Search NASA⌕ Search

SEARCH · Search NASA

Results for “electrical interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Advanced Power Electronics Designs - Reliability and Prognostics (Keystone Project 1)

The primary deliverable for this project will be to construct a power electronics package utilizing an organic electrically insulating substrate material with a direct chip-to-chip interconnect technology and demonstrate superior thermal performance and greater reliability under thermal cycling, thermal aging, vibration, power cycling, and electrical high-potential evaluation over traditional packages.

47 OTHER INSTRUMENTATION↗

Advanced Power Electronics Designs - Reliability and Prognostics (Keystone Project 1)

The primary deliverable for this project will be to construct a power electronics package utilizing an organic electrically insulating substrate material with a direct chip-to-chip interconnect technology and demonstrate superior thermal performance and greater reliability under thermal cycling, thermal aging, vibration, power cycling, and electrical high-potential evaluation over traditional packages.

ADVANCED PROPULSION SYSTEMS↗

Advanced Power Electronics Designs - Reliability and Prognostics (Keystone Project 1)

The primary deliverable for this project will be to construct a power electronics package utilizing an organic electrically insulating substrate material with a direct chip-to-chip interconnect technology and demonstrate superior thermal performance and greater reliability under thermal cycling, thermal aging, vibration, power cycling, and electrical high-potential evaluation over traditional packages.

ADVANCED PROPULSION SYSTEMS,ENGINEERING↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate change and its influence on water systems increases the cost of electricity system decarbonization

The electric sector simultaneously faces two challenges: decarbonization to mitigate, and adaptation to manage, the impacts of climate change. In many regions, these challenges are compounded by an interdependence of electricity and water systems, with water needed for hydropower generation and electricity for water provision. Here, we couple detailed water and electricity system models to evaluate how the Western Interconnection grid can both adapt to climate change and develop carbon-free generation by 2050, while accounting for interactions and climate vulnerabilities of the water sector. We find that by 2050, due to climate change, annual regional electricity use could grow by up to 2% from cooling and water-related electricity demand, while total annual hydropower generation could decrease by up to 23%. To adapt, we show that the region may need to build up to 139 GW of additional generating capacity between 2030 and 2050, equivalent to nearly thrice California's peak demand, and could incur up to $\$$150 billion (+7%) in extra costs.

13 HYDRO ENERGY↗

Frequency Regulation and Oscillation Damping Contributions of Variable-Speed Wind Generators in the U.S. Eastern Interconnection (EI)

The U.S. Eastern Interconnection (EI) is one of the largest electric power grids in the world and is expected to have difficulties in dealing with frequency regulation and oscillation damping issues caused by the increasing wind power. On the other side, variable-speed wind generators can actively engage in frequency regulation or oscillation damping with supplementary control loops. This paper creates a 5% wind power penetration simulation scenario based on the 16 000-bus EI system dynamic model and developed the user-defined wind electrical control model in PSS (R) E that incorporates additional frequency regulation and oscillation damping control loops. We evaluated the potential contributions of variable-speed wind generations to the EI system frequency regulation and oscillation damping, and simulation results demonstrate that current and future penetrations of wind power are promising in the EI system frequency regulation and oscillation damping.

17 WIND ENERGY↗

High Performance Ceramic Interconnect Material for Solid Oxide Fuel Cells (SOFCs): Ca- and Transition Metal-doped Yttrium Chromite

