Estimating Energy Market Schedules Using Historical Price Data: Preprint

The global climate crisis is expected to reshape the energy generation landscape in the coming decades. Increasing integration of non-dispatchable renewable energy resources into energy infrastructures and markets increases uncertainty and creates new opportunities for flexible energy systems. To conduct proper economic evaluation of flexible energy systems, such as integrated energy systems (IES), advancements in modelling of market interactions, such as bidding, is crucial. This work presents a shortcut algorithm which uses two mixed integer linear programs to compute dispatch schedules (e.g., hourly power production targets) that are constrained by the resource's bid information and characteristics (e.g., minimum up and down times) based on historical locational marginal price (LMP) data. This is orders of magnitude less data than required for a market clearing calculation with a full production cost model (PCM). We find the shortcut simulator recapitulates generator dispatch signals for the Prescient PCM with approximately 4% error for the RTS-GMLC test system.

electricity generation↗

Estimating Energy Market Schedules using Historical Price Data

The global climate crisis is expected to reshape the energy generation landscape in the coming decades. Increasing integration of non-dispatchable renewable energy resources into energy infrastructures and markets creates uncertainty as well as new opportunities for flexible energy systems. To conduct proper economic evaluation of flexible energy systems, such as integrated energy systems (IES), advancements in modelling of market interactions, such as bidding, is crucial. This work presents a shortcut algorithm which uses two mixed integer linear programs to compute dispatch schedules (e.g., hourly power production targets) that are constrained by the resource's bid information and characteristics (e.g., minimum up and down times) based on historical locational marginal price (LMP) data. The proposed algorithm is approximately 100 times faster and uses orders of magnitude less data than a full production cost model (PCM). We find the shortcut simulator recapitulates generator dispatch signals for the Prescient PCM with approximately 4% error for the RTS-GMLC test system.

electricity generation↗

PR100: Estimated Medium- and Heavy-Duty Electric Vehicle Adoption and Load Estimation in Puerto Rico through 2050

The 2-year Puerto Rico Grid Resilience and Transition to 100% Renewable Energy Study analyzed stakeholder-driven pathways to Puerto Rico’s clean energy future. Outputs relating to electricity demand modeling were partially informed by estimates of electric vehicle adoption across all classes of medium- and heavy-duty vehicles (MHDVs), and the ensuing charging loads. To create these estimates, the team developed a transportation model for MHDVs in Puerto Rico to estimate the amount and geospatial distribution of energy used. Charging schedules for the different end uses of MHDVs were then used to construct electric load shapes assuming a portion of those vehicles would be replaced by battery electric counterparts. Study results showed that, by 2050, electric vehicles may constitute roughly 50% of the MHDV population in Puerto Rico. The resulting electrical demand curve attributable to MHDV charging showed that, for solar energy-based electrical systems with limited energy storage, this demand may create challenges unless appropriately managed either on the demand or supply side.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nuclear Materials Process Modeling at the Y-12 National Security Complex

The Y-12 National Security Complex (Y-12) has implemented process modeling for various accountable nuclear materials operations that are performed throughout the plant. Using a discrete, event-based dynamic simulation program, key nuclear material streams are modeled, allowing Y-12 to effectively manage numerous points of interest within the plant’s production operations. Integration of the various material processes into a single, interdependent supply and demand model is one of the ongoing focuses within Y-12’s process modeling effort. The primary purpose of using dynamic simulation modeling is to allow for analysis of the nuclear materials inventories and forecasted supplies based on future demands. Analysis of these inventories includes capacity evaluation, bottleneck mitigation, and assessments of individual pieces of equipment to inform future facility investment decisions and associated project schedules. Modeling of the nuclear materials processes throughout the complex also allows for incorporation of changes relevant to production capabilities such as the upcoming transition of specific operations to the new Uranium Processing Facility. Prior to implementation of process modeling, Y-12 forecasted supply and demand of accountable nuclear materials streams using Microsoft Excel. With deterministic models such as Microsoft Excel, the annual forecasts, generated within data input condition parameters, can only provide a fixed point of data. Fixed data cannot simulate integrated material streams and account for the possibility of occurrences and other changes that dynamic simulations take into consideration. Y-12’s dynamic process modeling allows integrated simulations of multiple accountable nuclear materials processes, including supply and demand forecasting and analysis, and is a coordinated effort involving many steps of verification and validation (V&V), site briefings, testing, reporting, data mining, planning, and documentation that spans various programs throughout the Y-12 complex.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of wind power scenario creation methods for stochastic power systems operations

