Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Flexible FlueCO2

Carbon dioxide (CO2) emission reductions remain a significant challenge on the path to clean energy. There are increasing legislative, social, and environmental factors motivating CO2 emissions reduction from power plants with carbon capture and storage (CCS). CCS in natural gas combined cycle (NGCC) power plants is critical to achieve a net-zero carbon electricity grid. Enhanced 45Q tax credits provide new incentives, but currently available technologies are unable to profitably operate in grids with deep variable renewable penetration which require flexible NGCC operation. Luna Labs has developed the FlueCO2 membrane to enable a profitable NGCC-CCS process. The FlueCO2 membrane couples steam transport across the membrane to CO2 transport in the opposite direction, enabling high capture efficiencies and low energy costs even at low CO2 concentrations. The dual-phase membrane can operate in the range of typical flue gas temperatures and pressures and does not require temperature or pressure cycling. Luna Labs’ FlueCO2 technology enables flexible and profitable operation of NGCC plants with lower capital investment and impact on electricity prices. In this Phase 1 project, Luna Labs utilized experimental testing, modeling, process simulation, and standardized costing methodologies to evaluate the techno-economic value of a 650 MW greenfield NGCC plant with FlueCO2 (NGCC-FlueCO2). Key design requirements for operation were established and plant performance under load-leveling conditions was validated through computational fluid dynamics and process modeling. Luna Labs developed a dynamic modeling tool which modeled plant operational modes across a variety of tax structures and electricity pricing scenarios to project the overall Net Present Value (NPV) of the NGCC-FlueCO2. FlueCO2 minimizes the impact of CCS integration on plant operation by integrating directly into the NGCC heat recovery steam generator (HRSG). By tapping into the plant’s low-pressure (LP) steam, operators can divert LP steam to the greenfield NGCC and/or CCS process in response to dynamic markets. Since FlueCO2 will not significantly affect HRSG (or NGCC) operation, CCS only turns off during peak power demand (>$250/MWh). Under baseload conditions, FlueCO2 lowers the capital (37%), energy (36%) and carbon capture (<$40/tonne) costs and can increase the overall plant lifetime NPV by approximately ~$1B in comparison with NGCC solvent-based capture reference cases (NETL Case 31B). Luna Labs has shared its costing tools with several interested partners and customers, which follows a generalizable approach to costing analysis.

Kelly, Jesse↗

Incorporation of market signals for the optimal design of post combustion carbon capture systems

Recent studies have shown that fossil generators equipped with post-combustion carbon capture (PCC) systems are needed to reduce the cost of deep decarbonization. Such generators need to be flexible and responsive to grid conditions, particularly in a high variable renewable energy (VRE) environment. In this work, we evaluate the net present value (NPV) of retrofitting an existing natural gas combined cycle (NGCC) unit with a flexible PCC system while incorporating market signals from a high VRE grid. We use our industrial partner’s NGCC configuration as representative of existing NGCC units and Svante’s rapid-temperature swing adsorption (TSA) for PCC. Because of its ability to rapidly startup/shutdown and ramp-up/ramp-down, the chosen capture technology is very attractive for load-following operations. For a given set of market signals, we formulate a two-stage stochastic multi-period optimization problem, under the price-taker assumption, to simultaneously optimize the design of the capture system and operation of the entire plant. Rigorous models for the NGCC unit, PCC system, and compression system are developed using commercial process simulators and validated with either plant or vendor data. For computational tractability, we develop surrogate/reduced-order models for use in the optimization problem. The surrogate model for the NGCC plant is constructed by linearizing the rigorous dynamic model at 75% load, while data-driven nonlinear surrogate models for the capture and compression systems are constructed using simulation data from the rigorous models. The optimization problem, formulated as a mixed integer bilinear program, is implemented in the IDAES® integrated platform and solved to global optimality using Gurobi 9.5. Using this formulation, we determine the profitability of retrofitting an existing NGCC unit with the chosen capture system for multiple regions in the U.S. under two scenarios with different carbon prices. Importantly, the results show that the optimal decision strongly depends on the region and on the carbon price, thereby demonstrating the importance of the inclusion of market signals in the design process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Developing a Power Plant Suitability Model for the Energy Zones Mapping Tool