The effect of transition metal substitution on thermal and electrical properties of Ca-doped yttrium chromite was investigated in relation to use as a ceramic interconnect in high temperature solid oxide fuel cells (SOFCs). 10 at% Co, 4 at% Ni, and 1 at% Cu substitution on B-site of 20 at% Ca-doped yttrium chromite led to a close match of thermal expansion coefficient (TEC) with that of 8 mol% yttria-stabilized zirconia (YSZ), and a single phase Y0.8Ca0.2Cr0.85Co0.1Ni0.04Cu0.01O3 remained stable between 25 and 1100 degree C over a wide oxygen partial pressure range. Doping with Cu significantly facilitated densification of yttrium chromite. Ni dopant improved both electrical conductivity and dimensional stability in reducing environments, likely through diminishing the oxygen vacancy formation. Substitution with Co substantially enhanced electrical conductivity in oxidizing atmosphere, which was attributed to an increase in charge carrier density and hopping mobility. Electrical conductivity of Y0.8Ca0.2Cr0.85Co0.1Ni0.04Cu0.01O3 at 900 degree C is 57 S/cm in air and 11 S/cm in fuel (pO2=5×10^-17 atm) environments. Chemical compatibility of doped yttrium chromite with other cell components was verified at the processing temperatures. Based on the chemical and dimensional stability, sinterability, and thermal and electrical properties, Y0.8Ca0.2Cr0.85Co0.1Ni0.04Cu0.01O3 is suggested as a promising SOFC ceramic interconnect to potentially overcome technical limitations of conventional acceptor-doped lanthanum chromites.

30 DIRECT ENERGY CONVERSION↗

Evaluation of Multi-Inverter Anti-Islanding with Grid Support and Ride-Through and Investigation of Island Detection Alternatives

As utility interconnected photovoltaic systems (PV) become integrated into the electrical power system (EPS) at an increasing rate, utilities and regulators have become concerned about the potential for increased voltage and frequency deviations as well as EPS reliability and resiliency. These concerns have initiated the need to amend the utility interconnection standard to allow advanced inverter control functionalities that provide: (1) reactive power control for voltage support, (2) real (active) power control for frequency support and (3) voltage and frequency ride- through for bulk system support. The new real and reactive power modulation are intended to reduce EPS voltage and frequency deviations by mimicking the droop and excitation controls of conventional generation. The new ride-through capabilities are needed to prevent a large quantity of generation from autonomously de-energizing or disconnecting in response to a voltage or frequency deviation. These changes, however, may have the potential to interfere with autonomous anti-islanding, especially when multiple inverters from different vendors are co-located on one bus. This report presents results from an investigation of multi-inverter autonomous anti- islanding with advanced functions, and the development of a means to mitigate adverse interaction between the two.

14 SOLAR ENERGY↗

A First Look at the Impact of Electric Vehicle Charging on the Electric Grid in the EV Project

ECOtality was awarded a grant from the U.S. Department of Energy to lead a large-scale electric vehicle charging infrastructure demonstration, called The EV Project. ECOtality has partnered with Nissan North America, General Motors, the Idaho National Laboratory, and others to deploy and collect data from over 5,000 Nissan LEAFsTM and Chevrolet Volts and over 10,000 charging systems in 18 regions across the United States. This paper summarizes usage of residential charging units in The EV Project, based on data collected through the end of 2011. This information is provided to help analysts assess the impact on the electric grid of early adopter charging of grid-connected electric drive vehicles. A method of data aggregation was developed to summarize charging unit usage by the means of two metrics: charging availability and charging demand. Charging availability is plotted to show the percentage of charging units connected to a vehicle over time. Charging demand is plotted to show charging demand on the electric gird over time. Charging availability for residential charging units is similar in each EV Project region. It is low during the day, steadily increases in evening, and remains high at night. Charging demand, however, varies by region. Two EV Project regions were examined to identify regional differences. In Nashville, where EV Project participants do not have time-of-use electricity rates, demand increases each evening as charging availability increases, starting at about 16:00. Demand peaks in the 20:00 hour on weekdays. In San Francisco, where the majority of EV Project participants have the option of choosing a time-of-use rate plan from their electric utility, demand spikes at 00:00. This coincides with the beginning of the off-peak electricity rate period. Demand peaks at 01:00.