Probabilistic scenarios of renewable energy production, such as wind, have been gaining popularity for use in stochastic variants of power systems operations scheduling problems, allowing for optimal decision-making under uncertainty. The quality of the scenarios has a direct impact on the value of the resulting decisions, but until now, methods for creating scenarios have not been compared under realistic operational conditions. Here, we compare the quality of scenario sets created using three different methods, based on a simulated re-enactment of stochastic day-ahead unit commitment and subsequent dispatch for a realistic test system. We create scenarios using a dataset of forecasted and actual wind power values, scaled to evaluate the effects of increasing wind penetration levels. We show that the choice of scenario set can significantly impact system operating cost, renewable energy use, and the ability of the system to meet demand. This result has implications for the ability of system operators to efficiently integrate renewable production into their day-ahead planning, highlighting the need for the use of performance-based assessments for scenario evaluation.

17 WIND ENERGY↗

Deployment of Dynamic Neural Network Optimization to Minimize Heat Rate During Ramping for Coal Power Plants (Final Technical Report)

Much success was achieved throughout the course of this project. A successful implementation of Dynamic Neural Network Optimization (D-NNO) was coupled with Adaptive Predictive Controls (APC) and a novel hardware installation comprised of an advanced sensor network (ASN) measuring mass-weighted averages of flue gas constituents above the horizontal superheater of a coal-fired utility boiler. From 2019 through 2023 (including an extension due to COVID delays), the team was able to prototype, evaluate, deploy, iterate, and ultimately finalize an advanced closed-loop control D-NNO system which demonstrated the ability to: •improve unit efficiency ~2.0% relative to unoptimized operation (represented as total fuel fired per MWh generated) •improve unit NOx emission rates 10%+ beyond static optimization baselines •improve unit temperature stability as much as 58% and on average 12% •improve operating load stability as much as 35% The culmination of this project has generated an advanced methodology of deploying specially designed recurrent neural networks (long short-term memory, gated recurrent unit, encoder-decoder networks, transformers, etc.), customized trajectory planning and closed-loop optimization modules capable of adapting to live electric grid responses and demands, self-tuning and adaptive expert controls constantly adjusting prediction parameters to real-time unit behavior, and a hardware/software package able to reliably calculate net unit heat rate (NUHR) in real-time using flue gas constituents, machine learning, and known combustion relationships. Through this real-time NUHR value, immediate feedback on system adjustments relative to operating efficiency was available, allowing for rapid improvements to system performance. In addition to development and deployment of the advanced D-NNO system, the approach methodology has been readily commercialized through the project platform Griffin Open Systems, LLC, the D-NNO software platform host. Similar methodologies to those developed by this project have already been deployed at 5 other units across the United States, with another 6 implementations scheduled, and more expected. Over the course of the project, multiple academic papers were submitted and accepted for publication within esteemed academic journals, and PhD students were trained and graduated, as well as undergraduate students becoming involved and participating to project objectives.

01 COAL, LIGNITE, AND PEAT↗

Implication of production tax credit on economic dispatch for electricity merchants with storage and wind farms

The production tax credit (PTC) promotes wind energy development, reduces power generation costs, and can affect merchants’ joint economic dispatch, particularly for electricity merchants with both energy storage and wind farms. Two common PTC policies are studied – in the first policy, a wind farm receives PTC by selling wind generation to the market and its storage can be used to store energy from the wind generation and energy purchased from the grid but the energy released from the storage cannot receive PTC; in the second policy, the energy released from the storage can also qualify for PTC but purchasing energy from the grid is not allowed. We then employ dynamic programming to study merchants' optimal decision-making while considering PTC and the physical characteristics of storage systems. We analytically show that the state of charge (SOC) range can be segmented into different regions by SOC reference points under two PTC policies. The merchant's optimal action can be conveniently and uniquely determined based on the region within which the current SOC falls. Moreover, this study illustrates that PTC could substantially alter the optimal scheduling policy structures by affecting reference points and their relationships. The results showed that the frequencies for charging and discharging storage decisions decreased with an increase in PTC subsidy. Last, we confirm that, although the first policy allows merchants to buy electricity from the market, the second policy can bring more profits when the PTC is large at the current PTC rates. Furthermore, the findings can provide multistage decision-making guidance to electricity merchants in the wholesale power market.

