility Management Information System (SSFF-MIS) Development

This report summarizes the chronology, results, and lessons learned from the development of the SSFF-MIS. This system has been nearly two years in development and has yielded some valuable insights into specialized MIS development. General: In December of 1994, the Camber Corporation and Science Applications International Corporation (SAIC) were contracted to design, develop, and implement a MIS for Marshall Space Flight Center's Space Station Furnace Facility Project. The system was to be accessible from both EBM-Compatible PC and Macintosh platforms. The system was required to contain data manually entered into the MIS as well as data imported from other MSFC sources. Electronic interfaces were established for each data source and retrieval was to be performed at prescribed time intervals. The SOW requirement that predominantly drove the development software selection was the dual-platform (IBM-PC and Macintosh) requirement. The requirement that the system would be maintained by Government personnel influenced the selection of Commercial Off-the-shelf software because of its inherent stability and readily available documentation and support. Microsoft FoxPro Professional 2.6 for Windows and Macintosh was selected as the development tool. This is a software development tool that has been in use for many years. It is stable and powerful. Microsoft has since released the replacement for this product, Microsoft Visual FoxPro, but at the time of this development, it was only available on the Windows platform. The initial contract included included the requirement for capabilities relating to the Work- and Organizational Breakdown Structures, cost (plan and actuals), workforce (plan and actuals), critical path scheduling, trend analysis, procurements and contracts, interface to manufacturing, Safety and Mission Assurance, risk analysis, and technical performance indicators. It also required full documentation of the system and training of users. During the course of the contract, the requirements for Safety and Mission Assurance interface, risk analysis, and technical performance indicators were deleted. Additional capabilities were added as reflected in the Contract Chronology below. Modification 4 added the requirement for Support Contractor manpower data, the ability to manually input data not imported from non-nal sources, a general 'health' indicator screen, and remote usage. Mod 6 included the ability to change the level of planning of Civil Service Manpower at any time and the ability to manually enter Op Codes in the manufacturing data where such codes were not provided by the EMPACS database. Modification 9 included a number of changes to report contents and formats. Modification 11 required the preparation of a detailed System Design Document.

Meade, Robert M.↗

Ames Engineering Directorate

The Ames Engineering Directorate is the principal engineering organization supporting aerospace systems and spaceflight projects at NASA's Ames Research Center in California's Silicon Valley. The Directorate supports all phases of engineering and project management for flight and mission projects-from R&D to Close-out-by leveraging the capabilities of multiple divisions and facilities.The Mission Design Center (MDC) has full end-to-end mission design capability with sophisticated analysis and simulation tools in a collaborative concurrent design environment. Services include concept maturity level (CML) maturation, spacecraft design and trades, scientific instruments selection, feasibility assessments, and proposal support and partnerships. The Engineering Systems Division provides robust project management support as well as systems engineering, mechanical and electrical analysis and design, technical authority and project integration support to a variety of programs and projects across NASA centers. The Applied Manufacturing Division turns abstract ideas into tangible hardware for aeronautics, spaceflight and science applications, specializing in fabrication methods and management of complex fabrication projects. The Engineering Evaluation Lab (EEL) provides full satellite or payload environmental testing services including vibration, temperature, humidity, immersion, pressure/altitude, vacuum, high G centrifuge, shock impact testing and the Flight Processing Center (FPC), which includes cleanrooms, bonded stores and flight preparation resources. The Multi-Mission Operations Center (MMOC) is composed of the facilities, networks, IT equipment, software and support services needed by flight projects to effectively and efficiently perform all mission functions, including planning, scheduling, command, telemetry processing and science analysis.

Small Satellites↗

V/STOL tilt rotor aircraft study. Volume 6: Preliminary design of a composite wing for tilt rotor research aircraft

The results of a study of the use of composite materials in the wing of a tilt rotor aircraft are presented. An all-metal tilt rotor aircraft was first defined to provide a basis for comparing composite with metal structure. A configuration study was then done in which the wing of the metal aircraft was replaced with composite wings of varying chord and thickness ratio. The results of this study defined the design and performance benefits obtainable with composite materials. Based on these results the aircraft was resized with a composite wing to extend the weight savings to other parts of the aircraft. A wing design was then selected for detailed structural analysis. A development plan including costs and schedules to develop this wing and incorporate it into a proposed flight research tilt rotor vehicle has been devised.

Soule, V. A.↗

A computer program for the generation of logic networks from task chart data

The Network Generation Program (NETGEN), which creates logic networks from task chart data is presented. NETGEN is written in CDC FORTRAN IV (Extended) and runs in a batch mode on the CDC 6000 and CYBER 170 series computers. Data is input via a two-card format and contains information regarding the specific tasks in a project. From this data, NETGEN constructs a logic network of related activities with each activity having unique predecessor and successor nodes, activity duration, descriptions, etc. NETGEN then prepares this data on two files that can be used in the Project Planning Analysis and Reporting System Batch Network Scheduling program and the EZPERT graphics program.