33 ADVANCED PROPULSION SYSTEMS↗

Draft Electric Rule 21 Test Protocols for Advanced Inverter Functions

Disclaimer: The following document includes draft certification protocols and should not be viewed as a consensus-based performance standard. Distributed energy resources (DERs), such as photovoltaic (PV) systems, when deployed in a large scale, are capable of significantly influencing the operation of bulk and local power systems. Looking to the future, European and American stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. One of the jurisdictions considering modifications to the DER interconnection requirements is California. To determine what changes could improve electric grid reliability and allow greater penetrations of renewable energy, the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC), in conjunction with consultant Frances Cleveland, convened the Smart Inverter Working Group (SIWG) in January 2013. The SIWG--composed of state agencies, utility engineers, national laboratories, manufacturers, trade associations, and advocacy groups--provided the CPUC a set of recommendations in early 2014 1 . The recommendations included specific advanced DER functions and interoperability requirements, along with a proposed timeline, for California to add new capabilities to grid-interconnected DER. On August 18, 2014 the three California Investor-Owned Utilities (IOUs)--Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE) and San Diego Gas & Electric Company (SDG&E)--drafted a Advice Letter filing to the CPUC setting forth revisions to Electric Tariff Rule 21 to conform to the seven recommendations made by the Working Group 2 . After a comment period, the CPUC issued an update to the IOU recommendations 3 . At the time of this publication, there was no final legal ruling on the CPUC Rulemaking (R.) 11-09-011 ("Order Instituting Rulemaking on the Commission's Own Motion to improve distribution level interconnection rules and regulations for certain classes of electric generators and electric storage resources"). In the U.S., Nationally Recognized Test Laboratories (NRTLs) independently verify products to safety and functional standards. PV inverters are certified to Underwriters Laboratories (UL) Standard 1741 4 . However, new advanced inverter functions described in the SIWG and IOU proposals are not included in this standard, so there is a critical need to develop test protocols for these functions in preparation of a positive ruling by the CPUC. Through a California Solar Initiative Grant, Sandia National Laboratories (Sandia or SNL), Underwriters Laboratories (UL), Electric Power Research Institute, Inc. (EPRI), Xanthus Consulting, SunSpec Alliance, Loggerware, and utility and PV inverter manufacturers have collaborated to draft this certification protocol for the Rule 21 SIWG Phase 1 advanced inverter functions. This report also includes test procedures for Phase 2 and Phase 3 functions that will be demonstrated later in the CSI4 project. This collaborative effort was performed in close junction with the UL 1741 Standards Technical Panel (STP) working group. This document represents a snapshot of the draft testing protocols at the time of publication and not a consensus certification protocol for advanced inverters. 1 California Public Utilities Commission, "Recommendations for Updating the Technical Requirements for Inverters in Distributed Energy Resources, Smart Inverter Working Group Recommendations," Filed 7 Feb 2014. 2 J.J. Newlander, R.G. Litteneker, S.W. Walter, M. Dwyer, Joint motion of Pacific Gas and Electric Company (U 39 E), Southern California Edison Company (U 338 E) and San Diego Gas & Electric Company (U 902 E) regarding implementation of smart inverter functionalities, Rulemaking 11-09-011 Advice Letter, 18 July, 2014. 3 J.T. Sullivan, CPUC Rulemaking 11-09-011 Agenda ID #13460, 13 Nov, 2014. 4 Underwriters Laboratories Std. 1741 Ed. 2, "Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources," 2010.

42 ENGINEERING↗

Considerations for Distributed Edge Data Centers and Use of Building Loads to Support Large Interconnections

The rapid expansion of artificial intelligence (AI) and machine learning is driving unprecedented electricity demand from data centers. It is predicted that by 2030, 90% of AI workloads will be inference-based, requiring interconnection of multiple low-latency edge data centers (<20 MW) sited closer to end users - often on already constrained distribution feeders. Although individually small, these loads can aggregate to large loads per feeder, straining infrastructure, creating multi-year interconnection delays, and driving up customer costs. This paper proposes a data center-focused grid-integration framework that combines feeder hosting capacity analysis with building energy efficiency, building load flexibility, and waste heat reuse to expand effective feeder and substation headroom. Such approaches can reduce interconnection delays, lower costs for ratepayers, and accelerate AI-ready infrastructure deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Compliant alkali silicate sealing glass for solid oxide fuel cell applications: the effect of protective YSZ coating on electrical stability in dual environment