17 WIND ENERGY↗

Analysis of Residential Time-of-Use Utility Rate Structures and Economic Implications for Thermal Energy Storage

Thermal energy storage (TES) is an increasingly popular tool to level out the daily electrical demand and add stability to the electrical grid as more intermittent renewable energy sources are installed. TES systems can locally decouple high thermal loads from the operation of a heat pump or reduce the electrical energy demand of the heat pump by providing a more favorable temperature gradient. In addition, many policy makers and utility providers have introduced time-of-use (TOU) rate schedules for residential customers to better reflect the price of electricity generation and demand for specific times. TOU rate schedules price grid-provided electricity differently throughout the day depending on the region’s climate, time of year, and electrical production. Large differences between on-peak and off-peak electrical prices may create an economic advantage for a residential customer to install a TES system. In this work, the economic and energy savings are calculated for a modeled 2,400 square foot residential building with water/ice-based TES using a TOU rate structure. The weather data is from Fresno County, CA, ASHRAE climate zone 3B, and a representative residential TOU utility rate structure from Pacific Gas and Electric (PG&E) was used. The results showed that total energy consumption could be reduced by 14.5% with an 87.5% reduction in on-peak energy usage when the TES is installed. The cost of operating this system for space cooling was reduced by nearly 20% using the sample utility rate plan.

Sultan, Sara↗

Argonne Leadership Computing Facility: 2021 Operational Assessment Report

This Operational Assessment Report describes how the Argonne Leadership Computing Facility (ALCF) met or exceeded every one of its goals for calendar year (CY) 2021 as an advanced scientific computing center. In CY 2021, the ALCF operated its production resource, Theta, an Intel-based Cray XC40 system (11.7-petaflops) augmented with 24 NVIDIA DGX A100-based nodes (3.9-petaflops) that supports diverse workloads, integrating data analytics with artificial intelligence (AI) training and learning in a single platform. In 2021, we began deploying Polaris, our newest 40- petaflops system, and augmented this powerful testbed system with an additional 28 nodes to support the integration of real-time experiments and HPC resources. We also deployed our two largest storage systems yet, named Grand and Eagle, that will bring new services to our users and will power data-driven research for years to come. Last year, Theta delivered a total of 20.8 million node-hours to 16 Innovative and Novel Computational Impact on Theory and Experiment (INCITE) projects and 7.2 million node-hours to ASCR Leadership Computing Challenge (ALCC) projects (32 awarded during the 2020–2021 ALCC year and 17 awarded during the 2021–2022 ALCC year), as well as substantial support to Director’s Discretionary (DD) projects (5.5 million node-hours). As Table ES.1 shows, Theta performed exceptionally well in terms of overall availability (95.1 percent), scheduled availability (99.4 percent), and utilization (98.1 percent; Table 2.1). As of the submission date of this document, ALCF’s user community has published 249 papers in high-quality, peer-reviewed journals and technical proceedings. At the 2021 International Conference for High Performance Computing, Networking, Storage and Analysis (SC’21), Argonne researchers won two HPCwire Readers’ Choice Awards and were part of a Gordon Bell Prize finalist team recognized for developing an AI-enabled, multi-resolution simulation framework for studying complex biomolecular machines. Their framework was used to observe the SARS-CoV-2 replication-transcription machinery in action, by directly integrating experimental data. ALCF also provided a comprehensive program of high-performance computing (HPC) support services to help our community make productive use of the facility’s diverse and growing collection of resources. We are now entering the exascale era, with exascale machines being planned for national laboratories across the country, including Aurora at Argonne National Laboratory (Argonne) in 2023. ALCF researchers have been leading and guiding numerous strategic activities that will push the boundaries of what’s possible in computational science and engineering and allow us to deliver science on day one.

97 MATHEMATICS AND COMPUTING↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

97 MATHEMATICS AND COMPUTING↗

A New Era of Discovery: The 2023 Long-Range Plan for Nuclear Science (V.1.2)

Nuclear science is the investigation of how protons and neutrons are formed from elementary particles and how the forces between those particles produce both nuclei and the vast variety of nuclear phenomena that occur in the universe. It has evolved into a broad field that addresses profound scientific questions: Where does the mass of visible matter come from? How do stars ignite, live, and die? How do nuclei illuminate the search for new laws of nature? This science points the way to using nuclei to build new technologies that benefit society. The 2015 Nobel Prize in physics was shared by nuclear physicists Art McDonald and Takaaki Kajita for the discovery of neutrino oscillations, which confirmed that neutrinos have mass. Our progress on big questions like this one since 2015 has been remarkable owing to new experimental tools, theoretical breakthroughs, powerful computational techniques, and the talented people who make these innovations possible. Focusing on these new tools, the Facility for Rare Isotope Beams (FRIB) at Michigan State University is already producing exciting results on decays of never-before-produced isotopes a year after it was completed on time and on budget. The energy upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility (Jefferson Lab) was also completed on schedule and on budget—new data from this facility are revealing the spectrum, structure, and dynamics of protons, neutrons, nuclei, and mesons. On the theory front, we can now calculate the distribution of quarks inside the proton from first principles. The implementation of artificial intelligence (AI) and machine learning (ML) techniques has led to improved data analysis and increased efficiency in running experiments and theoretical calculations. The impact of nuclear science goes beyond expanding the frontiers of knowledge about matter in the universe. We simultaneously develop a STEM work force that advances the security, technology, health, and wealth of our nation. Some connections are obvious. Expert scientists trained to work with radioactive nuclei are in demand in nuclear security arenas and are highly sought after by various government agencies and private industries. Graduate students and postdoctoral fellows (postdocs) obtain extensive computational, modeling, and data science skills that are similarly in high demand. Less obvious but equally important is the connection between these trained scientists and success in other professions, including medicine, energy, and entrepreneurial pursuits. The workforce that enables discovery in nuclear science also makes breakthroughs in technologies with tremendous impact on the nation’s economic advancement.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

