Search NASA⌕ Search

SEARCH · Search NASA

Results for “Failure Rate”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Spacecraft Parachute Recovery System Testing from a Failure Rate Perspective

Spacecraft parachute recovery systems, especially those with a parachute cluster, require testing to identify and reduce failures. This is especially important when the spacecraft in question is human-rated. Due to the recent effort to make spaceflight affordable, the importance of determining a minimum requirement for testing has increased. The number of tests required to achieve a mature design, with a relatively constant failure rate, can be estimated from a review of previous complex spacecraft recovery systems. Examination of the Apollo parachute testing and the Shuttle Solid Rocket Booster recovery chute system operation will clarify at which point in those programs the system reached maturity. This examination will also clarify the risks inherent in not performing a sufficient number of tests prior to operation with humans on-board. When looking at complex parachute systems used in spaceflight landing systems, a pattern begins to emerge regarding the need for a minimum amount of testing required to wring out the failure modes and reduce the failure rate of the parachute system to an acceptable level for human spaceflight. Not only a sufficient number of system level testing, but also the ability to update the design as failure modes are found is required to drive the failure rate of the system down to an acceptable level. In addition, sufficient data and images are necessary to identify incipient failure modes or to identify failure causes when a system failure occurs. In order to demonstrate the need for sufficient system level testing prior to an acceptable failure rate, the Apollo Earth Landing System (ELS) test program and the Shuttle Solid Rocket Booster Recovery System failure history will be examined, as well as some experiences in the Orion Capsule Parachute Assembly System will be noted.

Stewart, Christine E.↗

Vacuum Bellows, Vacuum Piping, Cryogenic Break, and Copper Joint Failure Rate Estimates for ITER Design Use

The ITER international project design teams are working to produce an engineering design in preparation for construction of the International Thermonuclear Experimental Reactor (ITER) tokamak. During the course of this work, questions have arisen in regard to safety barriers and equipment reliability as important facets of system design. The vacuum system designers have asked several questions about the reliability of vacuum bellows and vacuum piping. The vessel design team has asked about the reliability of electrical breaks and copper-copper joints used in cryogenic piping. Research into operating experiences of similar equipment has been performed to determine representative failure rates for these components. The following chapters give the research results and the findings for vacuum system bellows, power plant stainless steel piping (amended to represent vacuum system piping), cryogenic system electrical insulating breaks, and copper joints.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

In-Vessel Coil Material Failure Rate Estimates for ITER Design Use

The ITER international project design teams are working to produce an engineering design for construction of this large tokamak fusion experiment. One of the design issues is ensuring proper control of the fusion plasma. In-vessel magnet coils may be needed for plasma control, especially the control of edge localized modes (ELMs) and plasma vertical stabilization (VS). These coils will be lifetime components that reside inside the ITER vacuum vessel behind the blanket modules. As such, their reliability is an important design issue since access will be time consuming if any type of repair were necessary. The following chapters give the research results and estimates of failure rates for the coil conductor and jacket materials to be used for the in-vessel coils. Copper and CuCrZr conductors, and stainless steel and Inconel jackets are examined.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Improving the Estimates of International Space Station (ISS) Induced K-Factor Failure Rates for On-Orbit Replacement Unit (ORU) Supportability Analyses

This is a case study on revised estimates of induced failure for International Space Station (ISS) on-orbit replacement units (ORUs). We devise a heuristic to leverage operational experience data by aggregating ORU, associated function (vehicle sub -system), and vehicle effective' k-factors using actual failure experience. With this input, we determine a significant failure threshold and minimize the difference between the actual and predicted failure rates. We conclude with a discussion on both qualitative and quantitative improvements the heuristic methods and potential benefits to ISS supportability engineering analysis.

Anderson, Leif F.↗

Analysis of field usage failure rate data for plastic encapsulated solid state devices

Survey and questionnaire techniques were used to gather data from users and manufacturers on the failure rates in the field of plastic encapsulated semiconductors. It was found that such solid state devices are being successfully used by commercial companies which impose certain screening and qualification procedures. The reliability of these semiconductors is now adequate to support their consideration in NASA systems, particularly in low cost systems. The cost of performing necessary screening for NASA applications was assessed.