Recently, compliant sealing glass has been proposed as a potential candidate sealant for solid oxide fuel cell (SOFC) applications. In a previous paper, the thermal stability and chemical compatibility were reported for a compliant alkali-containing silicate glass sealed between anode supported YSZ bi-layer and YSZ-coated stainless steel interconnect. In this paper, we will report the electrical stability of the compliant glass under a DC load and dual environment at 700-800 degrees C. Apparent electrical resistivity was measured with a 4-point method for the glass sealed between two plain SS441 metal coupons or YSZ-coated aluminized substrates. The results showed instability with plain SS441 at 800 degrees C, but stable behavior of increasing resistivity with time was observed with the YSZ coated SS441. In addition, results of interfacial microstructure analysis with scanning electron microscopy will be correlated with the measured resistivity results. Overall, the YSZ coating demonstrated chemically stability with the alkali-containing compliant silicate sealing glass under electrical field and dual environments.

coating↗

The future evolution of energy-water-agriculture interconnectivity across the US

Abstract Energy, water, and agricultural resources across the globe are highly interconnected. This interconnectivity poses science challenges, such as understanding and modeling interconnections, as well as practical challenges, such as efficiently managing interdependent resource systems. Using the US as an example, this study seeks to define and explore how interconnectivity evolves over space and time under a range of influences. Concepts from graph theory and input–output analysis are used to visualize and quantify key intersectoral linkages using two new indices: the ‘Interconnectivity Magnitude Index’ and the ‘Interconnectivity Spread Index’. Using the Global Change Analysis Model (GCAM-USA), we explore the future evolution of these indices under four scenarios that explore a range of forces, including socioeconomic and technological change. Analysis is conducted at both national and state level spatial scales from 2015 to 2100. Results from a Reference scenario show that resource interconnectivity in the US is primarily driven by water use amongst different sectors, while changes in interconnectivity are driven by a decoupling of the water and electricity systems, as power plants become more water-efficient over time. High population and GDP growth results in relatively more decoupling of sectors, as a larger share of water and energy is used outside of interconnected sector feedback loops. Lower socioeconomic growth results in the opposite trend. Transitioning to a low-carbon economy increases interconnectivity because of the expansion of purpose-grown biomass, which strengthens the connections between water and energy. The results highlight that while some regions may experience similar sectoral stress projections, the composition of the intersectoral connectivity leading to that sectoral stress may call for distinctly different multi-sector co-management strategies. The methodology we introduce here can be applied in diverse geographical and sectoral contexts to enable better understanding of where, when, and how coupling or decoupling between sectors could evolve and be better managed.

Khan, Zarrar (ORCID:0000000281478553)↗

Interconnection-wide hour-ahead scheduling in the presence of intermittent renewables and demand response: A surplus maximizing approach

This study describes a new approach for solving the multi-area electricity resource allocation problem when considering both intermittent renewables and demand response. The method determines the hourly inter-area export/import set that maximizes the interconnection (global) surplus satisfying transmission, generation and load constraints. The optimal inter-area transfer set effectively makes the electricity price uniform over the interconnection apart from constrained areas, which overall increases the consumer surplus more than it decreases the producer surplus. The method is computationally efficient and suitable for use in simulations that depend on optimal scheduling models. The method is demonstrated on a system that represents North America Western Interconnection for the planning year of 2024. Simulation results indicate that effective use of interties reduces the system operation cost substantially. Excluding demand response, both the unconstrained and the constrained scheduling solutions decrease the global production cost (and equivalently increase the global economic surplus) by 12.30B and 10.67B per year, respectively, when compared to the standalone case in which each control area relies only on its local supply resources. This cost saving is equal to 25% and 22% of the annual production cost. Including 5% demand response, the constrained solution decreases the annual production cost by 10.70B, while increases the annual surplus by 9.32B in comparison to the standalone case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electrically Conductive and Protective Coating for Planar SOFC Stacks