This report provides an example of designing, developing, and running a power plant suitability model in the Energy Zones Mapping Tool (EZMT), a public, web-based mapping tool with a large spatial database focused on energy infrastructure, energy resources, and related siting factors. The example focuses on natural gas combined cycle (NGCC) power plants, which have several unique and interesting characteristics. NGCC plants typically provide peaking power to the electrical grid. Such plants can be started or stopped relatively quickly and are often used to supplement base load plants (such as nuclear or coal) during times of peak electrical consumption or to counterbalance lulls in variable power generation (such as wind or solar). Due to these and other factors, NGCC plants have been projected to increase in number under energy planning studies such as Hadley et al. The scope of the Hadley et. al. study is the Eastern Interconnection (EI), the electrical transmission grid serving much of the United States and Canada east of the Rocky Mountains. Results in the study are organized according to 22 Multi-region National—North American Electricity and Environment Model (NEEM) regions within the EI. NGCC plants usually have lower water requirements than other thermoelectric power plants they may replace; therefore, they are expected to have an interesting role in reducing the overall water requirements of energy generation.

20 FOSSIL-FUELED POWER PLANTS↗

Modular, Crushed-Rock Thermal Energy Storage Pilot Design (Final Report)

The goal of this project was to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The completed effort included a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. For the feasibility study, the Brenmiller technology was designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) NGCC plant in Astoria, New York. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. The study also included a techno-economic evaluation of a 200 MWh commercial-scale demonstration. Prior to this project, EPRI had reviewed Brenmiller’s technology, which is being built to demonstrate bGen™ at 1.7 MWe on a solar plant (Rotem) and has been designed for an NGCC facility in Italy, assessing it at technology readiness level (TRL) 5. Brenmiller is also conducting a separate 1-MWth pilot with NYPA that pairs a bGen™ module with a microturbine for a combined-heat-and-power (CHP) application to improve efficiency and provide flexibility. The next-step pilot being designed as part of this project would represent a 5-fold increase in scale, versus Rotem, and would show the technology’s ability to provide effective and economical energy storage, bringing the technology to TRL 6. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. The main objective of the work completed by the Electric Power Research Institute, Inc. (EPRI), Brenmiller Energy (Brenmiller), New York Power Authority (NYPA), and United E&C (formerly AECOM) was to perform a Phase I feasibility study on the integration of a crushed-rock thermal energy storage (TES) with a fossil plant. Under this project, the EPRI-led team successfully completed a feasibility study to prepare for the potential future Phase II pre-front end engineering design (pre-FEED) to implement a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. Specific deliverables under this project included the Technology Maturation Plan, Conceptual Study, Techno-Economic Assessment, Technology Gap Assessment, Project Plan for Phase II (submitted as Phase II Renewal Application), Commercialization Plan, and the Final Report (this document). This Final Report includes a compilation of the various summary reports that were prepared during the 12-month schedule of the Phase I project execution under award DE-FE0032017.

03 NATURAL GAS↗

Development of a Modular, Crushed-Rock Thermal Energy Storage Pilot Design

The goal of this project, primarily funded by the U.S. Department of Energy, is to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The current effort will complete a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. The TES technology is being designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) natural gas combined cycle (NGCC) plant. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. Final sizing is being determined during the ongoing feasibility study. The next-step pilot being designed as part of the current project will represent a 5-fold increase in scale for this TES technology, and will be used to validate the technology’s ability to provide effective and economical energy storage. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. This project is expected to design the critical next-step pilot, which will be undertaken in real-world operating conditions to better determine the crushed rock TES technology’s ability to be integrated with an NGCC plant and assess degradation over transient cycling at rates befitting various marketplaces. The crushed-rock TES pilot design is a technically feasible next step in the development of the technology and is built upon years of prior testing and demonstration. The proposed TES technology was developed by Brenmiller over the last 8 years and has been tested in 3 generations of demonstration units at various sites, globally. During this field testing, different characteristics and performance of the technology were validated, including the following key features: energy storage capacity, energy storage charge/discharge rate, energy storage loses, energy storage mechanical testing. This presentation will provide an update on the results of the conceptual design study for the modular crushed-rock TES system, integrated with a NGCC power plant.

