Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Vertical Septum Magnet Design for the APS Upgrade

The vertical injection scheme proposed for the APS Upgrade (APS-U) Project requires a challenging septum magnet that must meet stringent beam physics, magnetic field leakage, and vacuum requirements. The current iteration of this magnet design includes an enlarged stored-beam chamber aperture of 9 mm x 12 mm and a reduction of the septum thickness to 1.5 mm. The enlarged aperture accommodates a non-evaporable getter (NEG)-coated stored beam chamber to better achieve the required vacuum. A prototype septum magnet has been built and measurements confirm the cancellation of a peak leakage field even though the value is six times larger than the design. The leakage field measured at the upstream (US) end cancels the downstream (DS) end as was expected by design. The measured and simulated leakage field and the stored beam trajectories are reported.

43 PARTICLE ACCELERATORS↗

Design of a 10 MeV beamline at the Upgraded Injector Test Facility for e-beam irradiation

Electron beam irradiation near 10 MeV is suitable for wastewater treatment. The Upgraded Injector Test Facility (UITF) at Jefferson Lab is a CW superconducting linear accelerator capable of providing an electron beam of energy up to 10 MeV and up to 100 µA current. This contribution presents the beam transport simulations for a beamline to be used for the irradiation of wastewater samples at the UITF. The simulations were done using the code General Particle Tracer with the goal of obtaining an 8 MeV electron beam of radius (3-σ) of ~2.4 cm. The achieved energy spread is ~74.5 keV. The space charge effects were investigated when the bunch charge is varied to be up to 1000 times and the results showed that they do not affect the beam quality significantly.

Li, X.↗

Current Status of the FFA@CEBAF Energy Upgrade Study

This work will describe the current status of the FFA@CEBAF energy upgrade feasibility studies. Technical updates are given, but more specific details are left to separate contributions. Specifically, this work will discuss improvements to the FFA arcs, a new recirculating injector proposal, and numerous modifications to the current 12 GeV CEBAF which will be required, such as the spreaders and recombiners architecture, splitters (time-of-flight chicanes), the extraction system, and the hall lines.

Bodenstein, R. M.↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

RESONANT MATCHING SECTION FOR CEBAF ENERGY UPGRADE

Thomas Jefferson National Accelerator Facility (Jeffer- son Lab) currently studies the feasibility of upgrading its energy to 22 GeV. It considers addition of six more linac passes. The highest energy passes will share two new arcs designed using the Fixed-Field Alternating Gradient (FFA) technology. The FFA arcs are built using permanent combined-function magnets. They will be connected to the linacs through transition sections that will match the optics of all six passes to the linacs. With the high number of con- straints and the limited space available, we are investigating a parametric resonance technique to match the optics quasi- independently at each energy. A resonance is excited at each individual energy to selectively control its optics. The reso- nant dipole and quadrupole kick harmonics are imposed for all energies simultaneously using Panofsky corrector mag- nets placed throughout the FFA arcs. This paper presents the current progress on that transition section design

Deitrick, K.↗

Horizontal Splitter Design For FFA@CEBAF Energy Upgrade: Current Status

Thomas Jefferson National Accelerator Facility (Jefferson Lab) is currently studying the feasibility of an energy upgrade based upon Fixed-Field Alternating Gradient (FFA) permanent magnet technology. The current plan is to replace the highest-energy recirculation arcs with FFA arcs, increasing the total number of beam recirculations, thus the energy. In order to accommodate multiple passes in the FFA arcs, horizontal splitters are being designed to control the beam parameters entering the FFA arcs, as well as the time of flight and R_56. In the current design, six passes will recirculate through the FFA arcs, necessitating the design of six independent beamlines to control the optics and beam dynamics matching into the arcs. These beamlines must fit into the current CEBAF tunnel, while allowing for personnel and equipment access. They must also be flexible enough to accommodate the beam under realistic operational conditions and fluctuations. The constraints on the system are highly restrictive, complicating the design. This document will describe the current state of the design, and indicate the work remaining for a complete conceptual design.

Benesch, Jay↗

Current status of conceptual horizontal splitter design for FFA@CEBAF energy Upgrade

Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) is currently investigating the feasibility of upgrading its maximum operating energy using Fixed-Field Alternating-gradient (FFA) recirculating arcs to increase the total number of recirculations of the beam through the pair of LINACs. These FFA arcs will be composed of permanent magnets, with small Panofsky-style multipole correctors. In order to control the beam parameters through these FFA arcs, horizontal splitters must be used. The geometrical and physical constraints, as well as the beam matching requirements are very restrictive, complicating the design. This work will show the current status of the most mature design, which includes matching solutions, as well as options for extraction of the beam.