Herbert, H. E.↗

Mission planning and scheduling concept for the Advanced X-ray Astrophysics Facility (AXAF)

Projected for launch in the latter part of 1998, the Advanced X-ray Astrophysics Facility (AXAF), the third satellite in the Great Observatory series, promises to dramatically open the x-ray sky as the Hubble and Compton observatories have done in their respective realms. Unlike its companions, however, AXAF will be placed in a high altitude, highly elliptical orbit (10,000 x 100,000 km), and will therefore be subject to its own unique environment, spacecraft and science instrument constraints and communication network interactions. In support of this mission, ground operations personnel have embarked on the development of the AXAF Offline System (OFLS), a body of software divided into four basic functional elements: (1) Mission Planning and Scheduling, (2) Command Management, (3) Altitude Determination and Sensor Calibration and (4) Spacecraft Support and Engineering Analysis. This paper presents an overview concept for one of these major elements, the Mission Planning and Scheduling subsystem (MPS). The derivation of this concept is described in terms of requirements driven by spacecraft and science instrument characteristics, orbital environment and ground system capabilities. The flowdown of these requirements through the systems analysis process and the definition of MPS interfaces has resulted in the modular grouping of functional subelements depicted in the design implementation approach. The rationale for this design solution is explained and capabilities for the initial prototype system are proposed from the user perspective.

Newhouse, M.↗

Work Plan for the Site-wide SSHAC Level 3 Probabilistic Seismic Hazard Analysis at INL

This work plan provides the overall framework, key activities, key tasks, and schedule for the execution of a probabilistic seismic hazard analysis at Idaho National Laboratory (INL). The probabilistic seismic hazard analysis will follow processes and procedures appropriate for the Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 study provided in U. S. Nuclear Regulatory Commission guidance, NUREG-2213. The SSHAC Level 3 probabilistic seismic hazard analysis (PSHA) is being conducted as an INL site-wide effort. The work plan was developed and revised by participants who will perform the SSHAC Level 3 PSHA. The work plan also includes the quality assurance requirements commensurate with American Society of Mechanical Engineers Nuclear Quality Assurance NQA 1 2008/2009 and 2011 Addendum for design nuclear facilities under the U.S. Department of Energy and U. S. Nuclear Regulatory Commission. The scope of the SSHAC Level 3 PSHA is designed to produce the mean-centered definition of the seismic hazard with the appropriate treatment of uncertainties supported by the associated technical justifications. The SSHAC Level 3 study will properly implement and completely document the activities of evaluation, integration, and documentation. The evaluation process will consider data, models, and methods proposed by the larger technical community that are relevant to the PSHA at INL. The integration process will build seismic-source and ground-motion characterization models that represent the center, body, and range of technically defensible interpretations, taking into consideration the outcomes of the evaluation process. Key tasks and activities—such as a project kickoff meeting, three workshops, four formal working meetings, and a briefing meeting with the Participatory Peer Review Panel—will occur for the seven-member technical integration teams to construct seismic-source and ground-motion-characterization models. Both preliminary and final hazard-input documents will be developed to perform sensitivity analyses and the final PSHA, respectively. The entire study will be thoroughly documented in draft and final reports. The Participatory Peer Review Panel will review the SSHAC Level 3 study from start to finish, including the draft and final INL Site-wide PSHA reports, so they can provide a closure letter documenting the study’s adherence to SSHAC processes and technical adequacy of the final products.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Use of 3.0-T MRI for Stereotactic Radiosurgery Planning for Treatment of Brain Metastases: A Single-Institution Retrospective Review

Purpose: To investigate the efficacy of 3.0-T magnetic resonance imaging (MRI) for detecting brain metastases for stereotactic radiosurgery (SRS) planning. Methods and Materials: All adult patients scheduled for SRS treatment for brain metastases at our institution between October 2005 and January 2008 were eligible for analysis. All patients underwent radiosurgery treatment planning 3.0-T MRI on the day of scheduled radiosurgery and a diagnostic 1.5-T MRI in the days or weeks prior to radiosurgery for comparison. Both scans were interpreted by neuroradiologists who reported their findings in the radiology reports. We performed a retrospective review of the radiology reports to determine the number of brain metastases identified using each MRI system. Results: Of 254 patients scheduled for treatment from October 2005 to January 2008, 138 patients had radiology reports that explicitly described the number of metastases identified on both scans. With a median interval of 17 days (range, 1-82) between scans, the number of metastases detected using 1.5-T MRI system ranged from 1 to 5 and from 1 to 8 using the 3.0 T-MRI system. Twenty-two percent of patients were found to have a greater number of metastases with the 3.0 T-MRI system. The difference in number of metastases detected between the two scans for the entire cohort ranged from 0 to 6. Neither histology (p = 0.52 by chi-sq test) nor time between scans (p = 0.62 by linear regression) were significantly associated with the difference in number of metastases between scans. Conclusions: The 3.0-T MRI system appears to be superior to a 1.5-T MRI system for detecting brain metastases, which may have significant implications in determining the appropriate treatment modality. Our findings suggest the need for a prospectively designed study to further evaluate the use of a 3.0 T-MRI system for stereotactic radiosurgery planning in the treatment of brain metastases.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Opportunistic Planning and Execution for Planetary Exploration

We are developing technologies to increase the autonomous capabilities of future rover missions. Our objectives are to make rovers easier to command and to enable them to make more effective use of rover resources when problems arise or when things go better than expected. We will demonstrate OASIS (Onboard Analysis Science Investigation System) which combined planning and scheduling techniques with machine learning to enable rovers to perform robust and opportunistic science operations.

autonomous planning↗

Solving the AI Planning Plus Scheduling Problem Using Model Checking via Automatic Translation from the Abstract Plan Preparation Language (APPL) to the Symbolic Analysis Laboratory (SAL)

This paper describes a translator from a new planning language named the Abstract Plan Preparation Language (APPL) to the Symbolic Analysis Laboratory (SAL) model checker. This translator has been developed in support of the Spacecraft Autonomy for Vehicles and Habitats (SAVH) project sponsored by the Exploration Technology Development Program, which is seeking to mature autonomy technology for the vehicles and operations centers of Project Constellation.

Butler, Ricky W.↗