03 NATURAL GAS↗

Techno-Economic Analysis and Optimization of a Compressed-Air Energy Storage System Integrated with a Natural Gas Combined-Cycle Plant

To address the rising electricity demand and greenhouse gas concentration in the environment, considerable effort is being carried out across the globe on installing and operating renewable energy sources. However, the renewable energy production is affected by diurnal and seasonal variability. To ensure that the electric grid remains reliable and resilient even for the high penetration of renewables into the grid, various types of energy storage systems are being investigated. In this paper, a compressed-air energy storage (CAES) system integrated with a natural gas combined-cycle (NGCC) power plant is investigated where air is extracted from the gas turbine compressor or injected back into the gas turbine combustor when it is optimal to do so. First-principles dynamic models of the NGCC plant and CAES are developed along with the development of an economic model. The dynamic optimization of the integrated system is undertaken in the Python/Pyomo platform for maximizing the net present value (NPV). NPV optimization is undertaken for 14 regions/cases considering year-long locational marginal price (LMP) data with a 1 h interval. Design variables such as the storage capacity and storage pressure, as well as the operating variables such as the power plant load, air injection rate, and air extraction rate, are optimized. Results show that the integrated CAES system has a higher NPV than the NGCC-only system for all 14 regions, thus indicating the potential deployment of the integrated system under the assumption of the availability of caverns in close proximity to the NGCC plant. The levelized cost of storage is found to be in the range of 136–145 $/MWh. Roundtrip efficiency is found to be between 74.6–82.5%. A sensitivity study with respect to LMP shows that the LMP profile has a significant impact on the extent of air injection/extraction while capital expenditure reduction has a negligible effect.

25 ENERGY STORAGE↗

Deployment Feasibility Futures Analysis of Natural Gas Combined Cycle with Carbon Capture in Five U.S. Regions

A broad suite of technologies will be required to enable the United States to meet the current goal of a zero-carbon power sector by 2035, while continuing to provide the U.S. consumer with reliable, secure, stable, and affordable electricity. This study was conducted to evaluate the competitiveness of a natural gas combined cycle (NGCC) with carbon capture and storage (CCS) in five independent system operating areas, the PJM interconnection (PJM) regional transmission organization, Midcontinent Independent System Operator (MISO), Western Electricity Coordinating Council’s (WECC) Northwest Power Pool (NWPP) region, the Electric Reliability Council of Texas (ERCOT) and the SERC Reliability Corporation (SERC) in the 2030 to 2035 time horizon. The modeling and simulation efforts focused on determining the dispatch characteristics and the economic feasibility of constructing an NGCC plant with CCS in each of those regions. The analysis indicates that a NGCC system with CCS can be economically viable in the ERCOT and PJM regions. Additional revenue stream and/or capacity payments are required in MISO, NWPP, and SERC to enable successful commercial deployment of a NGCC with CCS.

Pickenpaugh, Gavin↗

Performance and Economic Evaluation of sCO2 Bottoming Cycles for Natural Gas Combined Cycle Plants with Capture

Natural gas combined cycles (NGCCs) with carbon capture are expected to play a significant role in decarbonization of the power generation sector. NGCC plants generally use triple pressure reheat steam Rankine power cycles for the bottoming cycle. Some studies in the literature have investigated the application of recompression and cascade style supercritical CO2 (sCO2) cycles for NGCC bottoming cycle applications but these studies have focused on power plants without carbon capture. However, NGCC plants fitted with post-combustion solvent-based CO2 capture systems will require a significant amount of steam for solvent regeneration and this can have a major impact on the optimal sCO2 bottoming cycle design. This study investigates the performance and economic potential of sCO2 bottoming cycles for H-class gas turbine based NGCC plants with a post-combustion capture system. A portion of the gas turbine exhaust heat is used for generation of steam required for solvent-based capture system while the rest of the waste heat is utilized in an sCO2 bottoming cycle for power generation. Overall, the performance and LCOE of investigated sCO2 bottoming cycles is similar to that of a state-of-the-art triple pressure reheat steam Rankine cycle. As the gas turbine exhaust temperature increases (beyond 630oC), sCO2 bottoming cycles begin to show greater performance and economic benefits compared to a steam Rankine cycle.

Pidaparti, Sandeep↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Economic viability of using thermal energy storage for flexible carbon capture on natural gas power plants