Source record↗

Field Programmable Gate Array Failure Rate Estimation Guidelines for Launch Vehicle Fault Tree Models

Today's launch vehicles complex electronic and avionic systems heavily utilize the Field Programmable Gate Array (FPGA) integrated circuit (IC). FPGAs are prevalent ICs in communication protocols such as MIL-STD-1553B, and in control signal commands such as in solenoid/servo valves actuations. This paper will demonstrate guidelines to estimate FPGA failure rates for a launch vehicle, the guidelines will account for hardware, firmware, and radiation induced failures. The hardware contribution of the approach accounts for physical failures of the IC, FPGA memory and clock. The firmware portion will provide guidelines on the high level FPGA programming language and ways to account for software/code reliability growth. The radiation portion will provide guidelines on environment susceptibility as well as guidelines on tailoring other launch vehicle programs historical data to a specific launch vehicle.

Al Hassan, Mohammad↗

Field Programmable Gate Array Failure Rate Estimation Guidelines for Launch Vehicle Fault Tree Models

Today's launch vehicles complex electronic and avionics systems heavily utilize Field Programmable Gate Array (FPGA) integrated circuits (IC) for their superb speed and reconfiguration capabilities. Consequently, FPGAs are prevalent ICs in communication protocols such as MILSTD- 1553B and in control signal commands such as in solenoid valve actuations. This paper will identify reliability concerns and high level guidelines to estimate FPGA total failure rates in a launch vehicle application. The paper will discuss hardware, hardware description language, and radiation induced failures. The hardware contribution of the approach accounts for physical failures of the IC. The hardware description language portion will discuss the high level FPGA programming languages and software/code reliability growth. The radiation portion will discuss FPGA susceptibility to space environment radiation.

Al Hassan, Mohammad↗

Evaluation of errors in prior mean and variance in the estimation of integrated circuit failure rates using Bayesian methods

The critical point of any Bayesian analysis concerns the choice and quantification of the prior information. The effects of prior data on a Bayesian analysis are studied. Comparisons of the maximum likelihood estimator, the Bayesian estimator, and the known failure rate are presented. The results of the many simulated trails are then analyzed to show the region of criticality for prior information being supplied to the Bayesian estimator. In particular, effects of prior mean and variance are determined as a function of the amount of test data available.

Fletcher, B. C.↗

A system reliability analysis for stand-by spares with non-zero unpowered failure rates

Equations which define the reliability of n-fold parallel systems with stand-by spares, and triply redundant, majority-voting systems with stand-by spares have been derived. The stand-by spares have been assumed to have a non-zero failure rate while in the stand-by mode. A Monte Carlo system simulation has been generated and the results compared to the theoretical reliability predictions. A comparison of these two stand-by configurations is also presented for three through six total units.

Taylor, D. S.↗

Impact of Dose on Local Failure Rates After Image-Guided Reirradiation of Recurrent Paraspinal Metastases

Purpose: To examine the impact of dose on local failure (LF) rates in the re-treatment of recurrent paraspinal metastases with image-guided intensity-modulated radiotherapy (IG-IMRT). Methods and Materials: The records of patients with in-field recurrence after previous spine radiation (median dose, 30 Gy) who received salvage IG-IMRT with either five 4-Gy (20-Gy group, n = 42) or five 6-Gy (30-Gy group, n = 55) daily fractions between January 2003 and August 2008 were reviewed. Institutional practice was 20 Gy before April 2006, when it changed to 30 Gy. A total of 47 cases (48%) were treated adjuvantly, after surgery to decompress epidural disease. LF after IG-IMRT was defined radiographically. Results: The median follow-up was 12.1 months (range, 0.2-63.6 months). The 1-year cumulative incidences of LF after 20 Gy and 30 Gy IG-IMRT were 45% and 26%, respectively (p = 0.04). Of all treatment characteristics examined (20-Gy vs. 30-Gy dose group, dose to 95% of the planned and gross target volume, tumor size, histology, receipt of surgery, and interval between first and second radiation), only dose group had a significant impact on actuarial LF incidence (p = 0.04; unadjusted HR, 0.51; 95% CI, 0.27-0.96). There was no incidence of myelopathy. Conclusions: A significant decrease in LF after IG-IMRT with five 6-Gy fractions compared with five 4-Gy fractions was observed without increased risk of myelopathy. Until prospective data comparing stereotactic hypofractionated and single-fraction regimens become available, when reirradiating recurrent paraspinal metastases with IG-IMRT, administration of five 6-Gy daily fractions is reasonable.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Correlation study between vibrational environmental and failure rates of civil helicopter components