Ferritic stainless steels are preferred interconnect materials for intermediate temperature SOFCs because of their resistance to oxidation, high formability and low cost. However, their protective oxide layer produces Cr-containing volatile species at SOFC operating temperatures and conditions, which can cause cathode poisoning. Electrically conducting spinel coatings have been developed to prevent cathode poisoning and to maintain an electrically conductive pathway through SOFC stacks. However, this coating is not compatible with the formation of stable, hermetic seals between the interconnect frame component and the ceramic cell. Thus, a new aluminizing process has been developed by PNNL to enable durable sealing, prevent Cr evaporation, and maintain electrical insulation between stack repeat units. Hence, two different types of coating need to have stable operation of SOFC stacks. This paper will focus on the electrically conductive coating process. Moreover, an advanced coating process, compatible with a non-electrically conductive coating will be

Choi, Jung-Pyung↗

X-ray photoelectron spectroscopy investigation of the Schottky barrier at low-k a-SiO(C):H/Cu interfaces

In order to understand the fundamental mechanisms involved in electrical leakage in low-k/Cu interconnects, we have utilized x-ray photoelectron spectroscopy to determine the Schottky barrier present at interfaces formed by plasma enhanced chemical vapor deposition of low-k a-SiO{sub x}C{sub y}:H thin films on polished Cu substrates. We find the Schottky Barrier at this interface to range widely from 1 to >4 eV and to be dependent on the amount of network carbon incorporated into the a-SiOC:H thin films.

36 MATERIALS SCIENCE↗

Photovoltaic generator with a spherical imaging lens for use with a paraboloidal solar reflector

The invention is a generator for photovoltaic conversion of concentrated sunlight into electricity. A generator according to the invention incorporates a plurality of photovoltaic cells and is intended for operation near the focus of a large paraboloidal reflector pointed at the sun. Within the generator, the entering concentrated light is relayed by secondary optics to the cells arranged in a compact, concave array. The light is delivered to the cells at high concentration, consistent with high photovoltaic conversion efficiency and low cell cost per unit power output. Light enters the generator, preferably first through a sealing window, and passes through a field lens, preferably in the form of a full sphere or ball lens centered on the paraboloid focus. This lens forms a concentric, concave and wide-angle image of the primary reflector, where the intensity of the concentrated light is stabilized against changes in the position of concentrated light entering the generator. Receiving the stabilized light are flat photovoltaic cells made in different shapes and sizes and configured in a concave array corresponding to the concave image of a given primary reflector. Photovoltaic cells in a generator are also sized and interconnected so as to provide a single electrical output that remains high and stable, despite aberrations in the light delivered to the generator caused by, for example, mispointing or bending of the primary reflector. In some embodiments, the cells are set back from the image formed by the ball lens, and part of the light is reflected onto each cell small secondary reflectors in the form of mirrors set around its perimeter.

14 SOLAR ENERGY↗

Regulatory and Technical Challenges and Barriers to Adoption of Distributed Wind Energy in Agricultural Settings

Distributed wind (DW) energy development can benefit agricultural landowners through the possibility of improved resilience of electrical service from onsite generation and associated economic benefits. DW development currently faces technical and regulatory challenges related to interconnection of projects with distribution or transmission equipment on the main electrical grid. A review was conducted of barriers to adoption for agricultural DW projects and potential roles of various stakeholders in addressing them. One major barrier is that the unique characteristics of wind energy generation such as its variability and intermittency, may require upgrades for the whole power line, which can lead to prohibitive cost burdens on individual interconnection customers. Another barrier is compliance with federal, state, or utility-level regulations that require technology-agnostic, industry-standard equipment that is often not technically realistic for DW projects. DW developers, grid infrastructure owner-operators, regulators, and standards publishers can work together to address these challenges and facilitate DW development.

17 WIND ENERGY↗