Fossil fuel-based power plants generate 80% of the electricity in the United States and provide a reliable generation source for both base and peak power demands. These plants are expected to adapt to changes in environmental policies that will require carbon management with carbon capture and storage (CCS) representing a possible solution. Current solvent-based CCS has a detrimental impact on a power plant's performance due to large heat loads required for carbon capture solvent regeneration. This parasitic load restricts the power plant's output and operation flexibility. Therefore, this study evaluates the feasibility of using thermal storage technologies for natural gas combined cycle (NGCC) power plants coupled with CCS to minimize the impact of solvent regeneration and enable the plant to operate at peak power output. Thermal storage can minimize the impact of CCS on the power plant by providing the heat load required for solvent regeneration during times of peak demand which will allow the plant to operate unrestricted and at full power. In total, fifteen unique thermal storage configurations were evaluated from three thermal storage categories: Brayton cycle heat pump, vapor compression heat pump, and heat recovery steam generator steam extraction for storage. The viability of these systems was determined by evaluating each configuration on thousands of real-world Locational Marginal Pricing (LMP) profiles from the New York Independent System Operator and California Independent System Operator electricity markets using a techno-economic analysis. Afterwards, results were compared to the performance of a base power plant (NGCC with CCS and no thermal storage) to determine the impact of thermal storage on power plant economics. Overall, six of the thermal storage configurations performed better than base CCS enabled power plant on between 11.5% and 38.7% of the LMP signals evaluated. The best performing configuration was a vapor compression heat pump that used flue gas as the working fluid and had both hot and cold thermal storage units. This configuration performed better than the base CCS power plant on 38.7% of the LMP profiles. The results of this study show thermal storage can mitigate the economic impact of carbon capture solvent regeneration on NGCC power plants. Discussion focuses on the impact of electricity pricing on the optimal thermal storage system, the advantages and disadvantages of the systems evaluated, and identifies limitations with the study.

25 ENERGY STORAGE↗

Modeling Power Plant Siting Opportunities and Constraints in the Eastern Interconnection

The electrical transmission grid is a critical part of the U.S. national infrastructure, and its modernization is a U.S. Department of Energy (DOE) priority. We describe the Energy Zones Mapping Tool (EZMT), a unique, powerful, and public web-based system with multi-criteria decision analysis (MCDA) models for more than 20 power plant technologies and many other capabilities. Through a case study on natural gas combined cycle (NGCC) power plants in the Eastern Interconnection (EI), we provide an example of incorporating an EZMT MCDA model into a larger planning context, with projections of interconnection-level capacity expansion, thermoelectric power plant retirements, and water availability. Our results provide insights on candidate NGCC site distributions and the criteria influencing them. The case study provides both an efficient methodology for performing similar analyses and hundreds of candidate NGCC power plant sites that can be studied in more detail as potential project sites.

20 FOSSIL-FUELED POWER PLANTS↗

Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation

This is the final scientific / technical report for Front End Engineering Design (FEED) study “Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation” funded by the US Department of Energy (DOE), Office of Fossil Energy and Carbon Management (FECM), Carbon Capture R&D Program under award DE-FE0032131. The prime recipient is General Electric Company working through its Gas Power division (GEGP) with subrecipients Southern Company and Linde Engineering plus subcontractor Kiewit. Southern Company’s Plant Barry, a 2x1 7F.04 CCGT, is the host site. GEGP led the overall integration of the carbon capture system (CCS) with the existing natural gas combined cycle (NGCC) facility. Linde provided the detailed process engineering and equipment costing for the carbon capture island. Kiewit focused on plant layout, constructability, and installation. With the FEED study finished, the engineering is approximately 50% complete towards the detailed design package needed to proceed to procure, install, build, commission, and operate the integrated NGCC+CCS facility. This FEED study focuses on retrofitting a 95% CO 2 capture system with attention on plant integration. The study was particularly challenging due to unique and substantial cost impacts related to global sourcing challenges associated with COVID. Additional incentives, regulatory support, and dispatch certainty are needed to move forward with implementing CCS at this or other sites in the US. This FEED study highlights the value of integrating NGCC+CCS and is a template for future CCS retrofit studies.

42 ENGINEERING↗

Enhancement of Carbon Capture Reactor Performance (Final Technical Report)

Significant challenges are still present in post-combustion CO 2 capture and new technologies and advanced components are needed to significantly advance the deployment of CO 2 capture for natural gas combined cycle (NGCC) plants. Critical elements of CO 2 capture that still need to be addressed include how to increase CO 2 mass transfer in the absorber column with liquid to gas ratios of <1.2, while reducing the size of the absorber column to reduce capital costs. Research involving chemical mechanism with design, synthesis, and assembly of materials with targeted functionally were combined with advanced additive manufacturing techniques towards development of enhanced CO 2 capture reactors that can lead to safe, reliable, and low-cost carbon capture technologies. The objective of the project was to develop and test novel carbon capture materials and reactor components that contribute to increased CO 2 mass transfer through increased turbulent gas-liquid interface and improved solvent wetting within the absorber. A technoeconomic analysis (TEA) was completed showing how the proposed technology decreases capital costs by reducing the size of the absorber column and the amount of packing required for high CO 2 capture rates. A technology maturation plan (TMP) was also developed to describe the current technology readiness levels (TRL) and outline additional research and development (R&D) needed to further develop these advanced components for NGCC CO 2 capture plants. The successful completion of this project has shown a pathway to reduce the absorber size and associated construction costs of post-combustion NGCC CO 2 capture systems at 97% capture and promote the utilization of abundant natural gas for production of reliable electricity.