An investigation of two selected helicopter types, namely, the Models 206A/B and 212, is reported. An analysis of the available vibration and reliability data for these two helicopter types resulted in the selection of ten components located in five different areas of the helicopter and consisting primarily of instruments, electrical components, and other noncritical flight hardware. The potential for advanced technology in suppressing vibration in helicopters was assessed. The are still several unknowns concerning both the vibration environment and the reliability of helicopter noncritical flight components. Vibration data for the selected components were either insufficient or inappropriate. The maintenance data examined for the selected components were inappropriate due to variations in failure mode identification, inconsistent reporting, or inaccurate informaton.

Alaniz, O.↗

Voltage stress effects on microcircuit accelerated life test failure rates

The applicability of Arrhenius and Eyring reaction rate models for describing microcircuit aging characteristics as a function of junction temperature and applied voltage was evaluated. The results of a matrix of accelerated life tests with a single metal oxide semiconductor microcircuit operated at six different combinations of temperature and voltage were used to evaluate the models. A total of 450 devices from two different lots were tested at ambient temperatures between 200 C and 250 C and applied voltages between 5 Vdc and 15 Vdc. A statistical analysis of the surface related failure data resulted in bimodal failure distributions comprising two lognormal distributions; a 'freak' distribution observed early in time, and a 'main' distribution observed later in time. The Arrhenius model was shown to provide a good description of device aging as a function of temperature at a fixed voltage. The Eyring model also appeared to provide a reasonable description of main distribution device aging as a function of temperature and voltage. Circuit diagrams are shown.

Johnson, G. M.↗

The System Complexity Metric (SCM) Explains Systems Design and is Correlated with Cost and Failure Rate

The human short term memory span and working capacity is limited to three to five items, especially if they are organized complex “chunks” of information. The impression of complexity occurs when a system is simply difficult to understand, where there is no apparent pattern to predict its behavior. Hierarchical systems design can reduce perceived complexity and increase the amount of information that can be managed. The SCM was developed to measure complexity and help compare proposed overall system architectures before detailed design information is available. The SCM is defined as the sum of the number of major nodes, N, in the system block diagram plus the number of one-way interactions, I, between the nodes. SCM = N + I. SCM’s are easily determined by direct inspection of high-level block diagrams of life support systems. Axiomatic design develops a hierarchy of subsystem requirements and designs together in a top-down, back-and-forth process. A coupling matrix is used to control the relationships between the subsystem functions and design concepts. Axiomatic design can improve system design by decoupling requirements and designs. Axiomatic design was applied to the planning of a closed life support system, similar to that used on the International Space Station. A materially open as opposed to a closed system design was created by removing the interconnections required to close the system. The open system had the same number of designed subsystems as the closed system, but it had many fewer interconnections and its SCM was lower by about half. The costs were estimated and the MTBF (Mean Time Before Failure) tabulated for open and closed space life support systems. The estimated costs were linearly proportional to SCM for the wide variations of SCM in life support, but small differences may not be significant. The flight and preflight MTBF’s both declined exponentially with increasing MTBF, faster than MTBF-2, even though the preflight estimated MTBF’s were about ten times higher than the flight MTBF’s.

System Complexity Metric (SCM)↗