Accelerator Physics↗

An extraction scheme for future CEBAF FFA based energy upgrade

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

Accelerator Physics↗

Developments Towards FRIB Upgrade to 400 MeV/u for Heaviest Uranium Ions

High-Q₀ medium-velocity (beta opt = 0.6) 5-cell elliptical cavities for superconducting linacs are critical technology for advancing current and future projects such as the Proton Improvement Plan II linac and the proposed energy upgrade of Michigan State University’s Facility For Rare Isotope Beams linac, FRIB400. Previous work established the validity of the novel geometry of the FRIB400 prototype 644 MHz 5-cell elliptical β = 0.65 cavities for future high Q₀ development. In collaboration with FNAL, two leading-edge high-Q₀ recipes, N-doping and Mid-T baking, were tested in the 5-cell format. 2/0 N-doping + cold electropolishing was successful at achieving FRIB400 and PIP-II Q₀ requirements, achieving an unprecedented 3.8 x 10¹⁰ at 17.5 MV/m, satisfying the FRIB400 Q₀ requirements by 1.75 times in a low-gauss environment. Mid-T baking exceeded FRIB400 Q₀ requirements by 1.4 times, and benefitted from decreased residual resistance compared to the N-doped cavity test. Systematic ultrasonic thickness measurements in single-cell revealed bulk (150 microns) EP with the modified EP tool is consistent across the inner surfaces of the cavity walls.

43 PARTICLE ACCELERATORS↗

Design update on the transition beamline for the CEBAF Energy Upgrade

For Jefferson Lab’s 22GeV upgrade, two new permanent-magnet Fixed-Field Alternating Gradient (FFA) arcs will be integrated to serve the accelerator’s six highest-energy recirculation passes. Connecting these FFA arcs to the existing linear accelerator (linac) requires a carefully engineered transition section. The current design has two parts where the first part adiabatically matches the beam dispersion and orbit trajectories, while the second part aligns the Twiss parameters (alpha and beta functions) with those at the linac entrance. Given the tight spatial constraints and multiple matching requirements, a genetic algorithm is being explored to optimize the beam optics matching. This paper presents the current progress in developing and optimizing this transition.

Accelerator Physics↗

Status of conceptual horizontal splitter design for FFA@CEBAF energy upgrade

Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) is currently investigating the feasibility of upgrading its maximum operating energy using Fixed-Field Alternating-gradient (FFA) recirculating arcs to increase the total number of recirculations the beam through the pair of LINACs. These FFA arcs will be composed of permanent magnets, with small Panofsky-style multipole correctors. Horizontal splitters are needed to control the beam parameters through these FFA arcs. The geometrical and physical constraints, as well as the beam matching requirements are very restrictive, complicating the design. This work will show the current status of the most mature design, which includes matching solutions, as well as options for extraction of the beam.

Accelerator Physics↗

Algae/Wood Blends Hydrothermal Liquefaction and Upgrading: 2019 State of Technology

The fiscal year (FY) 2019 State of Technology (SOT) Assessment for a microalgae and woody biomass blend feedstock hydrothermal liquefaction (HTL) and biocrude upgrading system has been completed and reported here. This study is a preliminary economic analysis for this system. Inputs from the 2019 NREL open pond algae cultivation model provided microalgae seasonal flowrates and dewatered algae feedstock price. These inputs have been coupled with modeled experimental data from PNNL for algae/wood blends processed via HTL to assess the cost impacts. The TEA results demonstrated a 28% reduction in the conversion cost only from $1.22/gge in 2018 to $0.88/gge in 2019.

09 BIOMASS FUELS↗

Q-6 DARHT Weather Enclosure Project Upgrades Design Review

The Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility is adding a weather enclosure for the vessel area that will require the Detonation Science and Technology Group’s (Q-6) support for installing new cabling infrastructure to support capacitive discharge unit (CDU) firing operations and diagnostics. The requirement’s work scope is described in Q-6-TR-0034U*, Q-6 Support for the DARHT Weather Enclosure Upgrade Project, Customer Requirements Review (CRR).