20 FOSSIL-FUELED POWER PLANTS↗

Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity

This report presents an independent assessment of the cost and performance of select fossil energy power systems—pulverized coal (PC) and natural gas combined cycle (NGCC) plants—using a systematic, transparent, technical, and economic approach. This is Volume 1 of the baseline series: Bituminous Coal and Natural Gas to Electricity. The cost and performance of fossil fuel‐based generation technologies represented in this report are important inputs to assessments and determinations of technology combinations to be utilized to meet the projected demands of future power markets. From a research and development perspective, this report is used to assess goals and metrics and to provide a consistent basis for comparing developing technologies. The main report consists of fifteen power plant configurations, six PC cases (with and without carbon capture) nine NGCC cases (with and without carbon capture) and few additional cases of higher capture rate, for both PC and NGCC plants in the appendix. In addition to the report, an interactive tool was developed that allows users to manipulate six key study parameters simultaneously for each case and visualize the impact on three metrics: 1) levelized cost of electricity (LCOE), 2) cost of CO 2 capture (CCC), and 3) cost of CO 2 avoided (CCA). Following is the link to the interactive tool: https://netl.doe.gov/NETLVol1BaselineTool

20 FOSSIL-FUELED POWER PLANTS↗

Fluor Solvent Evaluation and Testing New Scope: Techno-economic Assessment of EEMPA Solvent for CO 2 Separations from Natural Gas Combined Cycle Power Plant

In this project, a techno-economic analysis (TEA) and sensitivity studies were conducted to assess the PNNL’s leading water-lean CO 2 capture solvent, EEMPA, for capture CO 2 from a natural gas combined cycle (NGCC) power plant at different levels of capture rate. Process models for the NGCC power plant, integrated with EEMPA carbon capture processes, were developed in Aspen Plus V14 using the most up-to-date property package for EEMPA-H 2 O-CO 2 system. The TEA evaluated EEMPA carbon capture process at normal capture rates (90%, 95% and 97%) against Case B32B (Cansolv) described in NETL Rev4a baseline report, and at higher capture rates aimed at achieving zero or negative emissions from the power plant (400 ppmv, 200 ppmv, and 100 ppmv CO 2 in exhaust gas), compared to typical Direct Air Capture (DAC) technologies. A manuscript was drafted for peer-reviewed publication. The results suggested that the carbon capture cost reaches a minimum of $\$$53.7/tonne CO 2 at 90% capture rate. Compared to Cansolv, one of the industrial benchmarks, EEMPA demonstrates 2-4% cost savings at capture rates up to 95%, but minimal savings at higher capture rate. The water lean-solvent system proves economically attractive for achieving moderate negative emissions (about 200 ppmv CO 2 in exhaust gas, and equivalent to 50% CO 2 removal from air) for NGCC flue gas, with marginal capture costs comparable to direct air capture (DAC) technologies. A sensitivity analysis results reveal that its economic advantage, unaffected by EEMPA price due to low solvent loss and degradation rate. However, the marginal carbon capture cost exceeds $\$$1,000/tonne CO 2 when transitioning from moderate to extreme negative emissions (100 ppmv CO 2 in exhaust gas), suggesting that water-lean solvents may not be economically competitive with other DAC technologies for removing more than 75% CO 2 from air. In addition, initial connection was established with Technology Center Mongstad (TCM) for a potential pilot testing proposal. However, detailed modeling and proposal preparation was not conducted due to the delay of non-disclosure agreement.