O’Hare Airport Short-Term Ground Transportation Modal Demand Forecast Using Gaussian Processes

Here, the principal objective of this study is to analyze the spatial and temporal variation of ground transportation airport demand and provide demand forecast to inform planning capability and explore alternatives for investments to accommodate airport growth. Because of its good adaptability and strong generalization ability for dealing with high-dimensional input, small-sample, and nonlinear spatial data, Gaussian process (GP) regression is used to provide forecast estimates using data from transportation network company (TNC) trips and urban rail passengers at Chicago's O'Hare International Airport. TNC airport trips differ significantly, with three times more distance, more than twice the travel time, and half of the share requests compared with nonairport trips. This highlights the need for separate demand models. Hourly analysis of the rail service indicates that this is likely heavily used by airport workers, whereas TNC services focus on travelers because of variations in the peak demand hours. Heteroscedastic GP regression is implemented because of differences in trip variance between night and day hours. Estimates are given for weekdays and weekend trips, and the 95% confidence intervals are calculated. The introduction of flight schedule information into the models shows marginal improvements in their performance. However, fitting a GP regression becomes computationally expensive with increased sample size and the introduction of spatial components. Transportation planners and policymakers can use the results and methods implemented in this study to optimize transportation assets and provide long-range simulations of the current and future conditions in the area.

42 ENGINEERING↗

Design Requirements and Software Specification for the Autonomous Energy Management Software System for Small Commercial Buildings

Commercial buildings are responsible for approximately 20 percent of the total United States energy consumption and greenhouse gas emissions. Over 85 percent of these buildings lack building automation systems. Many of these buildings are small (<50,000 square feet), underserved, and use rooftop units for heating, ventilation, and air-conditioning needs. Because these buildings lack proper energy management systems, they have several operational deficiencies that lead to excess energy consumption. Studies have shown that managing the rooftop units heating and cooling set points, schedules, setbacks, and optimal start can result in 20 to 25 percent reduction in electricity consumption in small commercial buildings. In addition, improving demand flexibility of these buildings will result additional cost savings for the building owner. Therefore, the Department of Energy’s Building Technologies Office approved a project to address the needs for small commercial buildings. The project is led by Pacific Northwest National Laboratory (PNNL) with Intellimation LLC as the cooperative research and development agreement partner. The primary goal of the project is to develop and validate an autonomous energy management software (AEMS) system that will continuously optimize small commercial building operations by minimizing energy consumption and cost, while providing a solution for maximizing decarbonization benefits from electrification of buildings. The work will leverage the vast experience of PNNL research and development staff who have over two decades of experience in developing and successfully transferring software technologies to the private sector. This solution will be jointly developed with Intellimation, a company that plans to use it to scale their building energy efficiency (EE) and grid services offering. Widespread deployment of the AEMS system will improve the EE and demand flexibility of the building commercial building stock. It should also support cities and states in meeting their climate change mitigation goals. This document describes the various EE and grid service features of the AEMS system, infrastructure and data required to implement those features, and how the features should be automated. It also details how the various features will be tested and validated, including field validation. The document also details what flexibility the users have and how they will be able to leverage those capabilities exercise those. The intent is to create an AEMS system that would support scalable deployment, requires minimal configuration, and is easy to maintain over its expected lifespan. The initial alpha release of AEMS system is planned for March 2023, and the beta release is planned for the summer of 2023. The final release is planned for March 2024. Section 2 of the report documents the relevant building types that AEMS is suitable for. Section 3 documents EE features that will be supported. It will also include the data requirements, hardware requirements, implementation details, and how EE features will be tested and validated. Grid service features will be documented in section 4, including data requirements, hardware requirements, implementation details, and how the services will be tested and validated. Planned next steps are described in section 5.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.