42 ENGINEERING↗

WNR Facility T4GEN2 Spallation Target Upgrade

In July 2020, a second generation (GEN2) spallation target was installed at the Weapons Neutron Research (WNR) facility. This new spallation was installed in place of a traditional target 4 (T4) spallation target at the facility. The need for this upgrade, design of this GEN2 spallation target, metrology workflow, and results of the effort will be detailed.

43 PARTICLE ACCELERATORS↗

Optimization of a traveling wave superconducting radiofrequency cavity for upgrading the International Linear Collider

The standing wave TESLA niobium-based superconducting radio frequency structure is limited to an accelerating gradient of about 50 MV/m by the critical rf magnetic field. To break through this barrier, we explore the option of niobium-based traveling wave (TW) structures. Optimization of TW structures was done considering experimentally known limiting electric and magnetic fields. It is shown that a TW structure can have an accelerating gradient above 70 MeV/m that is about 1.5 times higher than contemporary standing wave structures with the same critical magnetic field. The other benefit of TW structures shown is R/Q about 2 times higher than the TESLA structure that reduces the dynamic heat load by a factor of 2. A method is proposed how to make TW structures multipactor-free. Some design proposals are offered to facilitate fabrication. Further increase of the real-estate gradient (equivalent to 80 MV/m active gradient) is also possible by increasing the length of the accelerating structure because of higher group velocity and cell-to-cell coupling. Realization of this work opens paths to International Linear Collider energy upgrades beyond 1 to 3 TeV in competition with CLIC. The paper will discuss corresponding opportunities and challenges.

43 PARTICLE ACCELERATORS↗

Hydrothermal Liquefaction and Upgrading of Wastewater-Grown Microalgae: 2021 State of Technology

The fiscal year (FY) 2021 State of Technology (SOT) Assessment for the hydrothermal liquefaction (HTL) of wastewater (WW)-grown microalgae and biocrude upgrading system was completed and reported here. An industrial partner, Gross-Wen Technologies (GWT), provided algae feedstock cultivated on a revolving algal biofilm (RAB) system by using the primary effluent from a water resource recovery facility (WRRF). This provided algae was tested at PNNL for HTL processing. The experimental results provided the major design basis of the HTL process of the SOT baseline case. The primary effluent of the Metropolitan Water Reclamation District (MWRD) of Greater Chicago was assumed to be the nutrients source for algae growth and the algae yield data per gallon wastewater provided by GWT were used to estimate the total algae production rate and thus the HTL conversion plant scale. Considering different cultivation technologies and wastewater streams with different flow rates and nutrients contents can be used to produce algae, this SOT assessment just provided an example case study for WW-grown algae based HTL conversion to fuels systems. A preliminary economic analysis was developed based on process simulation results. Sensitivity analysis was implemented to evaluate cost impacts of plant scales, potential cost improvements and other key factors.

54 ENVIRONMENTAL SCIENCES↗

Wet Waste Hydrothermal Liquefaction and Biocrude Upgrading to Hydrocarbon Fuels: 2021 State of Technology

Each year the U.S. Department of Energy Bioenergy Technologies Office (BETO) assesses progress in their research and development efforts toward sustainable production of renewable fuels (DOE 2016) through the annual state of technology (SOT) assessment. The SOT assessment evaluates the impact of the year’s research progress on the modeled minimum fuel selling price (MFSP) for selected biofuel conversion pathways and measures the current state of the technology relative to defined goal case projections. Supply chain sustainability analysis to track and guide research toward improved greenhouse gas (GHG) emissions, energy usage, water usage and other environmental metrics for the pathway is performed by Argonne National Laboratory (Cai et al. 2018, 2020). Technical and cost targets for a projected goal case set for the year 2022 were previously established for the wet waste hydrothermal liquefaction (HTL) and biocrude upgrading pathway and summarized in a design report (Snowden-Swan et al. 2017). Process performance advancements made for HTL and biocrude hydrotreating have resulted yearly reductions in the modeled MFSP relative to the initial SOT (2018) (Snowden-Swan et al. 2020, 2021). This report summarizes the research and associated techno-economic analysis (TEA) for the pathway 2021 SOT. Methods and economic assumptions for the nth plant analysis used for the TEA are consistent with the design report (Snowden-Swan et al. 2017), with the exception of updates in the modeled cost year (2016) and income tax rate (21%).

09 BIOMASS FUELS↗