20 FOSSIL-FUELED POWER PLANTS↗

Dynamic Optimal Dispatch of Energy Systems with Intermittent Renewables and Damage Model

With the increasing penetration of intermittent renewable energy sources into the grid, there is a growing need for process systems-based strategies that integrate dispatchable and variable energy systems for supplying the demand while maintaining grid reliability. The proposed framework corresponds to a dynamic mixed-integer linear programming optimization approach that integrates coal-fired and natural gas-fired power plants, NaS batteries for energy storage, and solar/wind energy to supply the demand. This optimization approach considers an economic goal and constraints to provide power balance while maintaining the overall damage of the natural gas combined cycle (NGCC) power plant drum under a maximum stress as well as avoiding the overheating of the NGCC superheater and reheater. Renewable curtailment levels are also retained at minimum levels. Case studies are analyzed considering different loads and renewable penetration levels. The results show that the demand was met for all cases. Grid flexibility was mostly provided by the NGCC, while the batteries were used sparingly. In addition, considering a CO 2 equivalent analysis, the environmental performance was intrinsically connected to grid flexibility and the level of renewable penetration. Stress analysis results reinforced the necessity for an equipment health-related constraint.

97 MATHEMATICS AND COMPUTING↗

Performance and Cost Potential for Direct-Fired Supercritical CO2 Natural Gas Power Plants

Direct-fired supercritical CO2 (sCO2) power cycles are being explored as an attractive alternative to natural gas combined cycle (NGCC) plants with carbon capture and storage (CCS). Therefore, understanding their performance and cost potential is important for the commercialization of the technology. This study presents the techno-economic optimization results of natural gas-fired, utility-scale power plants based on the direct sCO2 power cycle, which are lacking in public literature. To identify the optimum plant configuration, the study considered multiple cases with varying levels of thermal integration with the plant air separation unit (ASU). Several design variables for each power cycle configuration were identified and optimized to minimize the levelized cost of electricity (LCOE) for each case. The optimization design variables include the sCO2 cooler outlet temperatures, recuperator approach temperatures, and pressure drops. High fidelity models for recuperators, coolers, and turbines were developed and used to capture the impact of design variables on plant efficiency and capital costs. The optimization was conducted using a combination of manual sensitivity analyses and automated derivative-free optimization algorithms available under NETL’s Framework for Optimization and Quantification of Uncertainty and Sensitivity platform. The optimized direct sCO2 power plants offered similar or slightly higher plant efficiencies than the reference NGCC plants based on the F-class gas turbine with CCS. The LCOE of the optimized direct sCO2 plants is 13 to 17% higher than the reference NGCC plants with CCS due to high capital costs associated with the ASU and sCO2 power block, though there is significant room for improvement due to the high uncertainty in component capital costs for these new plants. Recuperators make up over 50% of the sCO2 power block costs. Consequently, any research and development efforts to reduce the recuperator capital costs will benefit the technology’s commercialization. The study also presents preliminary results showing the impact of co-firing landfill gas and natural gas on plant efficiency, LCOE, and CO2 emissions.

Pidaparti, Sandeep↗

Performance and Cost Potential for Direct-Fired Supercritical CO2 Natural Gas Power Plants

Direct-fired supercritical CO2 (sCO2) power cycles are being explored as an attractive alternative to natural gas combined cycle (NGCC) plants with carbon capture and storage (CCS). Therefore, understanding their performance and cost potential is important for the commercialization of the technology. This study presents the techno-economic optimization results of natural gas-fired, utility-scale power plants based on the direct sCO2 power cycle, which are lacking in public literature. To identify the optimum plant configuration, the study considered multiple cases with varying levels of thermal integration with the plant air separation unit (ASU). Several design variables for each power cycle configuration were identified and optimized to minimize the levelized cost of electricity (LCOE) for each case. The optimization design variables include the sCO2 cooler outlet temperatures, recuperator approach temperatures, and pressure drops. High fidelity models for recuperators, coolers, and turbines were developed and used to capture the impact of design variables on plant efficiency and capital costs. The optimization was conducted using a combination of manual sensitivity analyses and automated derivative-free optimization algorithms available under NETL’s Framework for Optimization and Quantification of Uncertainty and Sensitivity platform. The optimized direct sCO2 power plants offered similar or slightly higher plant efficiencies than the reference NGCC plants based on the F-class gas turbine with CCS. The LCOE of the optimized direct sCO2 plants is 13 to 17% higher than the reference NGCC plants with CCS due to high capital costs associated with the ASU and sCO2 power block, though there is significant room for improvement due to the high uncertainty in component capital costs for these new plants. Recuperators make up over 50% of the sCO2 power block costs. Consequently, any research and development efforts to reduce the recuperator capital costs will benefit the technology’s commercialization. The study also presents preliminary results showing the impact of co-firing landfill gas and natural gas on plant efficiency, LCOE, and CO2 emissions.

Pidaparti, Sandeep↗